CHENANGO ASPHALT PRODUCTS CORP.

Company Details

Name: CHENANGO ASPHALT PRODUCTS CORP.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Inactive
Date of registration: 30 Sep 1958 (67 years ago)
Date of dissolution: 15 Dec 1992
Entity Number: 113544
County: Chenango
Place of Formation: New York
Address: 2-4 MAYDOLE ST., NORWICH, NY, United States

Shares Details

Shares issued 0

Share Par Value 100000

Type CAP

DOS Process Agent

Name Role Address
CHENANGO ASPHALT PRODUCTS CORP. DOS Process Agent 2-4 MAYDOLE ST., NORWICH, NY, United States

Filings

Filing Number Date Filed Type Effective Date
921215000146 1992-12-15 CERTIFICATE OF DISSOLUTION 1992-12-15
B544777-2 1987-09-16 ASSUMED NAME CORP INITIAL FILING 1987-09-16
124724 1958-09-30 CERTIFICATE OF INCORPORATION 1958-09-30

Mines

Mine Name Type Status Primary Sic
North Norwich Bundy Pit Surface Abandoned Construction Sand and Gravel
Directions to Mine Take US20 past Lafayette. Right on Apulia Road. 4.3 miles to Left on NY80 East. 20.7 miles to right on NY26S/NY80E. 3.6 miles left on NY80E. 8.9 miles right o South Street. Turns into COunty Rd 20. 4.0 miles right on County Rd. 23.6 miles mine in on the right.

Parties

Name Chenango Asphalt Products
Role Operator
Start Date 1991-09-01
End Date 2018-05-01
Name Bundy Concrete Company
Role Operator
Start Date 1950-01-01
End Date 1983-07-20
Name Bundy Sand & Gravel Inc
Role Operator
Start Date 1983-07-21
End Date 1991-08-31
Name Burrell's Excavating, Inc.
Role Operator
Start Date 2018-05-02
Name Dave Burrell
Role Current Controller
Start Date 2018-05-02
Name Burrell's Excavating, Inc.
Role Current Operator

Accidents

Accident Date 2014-06-20
Degree Inhury ACCIDENT ONLY
Accident Type Accident type, without injuries
Ocupation NO VALUE FOUND
Narrative Working to change the seal on an oil leak on the screen deck. Cut a hole with torch on Seco deck. Used a come-a-long to take the counter balance off. A spark must have gone into bottom of screen deck & smoldered. Flared up at 9:30.
Accident Date 2011-02-02
Degree Inhury DAYS AWAY FROM WORK ONLY
Accident Type Struck by... NEC
Ocupation Miner, Prospector, NEC
Narrative Vendor ee was moving tires from a loader. He was using an excavator to remove tires. EE & another ee (plant mgr) had discussed need to put blocks under loader to crib it up. Loader moved & counter weight hit him in leg/side. 911 called
Accident Date 2005-06-16
Degree Inhury DYS AWY FRM WRK & RESTRCTD ACT
Accident Type Struck by falling object
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative A ROCK FELL FROM THE DECK ABOVE DURING THE CRUSHING OPERATION AND HIT EE IN THE HARD HAT & THEN BOUNCED OFF HIS RIGHT SHOULDER. HE GRABBED FOR HIS HARD HAT, SPUN AROUND, HIT THE LEFT SIDE OF HIS HEAD ON THE STEEL I BEAM & FELL TO THE DECK.
Accident Date 2004-01-27
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Struck against stationary object
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative WHILE GRINDING ON PLATE HE MOVED HIS HAND AND CUT FINGER ON STEEL PLATE.
Accident Date 2003-09-12
Degree Inhury NO DYS AWY FRM WRK,NO RSTR ACT
Accident Type Over-exertion NEC
Ocupation Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
Narrative HE TWISTED HIS LEFT KNEE WHILE PULLING ON A PIPE. HIS FOOT GOT STUCK IN THE MUD.
Accident Date 2003-07-01
Degree Inhury DAYS AWAY FROM WORK ONLY
Accident Type Over-exertion in lifting objects
Ocupation Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator
Narrative WHILE LIFTING A GAS CAN ONTO THE DRAGLINE, HE FELT A STABBING PAIN IN HIS LOWER BACK.

Inspections

Start Date 2019-08-07
End Date 2019-08-08
Activity Mine Idle Activity
Number Inspectors 1
Total Hours 7.75
Start Date 2018-05-07
End Date 2018-05-07
Activity Compliance Follow-up Inspection
Number Inspectors 1
Total Hours 6.25
Start Date 2018-05-03
End Date 2018-05-04
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 17.25
Start Date 2014-09-17
End Date 2014-09-18
Activity Spot Inspection
Number Inspectors 1
Total Hours 19.25
Start Date 2014-04-08
End Date 2014-04-09
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 11
Start Date 2013-10-17
End Date 2013-10-17
Activity Spot Inspection
Number Inspectors 1
Total Hours 8
Start Date 2012-09-17
End Date 2012-10-01
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 23.5
Start Date 2011-10-06
End Date 2011-10-12
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 24.5
Start Date 2011-05-18
End Date 2011-05-19
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 16.75
Start Date 2010-06-16
End Date 2010-06-17
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 14.5
Start Date 2008-11-17
End Date 2008-11-18
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 17
Start Date 2007-10-22
End Date 2007-10-25
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 9.5
Start Date 2006-10-18
End Date 2006-10-18
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 10.5
Start Date 2005-10-25
End Date 2005-10-25
Activity Regular Safety and Health Inspection
Number Inspectors 1
Total Hours 12
Start Date 2005-01-05
End Date 2005-01-05
Activity MISCELLANEOUS INSPECTION/INVESTIGATION
Number Inspectors 1
Total Hours 9
Start Date 2004-07-07
End Date 2004-07-07
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 20
Start Date 2004-02-03
End Date 2004-02-03
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 8
Start Date 2003-06-18
End Date 2003-06-18
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 15
Start Date 2003-03-18
End Date 2003-03-18
Activity COMPLIANCE FOLLOW-UP INSPECTION
Number Inspectors 1
Total Hours 6
Start Date 2003-01-14
End Date 2003-01-15
Activity REGULAR INSPECTION
Number Inspectors 1
Total Hours 27

Productions

Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2019
Annual Hours 268
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 134
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2019
Annual Hours 14
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 14
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2018
Annual Hours 795
Annual Coal Prod 0
Avg. Annual Empl. 2
Avg. Employee Hours 398
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2018
Annual Hours 190
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 190
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2014
Annual Hours 7904
Annual Coal Prod 0
Avg. Annual Empl. 7
Avg. Employee Hours 1129
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2014
Annual Hours 1067
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1067
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2013
Annual Hours 7745
Annual Coal Prod 0
Avg. Annual Empl. 4
Avg. Employee Hours 1936
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2013
Annual Hours 1640
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1640
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2012
Annual Hours 9641
Annual Coal Prod 0
Avg. Annual Empl. 6
Avg. Employee Hours 1607
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2012
Annual Hours 1600
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1600
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2011
Annual Hours 10253
Annual Coal Prod 0
Avg. Annual Empl. 5
Avg. Employee Hours 2051
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2011
Annual Hours 1669
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1669
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2010
Annual Hours 9915
Annual Coal Prod 0
Avg. Annual Empl. 6
Avg. Employee Hours 1653
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2010
Annual Hours 1711
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1711
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2009
Annual Hours 10924
Annual Coal Prod 0
Avg. Annual Empl. 7
Avg. Employee Hours 1561
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2009
Annual Hours 1392
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 1392
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2008
Annual Hours 12458
Annual Coal Prod 0
Avg. Annual Empl. 6
Avg. Employee Hours 2076
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2008
Annual Hours 2120
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 2120
Sub-Unit Desc STRIP, QUARY, OPEN PIT
Year 2007
Annual Hours 17388
Annual Coal Prod 0
Avg. Annual Empl. 7
Avg. Employee Hours 2484
Sub-Unit Desc OFFICE WORKERS AT MINE SITE
Year 2007
Annual Hours 2166
Annual Coal Prod 0
Avg. Annual Empl. 1
Avg. Employee Hours 2166
East River Road Pit Surface Abandoned Construction Sand and Gravel
Directions to Mine ?

Parties

Name Chenango Asphalt Products
Role Operator
Start Date 1991-09-01
Name Chenango Asphalt Products Corp
Role Operator
Start Date 1987-04-01
End Date 1991-08-31
Name Emil J Galasso
Role Current Controller
Start Date 1991-09-01
Name Chenango Asphalt Products
Role Current Operator

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
12027637 0215800 1976-07-14 EAST RIVER ROAD, Norwich, NY, 13815
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 1976-07-14
Case Closed 1976-08-09

Violation Items

Citation ID 01001
Citaton Type Other
Standard Cited 19100022 A01
Issuance Date 1976-07-19
Abatement Due Date 1976-07-22
Nr Instances 1
Citation ID 01002
Citaton Type Other
Standard Cited 19100023 A09
Issuance Date 1976-07-19
Abatement Due Date 1976-07-22
Nr Instances 1
Citation ID 01003
Citaton Type Other
Standard Cited 19100024 C
Issuance Date 1976-07-19
Abatement Due Date 1976-07-22
Nr Instances 1
Citation ID 01004
Citaton Type Other
Standard Cited 19100025 D01 X
Issuance Date 1976-07-19
Abatement Due Date 1976-07-22
Nr Instances 1
Citation ID 01005
Citaton Type Other
Standard Cited 19100219 E01 I
Issuance Date 1976-07-19
Abatement Due Date 1976-07-30
Nr Instances 1

Date of last update: 18 Mar 2025

Sources: New York Secretary of State