Inspection Type |
Referral
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2017-01-31
|
Case Closed |
2019-07-11
|
Related Activity
Type |
Referral |
Activity Nr |
1175984 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19100217 D01 II |
Issuance Date |
2017-02-22 |
Abatement Due Date |
2017-03-06 |
Current Penalty |
6211.1 |
Initial Penalty |
8873.0 |
Final Order |
2017-03-10 |
Nr Instances |
2 |
Nr Exposed |
1 |
Related Event Code (REC) |
Referral |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.217(d)(1)(ii): Hand tool(s) were not used for freeing and removing work or scrap pieces from the die(s) of mechanical power press(es) so that no employee needed to reach into the point of operation for such purposes: a) Aluminum Cutting Area, on or about 1/24/17: Hand tools were not being used for removing parts from dies on a Federal full revolution mechanical power press #P6 and a Bliss full revolution mechanical power press #P4. Abatement documentation must be submitted for this item. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19100217 D09 IV |
Issuance Date |
2017-02-22 |
Abatement Due Date |
2017-03-06 |
Current Penalty |
4436.6 |
Initial Penalty |
6338.0 |
Final Order |
2017-03-10 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.217(d)(9)(iv): Safety blocks were not used when mechanical power press die(s) were being adjusted or repaired in the press: a) Aluminum Cutting Area, on or about 1/31/17: Employees performing servicing, adjustments, repairs or setting up on dies for approximately 16 mechanical power presses, were not using safety blocks. Abatement certification must be submitted for this item. |
|
Citation ID |
02001 |
Citaton Type |
Repeat |
Standard Cited |
19100217 E01 II A |
Issuance Date |
2017-02-22 |
Abatement Due Date |
2017-03-06 |
Current Penalty |
8873.2 |
Initial Penalty |
12676.0 |
Final Order |
2017-03-10 |
Nr Instances |
1 |
Nr Exposed |
10 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.217(e)(1)(ii)(A): Inspections and tests of each press on a weekly basis were not being completed to determine the condition of the clutch/ brake mechanism, anti repeat feature and single stroke mechanism: a) Aluminum Cutting Area, on or about 1/31/17: Weekly inspections on approximately 16 mechanical power presses were not being done on a weekly basis or prior to being put back into service. Abatement documentation must be submitted for this item. The Higgins Supply Company, Inc. was previously cited for a violation of this Occupational Safety and Health standard which was contained in OSHA Inspection number 988256, Citation number 1, Item number 6b and was affirmed as a final order on 9/19/14, with respect to a workplace located at 18-25 South Street, McGraw, NY 13101. |
|
Citation ID |
03001 |
Citaton Type |
Other |
Standard Cited |
19100147 C04 II |
Issuance Date |
2017-02-22 |
Abatement Due Date |
2017-03-06 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2017-03-10 |
Nr Instances |
1 |
Nr Exposed |
2 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) Aluminum Cutting Area, on or about 1/31/17: The lockout procedures for 16 mechanical power presses did not include specific procedural steps for blocking and securing presses to control hazardous energy. Abatement certification must be submitted for this item. |
|
|
Inspection Type |
Planned
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2014-08-05
|
Emphasis |
N: SSTARG14, P: SSTARG14
|
Case Closed |
2014-10-17
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
5A0001 |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
1249.5 |
Initial Penalty |
1785.0 |
Final Order |
2014-09-19 |
Nr Instances |
5 |
Nr Exposed |
2 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
OSH ACT of 1970 Section (5)(a)(1): Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by the load should the overhead hoist or bridge crane system fail: a) Plant 1, Press Alley, on or about 8/5/14: A 500 lb. P & H hoist was not provided with a safety latch on the lifting hook and the beam it was attached to had no rated load markings. b) Plant 1, Press Alley, on or about 8/5/14: A beam with a one ton chain hoist attached had no rated load markings. c) Plant 2, White Bone Dept., on or about 8/5/14: Two beams each with a 1/2 ton electric hoist attached had no rated load markings. Among other methods, several feasible and acceptable abatement methods to correct these hazards are to: 1. Install new safety latches on the lifting hooks in accordance with ANSI B30.16 Section 16-1.2.9. 2. Mark the appropriate rated load markings on the beams. Abatement certification must be submitted for these items. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19100107 L04 I |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
1666.0 |
Initial Penalty |
2380.0 |
Final Order |
2014-09-19 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.107(l)(4)(i): All areas were not kept free of the accumulation of powder coating dust: a) Plant 2, White Bone Dept., on or about 8/5/14: There was an accumulation of Sherwin Williams Powdura powder coating on the walls, floors and horizontal surfaces in and around the automated white bone machine. Abatement certification must be submitted for this item. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19100147 C04 I |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
1249.5 |
Initial Penalty |
1785.0 |
Final Order |
2014-09-19 |
Nr Instances |
1 |
Nr Exposed |
5 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) At the establishment, on or about 8/5/14: Where employees perform servicing and/or maintenance on various machinery or equipment, including, but not limited to mechanical power presses, coating machines, coiling machines, etc., the employer had not established specific energy control procedures to prevent the unexpected energizing, start up or release of stored energy of the equipment. Abatement certification must be submitted for this item. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19100157 G02 |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
1249.5 |
Initial Penalty |
1785.0 |
Final Order |
2014-09-19 |
Nr Instances |
35 |
Nr Exposed |
35 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting was not provided to all employees upon initial employment, and at least annually thereafter: a) At the establishment, on or about 8/5/14: Training was not provided to employees on the use of fire extinguishers and the hazards involved with incipient stage fire fighting. *ABATEMENT NOTE: By this date the employer must either correct the alleged violation or implement a Fire Safety Policy; as outlined in 29 CFR 1910.38 and 29 CFR 1910.39 which includes the evacuation requirements of 29 CFR 1910.157(b). Abatement certification must be submitted for this item. |
|
Citation ID |
01005 |
Citaton Type |
Serious |
Standard Cited |
19100212 A01 |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
1666.0 |
Initial Penalty |
2380.0 |
Final Order |
2014-09-19 |
Nr Instances |
7 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a) Plant 1, Spiral Dept., on or about 8/5/14: Ingoing nip points and moving machine parts on the Automatic Coating machine were not guarded in that the machine was operated with the door open. b) Plant 1, Coiling Dept., on or about 8/5/14: Ingoing nip points and point of operation at the feed wheels and crushing wheel press areas on three coiling machines 1, 2, and 3, were not guarded. c) Plant 1, Tipping Dept., on or about 8/5/14: Rotating nut projections on the crushing wheels, including, but not limited to, T16 and T17 were not guarded. d) Plant 1, Basement, Maintenance Shop, on or about 8/5/14: Rotating chuck on a Delta drill press was not guarded. Abatement certification must be submitted for these items. |
|
Citation ID |
01006A |
Citaton Type |
Serious |
Standard Cited |
19100217 C02 I A |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
2082.5 |
Initial Penalty |
2975.0 |
Final Order |
2014-09-19 |
Nr Instances |
3 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.217(c)(2)(i)(a): Point of operation guard(s) on mechanical power press(es) did not prevent entry of hands or fingers into the point of operation by reaching through, over, under or around the guard(s): a) Plant 1, Press Alley, on or about 8/5/14: Point of operation was not adequately guarded on a Rouselle part revolution mechanical power press #P35 in that you could reach around, through and under the guarding. b) Plant 1, Press Alley, on or about 8/5/14: Point of operation was not guarded on a Rouselle part revolution press #P7 in that you could reach through the guarding. c) Plant 1, Press Alley, on or about 8/5/14: Point of operation was not adequately guarded on the sides of a Pressrite part revolution press #P17 in that you could reach through guarding. Abatement certification must be submitted for these items. |
|
Citation ID |
01006B |
Citaton Type |
Serious |
Standard Cited |
19100217 E01 I |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-09-19 |
Nr Instances |
16 |
Nr Exposed |
10 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.217(e)(1)(i): A program of periodic and regular inspections of mechanical power press(es) was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment: a) Plant 1, on or about 8/5/14: There were no periodic or regular inspections conducted nor certified records maintained of those inspections on 16 mechanical power presses. Abatement certification must be submitted for this item. |
|
Citation ID |
01006C |
Citaton Type |
Serious |
Standard Cited |
19100217 E01 II |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-09-19 |
Nr Instances |
16 |
Nr Exposed |
10 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.217(e)(1)(ii): Mechanical power press(es) were not inspected and tested at least weekly to determine the condition of the clutch /brake mechanism, antirepeat feature and single stroke mechanism: a) Plant 1, on or about 8/5/14: There were no weekly inspections conducted nor records maintained of those inspections on 16 mechanical power presses. Abatement certification must be submitted for this item. |
|
Citation ID |
01007A |
Citaton Type |
Serious |
Standard Cited |
19100219 C02 I |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
1666.0 |
Initial Penalty |
2380.0 |
Final Order |
2014-09-19 |
Nr Instances |
3 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting: a) Plant 1, Coiling Dept., on or about 8/5/14: Horizontal shafting on coiling machines #1, 2, and 3 were not guarded. Abatement certification must be submitted for this item. |
|
Citation ID |
01007B |
Citaton Type |
Serious |
Standard Cited |
19100219 D01 |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-09-19 |
Nr Instances |
2 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) Plant 1, Coiling Dept., on or about 8/5/14: Pulleys driving the wire pullers in two areas on the Coiling machine #2 were not adequately guarded. Abatement certification must be submitted for this item. |
|
Citation ID |
01007C |
Citaton Type |
Serious |
Standard Cited |
19100219 E03 I |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-10-16 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-09-19 |
Nr Instances |
2 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o): a) Plant 1, Coiling Dept., on or about 8/5/14: V belt driving the wire pullers in two areas on the Coiling machine #2 were not adequately guarded. Abatement certification must be submitted for this item. |
|
Citation ID |
01008A |
Citaton Type |
Serious |
Standard Cited |
19100303 B02 |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-09-23 |
Current Penalty |
1249.5 |
Initial Penalty |
1785.0 |
Final Order |
2014-09-19 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Plant 1, Coiling Dept., on or about 8/5/14: A flexible cord was attached to a duplex receptacle outlet and being used as an extension cord to power a floor fan was not used in accordance with the listing or labeling. Abatement certification must be submitted for this item. |
|
Citation ID |
01008B |
Citaton Type |
Serious |
Standard Cited |
19100304 G05 |
Issuance Date |
2014-09-11 |
Abatement Due Date |
2014-09-23 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-09-19 |
Nr Instances |
3 |
Nr Exposed |
3 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a) Plant 1, Press Alley, on or about 8/5/14: An Aloha fan was not grounded in that the ground pin was missing from the plug end. b) Plant 1, Coiling Dept., on or about 8/5/14: An Air King fan and a large black fan were not grounded in that the extension cords providing current to the fans had ground pins missing from their plug ends. Abatement certification must be submitted for these items. |
|
|