Name: | S & S CONSTRUCTION GROUP, INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Inactive |
Date of registration: | 19 Dec 1995 (29 years ago) |
Date of dissolution: | 28 Oct 2009 |
Entity Number: | 1982965 |
ZIP code: | 11567 |
County: | Nassau |
Place of Formation: | New York |
Address: | 237 EAST FULTON STREET, LONG BEACH, NY, United States, 11567 |
Shares Details
Shares issued 1000
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
JAMES KAVANAGH | DOS Process Agent | 237 EAST FULTON STREET, LONG BEACH, NY, United States, 11567 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
DP-1798770 | 2009-10-28 | DISSOLUTION BY PROCLAMATION | 2009-10-28 |
951219000189 | 1995-12-19 | CERTIFICATE OF INCORPORATION | 1995-12-19 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342686763 | 0216000 | 2017-09-28 | 2880 EXTERIOR ST., BRONX, NY, 10463 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1267335 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2017-11-09 |
Current Penalty | 2000.0 |
Initial Penalty | 3078.0 |
Final Order | 2017-11-30 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Construction site north wall: Employees were exposed to fall hazards approximately 12 ft to concrete floor below when tubular welded frame scaffold was not fully planked while employees were working with formwork. Condition was observed on or about September 28, 2017. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 G01 |
Issuance Date | 2017-11-09 |
Current Penalty | 2000.0 |
Initial Penalty | 3078.0 |
Final Order | 2017-11-30 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level: Construction site north wall; a) Employees engaged in formwork activities and using a tubular welded frame scaffold, that was approximately 12 ft high, were not protected from falling to concrete floor below by a fall arrest or guard rail system. Condition was observed on or about September 28, 2017. |
Citation ID | 01003A |
Citaton Type | Serious |
Standard Cited | 19261053 B01 |
Issuance Date | 2017-11-09 |
Abatement Due Date | 2017-11-22 |
Current Penalty | 2000.0 |
Initial Penalty | 2897.0 |
Final Order | 2017-11-30 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) Construction site north wall; The ladder placed in front of the scaffold was not extended 3 feet past the landing platform, exposing the employees to fall hazards. Condition was observed on or about October 2, 2017. |
Citation ID | 01003B |
Citaton Type | Serious |
Standard Cited | 19261053 B05 I |
Issuance Date | 2017-11-09 |
Abatement Due Date | 2017-11-22 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2017-11-30 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(5)(i): Non-self-supporting ladders were not used at an angle such than the horizontal distance from the top support to the foot of the ladder way approximately one-quarter of the working length of the ladder (the distance along the ladder between the foot and the top support): Construction site north wall; a) Employees were using an extension ladder at an angle such that the horizontal distance from the top support to the foot of the ladder (approximately 8 feet) is more than one quarter of the working length of the ladder (12 feet approximately). |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2003-03-11 |
Emphasis | S: CONSTRUCTION, L: FALL |
Case Closed | 2004-02-17 |
Related Activity
Type | Complaint |
Activity Nr | 203948617 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260153 O |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-03 |
Current Penalty | 1800.0 |
Initial Penalty | 3000.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 C02 IV |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-03 |
Current Penalty | 1800.0 |
Initial Penalty | 3000.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260451 F07 |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-11 |
Current Penalty | 900.0 |
Initial Penalty | 1500.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 30 |
Gravity | 03 |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260454 A |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-07-01 |
Current Penalty | 900.0 |
Initial Penalty | 1500.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 30 |
Gravity | 03 |
Citation ID | 01005 |
Citaton Type | Serious |
Standard Cited | 19260503 A01 |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-07-01 |
Current Penalty | 900.0 |
Initial Penalty | 1500.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 03 |
Citation ID | 01006A |
Citaton Type | Serious |
Standard Cited | 19261053 B01 |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-03 |
Current Penalty | 720.0 |
Initial Penalty | 1200.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 02 |
Citation ID | 01006B |
Citaton Type | Serious |
Standard Cited | 19261053 B04 |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-03 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 02 |
Citation ID | 01007 |
Citaton Type | Serious |
Standard Cited | 19261060 A |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-07-01 |
Current Penalty | 720.0 |
Initial Penalty | 1200.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 30 |
Gravity | 02 |
Citation ID | 02001 |
Citaton Type | Repeat |
Standard Cited | 19260451 E01 |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-03 |
Current Penalty | 3600.0 |
Initial Penalty | 6000.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
Citation ID | 02002 |
Citaton Type | Repeat |
Standard Cited | 19260451 G01 |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-03 |
Current Penalty | 1800.0 |
Initial Penalty | 3000.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 2 |
Nr Exposed | 20 |
Gravity | 03 |
Citation ID | 02003 |
Citaton Type | Repeat |
Standard Cited | 19260501 B01 |
Issuance Date | 2003-05-29 |
Abatement Due Date | 2003-06-03 |
Current Penalty | 3600.0 |
Initial Penalty | 6000.0 |
Contest Date | 2003-06-30 |
Final Order | 2003-10-27 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
Inspection Type | Prog Related |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2002-06-04 |
Emphasis | S: CONSTRUCTION, L: FALL |
Case Closed | 2002-06-04 |
Date of last update: 14 Mar 2025
Sources: New York Secretary of State