Name: | BALL METAL BEVERAGE CONTAINER CORP. |
Jurisdiction: | New York |
Legal type: | FOREIGN BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 19 Jan 1996 (29 years ago) |
Branch of: | BALL METAL BEVERAGE CONTAINER CORP., Colorado (Company Number 19951151557) |
Entity Number: | 1991805 |
ZIP code: | 10005 |
County: | Saratoga |
Place of Formation: | Colorado |
Principal Address: | 9300 W. 108TH CIRCLE, WESTMINSTER, CO, United States, 80021 |
Address: | 28 LIBERTY ST., NEW YORK, NY, United States, 10005 |
Name | Role | Address |
---|---|---|
C T CORPORATION SYSTEM | DOS Process Agent | 28 LIBERTY ST., NEW YORK, NY, United States, 10005 |
Name | Role | Address |
---|---|---|
C T CORPORATION SYSTEM | Agent | 28 LIBERTY ST., NEW YORK, NY, 10005 |
Name | Role | Address |
---|---|---|
FISHER DANIEL | Chief Executive Officer | 10 LONGS PEAK DRIVE, BROOMFIELD, CO, United States, 80021 |
Start date | End date | Type | Value |
---|---|---|---|
2024-01-02 | 2024-01-02 | Address | 10 LONGS PEAK DRIVE, BROOMFIELD, CO, 80021, USA (Type of address: Chief Executive Officer) |
2024-01-02 | 2024-01-02 | Address | 10 LONGS PEAK DRIVE, BROOMFIELD, CO, 80021, 2510, USA (Type of address: Chief Executive Officer) |
2019-01-28 | 2024-01-02 | Address | 28 LIBERTY ST., NEW YORK, NY, 10005, USA (Type of address: Registered Agent) |
2019-01-28 | 2024-01-02 | Address | 28 LIBERTY ST., NEW YORK, NY, 10005, USA (Type of address: Service of Process) |
2016-01-05 | 2019-01-28 | Address | 1675 BROADWAY, DENVER, CO, 80202, USA (Type of address: Service of Process) |
2012-02-07 | 2024-01-02 | Address | 10 LONGS PEAK DRIVE, BROOMFIELD, CO, 80021, 2510, USA (Type of address: Chief Executive Officer) |
2002-01-04 | 2018-01-04 | Address | 9300 W. 108TH CIRCLE, BROOMFIELD, CO, 80021, 3682, USA (Type of address: Principal Executive Office) |
2002-01-04 | 2012-02-07 | Address | 10 LONGS PEAK DRIVE, BROOMFIELD, CO, 80021, 2510, USA (Type of address: Chief Executive Officer) |
2002-01-04 | 2016-01-05 | Address | 1675 BROADWAY, DENVER, CO, 80202, USA (Type of address: Service of Process) |
2000-09-28 | 2002-01-04 | Address | 9300 WEST 108TH CIRCLE, BROOMFIELD, CO, 80021, 3682, USA (Type of address: Principal Executive Office) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
240102000622 | 2024-01-02 | BIENNIAL STATEMENT | 2024-01-02 |
220110000385 | 2022-01-10 | BIENNIAL STATEMENT | 2022-01-10 |
200109060583 | 2020-01-09 | BIENNIAL STATEMENT | 2020-01-01 |
SR-23619 | 2019-01-28 | CERTIFICATE OF CHANGE (BY AGENT) | 2019-01-28 |
SR-23618 | 2019-01-28 | CERTIFICATE OF CHANGE (BY AGENT) | 2019-01-28 |
180104006331 | 2018-01-04 | BIENNIAL STATEMENT | 2018-01-01 |
160105006534 | 2016-01-05 | BIENNIAL STATEMENT | 2016-01-01 |
140227002510 | 2014-02-27 | BIENNIAL STATEMENT | 2014-01-01 |
120207002641 | 2012-02-07 | BIENNIAL STATEMENT | 2012-01-01 |
100219002158 | 2010-02-19 | BIENNIAL STATEMENT | 2010-01-01 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
346977655 | 0213100 | 2023-09-15 | 11 ADAMS ROAD, SARATOGA SPRINGS, NY, 12866 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 2081148 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100147 C04 II |
Issuance Date | 2024-03-04 |
Abatement Due Date | 2024-04-18 |
Current Penalty | 0.0 |
Initial Penalty | 16131.0 |
Final Order | 2024-03-19 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section: a) Worksite, Line 4 Decorator, Back End: On September 8, 2023, a back-end maintainer was utilizing energy control procedures on the Line 4 Decorator machine to do the label change process and the procedures were not clearly outlined. The employee was exposed to contact with a nip point. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Health |
Close Conference | 2020-02-11 |
Case Closed | 2021-12-09 |
Related Activity
Type | Referral |
Activity Nr | 1542333 |
Health | Yes |
Type | Inspection |
Activity Nr | 1455831 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19100022 A02 |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2020-05-07 |
Current Penalty | 0.0 |
Initial Penalty | 13494.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.22(a)(2): The employer did not ensure the floor of each workroom is maintained in a clean and, to the extent feasible, in a dry condition. When wet processes are used, drainage was not maintained and, to the extent feasible, dry standing places, such as false floors, platforms, and mats were not provided: a) Line 1 Trench Conveyor Area in the Front End - On or about January 7, 2020, an employee did not have a dry non slippery floor or surface to walk on inside the trench. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19100132 D01 I |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2020-05-07 |
Current Penalty | 0.0 |
Initial Penalty | 13494.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.132(d)(1)(i): When the employer had assessed the workplace hazard(s) and determined that hazard(s) were present, the employer did not select and/or use the types of personal protective equipment that would protect the affected employee from the hazard: a) Line 1 Trench Conveyor Area in the Front End - On or about January 7, 2020, an employee did not have a dry non slippery floor/surface to walk on inside the trench and the employer did not enforce the use of personal protective equipment for the protection of the body such as but not limited to, slip resistant shoes. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2020-01-14 |
Case Closed | 2024-08-28 |
Related Activity
Type | Referral |
Activity Nr | 1532428 |
Safety | Yes |
Type | Referral |
Activity Nr | 1542333 |
Health | Yes |
Type | Inspection |
Activity Nr | 1462036 |
Health | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Other |
Standard Cited | 19100023 B12 |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2021-12-09 |
Current Penalty | 10000.0 |
Initial Penalty | 13494.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.23(b)(12): Each employee did not use at least one hand to grasp the ladder when climbing up and down it: a) Line 1 Trench Conveyor Area in the Front End - On or about January 7, 2020, an employee did not have at least one hand grasping the ladder when climbing down it into the trench. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19100023 D04 |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2020-04-23 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.23(d)(4): The side rails of through or sidestep ladders did not extend 42 inches (1.1 m) above the top of the access level or landing platform served by the ladder: a) Line 1 Trench Conveyor Area in the Front End - On or about January 7, 2020, a fixed industrial ladder (South Ladder) located on the south side of the trench did not have side rails that extend 42 inches above the top of the access level or landing platform (the floor). Side rails of the South Ladder were just below floor level at approximately 49 inches high from the ground of the trench. The floor measured to be approximately 52 inches high from the ground of the trench. |
Citation ID | 01002 |
Citaton Type | Other |
Standard Cited | 19100028 B01 I |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2021-12-09 |
Current Penalty | 8000.0 |
Initial Penalty | 9639.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.28(b)(1)(i): The employer did not ensure that each employee on a walking-working surface with an unprotected side or edge that was 4 feet (1.2 m) or more above a lower level was protected from falling by one or more of the following: Guardrail systems, safety net systems, or personal fall arrest systems: a) Line 1 Trench Conveyor Area in the Front End - On or about January 7, 2020, the employer did not ensure employees were protected from falls when pulling up and removing floor grates, and working around an open trench that was approximately 4 feet 4 inches in depth. |
Citation ID | 01003A |
Citaton Type | Serious |
Standard Cited | 19100147 C04 I |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2021-12-09 |
Current Penalty | 10000.0 |
Initial Penalty | 13494.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 2 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Line 1 Can Conveying Wet Elevator Area in the Front End- On or about January 7, 2020, procedures were not utilized for the Line 1 Can Conveying Wet Elevator to clear a jam. b) Line 1 South Trench Conveyor in the Front End - On or about January 7, 2020, procedures were not utilized for the Line 1 South Trench Conveyor when an employee needed to access the Line 1 Trench to replace a belt on the Line 1 North Trench Conveyor that is located approximately 12 inches directly next to the Line 1 South Trench Conveyor. |
Citation ID | 01003B |
Citaton Type | Serious |
Standard Cited | 19100147 F03 I |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2020-04-23 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 2 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(f)(3)(i): A procedure was not utilized to afford the employees a level of protection equivalent to that provided by the implementation of a personal lockout or tagout device when servicing and/or maintenance was performed by a crew, craft, department or other group: a) Line 1 North Trench Conveyor in the Front End - On or about January 7, 2020, Group LOTO procedures were not utilized for the Line 1 North Trench Conveyor when an employee needed to access the Line 1 Trench to replace a belt on the Line 1 North Trench Conveyor that is located approximately 12 inches directly next to the Line 1 South Trench Conveyor. b) Line 1 South Trench Conveyor in the Front End - On or about January 7, 2020, Group LOTO procedures were not utilized for the Line 1 South Trench Conveyor when an employee needed to access the Line 1 Trench to replace a belt on the Line 1 North Trench Conveyor that is located approximately 12 inches directly next to the Line 1 South Trench Conveyor. |
Citation ID | 01003C |
Citaton Type | Serious |
Standard Cited | 19100219 F03 |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2020-04-23 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven (7) feet or less above floors or platforms were not enclosed: a) Front End Trench - On or about January 7, 2020, sprocket wheels and chains were not guarded for the main drive for the Line 1 South Trench Conveyor when an employee needed to access the Line 1 Trench to replace a belt on the Line 1 North Trench Conveyor that is located approximately 12 inches directly next to the Line 1 South Trench Conveyor. |
Citation ID | 02001 |
Citaton Type | Serious |
Standard Cited | 19100147 C06 I |
Issuance Date | 2020-04-17 |
Abatement Due Date | 2021-12-09 |
Current Penalty | 17300.0 |
Initial Penalty | 26988.0 |
Contest Date | 2020-05-08 |
Final Order | 2021-12-09 |
Nr Instances | 2 |
Nr Exposed | 2 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Line 1 Trench Conveyors (North and South Conveyors) in the Front End - On or prior to January 7, 2020, the employer did not conduct a periodic inspection of the energy control procedure for the Line 1 Trench Conveyors (North and South Conveyors). b) Line 1 Can Conveying Wet Elevator Area in the Front End- On or prior to about January 7, 2020, the employer did not conduct a periodic inspection of the energy control procedure for the Line 1 Can Conveying Wet Elevator. Ball Metal Beverage Container Corp. was previously cited for a violation of this occupational safety and health standard or its equivalent standard, 29 CFR 1910.147(c)(6)(i), which was contained in OSHA inspection number 1296296, citation number 1, item number 1, and was affirmed as a final order on 04/19/18 with respect to a workplace located at 124 Carson Road, Birmingham, AL 35215. |
Date of last update: 14 Mar 2025
Sources: New York Secretary of State