2025-02-27
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET SPENCER AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
No crew on site. Sidewalk flag barricaded concrete curing. one permanent restoration in the parking lane and one int he roadway near 2 double yellow lines in compliance
|
2025-02-27
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET SPENCER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Sidewalk flag barricaded concrete curing. Permanent cut in roadway. Double yellow lane markings inside of cut needs to be restored when permit gets rolled over
|
2025-02-26
|
No data
|
89 STREET, FROM STREET 156 AVENUE TO STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent roadway cut in parking lane
|
2025-02-22
|
No data
|
JACKSON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 158 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2025-02-20
|
No data
|
SOUTHERN BOULEVARD, FROM STREET JENNINGS STREET TO STREET LOUIS NINE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk in compliance
|
2025-02-18
|
No data
|
WEST 4 STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wearing Course passes with Restoration located in the parking.
|
2025-02-14
|
No data
|
WEST 4 STREET, FROM STREET 6 AVENUE TO STREET MAC DOUGAL STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated rwy, ifo #135, water leaking sprinkler line repair.
|
2025-02-13
|
No data
|
EAST 16 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permanent restoration sealed in parking lane, lane has been restored in kind
|
2025-02-11
|
No data
|
GRAND AVENUE, FROM STREET WEST 180 STREET TO STREET WEST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temporary restoration in roadway in compliance
|
2025-02-09
|
No data
|
CHAUNCEY STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Work done in parking lane and sidewalk.
|
2025-02-08
|
No data
|
CHAUNCEY STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Respondent failed to display ID signs at the worksite
|
2025-02-07
|
No data
|
CHAUNCEY STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Length 4' Width 3' 3" Depth 2' 8" First Lift 97.9.
|
2025-02-07
|
No data
|
CHAUNCEY STREET, FROM STREET HOPKINSON AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew excavated the s/w & p/l
|
2025-02-05
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET ALBANY CRESCENT TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Barricaded cut in parking lane
|
2025-02-01
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failure to post raise plow sign. Nov Issued
|
2025-01-30
|
No data
|
WEST 39 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in basement , one excavation made on roadway and one excavation made on sidewalk , crew on site to repair
|
2025-01-30
|
No data
|
EAST 234 STREET, FROM STREET PETERS PLACE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to located due to park car plus leave in the roadway
|
2025-01-28
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
this has been repaired by RRM
|
2025-01-28
|
No data
|
AVENUE X, FROM STREET STRYKER STREET TO STREET WEST 2 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
(SKT Inspection)Permanent restoration, in the parking lane, in front of 287 Avenue X. Contractor has paved the restoration up to the curb. In compliance with Sketch009 requirements.
|
2025-01-28
|
No data
|
EAST 16 STREET, FROM STREET CORTELYOU ROAD TO STREET DORCHESTER ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating, ifo #385, water leak repair, 3day.
|
2025-01-27
|
No data
|
EAST 239 STREET, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak. Was leaking in basement. DEP notice issued to homeowner. Crew excavating in roadway at this time
|
2025-01-25
|
No data
|
BAINBRIDGE AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass
|
2025-01-25
|
No data
|
HUDSON MANOR TERRACE, FROM STREET WEST 237 STREET TO STREET WEST 239 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration in the roadway . i/f/o 699.. cut closest to west 239 st
|
2025-01-24
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Base rescheduled for later Unable to pour concrete due to low temperatures
|
2025-01-23
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer backed up going into basement of home Contractor working in roadway excavation to make necessary repairs. Street closure operator #49.
|
2025-01-23
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Spoke to Shamus has an open excavation in driving lane correct address is I/F/O 2236. E# permit operator # 49. Sewer backing up into basement house. Can't unclog the sewer line, has to excavate r/w closed. Email complaint from EMERGENCY RESPONSE.
|
2025-01-22
|
No data
|
EAST 117 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
75 ‘East of 5th Ave Repair water restoration in the middle of the roadway is flushed and sealed to grade (aka 14 29 5th avenue)
|
2025-01-21
|
No data
|
EAST 206 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET PERRY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration in the roadway
|
2025-01-18
|
No data
|
POST ROAD, FROM STREET DEAD END TO STREET FIELDSTONE TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm. roadway and sidewalk cut
|
2025-01-17
|
No data
|
WEST 139 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
I/F/O #313 WEARING COURSE COMPLETED TACT COTE WAS APPLIED ASPHALT COMPACTED IN TWO LAWERS WEARING CORSE PROPERLY SEALED AND COLOR CODE APPLIED .
|
2025-01-16
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration sunken at the curb 3” I/f/o 949
|
2025-01-16
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 260 STREET TO STREET WEST 261 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration in the roadway
|
2025-01-16
|
No data
|
WEST 139 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed in the parking/driving lane, cutbacks made and ready for concrete.
|
2025-01-15
|
No data
|
EAST 120 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #223 repair water restoration in roadway is missing 2024 IBM color code marker please install marker for identification purposes
|
2025-01-15
|
No data
|
WEST 139 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak in basement due to sprinkler system service break. Excavations roadway
|
2025-01-13
|
No data
|
HAVEMEYER AVENUE, FROM STREET ELLIS AVENUE TO STREET GLEASON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2025-01-13
|
No data
|
WEST 139 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed in the driving lane, cut backs made and ready for concrete.
|
2025-01-13
|
No data
|
WEST 139 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak. Excavation made in roadway at time of inspection.
|
2025-01-07
|
No data
|
BRIGGS AVENUE, FROM STREET BEND TO STREET EAST 194 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic sanitary sewer backing up in basement , one excavation made on roadway and one excavation made on sidewalk , crew on site.
|
2025-01-03
|
No data
|
HOSMER AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumber’s restoration in roadway partially resurfaced by BPP
|
2025-01-02
|
No data
|
DEKALB AVENUE, FROM STREET EAST 212 STREET TO STREET EAST 213 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic sanitary sewer backing up in basement , one excavation made on roadway and one excavation made on sidewalk at time of inspection.
|
2024-12-31
|
No data
|
EAST 63 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
M012024298A83
|
2024-12-31
|
No data
|
EAST 120 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in basement , 3 day notice issued from DEP , one excavation made on sidewalk at time of inspection.
|
2024-12-27
|
No data
|
SHERMAN AVENUE, FROM STREET ISHAM STREET TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #232 REPAIR WATER - PROTECTED CUT IN BIKE LANE / PARKING LANE IS FLUSHED & SEALED TO GRADE.
|
2024-12-27
|
No data
|
AVENUE X, FROM STREET STRYKER STREET TO STREET WEST 2 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill complete in parking lane tested at 98.7
|
2024-12-26
|
No data
|
WEST 81 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in compliance
|
2024-12-26
|
No data
|
LACONIA AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2024-12-25
|
No data
|
SHERIDAN EXPRESSWAY, FROM STREET BEND TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to locate
|
2024-12-23
|
No data
|
STADIUM AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway
|
2024-12-20
|
No data
|
EAST 222 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2024-12-20
|
No data
|
BAINBRIDGE AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm cuts on the bike lanes on both sides of the r/w. 1 is missing color code with I/B/M #, Year. The other cut need to reinstall white bike lane markings. I/F/O 2982 BAINBRIDGE AVE.
|
2024-12-19
|
No data
|
EAST 120 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
One perm cut on roadway /one sidewalk flag restored.
|
2024-12-19
|
No data
|
EAST 236 STREET, FROM STREET NAPIER AVENUE TO STREET VAN CORTLANDT PARK EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the driving lane, parking lane, new concrete s/w flags.
|
2024-12-17
|
No data
|
TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak. Excavation made in roadway at time of inspection.
|
2024-12-16
|
No data
|
HOSMER AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NOV for not obtaining confirmation number 2 hours prior to backfill.
|
2024-12-15
|
No data
|
EAST 117 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
single flag restored in front of property. perm restoration sealed to grade within the driving lane.
|
2024-12-15
|
No data
|
SOUTH 2 STREET, FROM STREET HAVEMEYER STREET TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration to grade located in the driving lane ifo property 270
|
2024-12-14
|
No data
|
MATTHEWS AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2024 permanent restoration in the roadway.
|
2024-12-14
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street was resurfaced
|
2024-12-14
|
No data
|
CALHOUN AVENUE, FROM STREET BARKLEY AVENUE TO STREET BRUCKNER BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the the parking lane.
|
2024-12-14
|
No data
|
EAST TREMONT AVENUE, FROM STREET HRP NORTHBOUND EXIT 2 TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flag installed.
|
2024-12-13
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut to grade within the driving lane, sidewalk flags restored around water valve 42-31 Colden Street.
|
2024-12-13
|
No data
|
GREYSTONE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the r/w
|
2024-12-12
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O#1613 REPAIR WATER RESTORATION IN TRAVEL / BIKE LANE IS FLUSHED & SEALED TO GRADE .
|
2024-12-12
|
No data
|
MIDDLETOWN ROAD, FROM STREET CROSBY AVENUE TO STREET GILLESPIE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak. Crew excavating sidewalk at this time
|
2024-12-10
|
No data
|
UNION TURNPIKE, FROM STREET AUSTIN STREET TO STREET KEW FOREST LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in front of 119-17 to grade in the parking lane.
|
2024-12-10
|
No data
|
TIFFANY STREET, FROM STREET EAST 165 STREET TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak. DEP notice issued to property. Working for 981 Westchester ave. Excavation on Tiffany st
|
2024-12-09
|
No data
|
AVENUE X, FROM STREET STRYKER STREET TO STREET WEST 2 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Heavy Domestic Water Leak Contractor Currently making Repairs in the Roadway. Property Owner on site
|
2024-12-08
|
No data
|
QUEENS BOULEVARD, FROM STREET 84 DRIVE TO STREET 138 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER-PERMRESTORATIONS ROADWAY AND SIDEWALK
|
2024-12-07
|
No data
|
POWELL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observe the respondent with a backhoe stored in the parking lane in front of #2065. No DOT permit in file to store equipment. Was identified by name O'GRADY PLUMBING permit X012024339A71.
|
2024-12-06
|
No data
|
EAST 174 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing damaged domestic water service leak in basement. One excavation in parking lane at this time
|
2024-12-05
|
No data
|
POWELL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Repaired water service leak. Roadway excavation and sidewalk excavation
|
2024-12-05
|
No data
|
POWELL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site. Repaired water service leak. Roadway excavation and sidewalk excavation
|
2024-12-05
|
No data
|
QUEENS BOULEVARD, FROM STREET 40 STREET TO STREET 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit on file, Permit #Q012024167A06
|
2024-12-02
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored wearing course it pass.
|
2024-11-29
|
No data
|
PACIFIC STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
MISSING BIKE LANE MARKING
|
2024-11-29
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 261 STREET TO STREET WEST 262 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway
|
2024-11-27
|
No data
|
BEACH AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic sanitary sewer backing up into property due to boulder laying on sewer line behind property ,one excavation made behind property line and one excavation made on roadway and one excavation made behind sidewalk , crew on site.
|
2024-11-26
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill Pass; cleanfill; 97.6%
|
2024-11-25
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken sprinkler service causing leak. Contractor working in excavations in roadway and sidewalks to replace broken service. Street closure operator 49.
|
2024-11-23
|
No data
|
LYON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET GLEBE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed in compliance
|
2024-11-23
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
509 west 144 street water restoration in compliance
|
2024-11-23
|
No data
|
STILLWELL AVENUE, FROM STREET BEND TO STREET SEMINOLE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint sealed
|
2024-11-22
|
No data
|
FORSYTH STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The permittee repaired the actual defect and obtained permit M012024268C00 to do the work.
|
2024-11-20
|
No data
|
BEVERLY ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sealer missing along curb.
|
2024-11-17
|
No data
|
FORSYTH STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with a water Restoration in the Roadway that did not meet the minimum width of 54” . The restoration was 42” after measuring. Respondent was notified via CAR 20245180315 issued on 8/28/2024.
|
2024-11-17
|
No data
|
WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2024-11-16
|
No data
|
EAST 242 STREET, FROM STREET RICHARDSON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2024-11-16
|
No data
|
CRANFORD AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2024-11-14
|
No data
|
EDISON AVENUE, FROM STREET BAISLEY AVENUE TO STREET PAINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flag behind property line, DOT paved Roadway
|
2024-11-14
|
No data
|
QUEENS BOULEVARD, FROM STREET 40 STREET TO STREET 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk has water valve within and flag restored IFO 40-08
|
2024-11-14
|
No data
|
EAST TREMONT AVENUE, FROM STREET PURITAN AVENUE TO STREET WATERBURY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the parking lane and sidewalk around water valve box
|
2024-11-12
|
No data
|
PARK AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the parking lane of the roadway.
|
2024-11-12
|
No data
|
WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found resurfaced
|
2024-11-11
|
No data
|
GRANT AVENUE, FROM STREET EAST 166 STREET TO STREET MC CLELLAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2024-11-11
|
No data
|
EAST 117 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak Contractor currently making Repairs in the Roadway 3 Day Dep Notice Issued.Property owner on site
|
2024-11-10
|
No data
|
WILLIAMSBRIDGE ROAD, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumbers restoration in the roadway in compliance
|
2024-11-10
|
No data
|
THIERIOT AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two permanent restorations in the roadway in compliance
|
2024-11-09
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Con Edison cut is from 7 years ago 2017. Relay btwn sidewalk and roadway is caved in.
|
2024-11-08
|
No data
|
ELLIOT PLACE, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway found resurfaced at time of inspection.
|
2024-11-07
|
No data
|
WEST 118 STREET, FROM STREET MANHATTAN AVENUE TO STREET MORNINGSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration in d/l; s/w flag in compliance
|
2024-11-06
|
No data
|
SHERIDAN EXPRESSWAY, FROM STREET BEND TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work started active permit
|
2024-11-02
|
No data
|
COLDEN AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut plated in the roadway and sidewalk, updated permit on file
|
2024-11-02
|
No data
|
COLDEN AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
cut plated in the roadway
|
2024-11-01
|
No data
|
WEST 249 STREET, FROM STREET ARLINGTON AVENUE TO STREET HENRY HUDSON PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one permanent roadway cut opposite 4959 on West 249 St.
|
2024-10-31
|
No data
|
HOLLAND AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 214 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak. Crew excavating in driving lane at this time
|
2024-10-29
|
No data
|
EAST TREMONT AVENUE, FROM STREET HRP NORTHBOUND EXIT 2 TO STREET HUTCHINSON RIVER PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service leak. Leaking in sidewalk. Crew excavating in sidewalk only. (Main in sidewalk)
|
2024-10-29
|
No data
|
MORRISON AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in parking lane
|
2024-10-29
|
No data
|
HOSMER AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway.
|
2024-10-29
|
No data
|
RIDER AVENUE, FROM STREET EAST 137 STREET TO STREET EAST 138 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in rw, sw flag good.
|
2024-10-28
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair restoration in roadway
|
2024-10-28
|
No data
|
EAST 63 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored WC. WC pass & complete. Arrival: 10:04AM Departure: 11AM
|
2024-10-28
|
No data
|
PACIFIC STREET, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BIKE LANE MARKING MISSING
|
2024-10-26
|
No data
|
NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway found resurfaced under permit B152024250C76
|
2024-10-25
|
No data
|
MILES AVENUE, FROM STREET BALCOM AVENUE TO STREET HUNTINGTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Plumbers cut in parking lane, wet 121.8 dry 114.5 max 118.0 Actual 6.4% .
|
2024-10-25
|
No data
|
MILES AVENUE, FROM STREET BALCOM AVENUE TO STREET HUNTINGTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing damaged domestic water service. Crew excavating in parking lane
|
2024-10-24
|
No data
|
ROBERTS AVENUE, FROM STREET HOBART AVENUE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service leak. Crew excavating sidewalk at this time
|
2024-10-24
|
No data
|
ROBERTS AVENUE, FROM STREET HOBART AVENUE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Cut in parking lane. Wet 124.2 Dry 114.3 Max 117.5 Actual 8.7% Cut Size 4'x4'x3'. Charles is the tester from exclusive, Shamie is the foreman from O'Grady 2 cuts behind property line
|
2024-10-23
|
No data
|
HOLLERS AVENUE, FROM STREET CONNER STREET TO STREET DE LAVALL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service leak. Crew excavating roadway at this time
|
2024-10-23
|
No data
|
EAST 230 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2024-10-23
|
No data
|
HOLLERS AVENUE, FROM STREET CONNER STREET TO STREET DE LAVALL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plumber onsite currently 2 cut on roadway
|
2024-10-22
|
No data
|
DECATUR AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 195 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing damaged water service leak. Crew excavating in parking lane at this time
|
2024-10-21
|
No data
|
MAHAN AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing damaged water service. Crew excavating in parking lane at this time
|
2024-10-21
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Spoke with John, from O'Grady Plumbing LLC., since all the work was done under the emergency permit, there were no stip at the time. Once permit was converted, the stip showed. Permittee can not work at night. Arrangements will be made. Protest denie
|
2024-10-18
|
No data
|
WEST 246 STREET, FROM STREET BEND TO STREET INDEPENDENCE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
can not locate cut.
|
2024-10-17
|
No data
|
WHITE PLAINS ROAD, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2024-10-17
|
No data
|
TOMLINSON AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway
|
2024-10-16
|
No data
|
LYON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET GLEBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk expansion joints need to be sealed
|
2024-10-16
|
No data
|
GILLESPIE AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ZULETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Long water restoration in the roadway
|
2024-10-13
|
No data
|
WATERBURY AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Domestic water leak at tap. Excavation made in roadway opposite 2322 property.
|
2024-10-13
|
No data
|
WEBSTER AVENUE, FROM STREET EAST 173 STREET TO STREET EAST MT EDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2024-10-10
|
No data
|
TAYLOR AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk in compliance
|
2024-10-10
|
No data
|
STILLWELL AVENUE, FROM STREET BEND TO STREET SEMINOLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints needs to be sealed between the curb and sidewalk flags that has in water valve box. i.f.o. 1534
|
2024-10-10
|
No data
|
TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New concrete sidewalk flag installed and in compliance
|
2024-10-08
|
No data
|
WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2024-10-08
|
No data
|
EAST 226 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbing restoration in the roadway flush to grade, color coded and sealed
|
2024-10-08
|
No data
|
LIEBIG AVENUE, FROM STREET BEND TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane.
|
2024-10-08
|
No data
|
BAINBRIDGE AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak Contractor currently making Repairs in the Roadway 3 Day Dep Notice Issued
|
2024-10-07
|
No data
|
EAST 52 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER: Opposite #248
|
2024-10-07
|
No data
|
CITY ISLAND AVENUE, FROM STREET BUCKLEY STREET TO STREET MARINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumbing job done in the sidewalk in compliance
|
2024-10-07
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2024-10-06
|
No data
|
CASANOVA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway in compliance
|
2024-10-05
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway and sidewalk
|
2024-10-05
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut to grade within the driving lane sidewalk flags restored around water valve I/F/O 42-31 Colden Street.
|
2024-10-05
|
No data
|
FORSYTH STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with a water Restoration in the Roadway that did not meet the minimum width of 54” . The restoration was 42” after measuring.
|
2024-10-03
|
No data
|
HARROD AVENUE, FROM STREET BRP SOUTHBOUND EXIT 3 TO STREET EAST 172 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway in compliance
|
2024-10-03
|
No data
|
THIERIOT AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing damaged water service. Damaged in basement. Crew excavating roadway opposite address at this time
|
2024-10-03
|
No data
|
HERING AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumbing job done in the roadway opposite 2424, and in the sidewalk
|
2024-10-03
|
No data
|
VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway in compliance
|
2024-10-03
|
No data
|
FIELDSTON ROAD, FROM STREET WEST 261 STREET TO STREET WEST 262 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane.
|
2024-10-03
|
No data
|
SHERMAN AVENUE, FROM STREET ISHAM STREET TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
WC PASS; P/L
|
2024-10-02
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cave in under vehicle Ifo 949 in line with permanent water cut
|
2024-10-02
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway and no work done on sidewalk
|
2024-10-02
|
No data
|
GUNTHER AVENUE, FROM STREET BARNES AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumbing job done in the roadway and sidewalk
|
2024-10-02
|
No data
|
SHERMAN AVENUE, FROM STREET ISHAM STREET TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated parking lane, ifo #232, water leak repair, 3day
|
2024-10-02
|
No data
|
SHERMAN AVENUE, FROM STREET ISHAM STREET TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored back fill it pass compaction at 96.1%.
|
2024-10-02
|
No data
|
COMPTON AVENUE, FROM STREET NEWMAN AVENUE TO STREET STEPHENS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway in compliance
|
2024-10-02
|
No data
|
MERRITT AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumbing restoration in the roadway and in the sidewalk in compliance. i/f/o3466
|
2024-10-01
|
No data
|
PARK AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service. Leaking in roadway. Crew excavating in roadway at this time
|
2024-10-01
|
No data
|
PARK AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
LL14 Base Pass
|
2024-09-27
|
No data
|
WEST 118 STREET, FROM STREET MANHATTAN AVENUE TO STREET MORNINGSIDE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak in basement. Excavations made in roadway and sidewalk.
|
2024-09-24
|
No data
|
OGDEN AVENUE, FROM STREET WEST 170 STREET TO STREET WEST 171 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak. Two excavations in roadway at this time
|
2024-09-23
|
No data
|
BEVERLY ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
s/w & rwy, water repair, ifo #1713,
|
2024-09-22
|
No data
|
BEVERLY ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
L4'2" x W3'2" x D2'8". The cut is on the driving lane opposite property 1713 and one sidewalk flag around a water valve in front of 1713. Cutbacks were done.
|
2024-09-22
|
No data
|
BEVERLY ROAD, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
L4'2" x W3'2" x D2'8". The cut is on the driving lane opposite property 1713 and one sidewalk flag around a water valve in front of 1713. Cutbacks were done.
|
2024-09-20
|
No data
|
FOREST AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 158 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service. DEP shut off notice. One excavation in roadway at this time
|
2024-09-18
|
No data
|
WEST 113 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The cut was cored and passed inspection. The cut had 3" W/C and 6" Concrete Base | The existing had 7 1/2" W/C.
|
2024-09-18
|
No data
|
EAST 230 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service lea. One excavation in roadway at this time
|
2024-09-17
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 261 STREET TO STREET WEST 262 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer leak in home, work done concrete base restoration on the roadway.
|
2024-09-17
|
No data
|
WEST 48 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a permanent restoration on the roadway, and one sidewalk flag was restored.
|
2024-09-16
|
No data
|
WEST 113 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration in d/l is acceptable.
|
2024-09-13
|
No data
|
CALHOUN AVENUE, FROM STREET BARKLEY AVENUE TO STREET BRUCKNER BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak. Was leaking in basement. Homeowner on site. One excavation in roadway and sidewalk
|
2024-09-12
|
No data
|
WEST 113 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Area made permanent (C)
|
2024-09-12
|
No data
|
EAST 63 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
DEP did not arrive. Arrival: 2:45PM Departure: 3:30PM
|
2024-09-11
|
No data
|
EAST 63 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
I observed the above respondent conducting non-emergency work with an emergency authorization number. Respondent was replacing/upgrading lead water line to unoccupied building. Active DOB renovation permit 123831309-01-AL on file.
|
2024-09-10
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
5' x 5' x 4'3" backfill passed within the driving lane I/F/O 42-31 Colden Street.
|
2024-09-07
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been resurfaced
|
2024-09-05
|
No data
|
EAST 110 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flushed to grade.
|
2024-09-05
|
No data
|
EAST TREMONT AVENUE, FROM STREET BELMONT AVENUE TO STREET HUGHES AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer break causing back up for building. Building has no plumbing service. Contractor working in sidewalk and roadway to replace broken sewer service,
|
2024-09-03
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed to restore Roadway from 1’ pass their permanent Gas Restoration to the nearest Curb for the length of their work, which is required by SKT009 Stipulation of the above permit.
|
2024-09-02
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm to grade water cut in the northbound driving lane.
|
2024-09-01
|
No data
|
EAST 38 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of #120 East 38 St 1 new sidewalk flag With Gas Valve & Water Valve, & In front of #115 opposite of #120 Permanent Cut on TRavel Lane. Permit expired.
|
2024-08-28
|
No data
|
FORSYTH STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permanent repair water Restoration in the Roadway does not meet the minimum width of 54” after all cutbacks are completed. Must restore Roadway as per NYC DOT Standard detail Drawing 1042B, note # 6. Cut measured 42” in width.
|
2024-08-27
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water service was leaking in basement. One excavation in roadway and sidewalk at this time
|
2024-08-26
|
No data
|
COMPTON AVENUE, FROM STREET NEWMAN AVENUE TO STREET STEPHENS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak. Excavation made in roadway at time of inspection.
|
2024-08-25
|
No data
|
BEEKMAN PLACE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag with water valve cover restored with sealed expansion joint at the curb.
|
2024-08-23
|
No data
|
PITMAN AVENUE, FROM STREET ELY AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2024-08-23
|
No data
|
EAST 138 STREET, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored in kind around water valve IFO 426.
|
2024-08-22
|
No data
|
EAST 226 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber doing sewer repair in the roadway, signs posted
|
2024-08-22
|
No data
|
EAST 226 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sanitary sewer backing up into property. Excavation made in roadway.
|
2024-08-19
|
No data
|
NOSTRAND AVENUE, FROM STREET HERKIMER PLACE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, set-up, water leak repair, ifo #566
|
2024-08-09
|
No data
|
EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the parking lane.
|
2024-08-03
|
No data
|
EAST GUN HILL ROAD, FROM STREET LACONIA AVENUE TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumber restoration in the roadway
|
2024-07-30
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic sanitary sewer backing up into property , one excavation made on sidewalk at time of inspection.
|
2024-07-26
|
No data
|
WEST 81 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
WC Rescheduled; due to asphalt not being available until 1pm. Foreman will call in for another number.
|
2024-07-25
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Mohamed, jumping jack, 5'6" x 3' depth 3' LAB Exclusive Testing, Denise, Sand cone, Item4, (W)123.9 (D)114.0(MD)120.5(AM)8.7 Test 98.6
|
2024-07-25
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in basement ( confirmed with store owner), one excavation made on roadway and one excavation made on sidewalk , crew on site.
|
2024-07-23
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The crew on site, and the concrete base restoration is coned off for concrete curing in the bus/parking lane. according to the crew, the restoration will be finalized today around 2 pm.
|
2024-07-23
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
I/F/O 38W within the bus/ parking lane of the roadway found a permanent flush to grade restoration, color code installed.
|
2024-07-22
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site excavated, ifo #38, water sprinkler repair
|
2024-07-22
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
The backfill passed, the cutbacks were made, and the crew was left on site because they did not have a steel plate to allow the concrete to cure. Foreman Shamsu was advised to allow the concrete to cure for 24hrs. ( 10’.6” X W 3’.3” X D 3’.7”)
|
2024-07-20
|
No data
|
JACKSON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 158 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint sealed IFO 765.
|
2024-07-19
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER - conf # taken out already on another previous permit. Active permit on file Q012024191B13
|
2024-07-18
|
No data
|
SOUTH 2 STREET, FROM STREET HAVEMEYER STREET TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak in the Basement. Contractor currently making Repairs in the Roadway & Sidewalk. Property owner on site
|
2024-07-18
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
- In Driving Lane - Temporary Restoration Sunken 3'' i/f/o 42-31 Colden Street
|
2024-07-18
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Temporary water restoration sunken 3” in the driving lane has been patched flush with temp matte at this time.
|
2024-07-18
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER-PERM ROADWAY . ACTIVE PERMIT Q012024191B13 ON FILE
|
2024-07-17
|
No data
|
WEST 81 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
IFO AKA 86 Riverside Drive (on West 81st street) within the parking lane, backfill completed with 6 inch cutbacks done. L5’ W3’6” D1’11” Blend TT 97.9.
|
2024-07-17
|
No data
|
WEST 81 STREET, FROM STREET RIVERSIDE DRIVE TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating s/w & rwy, water leak repair, basement.
|
2024-07-11
|
No data
|
NELSON AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET FEATHERBED LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in place at time of inspection.
|
2024-07-11
|
No data
|
WEBSTER AVENUE, FROM STREET EAST 173 STREET TO STREET EAST MT EDEN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Heavy domestic water leaking in roadway , one excavation made on roadway and one excavation made on sidewalk , crew on site to repair.
|
2024-07-08
|
No data
|
EAST 38 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing damaged water service. One excavation in roadway at this time
|
2024-07-05
|
No data
|
WEBSTER AVENUE, FROM STREET EAST 173 STREET TO STREET EAST MT EDEN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in sidewalk , one excavation made on sidewalk and one excavation made on roadway at time of inspection,3 day notice issued from DEP.
|
2024-06-26
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP Paved over portion of plumber restoration
|
2024-06-25
|
No data
|
COOPER STREET, FROM STREET ACADEMY STREET TO STREET WEST 204 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in compliance and flush to grade in the driving lane.
|
2024-06-24
|
No data
|
MANHATTAN AVENUE, FROM STREET INDIA STREET TO STREET JAVA STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, set-up, ifo #960, water leak repair, basement
|
2024-06-24
|
No data
|
MANHATTAN AVENUE, FROM STREET INDIA STREET TO STREET JAVA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Awaiting backfill
|
2024-06-24
|
No data
|
MANHATTAN AVENUE, FROM STREET INDIA STREET TO STREET JAVA STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill pass
|
2024-06-24
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Latest Permit# M012024114B16
|
2024-06-21
|
No data
|
WEST TREMONT AVENUE, FROM STREET GRAND AVENUE TO STREET KINGSLAND PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the driving lane and sidewalk flags restored in kind IFO 25w.
|
2024-06-21
|
No data
|
CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in place at time of inspection.
|
2024-06-18
|
No data
|
LACONIA AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway
|
2024-06-18
|
No data
|
47 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent repair water restoration in the driving lane is sealed and flush to grade at this time.
|
2024-06-17
|
No data
|
WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of building # 300, I found a sidewalk flag restored around the water valve cover and two permanent restorations flush to grade on the roadway. One is within the south parking lane, and the other is within the turning lane.
|
2024-06-17
|
No data
|
EAST 236 STREET, FROM STREET NAPIER AVENUE TO STREET VAN CORTLANDT PARK EAST
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Foreman Sheme, Jumping Jack, 4' x 3' depth 3' & 3' x 2' depth 3' Lab Exclusive Testing, Steven, Sand Cone, Blend, (W)123.3(D)115.9(MD)120.0 (AM)6.4 TEST 97.6 & 96.4 . 2 Cuts in the roadway will combine into one at final restoration. Backfill Accepted
|
2024-06-17
|
No data
|
EAST 170 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Long water restoration in the driving lane of the roadway.
|
2024-06-17
|
No data
|
COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the driving lane of the roadway.
|
2024-06-17
|
No data
|
WALTON AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2024-06-17
|
No data
|
EAST 236 STREET, FROM STREET NAPIER AVENUE TO STREET VAN CORTLANDT PARK EAST
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water service leaking in basement. Two excavations in roadway at this time
|
2024-06-17
|
No data
|
EAST 222 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway
|
2024-06-17
|
No data
|
EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flushed to grade.
|
2024-06-16
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Latest Permit# M012024114B16
|
2024-06-15
|
No data
|
JACKSON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 158 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk expansion joints needs to be sealed
|
2024-06-15
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway and L-shaped sidewalk flag in compliance
|
2024-06-13
|
No data
|
58 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm plumber restoration on sidewalk 1 flag reset in compliance
|
2024-06-13
|
No data
|
ORCHARD STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O # 71, found a permanent Restoration located in the driving lane and the Bike Share Station.
|
2024-06-11
|
No data
|
STILLWELL AVENUE, FROM STREET BEND TO STREET SEMINOLE STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak at the Tap. Contractor currently making Repairs in the Roadway DEP Inspector on site. 3 Day Notice Issued
|
2024-06-08
|
No data
|
SEYMOUR AVENUE, FROM STREET BEND TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway
|
2024-06-06
|
No data
|
MC CLELLAN STREET, FROM STREET GRANT AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2024-06-02
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 259 STREET TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut st pass
|
2024-06-02
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 260 STREET TO STREET WEST 261 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut st. pass
|
2024-05-31
|
No data
|
EAST 224 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2024-05-29
|
No data
|
VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in basement ,one plated excavation on roadway / one sidewalk restored
|
2024-05-28
|
No data
|
VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
WET DENSITY 122.1 DRY DENSITY 112.3 MAX. DRY DENSITY 117.0 ACTUAL MOISTURE 8.7% 5x2.5’. Top test 97.1%. Shamus, jumping jack. Exclusive testing, Steven. Sand cone, Item 4. Backfill accepted
|
2024-05-28
|
No data
|
EAST 225 STREET, FROM STREET CARPENTER AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk, at Corner Property of 3975
|
2024-05-24
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permanent plumber’s restoration resealed
|
2024-05-23
|
No data
|
MERRITT AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Repairing domestic water service leak. One excavation in roadway at this time
|
2024-05-22
|
No data
|
NELSON AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP
|
2024-05-21
|
No data
|
113 AVENUE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent long water restorations to grade within the parking lane, sidewalk flag restored with water valve in front of 150-19.
|
2024-05-21
|
No data
|
RIDER AVENUE, FROM STREET EAST 137 STREET TO STREET EAST 138 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic sanitary sewer backup. One excavation in roadway at this time
|
2024-05-20
|
No data
|
GILLESPIE AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ZULETTE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Property has low water pressure. Crew excavating roadway opposite address at this time
|
2024-05-17
|
No data
|
QUEENS BOULEVARD, FROM STREET 40 STREET TO STREET 41 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak in basement. Excavations made in roadway and sidewalk at time of inspection.
|
2024-05-17
|
No data
|
EVERGREEN AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair restoration in driving/parking lane
|
2024-05-17
|
No data
|
35 AVENUE, FROM STREET 37 STREET TO STREET 38 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut to grade within the parking lane, sidewalk flag restored around water valve expansion joints sealed I/F/O 37-11 35th Avenue.
|
2024-05-17
|
No data
|
WEST 104 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags in compliance
|
2024-05-16
|
No data
|
WEST 113 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating rwy, ifo #272, water leak repair. street closed op#
|
2024-05-15
|
No data
|
ARDEN STREET, FROM STREET BROADWAY TO STREET DONGAN PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Heavy Domestic Water Service Leak Contractor currently Making Repairs in the Roadway & Sidewalk 3 Day Dep Notice Issued
|
2024-05-08
|
No data
|
HUDSON STREET, FROM STREET 8 AVENUE TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 577, sidewalk work ( 2 flags ) fully restored in kind with existing area. Expansion joint installed / sealed at this time. No roadway cut.
|
2024-05-08
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Found two temporary restorations overdue for final I/F/O 508 in the Drive/Parking lanes.
|
2024-05-07
|
No data
|
WHITE PLAINS ROAD, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair restoration in roadway
|
2024-05-06
|
No data
|
WEST TREMONT AVENUE, FROM STREET GRAND AVENUE TO STREET KINGSLAND PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Repairing water service leak. One excavation in roadway at this time
|
2024-05-06
|
No data
|
WEST TREMONT AVENUE, FROM STREET GRAND AVENUE TO STREET KINGSLAND PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Open excavation found in the Travel Lane / buffer zone. Crew found on site. Flagger present.
|
2024-05-05
|
No data
|
113 AVENUE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent long water restorations to grade within the parking lane, sidewalk flag restored with water valve in front of 150-19.
|
2024-05-05
|
No data
|
ST LAWRENCE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair restoration in parking lane
|
2024-05-05
|
No data
|
CROSS BAY BOULEVARD, FROM STREET 149 AVENUE TO STREET VAN WICKLEN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two sidewalk flags adjacent to curb restored in kind.
|
2024-05-03
|
No data
|
EAST 117 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating s/w & rwy, ifo #220, water leak repair on valve.
|
2024-05-03
|
No data
|
HUGUENOT AVENUE, FROM STREET BOSTON ROAD TO STREET HOLLERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Long Water Work done in the parking lane, opposite side
|
2024-05-02
|
No data
|
FORSYTH STREET, FROM STREET RIVINGTON STREET TO STREET STANTON STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak Contractor currently making Repairs in the Roadway & Sidewalk 3 Day Dep Notice Issued. DEP Inspector on site
|
2024-05-01
|
No data
|
GUNTHER AVENUE, FROM STREET BARNES AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak in roadway. Crew excavating roadway at this time
|
2024-04-30
|
No data
|
CITY ISLAND AVENUE, FROM STREET BUCKLEY STREET TO STREET MARINE STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Heavy Domestic water Service Leak Contractor currently Pumping Water out from the Sidewalk & Therefore, Making Repairs. 3 Day Dep notice Issued
|
2024-04-29
|
No data
|
BAINBRIDGE AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Was Shut off by Dep after 3 Day Notice was issued. Contractor Currently Working in the Roadway & Sidewalk. Property Owner on site.
|
2024-04-28
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in compliance
|
2024-04-27
|
No data
|
EAST 117 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
111 east 117 st water restoration in compliance
|
2024-04-25
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permanent restoration in compliance as per M012024103B85.
|
2024-04-25
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints fully filled and sealed IFO 404.
|
2024-04-19
|
No data
|
VINCENT AVENUE, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway I/F/O 627
|
2024-04-19
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
IFO #230 within the driving lane, wearing course completed. Old asphalt has been broken up and area swept clean prior to new asphalt being applied. Previous tac coat was still intact, street opening joints have been sealed with color code marker.
|
2024-04-18
|
No data
|
MATTHEWS AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sprinkler Line Leaking Contractor currently making Repairs in the Roadway Building Superintendent on site
|
2024-04-18
|
No data
|
KINGSLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway
|
2024-04-16
|
No data
|
WATERBURY AVENUE, FROM STREET HAVEMEYER AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak at tap. Excavation made in roadway opposite property.
|
2024-04-15
|
No data
|
EAST 52 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Opposite #248 within the parking/driving lane, wearing course completed. Reflective membrane and tac coat used. L6’3” W6’ D2”. 24’ color code marker applied.
|
2024-04-15
|
No data
|
EAST 52 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
FYI: crew is having difficulties with removing their steel plate, they were advised they can leave it for 24 hours in an effort to bring the proper equipment the next day to have it removed.
|
2024-04-14
|
No data
|
HAVILAND AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cut in roadway resealed in compliance
|
2024-04-13
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent failed to properly seal wearing course in the roadway after being notified by car#20248310051 on 3/3/24
|
2024-04-12
|
No data
|
SHORE AVENUE, FROM STREET PINEGROVE STREET TO STREET REMINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water relay, perm roadway restoration in D/L maintain to grade.
|
2024-04-12
|
No data
|
BOUCK AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the parking lane
|
2024-04-11
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak in the Basement. Contractor currently making Repairs in the Roadway & Sidewalk. Property Owner on site
|
2024-04-10
|
No data
|
EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut okay in d/l.
|
2024-04-10
|
No data
|
89 STREET, FROM STREET 156 AVENUE TO STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in parking lane.
|
2024-04-09
|
No data
|
WEST 48 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken sanitary sewer line backing up into property. Excavation in roadway and sidewalk.
|
2024-04-07
|
No data
|
WEST 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I found the roadway milled and awaiting the final paving.
|
2024-04-06
|
No data
|
BEEKMAN PLACE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
IFO #29 the sidewalk flags expansion joints have been sealed, and CAR restoration permit number M042024031A06 is on file. CAR re-inspection passed.
|
2024-04-06
|
No data
|
EAST 222 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
3 Permanent restorations in the roadway
|
2024-04-05
|
No data
|
EAST 52 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leak in basement. Leak isn’t coming from domestic water line. DEP rescinded the 3 day notice. Excavation in parking lane opposite property.
|
2024-04-05
|
No data
|
EAST 52 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed opposite 248, cutbacks made and ready for concrete.
|
2024-04-04
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak in the Basement. Contractor currently making Repairs in the Roadway & Sidewalk. Property Owner on site
|
2024-04-04
|
No data
|
WILLIAMSBRIDGE ROAD, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber repaired water leak, cut made permanent in the driving lane
|
2024-03-30
|
No data
|
CRANFORD AVENUE, FROM STREET HILL AVENUE TO STREET MONTICELLO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the parking lane and grass area on the sidewalk
|
2024-03-30
|
No data
|
RICHARDSON AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2024-03-30
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration the roadway compliance.
|
2024-03-30
|
No data
|
WILLIAMSBRIDGE ROAD, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm restoration on roadway green color coats applied. No one on site.
|
2024-03-27
|
No data
|
EAST 206 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET PERRY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumber’s restoration in roadway
|
2024-03-27
|
No data
|
WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating rwy cuts opp of each other, water leak repair, 3day, work for #557 8Ave.
|
2024-03-27
|
No data
|
WEST 38 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill complete 6 inch cutbacks were done 12 inch cutbacks were marked out for final restoration , 2 temporary water restoration on opposite sides of the roadway info 300 West 38th street , 2 temporary restoration measuring 5'x 5' / 5'x4'
|
2024-03-24
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM RESTORATION IN THE ROADWAY AND SIDE WALK FLAGS INSTALLED
|
2024-03-22
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored wearing course it pass.
|
2024-03-22
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway in compliance
|
2024-03-22
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints are missing. Expansion joints need to be fully filled and sealed around water valve IFO 404.
|
2024-03-22
|
No data
|
FAILE STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in compliance
|
2024-03-20
|
No data
|
LACONIA AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in roadway , 2 excavations made on roadway at time of inspection , 3 day notice issued from DEP.
|
2024-03-19
|
No data
|
EAST 241 STREET, FROM STREET MUNDY LANE TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the driving lane. Work done on sidewalk in ribbon area.
|
2024-03-19
|
No data
|
EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in compliance in the roadway
|
2024-03-19
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
I/F/O 230, asphalt has broken out and down 1-2” below grade within your permanent restoration. Also missing IBM color code.
|
2024-03-19
|
No data
|
COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in roadway 2 excavations on roadway ,one excavation made on sidewalk ,3 day notice issued operator 91 contacted for roadway closure
|
2024-03-15
|
No data
|
WEST 74 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed
|
2024-03-14
|
No data
|
JACKSON AVENUE, FROM STREET EAST 156 STREET TO STREET EAST 158 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic sanitary sewer collapsed in roadway ,crew on site to trench roadway/sidewalk to replace sewer main.
|
2024-03-13
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temp restoration in roadway opposite address and new sidewalk flag.
|
2024-03-11
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
1 sidewalk flag restored to grade I/F/O 419, opposite 419 In the parking lane of the roadway lies a permanent flush to grade restoration.
|
2024-03-09
|
No data
|
242 STREET, FROM STREET 88 DRIVE TO STREET 89 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one perm cut on roadway at time of inspection.
|
2024-03-07
|
No data
|
EAST 222 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber on site doing water repair in the roadway.
|
2024-03-05
|
No data
|
EAST 110 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm. cut okay in p/l & d/l.
|
2024-03-04
|
No data
|
WHITE PLAINS ROAD, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sprinkler system shut off going into 2156,one excavation to be made on roadway,crew on site.
|
2024-03-03
|
No data
|
CHURCH AVENUE, FROM STREET EAST 96 STREET TO STREET ROCKAWAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the parking lane in compliance
|
2024-03-03
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut in roadway needs to be resealed
|
2024-03-02
|
No data
|
EAST 215 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2024-03-01
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent Restoration located in the driving and parking lanes.
|
2024-03-01
|
No data
|
PATTERSON AVENUE, FROM STREET BOLTON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway in compliance
|
2024-02-29
|
No data
|
FIELDSTON ROAD, FROM STREET WEST 261 STREET TO STREET WEST 262 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leaking, three day notice. One roadway cut
|
2024-02-28
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET CHATTERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass work doen
|
2024-02-27
|
No data
|
ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2024-02-21
|
No data
|
WEST 142 STREET, FROM STREET CHISUM PLACE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak on sprinkler system in side property, crew excavating across sidewalk on west 142 street between Chisum place and Lenox avenue for address 646 Lenox avenue,
|
2024-02-20
|
No data
|
HAVILAND AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut in roadway needs to be resealed
|
2024-02-20
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, please note THE FIRST 12’x3’6” BELONGS TO DEP. STARTING FROM SOUTH TOWARDS NORTH, IN LEFT TURN LANE. REMAINDER OF CUT OGRADY,
|
2024-02-19
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 183 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
DEP shut off water. 3-day notice. Excavation in roadway and sidewalk,
|
2024-02-16
|
No data
|
EDISON AVENUE, FROM STREET ROBERTS AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway
|
2024-02-15
|
No data
|
EAST TREMONT AVENUE, FROM STREET PURITAN AVENUE TO STREET WATERBURY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew is working on site
|
2024-02-15
|
No data
|
EAST TREMONT AVENUE, FROM STREET PURITAN AVENUE TO STREET WATERBURY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak. Excavation in sidewalk.
|
2024-02-14
|
No data
|
89 STREET, FROM STREET 156 AVENUE TO STREET 157 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
One perm cut on roadway (not sealed) at time of inspection.
|
2024-02-14
|
No data
|
ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway
|
2024-02-14
|
No data
|
HERING AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak in basement. Excavations in roadway.
|
2024-02-10
|
No data
|
EDISON AVENUE, FROM STREET BAISLEY AVENUE TO STREET PAINE STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking behind property ,two excavations made on roadway at time of inspection,one excavation made on sidewalk, crew on site.
|
2024-02-09
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I found the Street opening joints to the repair water restoration resealed in the roadway.
|
2024-02-09
|
No data
|
EAST 110 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak Contractor currently making Repairs in the Roadway 3 Day Dep Notice Issued.Property owner on site
|
2024-02-08
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 191 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm restoration in roadway. No one on site. Driving lane.
|
2024-02-06
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 temp cuts along water service sunken 2-4” in driving lane OPP 1821Both cuts overdue for final as well
|
2024-02-06
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per Raphael Castillo BX supervisor, conditions belong to NYc DEP.
|
2024-02-05
|
No data
|
CROSBY AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2024-02-05
|
No data
|
ADRIAN AVENUE, FROM STREET TERRACE VIEW AVENUE TO STREET WEST 227 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
House sewer backed up, replacing entire sewer, one cut on roadway, one on sidewalk the rest behind property line
|
2024-02-04
|
No data
|
WEST 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There is a permanent cut flush to grade in the driving lane partially within a Con Edison gas trench, along with work done on the sidewalk around a water valve cover.
|
2024-02-02
|
No data
|
TAYLOR AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Work done in sidewalk located 80 feet from morris Park Ave.
|
2024-01-31
|
No data
|
MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in the roadway/ sidewalk is flush to grade
|
2024-01-30
|
No data
|
HUGHES AVENUE, FROM STREET EAST 189 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer backed up in basement and going into yard. Contractor on site working in roadway to repair and make replacement.
|
2024-01-27
|
No data
|
EAST 6 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found permanent restoration in driving/parking lanes flush to grade.
|
2024-01-27
|
No data
|
EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Wearing course street joints resealed
|
2024-01-27
|
No data
|
BALCOM AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
street joints resealed
|
2024-01-26
|
No data
|
EAST 34 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration in the bus lane in front of #10 match to grade at this time.
|
2024-01-25
|
No data
|
GILDERSLEEVE AVENUE, FROM STREET PUGSLEY AVENUE TO STREET STEPHENS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway in compliance
|
2024-01-25
|
No data
|
SOUNDVIEW AVENUE, FROM STREET BOLTON AVENUE TO STREET BOLTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2024-01-25
|
No data
|
UNDERHILL AVENUE, FROM STREET PATTERSON AVENUE TO STREET SOUNDVIEW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2024-01-23
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plumber working, cleaning up work area. Water leak repaired. Work on roadway and sidewalk.
|
2024-01-21
|
No data
|
WEST 261 STREET, FROM STREET INDEPENDENCE AVENUE TO STREET PALISADE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass st cut
|
2024-01-20
|
No data
|
155 STREET, FROM STREET BEECH AVENUE TO STREET SANFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Long water perm cut to grade within the parking/driving lane opposite of 42-45 155th Street
|
2024-01-19
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1B issued for failure to obtain a confirmation number prior to expiration of DOT street opening permit (protected street)
|
2024-01-18
|
No data
|
WEST 139 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leak in home, contractor on site replacing valve on sidewalk and making repairs in the roadway. Home has no service at time of inspection.
|
2024-01-14
|
No data
|
HAMILTON PLACE, FROM STREET WEST 139 STREET TO STREET WEST 140 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance.
|
2024-01-14
|
No data
|
WEST 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found your permanent restoration in the roadway with the white lane markings missing. Please install the white lane markings dividing the parking, bike, and driving lanes on the permanent restoration.
|
2024-01-14
|
No data
|
WEST 162 STREET, FROM STREET AMSTERDAM AVENUE TO STREET JUMEL TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint at curb is sealed.
|
2024-01-11
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water service leaking in roadway. DEP notice issued to property. Crew working excavation in roadway opposite address. (Was previously plated by Con Edsion
|
2024-01-10
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic water service leak. DEP notice issued to property. Crew excavating in roadway and sidewalk
|
2024-01-10
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent has obtained the permitM022023275A02 to satisfy the CAR.
|
2024-01-09
|
No data
|
EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway.
|
2024-01-09
|
No data
|
LONGFELLOW AVENUE, FROM STREET ALDUS STREET TO STREET EAST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done near corner property
|
2024-01-08
|
No data
|
WEST 74 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please recess and seal expansion joints by tree pit.
|
2024-01-08
|
No data
|
EAST 165 STREET, FROM STREET LONGFELLOW AVENUE TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass work done
|
2024-01-04
|
No data
|
QUEENS BOULEVARD, FROM STREET 84 DRIVE TO STREET 138 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Heavy domestic water leaking in roadway , one excavation made on roadway at time of inspection , crew on site to repair.
|
2024-01-04
|
No data
|
EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of #356 in the driving lane, permanent water restoration match to grade at this time. Sidewalk flag next to water vale also restored in kind.
|
2024-01-03
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber cut made permanent
|
2023-12-31
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found permanent trench restoration in driving/parking lanes with restorations expansion joints needing to be resealed to roadway.
|
2023-12-30
|
No data
|
EAST GUN HILL ROAD, FROM STREET LACONIA AVENUE TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Resurfaced
|
2023-12-29
|
No data
|
STORY AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway
|
2023-12-27
|
No data
|
EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
WC Pass; membrane & tack coat used. Sealed and IBM color code placed.10'x10'x3" in D/L
|
2023-12-26
|
No data
|
CLINTON STREET, FROM STREET VERANDAH PLACE TO STREET WARREN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by DOT IN-HOUSE PAVING AND MILLING Permit #B152022174A08
|
2023-12-23
|
No data
|
EAST 188 STREET, FROM STREET BELMONT AVENUE TO STREET CAMBRELENG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2023-12-22
|
No data
|
EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
As per foreman Zeqir Haluci LL14 wearing course rescheduled for 1pm, maybe they may have to cancelled until another day.
|
2023-12-22
|
No data
|
EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Wearing course will be rescheduled for different date. Crew states they will not be able to finish today. Cold patch will be applied to milled out area for roadway access.
|
2023-12-20
|
No data
|
WEST 246 STREET, FROM STREET BEND TO STREET INDEPENDENCE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
small permanent roadway cut behind 7 Ploughmans Bush, on West 246 Street, opposite Delafield Estate and small pond
|
2023-12-17
|
No data
|
WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration in the parking IFO 1413.
|
2023-12-16
|
No data
|
BEACH CHANNEL DRIVE, FROM STREET BOROUGH BOUNDARY TO STREET HORTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No recent work done by respondent in block segment.
|
2023-12-15
|
No data
|
EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 steel plates recessed in the driving lane with no “Raise Plow” sign in site. Respondent failed to post “Raise Plow” signs in accordance with the winter moratorium from 12/1/23-4/1/24. Respondent ID by cited permit.
|
2023-12-15
|
No data
|
EAST TREMONT AVENUE, FROM STREET CLINTON AVENUE TO STREET CROTONA AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Base accepted
|
2023-12-15
|
No data
|
EAST TREMONT AVENUE, FROM STREET CLINTON AVENUE TO STREET CROTONA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service leak. One excavation in roadway at this time
|
2023-12-14
|
No data
|
EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
IFO # 356 East 50th Street, backfill in the driving lane completed: 7' x 4' x 3 1/2'
|
2023-12-13
|
No data
|
BALCOM AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm plumbers cut in roadway street joints must be completely resealed ifo 195.
|
2023-12-13
|
No data
|
EAST 50 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water repair, ifo #356, 3day
|
2023-12-13
|
No data
|
EAST 6 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wearing course done in the driving/ parking lanes of the roadway, sealed and to grade.
|
2023-12-12
|
No data
|
EAST 6 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O#341, found a plated excavation within the driving lane with one sidewalk flag restored around gas valve box.
|
2023-12-12
|
No data
|
EAST 6 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill pass. Undermines removed restoration left plated in front of 341. Measurements as followed; L-8'5" W- 6'6" D-3'5"
|
2023-12-11
|
No data
|
WILSON AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two perm cuts in roadway , 1 sidewalk flag installed
|
2023-12-10
|
No data
|
BEEKMAN PLACE, FROM STREET EAST 50 STREET TO STREET EAST 51 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must seal expansion joint between the curb and sidewalk
|
2023-12-08
|
No data
|
HAMILTON PLACE, FROM STREET WEST 139 STREET TO STREET WEST 140 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew & DEP on site excavating s/w & rwy, water main valve leaking, ifo #50
|
2023-12-07
|
No data
|
GREENPOINT AVENUE, FROM STREET 47 STREET TO STREET 48 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flag installed on the green point avenue side.
|
2023-12-06
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found portion of permanent restoration still temporary restoration and is overdue for finalization.
|
2023-12-05
|
No data
|
CITY ISLAND AVENUE, FROM STREET BUCKLEY STREET TO STREET MARINE STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic sanitary backup. Crew excavating sidewalk at this time
|
2023-12-04
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Portion of roadway found resurfaced under permit M152023135A94 With sidewalk flag restored.
|
2023-12-04
|
No data
|
PITMAN AVENUE, FROM STREET ELY AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut going across roadway in compliance
|
2023-12-04
|
No data
|
SUFFOLK STREET, FROM STREET EAST HOUSTON STREET TO STREET STANTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repair sidewalk: Specific Location: 154 Stanton street cut on Suffolk street. Sidewalk flag where the green mail box is located.
|
2023-12-03
|
No data
|
LELAND AVENUE, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found at time of inspection.
|
2023-11-30
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2023-11-30
|
No data
|
GRANT AVENUE, FROM STREET EAST 166 STREET TO STREET MC CLELLAN STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
9’x3’6”x8’ excavation in the roadway. Material passed. 6” marked out for cutbacks. Backfill passed.
|
2023-11-30
|
No data
|
HUDSON STREET, FROM STREET 8 AVENUE TO STREET WEST 11 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing domestic sanitary sewer backing up into property. One excavation in sidewalk at this time
|
2023-11-29
|
No data
|
HARROD AVENUE, FROM STREET BRP SOUTHBOUND EXIT 3 TO STREET EAST 172 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leak on service. Contractor on site cleaning up work. Steel plates on excavation.
|
2023-11-28
|
No data
|
WEST 16 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, water service leaking at valve. One excavation in roadway opposite address. One excavation in sidewalk in front of address
|
2023-11-28
|
No data
|
WEST 146 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wear and course passed 12x5x3 area in the Drive lane I/F/O 427
|
2023-11-24
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill rescheduled. There was an issue with DEP inspection. Water repair 4” pipe, service line to building is 6”. Difference in pipe size is not acceptable to DEP. Unable to start backfill. OGrady Sheamus, ETL Charles, DEP Aziz on site.
|
2023-11-22
|
No data
|
162 STREET, FROM STREET 76 AVENUE TO STREET 76 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
segment resurfaced
|
2023-11-18
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints around tree pit has been sealed ifo 1099
|
2023-11-18
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Move tape from expansion joints in front of 1099
|
2023-11-17
|
No data
|
TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in basement on lead line (visibly confirmed),one excavation made on roadway and one excavation made on sidewalk at time of inspection.
|
2023-11-16
|
No data
|
35 AVENUE, FROM STREET 37 STREET TO STREET 38 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one temporary cut on roadway and one plated excavation on sidewalk at time of inspection.
|
2023-11-15
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w okay
|
2023-11-14
|
No data
|
ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repair water leak
|
2023-11-13
|
No data
|
113 AVENUE, FROM STREET 155 STREET TO STREET SUTPHIN BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak in basement. Excavations in roadway and sidewalk.
|
2023-11-13
|
No data
|
WEST 162 STREET, FROM STREET AMSTERDAM AVENUE TO STREET JUMEL TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w joints need seal.
|
2023-11-12
|
No data
|
WILSON AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Restoration I/F/O 2436 was properly resealed at the edges
|
2023-11-10
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Wearing course corrected and in compliance at time of re-inspection.
|
2023-11-09
|
No data
|
WEST 146 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed on the sidewalk and driving lane in front of 418, cutbacks made and ready for concrete.
|
2023-11-08
|
No data
|
WEST 146 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water & Sprinkler Leak. Contractor Making Repairs in the Roadway & Sidewalk 3 Day Dep Notice Issued. Property Owner on site.
|
2023-11-08
|
No data
|
WEST 146 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
steel plate pinned and ramped on roadway in front of 418 West 146 street
|
2023-11-06
|
No data
|
WEST 147 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Small ‘L’ shaped excavation in driving lane. There are two different widths due to shape, the widest portion measures 5’.6” at this time.7’.6” X 3’ X 2’.8”
|
2023-11-06
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut okay in p/l.
|
2023-11-04
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass
|
2023-11-02
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm sewer restoration in the roadway driving/parking lane sealed in compliance ifo property 1099clarkson
|
2023-11-02
|
No data
|
WEST 147 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sprinkler system break in service. Contractor working in roadway and sidewalk. Removed broken service and replacing. Excavations on sidewalk and roadway. Street closure Operator #91.
|
2023-11-02
|
No data
|
WEST 147 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway closed at st. Nicholas ave.
|
2023-11-01
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Balkan cut into this cut, cut belongs to Balkan. Told foreman and supervisor from Balkan to update permits adding both addresses 2751/2753
|
2023-10-30
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak in roadway. Excavation in parking lane.
|
2023-10-27
|
No data
|
TOMLINSON AVENUE, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak in roadway. Excavation in parking lane. Work done for 1122 Pelham Pkwy.
|
2023-10-24
|
No data
|
WEST 147 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored Backfill. Backfill pass & complete. 6'4"x2'10"x3'2" Arrival: 12:06PM Departure: 2PM
|
2023-10-24
|
No data
|
EAST 225 STREET, FROM STREET CARPENTER AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in compliance
|
2023-10-23
|
No data
|
EAST 237 STREET, FROM STREET RICHARDSON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass work done
|
2023-10-23
|
No data
|
WEST 147 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site working with r/w closed to traffic. Oper. 91 notified.
|
2023-10-23
|
No data
|
WEST 147 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating rwy, ifo #402, water leak repair, 3day.
|
2023-10-21
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Excavation on roadway at location is plated. Active permit# Q012023278A32 on file for work.
|
2023-10-21
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2023-10-18
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Lead pipe service broken causing flooding in basement. Water pumped out, contractor replacing broken service with copper piping. Home has no service. Excavations behind property line and in roadway.
|
2023-10-18
|
No data
|
GRANT AVENUE, FROM STREET EAST 166 STREET TO STREET MC CLELLAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Backfill was canceled do to a D.E.P water leak inside the trench. Foreman James, Jack lab text on site. D.E.P need to repair leak can't backfill.
|
2023-10-17
|
No data
|
WALTON AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Excavation in parking lane. Cement curing.
|
2023-10-16
|
No data
|
MINNIEFORD AVENUE, FROM STREET BOWNE STREET TO STREET DITMARS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in roadway in compliance
|
2023-10-16
|
No data
|
WALTON AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
4x3.5 x3 cut in parking lane. 1 sw flag
|
2023-10-14
|
No data
|
WEST 74 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I/F/O #45 SIDEWALK (2) FLAGS HAS BEEN REPAIRED FREE OF DEFECTS AND SCORED 0401 Repair Sidewalk Permit Number:M042023255A3 to satisfy CAR 20237790492
|
2023-10-11
|
No data
|
GRANT AVENUE, FROM STREET EAST 166 STREET TO STREET MC CLELLAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, plated excavation in parking lane adjacent crosswalk
|
2023-10-09
|
No data
|
EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut in parking lane needs to be resealed
|
2023-10-08
|
No data
|
DYCKMAN STREET, FROM STREET HENSHAW STREET TO STREET PAYSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found sidewalk flags restored one around a water valve I/F/O 284.
|
2023-10-07
|
No data
|
POST ROAD, FROM STREET DEAD END TO STREET FIELDSTONE TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Perm cut in the r/w.
|
2023-10-07
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in roadway parking/driving lane sealed in compliance ifo 1099 Clarkson st
|
2023-10-06
|
No data
|
EAST 34 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
WC Pass; cutbacks and membrane applied IFO 10 (Bus Lane)
|
2023-10-06
|
No data
|
HAVEMEYER AVENUE, FROM STREET ELLIS AVENUE TO STREET GLEASON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Resurfaced by DOT
|
2023-10-05
|
No data
|
EAST 34 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
LL14 backfill PassCut#1 L: 7' 2" W: 4' 5"I/F/O #10 bus lane lead to 1 sidewalk flag around water valve box.
|
2023-10-05
|
No data
|
CRANFORD AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass work done
|
2023-10-04
|
No data
|
EAST 34 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water shut off,one excavation made on roadway and one excavation made on sidewalk,notice issued from DEP.
|
2023-10-03
|
No data
|
EVERGREEN AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permanent plumber’s restoration in the parking lane and sidewalk flags restored in kind IFO 1175. Updated on file.
|
2023-10-03
|
No data
|
MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permittee (50285)-O’Grady Plumbing LLC I/F/O 2768(property Bx Lobster)Block 4111/ Lot 43: Description of work: Install 6 inches combined new sewer connections to combined sewer main.
|
2023-10-03
|
No data
|
EVERGREEN AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumbers restoration in the parking lane and 2 sidewalk flags restored in kind around water valve IFO 1165. Updated permit on file (X012023264A28).
|
2023-10-02
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway and sidewalk
|
2023-10-02
|
No data
|
WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
4x3x3 cut in parking lane/ bus stop.
|
2023-10-02
|
No data
|
WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Work done on service. Backfill completed. Contractor on site waiting for steel plate.
|
2023-09-28
|
No data
|
HUGUENOT AVENUE, FROM STREET BOSTON ROAD TO STREET HOLLERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
GPS taking me to mount Vernon can’t inspect
|
2023-09-28
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2023-09-27
|
No data
|
MURDOCK AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass perm in roadway in compliance
|
2023-09-27
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET CHATTERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers long water cut driving lane I/F/O 1001 a.k.a. Cafe.
|
2023-09-27
|
No data
|
CRANFORD AVENUE, FROM STREET HILL AVENUE TO STREET MONTICELLO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass work done in parking lane
|
2023-09-27
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permanent water restoration in the roadway is not squared and aligned at the cut limits a required by Standard Detail Drawing 1042D, Note #3. cuts are 5' apart.
|
2023-09-27
|
No data
|
EAST 188 STREET, FROM STREET MARION AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 permanent restoration in the roadway and 1 on the sidewalk
|
2023-09-26
|
No data
|
EVERGREEN AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber’s permanent restoration in driving lane and work done in sidewalk. Permit still valid. I/F/O 1165.
|
2023-09-26
|
No data
|
EVERGREEN AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber’s permanent restoration in driving lane and work done in sidewalk. Updated permit on file still valid. I/F/O 1165.
|
2023-09-26
|
No data
|
REV JAMES POLITE AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair restoration in driving lane with cable vision cut
|
2023-09-25
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent repaired the condition on CAR #20226580128 which was issued on 9/15/2022 without the noted permit listed as required.
|
2023-09-24
|
No data
|
VINCENT AVENUE, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in d/l to grade
|
2023-09-22
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Found permanent restoration squared off at cut limits and lean margin restored with 0135P - C.A.R. RESTORATION - PROTECTED on permit # M012023250A77 on file.
|
2023-09-22
|
No data
|
WEST 162 STREET, FROM STREET AMSTERDAM AVENUE TO STREET JUMEL TERRACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wearing course completed, area sealed off.
|
2023-09-19
|
No data
|
EVERGREEN AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer backed up in basement. Contractor working on sidewalk and roadway changing sewer line. Building unable to use plumbing.
|
2023-09-18
|
No data
|
TOWNSEND AVENUE, FROM STREET EAST 171 STREET TO STREET EAST 172 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway found resurfaced by more recent permanent con Edison trench in roadway
|
2023-09-15
|
No data
|
WEST 162 STREET, FROM STREET AMSTERDAM AVENUE TO STREET JUMEL TERRACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak in basement. Work done on sidewalk and roadway. Backfill takin place. DOT on site for backfill
|
2023-09-15
|
No data
|
WEST 162 STREET, FROM STREET AMSTERDAM AVENUE TO STREET JUMEL TERRACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored Backfill. Backfill pass & complete. Cut #1: 3'7"x3'7"x3' Cut #2: 4'x2'8"x3' Arrival: 2:20PM Departure: 4:05PM
|
2023-09-13
|
No data
|
WILSON AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration I/F/O 2436 not properly sealed at the edges
|
2023-09-13
|
No data
|
GREYSTONE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the p/l, new concrete s/w flags.
|
2023-09-10
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the respondent has a temporary water restoration that is sunken by 1.5" in the northbound driving lane. Respondent was notified by CAR# 20236150350 on 06/26/23. Permit# Q012023177B32 was used to ID respondent.
|
2023-09-10
|
No data
|
WEST 218 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent restoration flush to grade opposite 409 and found a sidewalk restored around a water valve I/F/O 409.
|
2023-09-09
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The expansion joints between the sidewalk flag and curb aren’t sealed.
|
2023-09-09
|
No data
|
LIEBIG AVENUE, FROM STREET BEND TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Steel plate on roadway in driving lane. No one on site
|
2023-09-07
|
No data
|
EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent restoration flush to grade in the roadway I/F/O 385
|
2023-09-06
|
No data
|
MURRAY STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a permanent restoration flushed to grade in the bike/driving lane, and no work was done on the sidewalk.
|
2023-09-06
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 47 found a permanent flush to grade water restoration in the parking lane of the roadway.
|
2023-09-02
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 259 STREET TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Stop letters were install on the r/w.
|
2023-09-02
|
No data
|
WHITE PLAINS ROAD, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street joints resealed
|
2023-09-02
|
No data
|
WEST 74 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I found a permanent repair water cut with sidewalk flags not properly scored to 5’x5’. As per 34RCNY2-09(f)(4)(vii)Flags shall be 5'x 5' where feasible. The following methods of scoring shall be employed unless otherwise approved by the Commissioner.
|
2023-09-01
|
No data
|
CASANOVA STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service leak. Crew excavating roadway at this time
|
2023-09-01
|
No data
|
BEACH CHANNEL DRIVE, FROM STREET BOROUGH BOUNDARY TO STREET HORTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Heavy Domestic Water service Leak. Contractor Currently Making Repairs in the Roadway ( Inside NYCHA Complex Parking Lot) NYCHA Super on Site.
|
2023-09-01
|
No data
|
CORNELIA STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water repair in the sidewalk and parking lane
|
2023-09-01
|
No data
|
COMMONWEALTH AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers work being resurfaced by gas work, plumber encroached gas line. I/F/O 1404. CEBGO plate covering plumber’s work at this time.
|
2023-08-30
|
No data
|
230 STREET, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ONE PERM REPAIR WATER CUT IN P/L
|
2023-08-29
|
No data
|
SEYMOUR AVENUE, FROM STREET BEND TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water service leaking at valve inside property. One excavation in roadway at this time
|
2023-08-29
|
No data
|
POST ROAD, FROM STREET DEAD END TO STREET FIELDSTONE TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut in roadway overdue for final , BINDER not acceptable for wearing course, sidewalk flag expansion joints needs to be sealed also pallet needs to be removed
|
2023-08-28
|
No data
|
WEST 187 STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WADSWORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent restoration flush to grade in the parking/driving lane and two sidewalk flags restored in kind one around a water valve I/F/O 605
|
2023-08-28
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut near Clarkson okay
|
2023-08-28
|
No data
|
EAST 206 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET PERRY AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
3x3.3 down 2.5” in rw. 6 inch cutbacks observed
|
2023-08-28
|
No data
|
EAST 206 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET PERRY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water service leak. DEP 3 day notice issued. Crew excavating roadway in parking lane at this time
|
2023-08-27
|
No data
|
BRONX RIVER AVENUE, FROM STREET BEND TO STREET CLOSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2023-08-26
|
No data
|
LYON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET GLEBE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Domestic water service leaking in basement. Crew excavating roadway opposite address at this time
|
2023-08-24
|
No data
|
TOWNSEND AVENUE, FROM STREET EAST 171 STREET TO STREET EAST 172 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber work resurfaced by ConEdison permanent restoration in roadway curb to curb. Three new, small sidewalk flags restore in kind. I/F/O 1466.
|
2023-08-22
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR expired while permittee on hold. This CAR was passed out so new CAR could be issued. Permit will be pulled for new CAR.
|
2023-08-22
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 509 found a cut with wear and course broken and Down less than an inch in the parking/driving lane.
|
2023-08-22
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site working in roadway
|
2023-08-22
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET GILES PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Lead pipe burst caused flooding in home. Water still leaking. Plumber on site replacing broken servic with copper. Excavation on roadway and behind property line.
|
2023-08-21
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Domestic water service leaking in basement at valve. Crew excavating roadway opposite address at this time
|
2023-08-21
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass perm in roadway in compliance
|
2023-08-20
|
No data
|
WEST 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance.
|
2023-08-20
|
No data
|
KINGSLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temporary Water Service Restoration in the Roadway in Compliance
|
2023-08-19
|
No data
|
CORTELYOU ROAD, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration on the roadway
|
2023-08-19
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Wearing course defective.
|
2023-08-17
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk FLAG & Permanent Restoration in the Roadway in The Travel Lanes. Permit expired, New Permit.
|
2023-08-17
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to fully view roadway at this time .
|
2023-08-17
|
No data
|
WEBSTER AVENUE, FROM STREET CLAREMONT PARKWAY TO STREET EAST 171 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Lead pipe burst causing flooding in building. Contractor on site working in sidewalk and segment. Replacing with copper piping. Building has no service.
|
2023-08-16
|
No data
|
UNION TURNPIKE, FROM STREET AUSTIN STREET TO STREET KEW FOREST LANE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak Contractor currently Making Repairs in the Roadway & Sidewalk
|
2023-08-16
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV was issued to the respondent for repairing the condition on CAR #20226580128 which was issued on 9/15/2022 without the noted permit listed as required.
|
2023-08-16
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in the parking lane is flush to grade
|
2023-08-16
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new work found done
|
2023-08-13
|
No data
|
HOPKINSON AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in the roadway is flush to grade
|
2023-08-13
|
No data
|
TRINITY AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Area that had asphalt previously broken out & sunken has been made flushed with surround roadway
|
2023-08-13
|
No data
|
WEEKS AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2023-08-13
|
No data
|
TROY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in the roadway is flush to grade
|
2023-08-12
|
No data
|
WEST 231 STREET, FROM STREET BROADWAY TO STREET MAJOR DEEGAN EXPRESSWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Color code installed I/F/O 185
|
2023-08-08
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
TEMPORARY RESTORATION IN THE PARKING LANE CLOSER TO CLARKSON AND SIDE WALK FLAG INSTALLED NEW PERMIT ON FILE
|
2023-08-08
|
No data
|
ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm cuts in rw
|
2023-08-08
|
No data
|
ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
3 perm cut in rw.
|
2023-08-08
|
No data
|
EVERGREEN AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Domestic sanitary sewer backing up into building. Crew excavating sidewalk at this time
|
2023-08-07
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed respondent failed to respond to Corrective Action Request#20234030196 (issued 6/29/23)- Respondent had a permanent repair sewer restoration in the roadway that is not squared aligned at the cut limits as required by NYC DOT standard
|
2023-08-07
|
No data
|
EAST 165 STREET, FROM STREET LONGFELLOW AVENUE TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the driving lane and 1 sidewalk flag restored in kind around water valve.
|
2023-08-05
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent has a temporary water restoration that is sunken by 1.5" in the northbound driving lane. Respondent was notified by CAR# 20236150350 on 06/26/23 to make cut flush with surrounding roadway surface but, failed to do so.
|
2023-08-02
|
No data
|
WEST 174 STREET, FROM STREET BEND TO STREET FEATHERBED LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
temp asphalt there prior to permit start date. source* Google maps
|
2023-07-30
|
No data
|
EAST 93 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway in compliance
|
2023-07-30
|
No data
|
HOBART AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Perm cut re-sealed
|
2023-07-30
|
No data
|
HOBART AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Proper permits not taken / NOV issued
|
2023-07-29
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 259 STREET TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
perm trench in the driving lane. Failed to install back the ''STOP'' roadway pavement markings in the roadway. The half top portion of the letters are missing to the bottom portion. As per CAR # 20238310297 issued on 5/8/23.
|
2023-07-28
|
No data
|
WEST 74 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #45 your permanent repair water restoration on sidewalk has a sidewalk flag that needs to be properly scored.
|
2023-07-28
|
No data
|
WEST 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wearing course re-scheduled due to base not being cured for at least 24 hours, Spoke with Mario (foreman) and advised not to begin wearing course until new confirmation has been submitted. IFO AKA #122 5th Ave. 2 steel plates marked “CAC”
|
2023-07-27
|
No data
|
PROSPECT AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration in parking lane going towards middle of roadway I/F/O 1921.
|
2023-07-27
|
No data
|
WEST 17 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR WATER: BACK FILL- JOHAN HERNANDEZ WILL COMPLETE THE BACK FILL AND BASE.
|
2023-07-27
|
No data
|
STORY AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the parking lane
|
2023-07-26
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found permanent restoration in driving lane needs to be resealed around restoration.
|
2023-07-25
|
No data
|
NEWBOLD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk good
|
2023-07-24
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO CONFIRMATION NUMBER CUT IS STILL TEMPORARY
|
2023-07-21
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, open cut in parking lane, 1 lane maintained opp 712.
|
2023-07-21
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade crossing rw, small open excavation opp712, updated permit on file.
|
2023-07-21
|
No data
|
EAST 165 STREET, FROM STREET LONGFELLOW AVENUE TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 flag restored at corner property
|
2023-07-20
|
No data
|
HOBART AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
O’Grady Plumbing LLC I/F/O 1709 restoration is not properly sealed at the edges of the cut. Seal with liquid asphalt cement ironed in with a heated smoothing iron.The cut must be properly maintained throughout 1/22/2024 guarantee.
|
2023-07-19
|
No data
|
3 AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair restoration in parking/driving lane
|
2023-07-19
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 47 - 49, cobblestone restoration within west parking lane is flush at this time. No sidewalk work within stone slabs observed.
|
2023-07-17
|
No data
|
TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2023-07-17
|
No data
|
ST LAWRENCE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway
|
2023-07-17
|
No data
|
COMMONWEALTH AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2023-07-17
|
No data
|
GREYSTONE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Parking lane cut. Sidewalk acceptable due to active Bo
|
2023-07-17
|
No data
|
CONCORD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 145 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work in roadway found resurfaced by newly paved roadway
|
2023-07-16
|
No data
|
WEST 47 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk expansion joints were sealed. CAR corrected - no permit needed.
|
2023-07-16
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Consolidated Edison is doing work on the roadway
|
2023-07-15
|
No data
|
EAST 95 STREET, FROM STREET CLARKSON AVENUE TO STREET WINTHROP STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
STEEL PLATED EXCAVATION IN THE PARKING LANE ODD SIDE ODD SIDE OF THE STREET CLOSER TO CLARKSON CORNER
|
2023-07-15
|
No data
|
POST ROAD, FROM STREET DEAD END TO STREET FIELDSTONE TERRACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking in roadway , 3 day notice issued from DEP ,one excavation made on roadway and one excavation made on sidewalk at time of inspection
|
2023-07-14
|
No data
|
230 STREET, FROM STREET 135 AVENUE TO STREET MERRICK BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leak in roadway. Crew on site making repairs. Excavation in roadway.
|
2023-07-13
|
No data
|
WEST 104 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restoration in compliance.
|
2023-07-13
|
No data
|
EAST 165 STREET, FROM STREET LONGFELLOW AVENUE TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway, on Longwood Ave, corner property
|
2023-07-12
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, working in rw.
|
2023-07-12
|
No data
|
NELSON AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent sewer repair restoration in roadway, updated permits on file
|
2023-07-12
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work underway in rw, under updated permit.
|
2023-07-09
|
No data
|
WHITE PLAINS ROAD, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
O’Grady Plumbing LLC restoration I/F/O 2152 not properly sealed at the edges of the cut. Seal with liquid asphalt cement ironed in with a heated smoothing iron.The cut must be properly maintained throughout 6/16//2025 guarantee.period
|
2023-07-09
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
asphalt still broken out.
|
2023-07-07
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent repaired the condition on CAR #20226580128 issued on 9/15/2022 without the noted permit listed as required.
|
2023-07-07
|
No data
|
208 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway found newly resurfaced. IFO 89-15
|
2023-07-06
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SEWER: CAR issued to the latest permit # M012023159A85
|
2023-07-06
|
No data
|
EAST 174 STREET, FROM STREET BRONX RIVER AVENUE TO STREET WARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2023-07-06
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
One sidewalk flag around water valve actually I/F/O # 949.
|
2023-07-05
|
No data
|
215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk grass area is to grade.
|
2023-07-05
|
No data
|
SOUTHERN BOULEVARD, FROM STREET JENNINGS STREET TO STREET LOUIS NINE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two new sidewalk flags by tree pit I/F/O # 1345-s2. No work done in roadway.
|
2023-07-05
|
No data
|
MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Markout done in roadway, no cuts observed yet.
|
2023-07-05
|
No data
|
MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Excavator on site without. Storage of equipment permit, NOv issued.
|
2023-07-05
|
No data
|
WEST 174 STREET, FROM STREET BEND TO STREET FEATHERBED LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temporary asphalt inside concrete sidewalk is overdue for final permanent restoration. Full concrete flags must be restored. On W174 St. side of #1601.
|
2023-07-05
|
No data
|
BRONX RIVER AVENUE, FROM STREET EAST 172 STREET TO STREET WHEELER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway
|
2023-07-03
|
No data
|
MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Excavator on rw without permit, NOV issued.
|
2023-07-03
|
No data
|
KEPLER AVENUE, FROM STREET EAST 236 STREET TO STREET EAST 237 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass work done in parking lane , in compliance
|
2023-07-03
|
No data
|
MATTHEWS AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Currently no one on site, material and equipment occupying 95’. NOV issued
|
2023-07-02
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
IFO #27 the temporary restoration has been made permanent. C.A.R restoration permit number: M012023047A90
|
2023-07-01
|
No data
|
HAVILAND AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway and sidewalk
|
2023-07-01
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Pass
|
Department of Transportation
|
ATPO I observe respondent permanent restoration sunken about 2” in the roadway. CAR 20238320087 was issued 3/9/2023. Respondent failed to bring sunken area up to grade and flush with the surrounding area. I identify by expired permit X012022103A06.
|
2023-06-30
|
No data
|
HUDSON MANOR TERRACE, FROM STREET WEST 237 STREET TO STREET WEST 239 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2023-06-30
|
No data
|
GREYSTONE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass perm in roadway sidewalk not visible due to materials storage by b/o
|
2023-06-30
|
No data
|
CRANFORD AVENUE, FROM STREET HILL AVENUE TO STREET MONTICELLO AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak in basement, removing copper pipe, cut on roadway and dirt area of sidewalk
|
2023-06-30
|
No data
|
HOE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2023-06-29
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
REPAIR SEWER: cut has been made final Under permits M012023142B19 & M012023160B23 are 0135 permits.
|
2023-06-29
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed to adhere to Drawing 1042A Note #3: Failed to make restoration rectangle or square to the outer limits of the cut.
|
2023-06-28
|
No data
|
EAST 215 STREET, FROM STREET HOLLAND AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sw flag around water cap. Sealed in compliance
|
2023-06-26
|
No data
|
BAY 50 STREET, FROM STREET PRIVATE CATANZARO SQUARE TO STREET WEST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of property #105 Work not started. Permit expired ! Permanent Restoration and new sidewalk flags With 1 hardware In front of property #107 under a different respondent!
|
2023-06-26
|
No data
|
INDEPENDENCE AVENUE, FROM STREET BEND TO STREET KAPPOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In compliance perm in roadway
|
2023-06-26
|
No data
|
GREYSTONE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Cut on sidewalk , cut in roadway wet 125.1 dry 116.3 max 122.3 7.5% cut backs made
|
2023-06-26
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR issued to most recent permit # (Q012023177B32).
|
2023-06-26
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
In front of 42-31, There is a temporary restoration, that is sunken 1"-2" in the driving lane of the roadway. Restore roadway with surrounding area.
|
2023-06-25
|
No data
|
HOBART AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permittee Consolidated Edison I/F/O 1709 restoration is not properly sealed at the edges of the cut. Seal with liquid asphalt cement ironed in with a heated smoothing iron.The cut must be properly maintained throughout 12/23/2023 guarantee.
|
2023-06-24
|
No data
|
TRINITY AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumber’s permanent restoration in roadway with asphalt broken-out down 2” plumber #50285 green color code inside restoration used to ID.
|
2023-06-23
|
No data
|
EDISON AVENUE, FROM STREET ROBERTS AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak in the basement, one roadway cut and one cut in dirt area of sidewalk,
|
2023-06-23
|
No data
|
EAST 165 STREET, FROM STREET LONGFELLOW AVENUE TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done property
|
2023-06-23
|
No data
|
8 AVENUE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in roadway.
|
2023-06-22
|
No data
|
WEST 130 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in parking lane with sidewalk flag restored.
|
2023-06-22
|
No data
|
HOBART AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The work by O’Grady Plumbing LLC I/F/O 1615 restoration is not properly sealed at the edges of the cut. Seal with liquid asphalt cement ironed in with a heated smoothing iron.The cut must be properly maintained throughout 4/8/2024 guarantee.
|
2023-06-21
|
No data
|
EAST 181 STREET, FROM STREET DALY AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DOT paved roadway
|
2023-06-21
|
No data
|
MURDOCK AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken watermain, being pumped out, 3-day notice one roadway cut, one cut in dirt area of sidewalk
|
2023-06-18
|
No data
|
IRVING PLACE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent restoration within the driving lane partially overlapped by 2023 Con Edison trench.
|
2023-06-16
|
No data
|
58 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags installed and in compliance.
|
2023-06-16
|
No data
|
SYLVAN AVENUE, FROM STREET DEAD END TO STREET WEST 255 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut in roadway leads into dep cut , entire cut must be restored in kind.
|
2023-06-15
|
No data
|
EAST 170 STREET, FROM STREET WALTON AVENUE TO STREET WYTHE PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak from sprinkler system, shut off. DEP three day notice acquired. Work being done in roadway opposite location.
|
2023-06-15
|
No data
|
GREYSTONE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel plates in roadway updated permit on file X012023160B57
|
2023-06-14
|
No data
|
LONGFELLOW AVENUE, FROM STREET ALDUS STREET TO STREET EAST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
long water restoration in the roadway
|
2023-06-14
|
No data
|
WEST 74 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service was Damaged by Con Edison During Installation of New High Pressure Gas Main. Contractor Currently Making Repairs in the Roadway & Sidewalk.
|
2023-06-14
|
No data
|
90 STREET, FROM STREET 37 AVENUE TO STREET ROOSEVELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration to grade within the driving lane in front of 37-15.
|
2023-06-14
|
No data
|
SYLVAN AVENUE, FROM STREET DEAD END TO STREET WEST 255 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass in compliance
|
2023-06-12
|
No data
|
PIERCE AVENUE, FROM STREET WILLIAMSBRIDGE ROAD TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permittee (50285)-O’Grady Plumbing LLC I/F/O 1604 (property Bx Lobster)Block 4111/ Lot 43: Description of work: Install 6 inches combined new sewer connections to combined sewer main. Research shows a updated DOT permit number X012020273A88
|
2023-06-11
|
No data
|
EAST 234 STREET, FROM STREET EAST 233 STREET TO STREET KATONAH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cut resealed in parking lane
|
2023-06-11
|
No data
|
EAST 238 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cut resealed
|
2023-06-11
|
No data
|
KATONAH AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk expansion joints sealed in compliance
|
2023-06-10
|
No data
|
WEST 47 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
New CAR - Sidewalk expansion joints from water relay repairs, IFO premise, were not recess at 1/2" below grade and seal as required. Prior CAR was corrected - lane markings re-instated as per rule. Proper 0135 permit used M012023142B70.
|
2023-06-10
|
No data
|
EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 236 found 1 concrete sidewalk flag around a water valve fully replaced. No defects to report at this time.
|
2023-06-10
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 259 STREET TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
has a perm trench in the driving lane. Failed to install back the ''STOP'' roadway pavement markings in the roadway. The half top portion of the letters are missing to the bottom portion. As per CAR # 20238310297 issued on 5/8/23.
|
2023-06-10
|
No data
|
WEST 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
2023 ID color code marker installed. CAR defect corrected - no permit needed.
|
2023-06-10
|
No data
|
FAILE STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2023-06-10
|
No data
|
WEST 47 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New CAR - Sidewalk expansion joints from water relay repairs, IFO premise, were not recess at 1/2" below grade and seal as required. Prior CAR was corrected - lane markings re-instated as per rule. Proper 0135 permit used M012023142B70.
|
2023-06-09
|
No data
|
PROSPECT AVENUE, FROM STREET DEAD END TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water service leak in basement. Building has no service, three day notice acquired. Excavations in sidewalk and roadway.
|
2023-06-08
|
No data
|
ORCHARD STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of the Miaversper store in the bike station, I found a permanent restoration that is flush to grade.
|
2023-06-08
|
No data
|
NELSON AVENUE, FROM STREET BRANDT PLACE TO STREET MACOMBS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber’s permanent restoration in middle of roadway.
|
2023-06-07
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SEWER
|
2023-06-07
|
No data
|
COMMONWEALTH AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Home has no water pressure, homeowner confirmed. Contractor working in roadway and behind property line to restore pressure. 1st floor of residence has no water coming out.
|
2023-06-06
|
No data
|
CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
OGrady marked backhoe obstructing portion of parking lane, without a DOT permit for equipment. No license plate visible on backhoe. Backhoe parked opposite plumbers excavation in driving lane. No OGrady crew on site.
|
2023-06-06
|
No data
|
BARNES AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway.
|
2023-06-05
|
No data
|
FTELEY AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Very fine cracks developing in street joints
|
2023-06-04
|
No data
|
WEST 231 STREET, FROM STREET BROADWAY TO STREET MAJOR DEEGAN EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Color code missing from cut in roadway I/f/o 185
|
2023-06-04
|
No data
|
MURRAY STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration acceptable
|
2023-06-04
|
No data
|
TERRACE VIEW AVENUE, FROM STREET ADRIAN AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance.
|
2023-06-03
|
No data
|
CHISHOLM STREET, FROM STREET INTERVALE AVENUE TO STREET REV JAMES POLITE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent has a backhoe with OGrady markings parked adjacent to steel plate covering excavation in the roadway, steel plate does not have identifying markings as required.
|
2023-06-01
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Was not able to fully inspect area commercial dumpster I/F/O 508 in the parking lane.
|
2023-05-31
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 94, the water cobblestone restoration and sidewalk flag restored are present.
|
2023-05-30
|
No data
|
CORTELYOU ROAD, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating rwy, sewer repair, back-up into building.
|
2023-05-30
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway
|
2023-05-29
|
No data
|
HUGUENOT AVENUE, FROM STREET BOSTON ROAD TO STREET HOLLERS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Domestic water service leaking in roadway. Crew pumping water out of one excavation in roadway opposite address
|
2023-05-27
|
No data
|
POST AVENUE, FROM STREET 10 AVENUE TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration in compliance, sidewalk ok
|
2023-05-23
|
No data
|
GREENPOINT AVENUE, FROM STREET 47 STREET TO STREET 48 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
One sidewalk flag next to entrance door restored in kind.
|
2023-05-23
|
No data
|
GREYSTONE AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Has open excavation in the p/l, s/w. Not blocking the r/w, has flagman at this time.
|
2023-05-21
|
No data
|
WEST 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO #138 in the driving lane there is a permanent restoration flush to grade with a 2021 color code marker and delineator applied. (Lane markings starting to wear off but not CAR worthy at this time)
|
2023-05-21
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
asphalt still broken out.
|
2023-05-21
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A.T.P.O. I observed the above respondent 2’x2’ portion of plumber’s permanent restoration sunken 1(3/4)” below grade, failed to repair area as requested in CAR#20238320087 issued 3/9/23. Permit #X012022103A06 plumber’s # 50285 color code used for ID
|
2023-05-20
|
No data
|
STORY AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway
|
2023-05-18
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed a temporary asphalt “ REPAIR WATER” restoration in the roadway.Respondent failed to permanently restore cut within required time, Respondent was notified via CAR#20236390030 on 1/5/2023. Citied Permit expired on 11/4/2021.
|
2023-05-18
|
No data
|
WEST 261 STREET, FROM STREET INDEPENDENCE AVENUE TO STREET PALISADE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass in compliance
|
2023-05-14
|
No data
|
TRINITY AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
D5A issued for failing to seal and maintain permanent restoration
|
2023-05-12
|
No data
|
GILDERSLEEVE AVENUE, FROM STREET PUGSLEY AVENUE TO STREET STEPHENS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
street joints resealed
|
2023-05-12
|
No data
|
REV JAMES POLITE AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Service leak for residence. Water coming out roadway and leak In building. Plumber working in excavation in roadway. Three day notice adquired.
|
2023-05-12
|
No data
|
UNDERHILL AVENUE, FROM STREET PATTERSON AVENUE TO STREET SOUNDVIEW AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
street joints resealed
|
2023-05-10
|
No data
|
WEST 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Color codes re-installed in roadway in front of 351.
|
2023-05-10
|
No data
|
58 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property.Contractor currently making Repairs in the Sidewalk
|
2023-05-08
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 260 STREET TO STREET WEST 261 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway in compliance
|
2023-05-08
|
No data
|
8 AVENUE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill Pass; blend; 98.5%(IFO 2107 8th Ave)
|
2023-05-08
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 259 STREET TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut behind property line
|
2023-05-08
|
No data
|
8 AVENUE, FROM STREET WEST 113 STREET TO STREET WEST 114 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak coming from sidewalk. Plumber has three day notice. Backfill recorded on permit.
|
2023-05-06
|
No data
|
TERRACE VIEW AVENUE, FROM STREET ADRIAN AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Permit Water Restoration in Compliance
|
2023-05-06
|
No data
|
JEROME AVENUE, FROM STREET EAST 164 STREET TO STREET EAST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers work done in sidewalk.
|
2023-05-05
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV repaired the condition on CAR #20226580128 issued on 9/15/2022 without the noted permit listed as required.
|
2023-05-05
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut was resurfaced.
|
2023-05-04
|
No data
|
EAST 238 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in roadway needs to be resealed I/f/o 326
|
2023-05-04
|
No data
|
EAST 234 STREET, FROM STREET PETERS PLACE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to locate due to park car
|
2023-05-04
|
No data
|
KATONAH AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway minor cracks in cut
|
2023-05-04
|
No data
|
EAST 234 STREET, FROM STREET EAST 233 STREET TO STREET KATONAH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut in parking lane needs to be resealed
|
2023-05-03
|
No data
|
EAST 240 STREET, FROM STREET BOROUGH BOUNDARY TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass in compliance
|
2023-05-02
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
There is a cut in the roadway that is mounded 2" in the driving lane. The permit is still active.
|
2023-05-02
|
No data
|
KEPLER AVENUE, FROM STREET EAST 236 STREET TO STREET EAST 237 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway in compliance
|
2023-05-01
|
No data
|
BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration resurfaced by trench.
|
2023-05-01
|
No data
|
WYONA STREET, FROM STREET HEGEMAN AVENUE TO STREET LINDEN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Rw being resurfaced by dot
|
2023-04-27
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration.
|
2023-04-25
|
No data
|
WEST 117 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w okay.
|
2023-04-25
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please reference the most recent permit:M012023103B02 on file.
|
2023-04-24
|
No data
|
IRVING PLACE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2023-04-24
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work done.
|
2023-04-23
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in compliance, sidewalk flags ok
|
2023-04-21
|
No data
|
WILSON AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 Permanent Plumber restoration in the roadway and 1 on sidewalk
|
2023-04-21
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration.
|
2023-04-20
|
No data
|
EAST 237 STREET, FROM STREET RICHARDSON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 Permanent restoration in the roadway
|
2023-04-19
|
No data
|
WEST 47 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #533. there is a permanent repair water restoration in the roadway, missing the white lane markings of the travel/ Parking lane. pavement markings shall be maintained and restored in kind throughout guarantee period of all final restorations.
|
2023-04-18
|
No data
|
LONGFELLOW AVENUE, FROM STREET ALDUS STREET TO STREET EAST 165 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
4.9x3.2x 3.6. In rw, New sw flag,
|
2023-04-17
|
No data
|
UNDERHILL AVENUE, FROM STREET PATTERSON AVENUE TO STREET SOUNDVIEW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the parking lane needs to be sealed in front of #403.
|
2023-04-14
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk in compliance
|
2023-04-14
|
No data
|
GILDERSLEEVE AVENUE, FROM STREET PUGSLEY AVENUE TO STREET STEPHENS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please reseal permanent restoration in the parking lane in front of #1973.
|
2023-04-13
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
2’x2’ portion of plumbers permanent restoration sunken 1(3/4)” in the driving lane. The respondent failed to repair area as requested in CAR.
|
2023-04-13
|
No data
|
UNDERHILL AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk.
|
2023-04-13
|
No data
|
PATTERSON AVENUE, FROM STREET BOLTON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway.
|
2023-04-12
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak in home. Contractor work on sidewalk and roadway
|
2023-04-12
|
No data
|
EAST 117 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ifo 111, perm restoration in d/l ok
|
2023-04-12
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Found entire segment resurfaced. City will restore lane markings.
|
2023-04-12
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There is a Temporary restoration in the driving lanes that is overdue for final repair.
|
2023-04-10
|
No data
|
SOUTHERN BOULEVARD, FROM STREET JENNINGS STREET TO STREET LOUIS NINE BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer backup for building up into basement. Building can’t use plumbing at time of inspection. Contractor working in excavation in sidewalk.
|
2023-04-10
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut couldn’t be properly inspected do to vehicle park over cut
|
2023-04-08
|
No data
|
BOUCK AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street joints resealed
|
2023-04-07
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The above respondent has asphalt broken out and down 1" within their permanent restoration located in the driving lane of the roadway. Respondent was notified by CAR #20227380503 on 8/24/2022 to correct condition but, failed to do so
|
2023-04-07
|
No data
|
MURRAY STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
I/F/O 57, wearing course done for 7'8"L x 12'2"W x 3"D restoration. Note: Color codes used were year 22' and informed crew to have year 23' installed upon expiration of permit. Lane markings not restored at this time. Crew on site at depart: 12:09pm.
|
2023-04-04
|
No data
|
LELAND AVENUE, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work was done on the property
|
2023-04-04
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV failed to permanently restore a temporary overdue for final restoration in the roadway within the required time. Respondents Permit #(M012021279A19) expired on 11/4/2021. Respondent was notified to correct this Via CAR #(20236390030) on 1/5/2023.
|
2023-04-03
|
No data
|
CAROLL STREET, FROM STREET DEAD END TO STREET WILLIAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway, at DEAD END
|
2023-04-02
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel plate in roadway has updated permit on file
|
2023-04-02
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Steel plate in roadway in compliance
|
2023-04-02
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in compliance
|
2023-04-01
|
No data
|
TRINITY AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT WITH A PERMANENT GAS RESTORATION IN THE ROADWAY SUNKEN 2” RESPONDENT WAS NOTIFIED WITH A CAR ON 1/31/23 and ISSUED A CAR #20238310064. RESPONDENT FAILED TO FIX IT. WAS ID BY EXPIRED PERMIT PERMIT
|
2023-04-01
|
No data
|
HARDING AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumbers permanent restoration with prior sunken area made flush with surrounding roadway with permanent restoration. Also, yellow median and white bicycle lane markings were restored. CAR restoration permit #X012022339A67 on file. Pass.
|
2023-04-01
|
No data
|
HARDING AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration long water cut. Prior sunken area in driving lane cited in CAR was made flush with surrounding roadway with permanent restoration. Also yellow median and BP white bicycle lane markings were restored.
|
2023-04-01
|
No data
|
LOCUST AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass in compliance
|
2023-03-31
|
No data
|
EAST 138 STREET, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance expansion joints sealed
|
2023-03-31
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued due to the above respondent repaired the condition on CAR #20226580128 issued on 9/15/2022 without the noted permit listed as required.
|
2023-03-28
|
No data
|
WEST 104 STREET, FROM STREET AMSTERDAM AVENUE TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property. Contractor making Repairs in the Sidewalk. Building Super on site
|
2023-03-28
|
No data
|
WEST 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O #351, there is a 2022 repair water restoration that is missing its color code, partially covering another restoration. Color codes shall be re-installed in roadway and needs to be maintained throughout guarantee
|
2023-03-28
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temporary restoration to grade within the driving lane. Active permit #Q012023086E88 on file.
|
2023-03-28
|
No data
|
WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway I/F/O 1413.
|
2023-03-27
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET CHATTERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway in front of #1002.
|
2023-03-27
|
No data
|
WEST 174 STREET, FROM STREET BEND TO STREET FEATHERBED LANE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Service leak in basement due to broken pipe. Contractor working in sidewalk and in building to replace service. Building has no water at time of inspection.
|
2023-03-26
|
No data
|
BAY 50 STREET, FROM STREET PRIVATE CATANZARO SQUARE TO STREET WEST 17 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm Domestic Water Service Restoration in the Roadway in Compliance
|
2023-03-24
|
No data
|
WALLACE AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
DEP owns this cut.
|
2023-03-22
|
No data
|
WEST 117 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. No water going into property. Damaged valve. One excavation in sidewalk at this time
|
2023-03-22
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
IFO property there’s a temp trench cut in the travel lane. No work observed on the SWK.
|
2023-03-21
|
No data
|
COLLEGE AVENUE, FROM STREET EAST 169 STREET TO STREET EAST 170 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leak in service. Water leaking in excavation in roadway. Contractor to change valve pipes in building. Three day notice acquired. Building has no water service at time of inspection.
|
2023-03-17
|
No data
|
WALLACE AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sewer temporary asphalt restoration overdue for final permanent restoration, in the driving lane. I/F/O # 1838.
|
2023-03-17
|
No data
|
BARNES AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water shut off by DEP, street water leak. One roadway cut and cut in dirt area of sidewalk
|
2023-03-16
|
No data
|
INDEPENDENCE AVENUE, FROM STREET BEND TO STREET KAPPOCK STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
job complete no one on site, one small perm. roadway cut
|
2023-03-15
|
No data
|
230 STREET, FROM STREET 144 AVENUE TO STREET EDGEWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two perm cuts to grade across the roadway in front of 143-73 230th Street
|
2023-03-15
|
No data
|
DYCKMAN STREET, FROM STREET HENSHAW STREET TO STREET PAYSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW incompliance at time of inspection.
|
2023-03-12
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I found a Temporary trench flushed to grade across the driving lanes and no work was done on the sidewalk.
|
2023-03-12
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a temp trench flushed to grade across the driving lanes with an updated Permit: M012023067B00 on file.
|
2023-03-11
|
No data
|
WILSON AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 permanent water repair restorations found in roadway
|
2023-03-10
|
No data
|
BALCOM AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration in driving lane I/F/O # 195.
|
2023-03-10
|
No data
|
BAY 30 STREET, FROM STREET BESSEMUND AVENUE TO STREET DWIGHT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Perm water restoration flush to grade within d/p/l, sealed i/f/o 10-12
|
2023-03-10
|
No data
|
CROSS BAY BOULEVARD, FROM STREET 149 AVENUE TO STREET VAN WICKLEN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent sidewalk to grade
|
2023-03-09
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Will reissue CAR for sunken cut with measurements.
|
2023-03-09
|
No data
|
EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent sewer repair restoration in driving lane
|
2023-03-09
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
15” in diameter area of Plumbers permanent restoration sunken one and three quarters inches 1(3/4)” down below grade needs to be made flush to grade with surrounding roadway. In driving lane I/F/O # 2089.
|
2023-03-08
|
No data
|
BRUCKNER BOULEVARD, FROM STREET AUSTIN PLACE TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to locate cars on sidewalk
|
2023-03-07
|
No data
|
FAILE STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Cut in driving lane , 124.5 114.5 119 8.7% I/f/o 711 Faile street
|
2023-03-07
|
No data
|
FAILE STREET, FROM STREET HUNTS POINT AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Confirmed leak in basement, contractor on site working on roadway removed broken pipe and replacing with copper. Building has no service
|
2023-03-06
|
No data
|
EAST 237 STREET, FROM STREET RICHARDSON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
sheme, Jack Hammer, 4' x 3' depth 2'6" & 4' x 2'5" depth 2'6" LAB Exclusive Testing, Charles, Item 4, Sand Cone (W)127.2 (D)119.6 (MD)124.0 (AM)6.4 Test 96.4 & 97.9 . Backfill Accepted
|
2023-03-06
|
No data
|
EAST 237 STREET, FROM STREET RICHARDSON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Lead pipe break in house. Causing major leak in basement. Contractor working in roadway, sidewalk and in property. Home has low pressure service. Replacing with copper.
|
2023-03-03
|
No data
|
MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM RESTORATION IN THE DRIVING LANE. NEW FLAG AROUND WATER VALVE IFO PROPERTY #712.
|
2023-03-03
|
No data
|
WILSON AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leaking in and out of roadway and in home. Contractor working in excvati9ns in roadway and sidewalk replacing with copper. Three day notice applied.
|
2023-03-03
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 96 water cobblestone restoration in driving lane and sidewalk flags restoration are acceptable. Area sunken adjacent to restoration not part of this water restoration.
|
2023-03-02
|
No data
|
GREENPOINT AVENUE, FROM STREET 47 STREET TO STREET 48 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing damaged domestic sanitary sewer, crew excavating sidewalk only at this time
|
2023-03-02
|
No data
|
PATTERSON AVENUE, FROM STREET BOLTON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permanent restoration in the roadway has been resealed opposite #1900.
|
2023-02-27
|
No data
|
WEST 46 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating s/w & parking lane, ifo #351, water leak repair, basement.
|
2023-02-27
|
No data
|
MURRAY STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill complete 6 inches cutbacks were done 12 inch cutbacks will be done on final restoration
|
2023-02-26
|
No data
|
MURRAY STREET, FROM STREET CHURCH STREET TO STREET WEST BROADWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property. Contractor currently making Repairs in the Roadway. Property owner on site
|
2023-02-26
|
No data
|
EAST 152 STREET, FROM STREET MELROSE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started
|
2023-02-24
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV repaired the condition on CAR #20226580128 issued on 9/15/2022 without the noted permit listed as required.
|
2023-02-23
|
No data
|
EAST 14 STREET, FROM STREET AVENUE A TO STREET AVENUE B
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to locate work due to parked cars.
|
2023-02-21
|
No data
|
VINCENT AVENUE, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration in driving lane I/F/O #627.
|
2023-02-19
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit expired. Active permit #Q012023027A16 on file.
|
2023-02-19
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration flush to grade in front of 524 on the speed bump
|
2023-02-19
|
No data
|
IRVING PLACE, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temporary restoration in roadway flush with surrounding area
|
2023-02-15
|
No data
|
WEST 218 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to inspect due to parked Buses .
|
2023-02-15
|
No data
|
EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2023-02-10
|
No data
|
SYLVAN AVENUE, FROM STREET DEAD END TO STREET WEST 255 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm restoration in the roadway opposite in front of. No one on site.
|
2023-02-10
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water restoration has been made final. No defects to report
|
2023-02-06
|
No data
|
HERING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The water leak is behind property line
|
2023-02-06
|
No data
|
BRONX RIVER AVENUE, FROM STREET BEND TO STREET CLOSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the driving lane in front of #1170
|
2023-02-06
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permittee C.A.C Industries Inc has reconstruct the roadway and sidewalk.The upgrade sewer and water line under the DOT permit # X012022343C94 work end on March 30,2023. The description of work type Construcion Of Watermain. & Sewers ETC
|
2023-02-06
|
No data
|
EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration flush to grade
|
2023-02-04
|
No data
|
CODDINGTON AVENUE, FROM STREET EDISON AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers work resurfaced by building paving plan for #2865.
|
2023-02-03
|
No data
|
8 AVENUE, FROM STREET WEST 55 STREET TO STREET WEST 56 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
0113P - REPAIR WATER - PROTECTED RESTORATION IN RIGHT DRIVING LANE FLUSHED AND SEALED TO GRADE .
|
2023-02-03
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I found a Temporary trench across the roadway that is slightly mounded.
|
2023-02-03
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water COB Restoration in driving lane with one sidewalk flag restored around a water valve box.
|
2023-02-03
|
No data
|
HAVILAND AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer break flooding into basement. Contractor working in excavation on sidewalk and parking lane dumping sewage from hole. Plumber will replace service with new piping.
|
2023-02-03
|
No data
|
ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple water repair permanent restorations done in roadway
|
2023-02-02
|
No data
|
EAGLE AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In compliance cut in roadway
|
2023-02-02
|
No data
|
CAROLL STREET, FROM STREET DEAD END TO STREET WILLIAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Service leak confirmed water flooding in the basement. Contractor working behind property line and in roadway. Homeowner has 3 day notice.
|
2023-02-01
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water restoration has been made final. No defects to report
|
2023-02-01
|
No data
|
EAST 188 STREET, FROM STREET MARION AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Work done for 2446 Marion Ave. Water service leak. Water service is repaired and building has water. Contractor on site working on excavations in driving lanes of roadway.
|
2023-01-31
|
No data
|
BOUCK AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent sewer repair restoration needs to be resealed in driving lane IFO house #2445
|
2023-01-31
|
No data
|
TRINITY AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut in roadway has broken asphalt also needs to be reseal I/f/o 836
|
2023-01-30
|
No data
|
EAST 117 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water valve broke causing leak. Plumber on site working in basement and excavation in roadway parking lane. Building has no service at time of inspection.
|
2023-01-28
|
No data
|
PITMAN AVENUE, FROM STREET ELY AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber cut made permanent in the roadway
|
2023-01-28
|
No data
|
CRANFORD AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the parking lane, opposite side
|
2023-01-27
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
CUT L 15'4" x W 4' D 12" BACKFILL COMPLETED 6 " CUTBACKS WERE MADE BASE WIL NOT BE MONITORED BACKFILL WILL BE LEFT PLATED FOR CONCRETE CURING 1ST ITEM 4 PROCTOR WET 120.6 DRY 112.2 MAX 119.0 MOISUURE
|
2023-01-26
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property Contractor making Repairs in the Roadway will Replace with Cast Iron Pipe
|
2023-01-24
|
No data
|
HAVEMEYER AVENUE, FROM STREET ELLIS AVENUE TO STREET GLEASON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration in parking lane I/F/O # 1219.
|
2023-01-24
|
No data
|
BALCOM AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
4 inch valve in garage of coop ruted and leaking, shunting water to replace one cut on roadway the rest behind property line
|
2023-01-24
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found one sidewalk flag restored around a water valve at the curb with a temporary restoration in the parking/driving lane. Also, they have acquired a C.A.R restoration permit: M012023009B62.
|
2023-01-23
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I observed the above respondent has a permanent restoration, water repair work backfilled on a protected street but failed to obtain a confirmation number. Permit number expired 10/16/2022.
|
2023-01-22
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a permanent restoration in the parking lane with one sidewalk flag restored next to the cellar doors.
|
2023-01-22
|
No data
|
EAST 154 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut is flush and color coded ifo 430
|
2023-01-20
|
No data
|
CORNELIA STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating s/w & p/l, ifo #291, water leak repair, basement leak.
|
2023-01-20
|
No data
|
GLEBE AVENUE, FROM STREET DORIS STREET TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found roadway resurfaced. Permit #X152022069A13 on file for paving.
|
2023-01-17
|
No data
|
RICHARDSON AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2023-01-15
|
No data
|
EAST 224 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair restoration in parking lane opposite house #666, work also done on sidewalk IFO 666
|
2023-01-15
|
No data
|
EAST 225 STREET, FROM STREET CARPENTER AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work found done on sidewalk adjacent to water valve box IFO 3975
|
2023-01-14
|
No data
|
HAMILTON PLACE, FROM STREET WEST 139 STREET TO STREET WEST 140 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration flush to grade
|
2023-01-14
|
No data
|
WEST TREMONT AVENUE, FROM STREET KINGSLAND PLACE TO STREET WEST 177 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2023-01-14
|
No data
|
WEST 46 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #536 ONE SIDEWALK FLAG ADJACENT A WATER VALVE FREE OF DEFECTS; ROADWAY HAS BEEN RESURFACED.
|
2023-01-13
|
No data
|
VINCENT AVENUE, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Confirmed water service leak in home. Brass pipe break. Replaced with copper. No water service At this time. Excavation in roadway.
|
2023-01-12
|
No data
|
HARDING AVENUE, FROM STREET BALCOM AVENUE TO STREET GRAFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags around water valve in compliance, roadway was resurfaced.
|
2023-01-12
|
No data
|
HOSMER AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration in driving lane across from #196. Asphalt found in sidewalk has been in place since 2018, not 2022 plumbers work.
|
2023-01-12
|
No data
|
KEPLER AVENUE, FROM STREET EAST 236 STREET TO STREET EAST 237 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leaking at the street connection, shut off by DEP, one cut on the roadweay same excavation as previous emergency location
|
2023-01-12
|
No data
|
EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in d/l ok
|
2023-01-11
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/FO 47 water restoration done by O'Grady/Westchester Watermain is acceptable. Portion resurfaced by Con Edison.
|
2023-01-11
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut okay in d/l.
|
2023-01-10
|
No data
|
SHORE AVENUE, FROM STREET PINEGROVE STREET TO STREET REMINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent cut to grade sidewalk restored around water valve front of BO.
|
2023-01-07
|
No data
|
QUINCY AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumbers restoration in parking lane. Vehicle parked on top at time of inspection.
|
2023-01-07
|
No data
|
EAST TREMONT AVENUE, FROM STREET LAMPORT PLACE TO STREET ROOSEVELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration in driving lane, new sidewalk flags around water valve.
|
2023-01-06
|
No data
|
LOGAN AVENUE, FROM STREET DEWEY AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers permanent restoration in roadway resurfaced by building paving plan for #557–559. Also, Con Edison Permanent restoration in same area resurfaced by BPP.
|
2023-01-06
|
No data
|
KEPLER AVENUE, FROM STREET EAST 236 STREET TO STREET EAST 237 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water service leak due to broken copper pipe. Contractor on site pumping water out of excavation from leak. Homeowner presented DEP Three day notice. Excavation opposite i/f/o.
|
2023-01-05
|
No data
|
MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating s/w & rwy on the opposite side of #712, water leak repair basement
|
2023-01-05
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temporary excavation in the roadway must be finalized. In front of 27.
|
2023-01-05
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Temporary asphalt flush to grade. In front of 27.
|
2023-01-04
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw flags in compliance.
|
2023-01-04
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut is flush and color coded ifo 947( Foot Locker) in the P/L
|
2023-01-04
|
No data
|
MORTON STREET, FROM STREET BEND TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O# 46 Water cut in the driving lane is flush to grade
|
2023-01-03
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/FO 47 water restoration done by O'Grady/Westchester Watermain is acceptable. Portion resurfaced by Con Edison.
|
2022-12-29
|
No data
|
WALLACE AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer main break, leaking into excavation. Three day notice acquired. DEP on site with O’Grady on site. Excavation in driving lane.
|
2022-12-29
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Contractor paving Insp 544 on location
|
2022-12-29
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 94 cobblestone restoration and sidewalk flag restored and are acceptable.
|
2022-12-29
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
WC complete
|
2022-12-28
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
L 4' x W 3' XD 4' BACKFILL COMPLETED 6" CUTBACKS WERE MADE BACKFILL LEFT WITH RECESSED PLATES FOR CONCRETE CURING
|
2022-12-28
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leak out of Street. Contractor on site digging out sink hole adjacent to sewer utility access cover and sidewalk. Contractor removing lead piping and replacing with copper. Building service for now. Three day notice acquired.
|
2022-12-28
|
No data
|
CONTINENTAL AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumber’s restoration in driving/parking lane, minor cracks along street joints
|
2022-12-27
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed in the parking lane in front of 230, cutbacks made and is ready for concrete.
|
2022-12-26
|
No data
|
EAST 88 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Domestic water service leaking in basement of building. One excavation in middle of roadway and one excavation in sidewalk. Roadway closed since crew is excavating in driving lane. Operator #70
|
2022-12-26
|
No data
|
NELSON AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Countersunk plate in rw.
|
2022-12-26
|
No data
|
NELSON AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel plate countersunk in roadway under updated permit.
|
2022-12-23
|
No data
|
HOBART AVENUE, FROM STREET EAST 194 STREET TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumber’s restoration in the middle of roadway
|
2022-12-23
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent repaired the condition on Corrective Action Request #20226580128, issued on 9/15/2022, without the noted permit listed as required. No application on NYCSTREETS - summons issued.
|
2022-12-21
|
No data
|
NELSON AVENUE, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench crossing roadway
|
2022-12-18
|
No data
|
HAMILTON PLACE, FROM STREET WEST 139 STREET TO STREET WEST 140 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating rwy & s/w, ifo #52, water leak on sprinkler lead line, leaking in the basement. Confirmed, Street closed OP #55.
|
2022-12-18
|
No data
|
WICKHAM AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permittee I/F/O 4024 property 2 family Block 04977/ Lot :0015 Description Of Work:Two (2) restorations in the parking lane Length 7’ X Width 6’ X Depth zero a sidewalk flag Repair existing water relay service
|
2022-12-17
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent Restoration located in the driving / parking / Buffer lanes started to ravel, will be monitored no action taken at this time.
|
2022-12-17
|
No data
|
TILDEN AVENUE, FROM STREET EAST 53 STREET TO STREET EAST 54 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut sealed and in compliance
|
2022-12-15
|
No data
|
EAST 225 STREET, FROM STREET CARPENTER AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee 685 East 225 Street between White Plains/ Carpenter Ave Emergency repair sewers
|
2022-12-15
|
No data
|
EAST 225 STREET, FROM STREET CARPENTER AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer is broken and backed up. plumber on site, one cut is on sidewalk plated. Need to also dig to the middle of the roadway
|
2022-12-15
|
No data
|
HUNTER AVENUE, FROM STREET ERSKINE PLACE TO STREET STILLWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumber’s water repair restoration in driving lane opposite 2203/2205
|
2022-12-14
|
No data
|
UNDERHILL AVENUE, FROM STREET PATTERSON AVENUE TO STREET SOUNDVIEW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
backed up sewer, opening on the sidewalk at this time most likely will dig on the roadway
|
2022-12-14
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway.
|
2022-12-13
|
No data
|
CLOVER PLACE, FROM STREET 57 STREET TO STREET CEMETERY OF EVERGRNS BOUNDARY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent repair water restoration flush to grade in the parking & driving lane i/f/o 56-11.
|
2022-12-12
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak in service in front of 947. In excavation on sidewalk and roadway. Partial service, contractor waiting for DEP to asses damage and location
|
2022-12-11
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to fully inspect due parked cars.
|
2022-12-09
|
No data
|
SHORE AVENUE, FROM STREET PINEGROVE STREET TO STREET REMINGTON STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wearing course complete in the driving lane. 5' 3" x 4' x 3".
|
2022-12-08
|
No data
|
HOSMER AVENUE, FROM STREET HARDING AVENUE TO STREET SCHURZ AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak, large holes dug up by DEP because of street leak. Plumber to assume responsibility for restoration. Another hole made in dirt area of sidewalk.
|
2022-12-08
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
permittee is no longer in business
|
2022-12-05
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Joints on restoration in driving lane needs to be resealedPortion of restoration also slightly sunken
|
2022-12-05
|
No data
|
HOLLAND AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repair water restoration in parking lane
|
2022-12-05
|
No data
|
WEST 218 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
broken domestic water main valve in basement , no water going into building 409,one excavation made on roadway and shut valve to be installed on sidewalk, crew on site to repair.
|
2022-12-04
|
No data
|
29 STREET, FROM STREET 47 AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found.
|
2022-12-02
|
No data
|
UTICA AVENUE, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
found resurfaced due to nee bus lane installed
|
2022-12-01
|
No data
|
ARNOW AVENUE, FROM STREET MATTHEWS AVENUE TO STREET WILLIAMSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
3 perm restoration in the roadway
|
2022-11-29
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET CHATTERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two perm cuts in roadway.
|
2022-11-24
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observe respondent with a 5”x2” area within there repair water restoration within the bus lane with asphalt broken out 2-3” below the roadway. respondent failed to make the wearing course of their final restoration flush with surrounding area.
|
2022-11-23
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated s/w & rwy, ifo #345, water leak repair, stated leaking inside building elevator shaft. DEP notice was issued to property, Confirmed. Street closure OP #52.
|
2022-11-23
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Opposite #716, the 2020 permanent restoration needs to be resealed in the parking lane.
|
2022-11-23
|
No data
|
EAST 154 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
DEP detected water leaking on the roadway and dug two separate holes and issued 3 day notice. Plumber does not see any leaking water. Plumber only responsible for one of the two holes.
|
2022-11-23
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent failed to maintain the wearing course with surrounding area. The roadway cut is mounded 2". Contractor notified via CAR on 9/8/22. CAR#20227480304.
|
2022-11-23
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection I spoke to Shamus ( O'GRADY PLUMBING). There is a leak on the service to building #345 water was leaking into the elevator shaft of the building. There are 2 cuts one on the sidewalk and in the roadway.
|
2022-11-22
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit taken out to make CAR's repairs.
|
2022-11-21
|
No data
|
WEST 47 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating s/w & parking lane, ifo #533, DEP shut off, water leak repair, 3-day. Confirmed.
|
2022-11-18
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
FINAL RESTORATION ONLY: R/W resurfaced
|
2022-11-17
|
No data
|
SHORE AVENUE, FROM STREET PINEGROVE STREET TO STREET REMINGTON STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
LL14 Back fill Pass cut size: 4' x 2'8'' x 2'8''.
|
2022-11-17
|
No data
|
47 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permanent repair water restoration in the driving lane is sealed and flush to grade at this time.
|
2022-11-15
|
No data
|
EAST 138 STREET, FROM STREET BROWN PLACE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leaking due to broken pipe. Water was leaking from ground. Contractor presented 3 day notice. Contractor replacing and restoring service on sidewalk.
|
2022-11-12
|
No data
|
155 STREET, FROM STREET BEECH AVENUE TO STREET SANFORD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Permanent restoration in roadway opposite address flush with surrounding area
|
2022-11-12
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumber cut made permanent
|
2022-11-12
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber cut made permanently
|
2022-11-10
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for Wearing course not flush with surrounding area.
|
2022-11-10
|
No data
|
TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2022-11-09
|
No data
|
EAST 93 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon arrival respondent O'GRADY PLUMBING LLC has installed the 2 missing IBM COLOR CODE MARKERS in the 2 permanent water restorations in the roadway/parking lanes in front of property #18 EAST 93 STREET in compliance
|
2022-11-09
|
No data
|
HARDING AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
5’x5’x5” portion of a perm plumber restoration made temp, needs to be cut out and made perm. Also lane markings in the bike lane needs to be restored.
|
2022-11-09
|
No data
|
HARDING AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon inspection O’Grady temp sunken area to grade. Condition made safe, O’Grady will be on-site tomorrow to make condition perm.
|
2022-11-09
|
No data
|
HARDING AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
NICA to O'Grady Plumbing LLC. 1 of the 2 perm cuts 10'x5' has a portion sunken 5'x5'x 5'' exposing the concrete in the d/l. I/F/O 2962 Harding Ave. Also issuing a Re-dig. No traffic at this time also I/F/O SCHOOL.
|
2022-11-07
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 96 water cobblestone and sidewalk flags restoration in driving lane are acceptable. Area sunken adjacent to restoration not part of this water restoration.
|
2022-11-04
|
No data
|
LELAND AVENUE, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut found resurfaced by Con Edison emergency gas repair restoration IFO 1416
|
2022-11-02
|
No data
|
HOPKINSON AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration (r/w & s/w) found to be in compliance (Bus Stop)
|
2022-11-01
|
No data
|
EAST TREMONT AVENUE, FROM STREET LAMPORT PLACE TO STREET ROOSEVELT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
sewer backed up and broken, cuts on sidewalk and roadway
|
2022-10-31
|
No data
|
WEST 261 STREET, FROM STREET INDEPENDENCE AVENUE TO STREET PALISADE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
large water main break, one roadway cut
|
2022-10-31
|
No data
|
WEST 73 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway found resurfaced under permit M152021250A39 at this time.
|
2022-10-31
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm roadway restoration (P/L) found in compliance
|
2022-10-30
|
No data
|
BAY 30 STREET, FROM STREET BESSEMUND AVENUE TO STREET DWIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Opposite 10-12, Re-seal permanent restoration due to edge cracking.
|
2022-10-28
|
No data
|
STADIUM AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
7x7’ permanent plumber’s restoration in driving lane IFO 1647
|
2022-10-28
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for the above Respondent restored white lane pavement markings on a permanent Restoration located in the Roadway which was issued to restore on CAR # 20226580128 prior on 9/15/2022 without the noted permit listed as required.
|
2022-10-27
|
No data
|
EAGLE AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
perm. roadway cut and perm. sidewalk flag
|
2022-10-27
|
No data
|
KATONAH AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak to house connection, 3 day notice, cuts on roadway and sidewalk
|
2022-10-27
|
No data
|
KATONAH AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Pass. Wet 120.6 dry 113.4 Max 118.4 actual 6.4… cut backs made. Top Test 98.4 bottom Test 97.3
|
2022-10-25
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 260 STREET TO STREET WEST 261 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water line bent inside the house, no water at this time, two roadway cuts
|
2022-10-24
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm roadway restoration (P/L) found in compliance
|
2022-10-23
|
No data
|
DYCKMAN STREET, FROM STREET HENSHAW STREET TO STREET PAYSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plated excavation on swk IFO shop. No impaction to both conventional bike lanes.
|
2022-10-23
|
No data
|
3 AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass, work done.
|
2022-10-23
|
No data
|
CHURCH AVENUE, FROM STREET EAST 96 STREET TO STREET ROCKAWAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut sealed and in compliance
|
2022-10-22
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET CHATTERTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 Temporary Water Restorations in the Roadway & Sidewalk Concrete curing barricaded
|
2022-10-21
|
No data
|
BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-10-21
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut resealed.
|
2022-10-20
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 2241 water restoration has been made final as per 1 avenue concrete roadway requirements
|
2022-10-19
|
No data
|
5 AVENUE, FROM STREET EAST 127 STREET TO STREET EAST 128 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag surrounding water valve cover remains in acceptable condition. No defects to report
|
2022-10-19
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
sewer in backed up, one cut on the roadway at this time in front of 171
|
2022-10-19
|
No data
|
1 AVENUE, FROM STREET EAST 10 STREET TO STREET EAST 11 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Respondent is currently on site excavating the floating PLN. No impact to the bike lane.
|
2022-10-17
|
No data
|
CROSS BAY BOULEVARD, FROM STREET 149 AVENUE TO STREET VAN WICKLEN ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Work done in sidewalk, sidewalk concrete curing at this. In between Dairy Mill supermarket and Mattress firm
|
2022-10-15
|
No data
|
POPLAR STREET, FROM STREET LURTING AVENUE TO STREET ROSELLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2022-10-15
|
No data
|
BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by DOT
|
2022-10-12
|
No data
|
BRUCKNER BOULEVARD, FROM STREET AUSTIN PLACE TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
sewer is backed up plumber is on site, one cut on roadway one on sidewalk,
|
2022-10-11
|
No data
|
NELSON AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in rw. Missing lane marking. Updated permit on file
|
2022-10-11
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PASS PERM CUT IN ROADWAY
|
2022-10-11
|
No data
|
NELSON AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm cut in rw, updated permit on file, Missing markings,
|
2022-10-11
|
No data
|
BRINSMADE AVENUE, FROM STREET BARKLEY AVENUE TO STREET BRUCKNER BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent plumbers restoration in roadway as well as new sidewalk flag on sidewalk ifo 1025
|
2022-10-09
|
No data
|
HUDSON MANOR TERRACE, FROM STREET WEST 237 STREET TO STREET WEST 239 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak in the Basement. Work contained in the Roadway 3 Day Dep Notice Issued Building Super on site
|
2022-10-08
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #38 YOUR REPIR WATER RESTORATION IN THE PARKING LANE AND BUSS LANE HAS AN AREA 5”x2” ADJACENT THE CURB WITH ASPHALT BROKEN OUT 2-3” BELOW THE ROADWAY THE AREA NEEDS TO BE MAFDE FLUSH WITH SURROUNDING ROADWAY
|
2022-10-07
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass 2 perm cuts in roadway
|
2022-10-07
|
No data
|
EDISON AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done, DOT newly paved roadway
|
2022-10-07
|
No data
|
PATTERSON AVENUE, FROM STREET BOLTON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut needs to be resealed
|
2022-10-07
|
No data
|
SOUNDVIEW AVENUE, FROM STREET BOLTON AVENUE TO STREET BOLTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass perm cut in roadway
|
2022-10-05
|
No data
|
EAST 224 STREET, FROM STREET NEEDHAM AVENUE TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leaking into basement, one roadway and one sidewalk cut
|
2022-10-04
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for wearing course not flush with surrounding area.
|
2022-10-03
|
No data
|
COLDEN STREET, FROM STREET CHERRY AVENUE TO STREET FRANKLIN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sprinkler Line Currently not working inside School Building. 10 Day Dep Notice Issued Building Super on Site
|
2022-10-03
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DDC contractor CAC reconstruct the roadway and sidewalk to upgrade sewer and water line
|
2022-10-02
|
No data
|
WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced.
|
2022-10-02
|
No data
|
BATHGATE AVENUE, FROM STREET EAST 185 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration made final in mid roadway in compliance
|
2022-10-01
|
No data
|
LAFAYETTE AVENUE, FROM STREET VINCENT AVENUE TO STREET WILCOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway and sidewalk
|
2022-10-01
|
No data
|
WILLIAMSBRIDGE ROAD, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on sidewalk
|
2022-10-01
|
No data
|
EAST 97 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in compliance
|
2022-10-01
|
No data
|
WEST 183 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
515 west 183 st restoration in compliance non defective
|
2022-09-30
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration acceptable
|
2022-09-29
|
No data
|
EAST 181 STREET, FROM STREET DALY AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak at the tap, one roadway cut, DEP now on site plumber waiting for inspection waiting
|
2022-09-28
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A 5' x 3' area of plumber permanent restoration sunken 2" below grade. Wearing course needs to be made flush with surrounding areas.
|
2022-09-28
|
No data
|
HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-09-22
|
No data
|
BROOKLYN AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut found on roadway in front of 29 Brooklyn avenue
|
2022-09-21
|
No data
|
47 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temporary asphalt cut at 29 St with a marker needs to be made final and sealed.
|
2022-09-19
|
No data
|
EAST 224 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
small water leak in basement, cut on sidewalk and roadway
|
2022-09-19
|
No data
|
TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT WITH A STREET OPENING W/O A VAILD DOT PERMIT. RESPONDENT HAS A SEWER MARKED STEEL PLATE IN THE PARKING LANE OVER AN OPEN EXCAVATION W/O A VAILD DOT PERMIT. Permit expired 11/27/21. I/F/O 1324 Taylor avenue
|
2022-09-16
|
No data
|
KINGS HIGHWAY, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced
|
2022-09-16
|
No data
|
EAST 93 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR clean-up-Condition remains- CAR will be reissued
|
2022-09-16
|
No data
|
EAST 93 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
missing color code.
|
2022-09-15
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 245 sidewalk flag's expansion joints haven't been sealed. Restoration in driving lane is missing solid white lane marking.
|
2022-09-14
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR clean-up-Condition remians CAR will be re-issued
|
2022-09-14
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
reseal cut.
|
2022-09-13
|
No data
|
GRAND CONCOURSE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property Work Contained in the Sidewalk Property Owner on Site
|
2022-09-12
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration restoration flushed to grade in the DL.
|
2022-09-11
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #38 REPAIR WATER RESTORATION IN THE. MIDDLE OF THE ROADWAY IS IN COMPLIANCE .
|
2022-09-09
|
No data
|
EDISON AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street joints resealed
|
2022-09-09
|
No data
|
AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done permit expired
|
2022-09-08
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
There is a permanent restoration, that has edge cracking on the seal and needs to be re-sealed. Also, The permanent restoration is mounded 1" in the parking/driving lane. (CAR CLEAN UP PROJECT)
|
2022-09-08
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There is a permanent water restoration, that has edge cracking on the seal and needs to be re-sealed. Also, The permanent restoration is mounded 1" in the parking/driving lane. i/f/o 133-12
|
2022-09-06
|
No data
|
KINGS HIGHWAY, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Found roadway resurfaced - see remarks on previous permit (3 day notices D.E.P , CUTS MADE ON A MILLED STREET SO YOU WONT SEE CUTS IN RD/W)
|
2022-09-04
|
No data
|
WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance.
|
2022-09-01
|
No data
|
MURDOCK AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on school property. Roadway paved
|
2022-08-31
|
No data
|
STRANG AVENUE, FROM STREET MONTICELLO AVENUE TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
fine cracks developing in street joints
|
2022-08-27
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
530 west 149 st restoration in compliance
|
2022-08-26
|
No data
|
EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon arrival respondent O’GRADY PLUMBING LLC has installed proper IBM COLOR CODE MARKER in permanent water restoration in the roadway in front of property #106 EAST 116 STREET in compliance
|
2022-08-24
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Perm water restoration wearing course & missing IBM COLOR CODE MARKER needs to be installed condition remains in front of property #509 WEST 144 STREET, CORRECTIVE ACTION REQUEST previously re-issued on latest permit expired #M012022174A16
|
2022-08-24
|
No data
|
8 AVENUE, FROM STREET WEST 55 STREET TO STREET WEST 56 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed L 9’3 W 3’8 D4’ in driving lane. Awaiting Binder.
|
2022-08-24
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Wearing course breaking away. Inadequate wearing Course Depth Missing Color Codeplease restore/repair permanent water restoration wearing course flush with surrounding areas down 1” & install missing IBM COLOR CODE MARKER #509 WEST 144 STREET
|
2022-08-23
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I found the area within the permanent restoration that was broken out 2 inches, repaired, and sealed.
|
2022-08-23
|
No data
|
8 AVENUE, FROM STREET WEST 55 STREET TO STREET WEST 56 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in roadway , 3 day notice issued from DEP ,one excavation made on roadway at time of inspection, crew on site.
|
2022-08-23
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR acknowledged.
|
2022-08-21
|
No data
|
GEORGE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in the roadway is flush to grade
|
2022-08-21
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property Work Contained in the Sidewalk Property Owner on Site
|
2022-08-18
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 94 water cobblestone restoration and sidewalk flag restored in kind.
|
2022-08-18
|
No data
|
TROY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane markings restored
|
2022-08-17
|
No data
|
PITMAN AVENUE, FROM STREET ELY AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
sewer back up, two sewer cuts on the roadway
|
2022-08-15
|
No data
|
WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating parking lane, ifo #1099, water leak repair, 3day.
|
2022-08-14
|
No data
|
KINGS HIGHWAY, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 day notices D.E.P , CUTS MADE ON A MILLED STREET SO YOU WONT SEE CUTS IN RD/W -P/L , (S/W FLAGS )
|
2022-08-13
|
No data
|
WEST 187 STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WADSWORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration flush to grade in the roadway extending into the parking lane in front of property #605 WEST 187 STREET in compliance
|
2022-08-13
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent Restoration.
|
2022-08-13
|
No data
|
47 AVENUE, FROM STREET 28 STREET TO STREET 29 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Property issued DEP 3 day notice. Working for address 47-30 29 st, one excavation in roadway at 47 ave and 29 st
|
2022-08-12
|
No data
|
EAST 93 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
color code missing.
|
2022-08-09
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Ifo 2229, 2 sidewalk cuts, 1 in roadway 5x4.5’ down 3’
|
2022-08-07
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut need to be resealed.
|
2022-08-06
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2022-08-04
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating rwy & s/w, ifo #2229, water leak repair, 3day.
|
2022-08-02
|
No data
|
TYNDALL AVENUE, FROM STREET WEST 259 STREET TO STREET WEST 260 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Two sidewalk cuts in dirt area
|
2022-07-31
|
No data
|
TINTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration in driving lane
|
2022-07-29
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill to be rescheduled for a later time due no tester being on site.
|
2022-07-29
|
No data
|
JEFFERSON AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak Low Pressure Going into Property ( Insurance Job) Property Owner on Site
|
2022-07-27
|
No data
|
EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wearing course pass; IFO 385
|
2022-07-26
|
No data
|
EDISON AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
5x4’ perm cut in roadway needs to be resealed ifo 1067
|
2022-07-26
|
No data
|
BOUCK AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Foreman Zeqir. Jumping Jack. Cut 1- 7x4.5x1. Cut 2- 7x4x1. Binder 6". Cutbacks done.
|
2022-07-22
|
No data
|
EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
4x4x4 completed.
|
2022-07-22
|
No data
|
EDGECOMBE AVENUE, FROM STREET BEND TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 DAY NOTICE ISSUED , ONE CUT IN RD/W , THE CITY IS BLAMING THE BUILDING FOR A LEAK INSIDE OF THE PARK , WHICH THE PLUMBER DOESN'T BELIEVE ITS THE BUILDING . ANOTHER PERMIT MIGHT HAVE TO BE PULLED . FOR THIS LOCATION .
|
2022-07-15
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a perm cut within the travel lane.
|
2022-07-15
|
No data
|
BOUCK AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic sanitary sewer backing up into property due to tree roots, one excavation made on roadway at time of inspection.
|
2022-07-13
|
No data
|
HARDING AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water leaking on main valve in basement (visibly confirmed), one excavation made on roadway and sidewalk at time of inspection,crew on site
|
2022-07-10
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Temporary restoration overdue for final in roadway parking lane
|
2022-07-09
|
No data
|
TROY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
White lane marker near the crosswalk ifo 201 troy ave needs to be replaced
|
2022-06-30
|
No data
|
BROOKLYN AVENUE, FROM STREET ATLANTIC AVENUE TO STREET HERKIMER STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated rwy, ifo #29, water leak repair, inside building broken valve, Confirmed.
|
2022-06-29
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I found that the respondent has failed to remove temporary asphalt and restore their water restoration in the roadway. Respondent was notified via CAR#20217790007 on 1/20/21. Respondent was identified by cited permit. Permit expired 2/11/18.
|
2022-06-29
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm water cuts found on roadway in front of 1156 Dean street
|
2022-06-28
|
No data
|
WEST 73 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The respondent restored a sidewalk flag, and the Street was resurfaced.
|
2022-06-25
|
No data
|
MORTON STREET, FROM STREET BEND TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Water Service Leak in the Roadway 3 Day Dep Notice Issued Property Owner on site
|
2022-06-17
|
No data
|
RICHARDSON AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
SHEME, JUMPING JACK, 5' X 2' 8" DEPTH 3' LAB. EXCLUSIVE TESTING, Lewis, SANDCONE, Clean Fill, (W)126.0 (D)117.2 (MD)124.0 (AM)7.5 TEST 96.8. Backfill accepted
|
2022-06-17
|
No data
|
RICHARDSON AVENUE, FROM STREET EAST 239 STREET TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak on sidewalk hit by tree pit crew, cuts on roadway and sidewalk
|
2022-06-16
|
No data
|
EAST 218 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated s/w, broken sewer repair, back-up. Confirmed.
|
2022-06-16
|
No data
|
NELSON AVENUE, FROM STREET BRANDT PLACE TO STREET MACOMBS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated rwy, ifo #1693, water leak repair, 3day, confirmed, street closed OP# 58.
|
2022-06-15
|
No data
|
EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O: 106, permanent restoration in the driving lane cored and passed inspection.
|
2022-06-15
|
No data
|
LAFAYETTE AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET REVERE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the r/w.
|
2022-06-13
|
No data
|
HOPKINSON AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property Work Contained in the Roadway & Sidewalk Building Super on site
|
2022-06-11
|
No data
|
HOPKINSON AVENUE, FROM STREET MACON STREET TO STREET MAC DONOUGH STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property Work Contained in the Sidewalk. Building Super on site
|
2022-06-11
|
No data
|
PIERCE AVENUE, FROM STREET WILLIAMSBRIDGE ROAD TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2022-06-10
|
No data
|
ELLIOT PLACE, FROM STREET GRAND CONCOURSE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
perm restoration on roadway in front of house # 1387
|
2022-06-10
|
No data
|
112 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration flush to grade in the parking lane i/f/o 3416.
|
2022-06-10
|
No data
|
EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
please remove you incorrect color code marker and place the correct marker with IBM Number 50285
|
2022-06-08
|
No data
|
CODDINGTON AVENUE, FROM STREET EDISON AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Start at 12:00 PM
|
2022-06-08
|
No data
|
CODDINGTON AVENUE, FROM STREET EDISON AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The crew is O Grady Plumbing on site
|
2022-06-07
|
No data
|
LOCUST AVENUE, FROM STREET EAST 135 STREET TO STREET EAST 136 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated s/w & 2 rwy cuts opp of each other, water leak repair, basement. comfirmed.
|
2022-06-07
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O 96, cobblestones restored to roadway. Some cobblestones above grade due to sunken portion of roadway. One sidewalk flag restored. Permit remains active.
|
2022-06-07
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
restoration in compliance
|
2022-06-06
|
No data
|
WEST 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed in driving lane in front 136 West 13 Street.L 6’6 W 3 D 2’7 awaiting concrete base.
|
2022-06-06
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for failure to provide smooth riding surface free of defects in the final completed wearing course.
|
2022-06-05
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued on most recent permit as per (CAR #20226480083)
|
2022-06-05
|
No data
|
WEST 13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 day notices issued street closure # 88 leak on water service cut in driving lane & s/w
|
2022-06-05
|
No data
|
GRAND AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration in mid roadway in compliance
|
2022-05-29
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Ifo 133-12, There is a permanent restoration, that has edge cracking on the seal and needs to be re-sealed. Also, The permanent restoration is mounded 1" in the parking/driving lane. Restore roadway.
|
2022-05-29
|
No data
|
GILDERSLEEVE AVENUE, FROM STREET PUGSLEY AVENUE TO STREET STEPHENS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Permanent restoration in roadway flush with surrounding area
|
2022-05-29
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 212 sidewalk in compliance
|
2022-05-28
|
No data
|
TROY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm water cut short water
|
2022-05-26
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with temporary restoration in roadway parking lane over due for final. Failure to permanently restore cut within required time. Respondent failed to respond to CAR #20226480083. Permit expired 3/13/2022
|
2022-05-24
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water restoration remains in acceptable condition. No defects to report
|
2022-05-18
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cobblestone restoration monitored from 10:10-11am.Section of roadway restoration was done in had crooked rows and patch previously by DEP. In driving lane 4'x3' restoration finalized. One sidewalk flag restored.
|
2022-05-18
|
No data
|
WHITE PLAINS ROAD, FROM STREET LYDIG AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Heavy water service in roadway and in basement of property. Two excavations in roadway at this time
|
2022-05-17
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway parking lane sealed and flush
|
2022-05-17
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavated s/w & rwy, ifo #96, water leak repair, shut-off, 10day, confirmed. Street closed OP# 93.
|
2022-05-16
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Delinquent Emergencies
|
2022-05-15
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance.
|
2022-05-12
|
No data
|
WHITE PLAINS ROAD, FROM STREET EAST GUN HILL ROAD TO STREET MAGENTA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2022-05-12
|
No data
|
POST AVENUE, FROM STREET 10 AVENUE TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water restoration remains in acceptable condition.
|
2022-05-10
|
No data
|
LOGAN AVENUE, FROM STREET DEWEY AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Portion of plumber restoration paved over plumber restoration
|
2022-05-07
|
No data
|
PARK AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the r/w, new concrete s/w flags. I/F/O Family Store.
|
2022-05-06
|
No data
|
ROBINSON AVENUE, FROM STREET HARDING AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm long water restoration in the roadway
|
2022-05-05
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bike lane markings was restored on plumber restoration.
|
2022-05-03
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 94, 7'x'3 cobblestone restoration made in the driving lane. Restoration is acceptable, roadway has pre-existing twisted rows of cobblestones. One sidewalk flag restored.
|
2022-05-02
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumber restoration ok, sunken area more than 14" away from plumber restoration
|
2022-05-02
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Near 47 in parking lane, water cobblestone restoration is acceptable.
|
2022-05-02
|
No data
|
42 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon arrival respondent O'GRADY PLUMBING LLC has resealed all outer edges of the 2 permanent water restorations with liquid asphalt seal in the roadway extending into both parking lanes in front of property #25-39 42/STREET in compliance
|
2022-05-01
|
No data
|
EAST 188 STREET, FROM STREET BELMONT AVENUE TO STREET CAMBRELENG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2022-05-01
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permanent restoration was sealed
|
2022-04-30
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent has a temporary restoration in the parking lane. Respondent has failed to permanently restore cut within required time.
|
2022-04-26
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O 94, 7'x'3 cobblestone restoration made in the driving lane. Restoration remains wet. No plate to help curing process. Permit remains in emergency status at this time. Photos taken.
|
2022-04-25
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
asphalt broken out & color code missing
|
2022-04-25
|
No data
|
BANK STREET, FROM STREET 8 AVENUE TO STREET GREENWICH STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
ifo #94, excavating rwy & s/w, water leak repair, 3day. Confirmed, Street closed OP #79.
|
2022-04-23
|
No data
|
TIEMANN AVENUE, FROM STREET DEAD END TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2022-04-20
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut not rolled.
|
2022-04-18
|
No data
|
MERRICK BOULEVARD, FROM STREET 227 STREET TO STREET 228 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced.
|
2022-04-18
|
No data
|
215 PLACE, FROM STREET 93 AVENUE TO STREET 94 ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in basement ,(visibly confirmed)one excavation made in grass area at time of inspection,crew on site
|
2022-04-17
|
No data
|
CLINTON STREET, FROM STREET VERANDAH PLACE TO STREET WARREN STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane marking restored
|
2022-04-15
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temporary restoration in the parking lane at 790 Argyle rd akaE13 is overdue for final. Permit exp03/27/2022.
|
2022-04-14
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Large perm plumber restoration in the roadway
|
2022-04-13
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR pass, found white lane markings restored with Expansion Joints sealed at the Curb.
|
2022-04-13
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IF/O 47, portion of water restoration remains acceptable. Some of this restoration has been resurfaced by Con Edison gas restoration.
|
2022-04-13
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water wqas shut off by DEP, plumber restoring water, replacing line. Very large cut because DEP made several cuts.
|
2022-04-12
|
No data
|
WEST 46 STREET, FROM STREET 11 AVENUE TO STREET AMTRAK RR
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Heavy Domestic Water Service Leak in the Basement. Building Super on Site.
|
2022-04-12
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The restoration sealant was re-sealed at the edges of the wearing course. Sure be properly maintained throughout the life of the guarantee period.
|
2022-04-06
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut remains in acceptable condition
|
2022-04-02
|
No data
|
POST AVENUE, FROM STREET 10 AVENUE TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
okay
|
2022-04-01
|
No data
|
EAST GUN HILL ROAD, FROM STREET LACONIA AVENUE TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent long water restoration in roadway
|
2022-03-31
|
No data
|
EAST 216 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2022-03-29
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bike lane markings needs to be restored on plumber restoration.
|
2022-03-29
|
No data
|
EAST 97 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water repair in the driving/parking lane and also one sidewalk restored/repaired with expansion joint sealed is acceptable.
|
2022-03-29
|
No data
|
PARK AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
street water leak on a 6 inch watermain, large cut on roadway and sidewalk.
|
2022-03-23
|
No data
|
CRANFORD AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Arrived at 11:05am Dardon on site foreman. Charlie ETL sand cone. Had to redue 6'' saw cut in the p/l 4'x3'x3'. Opp 968 Cranford Ave. W.D 121.5 / D.D 114.2 / MAX D. 118/ moisture test 98.4. As per Green 1 test only.
|
2022-03-23
|
No data
|
WASHINGTON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut ok parking \driving lane
|
2022-03-20
|
No data
|
WEST TREMONT AVENUE, FROM STREET KINGSLAND PLACE TO STREET WEST 177 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water valve leaking in basement ,(visibly confirmed ) one excavation made on roadway and one excavation made on sidewalk at time of inspection, crew on site to repair.
|
2022-03-19
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No water cut on swk/rwy IFO property. Conventional bike lane is clear.
|
2022-03-19
|
No data
|
WEST TREMONT AVENUE, FROM STREET KINGSLAND PLACE TO STREET WEST 177 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ATPO I observed a backhoe with O’GRADY markings stored in the parking lane without a DOT permit. I identify by contractors name on construction equipment.
|
2022-03-18
|
No data
|
BRUNER AVENUE, FROM STREET BUSSING AVENUE TO STREET EDENWALD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-03-18
|
No data
|
BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway in compliance
|
2022-03-18
|
No data
|
BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
emergency permit converted
|
2022-03-18
|
No data
|
HAVEMEYER AVENUE, FROM STREET ELLIS AVENUE TO STREET GLEASON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Spoke to homeowner. Water pressure was very low. One roadway Cut in front of 1219 Havemeyer ave. Crew Working for address 2274 Ellis ave. (Corner house) Multiple addresses
|
2022-03-18
|
No data
|
WEST TREMONT AVENUE, FROM STREET KINGSLAND PLACE TO STREET WEST 177 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
huge water leak, broken main, opening the sidewalk, roadway next, 3 day notice.
|
2022-03-15
|
No data
|
NEREID AVENUE, FROM STREET EDSON AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-03-15
|
No data
|
WASHINGTON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut ok parking \driving lane
|
2022-03-14
|
No data
|
EAST 224 STREET, FROM STREET BEND TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-03-14
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration within the parking/driving lane and one sidewalk flag restored.
|
2022-03-11
|
No data
|
CRANFORD AVENUE, FROM STREET BOROUGH BOUNDARY TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
watermain was hit, huge water leak one cut opposite address
|
2022-03-10
|
No data
|
EAST 242 STREET, FROM STREET RICHARDSON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2022-03-07
|
No data
|
ALBANY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm restorations in the driving lane IFO property #228.
|
2022-03-06
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 2994 THE AREA NEXT TO YOUR CUTS IS SUNKEN 2'' WITH WATER POUNDING IN IT.
|
2022-03-02
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must restore white lane markings on 1 out of 2 permanent Restoration in the driving lane. Also missing Expansion Joints seal at the Curb.
|
2022-03-01
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 1135 the restoration sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the guarantee period.In accordance with the section 34RCNY 2-11)(12)(viii):The wearing course shall be properly sealed
|
2022-02-28
|
No data
|
EAST 231 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on sidewalk
|
2022-02-28
|
No data
|
EAST 228 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-02-28
|
No data
|
EAST 231 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2022-02-27
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The restoration sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the life of the guarantee period. In accordance with the section 34RCNY2-11(e) (12) (viii)
|
2022-02-27
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
concrete r/w is flush
|
2022-02-25
|
No data
|
EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-02-24
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS IN COMPLIANCE
|
2022-02-23
|
No data
|
EAST 233 STREET, FROM STREET BRUNER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2022-02-22
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Approx. 65' East of Washington St, a 4' x 4' work area within Cobblestone roadway ( newer stones observed and grout restored in-kind ). South sidewalk restored in distinctive grey brick design around Water valve. ( possibly by another contractor )
|
2022-02-21
|
No data
|
ROBINSON AVENUE, FROM STREET HARDING AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
heavy domestic water leaking in roadway , 3 day notice issued from DEP , roadway closed operator 55 contacted , one excavation made on roadway at time of inspection.
|
2022-02-15
|
No data
|
FENTON AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-02-10
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No roadway/sidewalk work observed at this time permit expired.
|
2022-02-10
|
No data
|
WEST 231 STREET, FROM STREET BROADWAY TO STREET MAJOR DEEGAN EXPRESSWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
renovating building water leak in basement one cut on roadway one on sidewalk
|
2022-02-08
|
No data
|
EAST 179 STREET, FROM STREET WEBSTER AVENUE TO STREET EAST 179 ST FOOTBRIDGE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak at the valve, one cut on roadway
|
2022-02-08
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not started
|
2022-02-07
|
No data
|
EAST 83 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
3ft x 3ft x 2.9ft in the driving laneCompaction 96.2%
|
2022-01-31
|
No data
|
STADIUM AVENUE, FROM STREET AMPERE AVENUE TO STREET WATT AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Mohamed, jumping jack, 4' x 3' depth 4' Clean fill Lab Exclusive Testing, Shaquille, Sand Cone (W)128.1 (D)119.1 (MD)124.0 (AM)7.5. Test 95.8 & 97.6 Backfill accepted
|
2022-01-28
|
No data
|
AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Indeed permittee didn't do any work in 2021 in front of 97 Avenue A. After further research it has been confirmed that this cut belongs to WESTCHESTER WATERMAINS & SEWERS LLC., & not O'GRADY PLUMBING LLC, even though it's their ID tag on the restorat
|
2022-01-27
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2022-01-27
|
No data
|
LONGFELLOW AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 1540 perm final in the driving lane
|
2022-01-26
|
No data
|
EAST 234 STREET, FROM STREET PETERS PLACE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak, 3 day notice one cut on roadway
|
2022-01-26
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not visible at time of inspection.
|
2022-01-21
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but fail to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12/31/21.
|
2022-01-18
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
I/F/O #202 12 inch Cut-backs done to curb as stipulated sketch 9 /area made safe.
|
2022-01-13
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Contractor will Re-schedule for later date.
|
2022-01-10
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration flush to grade
|
2022-01-09
|
No data
|
9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The Street was resurfaced on the Eastside of the segment.
|
2022-01-08
|
No data
|
AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #97 cyclist/dashed line lane markings needs to be restored in kind and 2020 ID marker needs to be installed and 2021 needs to be removed.
|
2022-01-06
|
No data
|
EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored Wearing Course. Wearing Course pass & complete. Cut#1- 7'x6'x2" Cut#2- 7'x5'6"x2" Arrival: 9:40AM Departure: 11:35AM
|
2022-01-04
|
No data
|
SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration, in the parking lane, in front of 23 South Portland Avenue.
|
2021-12-30
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
I/F/O #202 plumbers caught in the driving lane backfill completed 6”inch cutbacks done sidewalk work done on opposite side. (L)5’4” (W)3’(D)3’1”
|
2021-12-29
|
No data
|
EAST 22 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Operator # 55 street closure , cut on rd/w and s/w , leak on service replace broken valve
|
2021-12-28
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway
|
2021-12-28
|
No data
|
EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Cut one L 4’ W 3’ D 3’6” cut two L4’6” W2’6” D3’10”Backfill completed 6” cutbacks were made backfill left plated for concrete curing in driving lane and barricaded in the parking lane.
|
2021-12-28
|
No data
|
EAST 126 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Long water cuts 3 day notices issued
|
2021-12-27
|
No data
|
WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2021-12-26
|
No data
|
BOOTH MEMORIAL AVENUE, FROM STREET 163 STREET TO STREET 164 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag restored in kind.
|
2021-12-21
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Two cuts in the roadway (1) L-9' W-5' 4'' D-2' 2'' (2) L-8' W-6' D- 2' 2'' Reflective membrane used and tack coat sealed.
|
2021-12-19
|
No data
|
EFFINGHAM AVENUE, FROM STREET LACOMBE AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration not sealed
|
2021-12-17
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
8x6x3 wearing course completed. 12" cutbacks have been made. Reflective cracking membrane installed
|
2021-12-16
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 38 STREET TO STREET EAST 39 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in basement, 2 excavations made on roadway ,one excavation made on sidewalk at time of inspection , crew on site.
|
2021-12-14
|
No data
|
HOE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak in basement, cut on roadway
|
2021-12-14
|
No data
|
CLINTON STREET, FROM STREET VERANDAH PLACE TO STREET WARREN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
White lines have been fully restored.
|
2021-12-13
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temp cut in the parking lane
|
2021-12-11
|
No data
|
EAST 13 STREET, FROM STREET AVENUE H TO STREET GLENWOOD ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Temp water restoration is overdue for a permanent restoration. Please make flush to grade.
|
2021-12-10
|
No data
|
WEST 144 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I/F/O # 509 CUT L 5’ W 2’8” D 3” Back Fill & Base Completed 6” Cutbacks Were made backfill will be barricade while Contractor waits for concrete to cure then apply temp asphalt.
|
2021-12-09
|
No data
|
WASHINGTON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
824 Washington avenueL.6'0" x W. 4'4" x D. 8'0"Wet density:119.1Dry density:110.8Max dry density:115.5Actual moisture:7.5%First lift:97.5%Second lift:98.3%Third lift:99.2%
|
2021-12-09
|
No data
|
PATTERSON AVENUE, FROM STREET BOLTON AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 day notice water leak one cut on roadway
|
2021-12-08
|
No data
|
LELAND AVENUE, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
broken valve in basement
|
2021-12-08
|
No data
|
WASHINGTON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failure to countersink plates flush with roadway
|
2021-12-07
|
No data
|
WASHINGTON AVENUE, FROM STREET LINCOLN PLACE TO STREET ST JOHNS PLACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Arrived: 13:14, L: 10’ W: 5’ D: 7’6” I/F/O 824, Departed: 15:30, Additional excavation needed
|
2021-12-07
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Plumber cut made perm in the driving lane
|
2021-12-07
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a perm Cut flushed to grade in the driving lane.
|
2021-12-06
|
No data
|
BLEECKER STREET, FROM STREET ONDERDONK AVENUE TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic sanitary sewer backing up into property. One excavation in roadway
|
2021-12-05
|
No data
|
CENTRE STREET, FROM STREET CITY ISLAND AVENUE TO STREET WILLIAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to view sidewalk - covered with leaves
|
2021-12-02
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration (r/w & s/w) found to be in compliance (2 Cuts)
|
2021-12-01
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #38 2019 plumbers cut not visible due to 2021 con Edison gas work Permit#M012021054A18. Permit expired.
|
2021-11-30
|
No data
|
WATERBURY AVENUE, FROM STREET EDISON AVENUE TO STREET GILLESPIE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass. Cut sealed
|
2021-11-26
|
No data
|
EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-11-26
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Im unable to properly inspect due to vehicles on the roadway
|
2021-11-26
|
No data
|
DEAN STREET, FROM STREET BEDFORD AVENUE TO STREET NOSTRAND AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joint SEAL
|
2021-11-24
|
No data
|
CHURCH AVENUE, FROM STREET EAST 96 STREET TO STREET ROCKAWAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw and roadway has been restored
|
2021-11-24
|
No data
|
CLINTON STREET, FROM STREET VERANDAH PLACE TO STREET WARREN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
missing lane markings
|
2021-11-23
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permittee re-applied the color code marker and applied temp mac on the sunken area areas. The open CAR will remain open until the permittee is able to repave their cut as agreed. The permit stop will be released.
|
2021-11-21
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut okay on r/w & s/w.
|
2021-11-17
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #38 Plumbers cut partly observed due to 2020 con Edison work over restoration.
|
2021-11-16
|
No data
|
TINTON AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration in roadway and sidewalk in compliance
|
2021-11-16
|
No data
|
CLINTON STREET, FROM STREET VERANDAH PLACE TO STREET WARREN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Steel plate placed down in the parking lane going into the travel lane in front of 253.
|
2021-11-15
|
No data
|
CONVENT AVENUE, FROM STREET WEST 149 STREET TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water restoration remains in acceptable condition
|
2021-11-12
|
No data
|
NEWBOLD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one cut on sidewalk, sewer backed up tree roots
|
2021-11-09
|
No data
|
208 STREET, FROM STREET 89 AVENUE TO STREET 90 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water service leak. 3 day notice issued. One excavation in roadway opposite address
|
2021-11-09
|
No data
|
UTICA AVENUE, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags sealed and in compliance, perm cut in r/w okay
|
2021-11-09
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent failed to restore permanent restoration for water repair that has the asphalt broken out within and around restoration. . A CAR was issued ,CAR #20217790007
|
2021-11-07
|
No data
|
BRINSMADE AVENUE, FROM STREET BARKLEY AVENUE TO STREET BRUCKNER BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PASS ACTIVE WORK R/W MADE PERM SO FAR
|
2021-11-05
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
b.f passes
|
2021-11-05
|
No data
|
WEST 149 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
CUT L4’4” W 3’6” D4’ Backfill completed 6” cutbacks were made and backfill was left Barricaded for concrete curing.
|
2021-11-03
|
No data
|
97 STREET, FROM STREET 34 AVENUE TO STREET NORTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done at time of inspection.
|
2021-11-02
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flag with hardware IFO # 27. Closure Chart- RWY OPENED.
|
2021-11-01
|
No data
|
QUINCY AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crews on site, cut in parking lane and on property, leak in basement.
|
2021-11-01
|
No data
|
LAFAYETTE AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET REVERE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, home has no water service, cut in first driving lane over main.
|
2021-10-28
|
No data
|
BRINSMADE AVENUE, FROM STREET BARKLEY AVENUE TO STREET BRUCKNER BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
broken sewer, 2 cuts r/w s/w
|
2021-10-28
|
No data
|
WEST 153 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut located on the roadway in the driving lane remains in acceptable condition. Sidewalk flags remains in acceptable condition. No defects to report
|
2021-10-27
|
No data
|
EAGLE AVENUE, FROM STREET EAST 156 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak on property and basement, closure ok Oper#95.
|
2021-10-25
|
No data
|
POST AVENUE, FROM STREET 10 AVENUE TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut is flush and color coded ifo 148
|
2021-10-23
|
No data
|
WEST 15 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flag with hardware IFO # 27. Closure Chart- RWY OPENED.
|
2021-10-21
|
No data
|
TAYLOR AVENUE, FROM STREET MC GRAW AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm /rest r/w & s/w
|
2021-10-20
|
No data
|
EAST 188 STREET, FROM STREET BELMONT AVENUE TO STREET CAMBRELENG AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak, 3 day notice opposite 652. DEP issued to wrong house. leaking at hydrant
|
2021-10-20
|
No data
|
90 STREET, FROM STREET 37 AVENUE TO STREET ROOSEVELT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Courtesy call will be made by Queens Base to switch the correct IBM color code tag, inside permanent restoration in the roadway. Active permit on file.
|
2021-10-19
|
No data
|
42 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Asphalt sealer edges cracked on permanent water cuts(2) in front of 25-39.
|
2021-10-19
|
No data
|
230 STREET, FROM STREET 144 AVENUE TO STREET EDGEWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water service leaking in basement. Two excavations in roadway
|
2021-10-05
|
No data
|
ST LAWRENCE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wet: 123.9Dry: 116.5Max: 120.0Moisture: 6.4Lift: 96.3
|
2021-10-05
|
No data
|
EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in roadway is up to grade.
|
2021-10-04
|
No data
|
EDSON AVENUE, FROM STREET BOSTON ROAD TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Con Edison paved over portion of plumber restoration
|
2021-10-01
|
No data
|
90 STREET, FROM STREET 37 AVENUE TO STREET ROOSEVELT AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Not Verified. There are no cave-in conditions or leaks in the roadway. There is a temporary restoration in the roadway at this time. Valid permit on file.
|
2021-10-01
|
No data
|
BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
found resurfaced
|
2021-09-30
|
No data
|
CENTRE STREET, FROM STREET CITY ISLAND AVENUE TO STREET WILLIAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, sewer backing up, current cut on sidewalk, other to follow on property.
|
2021-09-30
|
No data
|
90 STREET, FROM STREET 37 AVENUE TO STREET ROOSEVELT AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Not Verified. Ifo 37-15, There is a temporary restoration, with the wrong IBM color code number. The IBM number does not match the permittee at this time. Restore correct color code to temporary restoration.
|
2021-09-29
|
No data
|
90 STREET, FROM STREET 37 AVENUE TO STREET ROOSEVELT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water service leak in roadway, One excavation in roadway
|
2021-09-29
|
No data
|
EAST 116 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak in basement, cut in driving lane.
|
2021-09-29
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
street joints resealed
|
2021-09-28
|
No data
|
ORCHARD STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 DAY NOTICE ISSUED , CUT IN RD/W ON ORCHARD ST
|
2021-09-27
|
No data
|
PRATT AVENUE, FROM STREET CONNER STREET TO STREET MAROLLA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-09-26
|
No data
|
3 AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temporary restoration sunken 2” inches in driving lane
|
2021-09-26
|
No data
|
3 AVENUE, FROM STREET EAST 150 STREET TO STREET EAST 151 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I/F/O 2910 temporary restoration was re-grades in driving lane
|
2021-09-23
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-09-22
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 PERM RESTORATIONS IN THE ROADWAY 1 ON SIDE OF THE STREET
|
2021-09-22
|
No data
|
EAST 216 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-09-21
|
No data
|
POST AVENUE, FROM STREET 10 AVENUE TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration and restored sidewalk flag in compliance.
|
2021-09-20
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-09-17
|
No data
|
TIEBOUT AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 188 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumbers rrestoration
|
2021-09-14
|
No data
|
TIEBOUT AVENUE, FROM STREET BEND TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
in compliance
|
2021-09-11
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O The respondent failed to have wearing course flush with surrounding area. After CAR#20217790007 was issued 1-20-2021 the restoration remians broken out and below grade.
|
2021-09-02
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
The respondent has removed the steel plates, and they restored the cobblestone roadway in kind.
|
2021-08-26
|
No data
|
ELY AVENUE, FROM STREET DEAD END TO STREET NEREID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2021-08-24
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass
|
2021-08-21
|
No data
|
EAST 228 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-08-21
|
No data
|
EAST 232 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk , Roadway newly paved
|
2021-08-18
|
No data
|
EAST 233 STREET, FROM STREET BRUNER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-08-18
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to reseal perm cut in the driving lane. As per CAR # 20214820160 was issued on 6/1/2021. Was I.D by permit.
|
2021-08-18
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #223 Plumbers restoration in the driving/parking lane (1) sidewalk flag repaired is in compliance.
|
2021-08-17
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2021-08-17
|
No data
|
EAST 231 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on sidewalk
|
2021-08-17
|
No data
|
EAST 231 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-08-16
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
M152021118A10-r/w resurfaced, s/w okay
|
2021-08-15
|
No data
|
WEST 142 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut okay in d/l.
|
2021-08-13
|
No data
|
EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-08-12
|
No data
|
EAST 223 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2021-08-08
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I discovered the above respondent temporary cut in the parking lane. The DOT permit to final restoration has expired June 3,2021.Final(permanent)restoration shall be completed prior to expiration of the permit.
|
2021-08-08
|
No data
|
SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water cut found on roadway in front of 23 South Portland avenue
|
2021-08-07
|
No data
|
EDISON AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway
|
2021-08-07
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2021-08-06
|
No data
|
ALBANY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm roadway in compliance.
|
2021-08-06
|
No data
|
TIEMANN AVENUE, FROM STREET BEND TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-07-31
|
No data
|
EAST 224 STREET, FROM STREET BEND TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane
|
2021-07-29
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed the respondents failure to permanently restore temporary cut in roadway within required time prior to permit expiration date on 3/8/2020
|
2021-07-28
|
No data
|
EAST 226 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway and sidewalk
|
2021-07-27
|
No data
|
EAST TREMONT AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET ST RAYMONDS CEMETERY BOUNDARY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition previously reported.
|
2021-07-27
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Gas cut overlapping the water cut in roadway.
|
2021-07-22
|
No data
|
GLENMORE AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2021-07-18
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The wearing courses shall be properly sealed completely at the edges of the cut. The use a liquid asphalt cement ironed in with a heated smoothing iron for the repair.
|
2021-07-16
|
No data
|
HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway and sidewalk in compliance.
|
2021-07-15
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to reseal perm cut in the driving lane. As per CAR # 20214820160 was issued on 6/1/2021. Was I.D by permit.
|
2021-07-12
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
The respondent has restored the cobblestone roadway in kind.
|
2021-07-09
|
No data
|
ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET SOUTHERN BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
work done
|
2021-07-07
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I/F/O 216, solid white line lane marking restored over top restoration.
|
2021-07-07
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O The respondent failed to have wearing course flush with surrounding area. After CAR#20217790007 was issued 1-20-2021 the restoration remians broken out and below grade.
|
2021-07-05
|
No data
|
WHITTIER STREET, FROM STREET LAFAYETTE AVENUE TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut covered by more rcent utility work.
|
2021-07-03
|
No data
|
18 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut ok
|
2021-07-01
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street joints resealed, color code installed
|
2021-06-30
|
No data
|
TINTON AVENUE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-06-30
|
No data
|
JACKSON AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-06-28
|
No data
|
67 AVENUE, FROM STREET QUEENS BOULEVARD TO STREET SAUNDERS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut to grade in the driving lane, sidewalk flag restored around water valve.
|
2021-06-26
|
No data
|
MULINER AVENUE, FROM STREET BRONXDALE AVENUE TO STREET NEILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Active gas cut, cutting over water cut
|
2021-06-26
|
No data
|
FOWLER AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2021-06-26
|
No data
|
BYRON AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-06-26
|
No data
|
BYRON AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-06-24
|
No data
|
GUNTHER AVENUE, FROM STREET GIVAN AVENUE TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-06-23
|
No data
|
EAST 211 STREET, FROM STREET BOSTON ROAD TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-06-23
|
No data
|
9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm rd/w cut flushed & sealed
|
2021-06-20
|
No data
|
WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration flush.
|
2021-06-17
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-06-16
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Gas cut out of Guarantee
|
2021-06-16
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut out of guarantee since last year
|
2021-06-15
|
No data
|
GEORGE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in the roadway
|
2021-06-09
|
No data
|
WHITE PLAINS ROAD, FROM STREET EAST GUN HILL ROAD TO STREET MAGENTA STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street joints resealed
|
2021-06-05
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
restored
|
2021-06-01
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Asphalt broken and cracked in permanent restoration street joints, street joints needs to be resealed .
|
2021-06-01
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-05-28
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w okay
|
2021-05-27
|
No data
|
WEST 37 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been resurfaced.
|
2021-05-27
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration half in driving lane, half in parking lane.
|
2021-05-26
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration cut in the travel lane in front of 84.
|
2021-05-23
|
No data
|
FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET SOUTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2021-05-23
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I discovered the above respondent has failed to reseal and maintain wearing course on permanent water cut on the roadway . Respondent was previously notified on 11/28/2020 via CAR # 20204170195 but has yet to be corrected.
|
2021-05-20
|
No data
|
ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET SOUTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent trench In the roadway needs green plastic color code applied.
|
2021-05-20
|
No data
|
WEST 164 STREET, FROM STREET ANDERSON AVENUE TO STREET WOODYCREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-05-19
|
No data
|
SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-05-19
|
No data
|
WEST 119 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
out of business
|
2021-05-18
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
s/w joints sealed.
|
2021-05-18
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for Failure to install a color coding marker at the end of the restoration.
|
2021-05-11
|
No data
|
EAST 149 STREET, FROM STREET BERGEN AVENUE TO STREET BROOK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2021-05-08
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the driving lane with minor defects.
|
2021-05-05
|
No data
|
WHITE PLAINS ROAD, FROM STREET EAST GUN HILL ROAD TO STREET MAGENTA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The 2 two restoration sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the life of the guarantee period. In accordance with the section 34RCNY2-11(e) (12) (viii)
|
2021-05-04
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit expired newer permit on file. B012020220D23.
|
2021-05-02
|
No data
|
WHITE PLAINS ROAD, FROM STREET EAST GUN HILL ROAD TO STREET MAGENTA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The restoration sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the life of the guarantee period. In accordance with the section 34RCNY2-11(e) (12) (viii)
|
2021-05-01
|
No data
|
EAST 206 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET PERRY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved
|
2021-04-29
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway in compliance, sidewalk flag in compliance
|
2021-04-23
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to restore yellow lines on the roadway over their permanent roadway restoration. Corrective action request issued on 9.24.20-CAR # 20204560196 but has yet to be corrected. In Front of 3840 Seton Ave
|
2021-04-20
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent has failed to complete the required base/and or wearing course cutbacks on a 32" in width restoration as per Standard Detail H-1042D note #6. cut width should be 54". Notification to correct this condition made Via CAR # 20204560141
|
2021-04-18
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
- REPAIR WATER: NOV will be issued for overdue
|
2021-04-18
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found respondent failed to permently restore water cut in the roadway within the required time. Respondent left a temporary restoration in the roadway. Permit # M012020311A97 expired 11/23/2020, and is also being used to identify respondent.
|
2021-04-16
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Work covered by permit M012021054A18.
|
2021-04-16
|
No data
|
EAST 148 STREET, FROM STREET COLLEGE AVENUE TO STREET COURTLANDT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-04-14
|
No data
|
GRAHAM AVENUE, FROM STREET MC KIBBIN STREET TO STREET SEIGEL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags in compliance.
|
2021-04-12
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 47, overdue for final asphalt restoration in driving lane. Active permit under Westchester Water-main for this location at this time. (M012021097A99)
|
2021-04-11
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk flag expansion joints have been sealed.
|
2021-04-07
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV failed to restore the solid white markings to the roadway over their permanent water restoration as required. Respondent was previously notified to correct this condition Via CAR #(20205180438) on 12/2/2020. In front 216.
|
2021-04-06
|
No data
|
5 AVENUE, FROM STREET EAST 8 STREET TO STREET EAST 9 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I/F/O Building #12 Lane marking must be restored in kind.
|
2021-04-06
|
No data
|
WARING AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Currently I/F/O 807 Asphalt around a permanent restoration street joint was resealed, street..
|
2021-04-06
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent has failed to reseal and maintain wearing course on permanent water cut on the roadway . Respondent was previously notified on 11/28/2020 via CAR # 20204170195 but has yet to be corrected.
|
2021-04-06
|
No data
|
3 AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
condition corrected
|
2021-04-05
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for failure to install a color coding marker at the end of the restoration.
|
2021-04-04
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with a permanent water cut in the roadway. portion of the cut is sunken 2 inches not flush with surrounding area. Respondent was notified via CAR # 20204560158 on 8/22/2020 but has yet to be corrected.
|
2021-04-02
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 47-49, half of asphalt restoration has been partially resurfaced by Con Ed major gas work in the parking lane. Asphalt rest. in driving lane remains (white marked). CAR remains active. Con Ed asphalt cut is near this work (closer to east curb).
|
2021-03-28
|
No data
|
TILDEN AVENUE, FROM STREET EAST 53 STREET TO STREET EAST 54 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway parking lane sealed and flush.
|
2021-03-27
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Re-seal expansion joints on restored sidewalk flag located I/F/O/ 212.
|
2021-03-27
|
No data
|
SEXTON PLACE, FROM STREET ADEE AVENUE TO STREET FISH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-03-25
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2021-03-25
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restored sidewalk flag in compliance.
|
2021-03-24
|
No data
|
FINDLAY AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk ok
|
2021-03-23
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to water
|
2021-03-23
|
No data
|
TRINITY AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2021-03-22
|
No data
|
OGDEN AVENUE, FROM STREET WEST 161 STREET TO STREET WEST 162 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-03-20
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restored sidewalk flag around water valve in compliance.
|
2021-03-20
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2021-03-18
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flush in the driving lane with restored sidewalk flag in compliance.
|
2021-03-17
|
No data
|
ELLSWORTH AVENUE, FROM STREET DEAD END TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
respondent has a permanent restoration, water backfill on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit # X012020279A02 expired on 11/3/2020.
|
2021-03-16
|
No data
|
CONVENT AVENUE, FROM STREET WEST 149 STREET TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration in compliance.
|
2021-03-14
|
No data
|
POST AVENUE, FROM STREET 10 AVENUE TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration flush to grade in roadway, sidewalk flags in compliance.
|
2021-03-14
|
No data
|
EAST 143 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done on roadway
|
2021-03-13
|
No data
|
3 AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber has updated permit with confirmation # X012020297A02 - confirm # X202029702
|
2021-03-10
|
No data
|
3 AVENUE, FROM STREET EAST 75 STREET TO STREET EAST 76 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water restoration in d/l is in compliance.
|
2021-03-09
|
No data
|
3 AVENUE, FROM STREET EAST 75 STREET TO STREET EAST 76 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water restoration in d/l is good.
|
2021-02-17
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway in compliance.
|
2021-02-16
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the parking lane and sidewalk flags in compliance.
|
2021-02-05
|
No data
|
8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to fully inspect due parked cars.
|
2021-01-29
|
No data
|
COLDEN AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on sidewalk
|
2021-01-28
|
No data
|
GRACE AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut was resurfaced.
|
2021-01-27
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-01-27
|
No data
|
SUMMIT AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-01-24
|
No data
|
AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ECS trench covering permanent water restoration
|
2021-01-21
|
No data
|
SOUTHERN BOULEVARD, FROM STREET EAST 156 STREET TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2021-01-20
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #218 Repair Permanent water restoration that has asphalt broken out 2” adjacent to curbing with missing color code.
|
2021-01-20
|
No data
|
SHERMAN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumb restoration in compliance
|
2021-01-19
|
No data
|
PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The restoration sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the life of the guarantee period. In accordance with the section 34RCNY2-11(e) (12) (viii)
|
2021-01-19
|
No data
|
EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2021-01-15
|
No data
|
WEST 142 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration and sidewalk flag in compliance.
|
2021-01-12
|
No data
|
EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O #41 Permanent Repair Water restoration in the Driving / Parking lane is in compliance.
|
2021-01-11
|
No data
|
BRONXWOOD AVENUE, FROM STREET CHESTNUT STREET TO STREET SOUTH OAK DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fine cracks developing in street joints, no Car issued.
|
2021-01-10
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found roadway resurfaced
|
2021-01-09
|
No data
|
EAST 86 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance
|
2021-01-05
|
No data
|
FENTON AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in the roadway.
|
2021-01-04
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Roadway found resurfaced
|
2021-01-04
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm concrete restoration in compliance in r/w ifo 1352
|
2020-12-16
|
No data
|
HILLSIDE AVENUE, FROM STREET 169 STREET TO STREET 170 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration within driving lane found flushed to grade in front of 169-12.
|
2020-12-16
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent with an OG labeled steel plate pinned and ramped in roadway at 2025/2027, respondent has failed to countersink plate during winter moratorium
|
2020-12-16
|
No data
|
EAST 240 STREET, FROM STREET BOROUGH BOUNDARY TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-12-15
|
No data
|
PIERCE AVENUE, FROM STREET WILLIAMSBRIDGE ROAD TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
: 1604 Williamsbridge road, cut on Pierce avenue
|
2020-12-11
|
No data
|
EAST 238 STREET, FROM STREET MARTHA AVENUE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-12-11
|
No data
|
EAST 236 STREET, FROM STREET NAPIER AVENUE TO STREET ONEIDA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-12-10
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to locate cut
|
2020-12-09
|
No data
|
PIERCE AVENUE, FROM STREET WILLIAMSBRIDGE ROAD TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cut plated and countersink, Raise plow signs posted
|
2020-12-08
|
No data
|
EAST GUN HILL ROAD, FROM STREET PERRY AVENUE TO STREET PUTNAM PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm flush to grade.
|
2020-12-08
|
No data
|
TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the d/l, p/l Opp 2909.
|
2020-12-05
|
No data
|
HUNTER AVENUE, FROM STREET ERSKINE PLACE TO STREET STILLWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-12-04
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk
|
2020-12-03
|
No data
|
ALBANY CRESCENT, FROM STREET BAILEY AVENUE TO STREET HEATH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2020-12-03
|
No data
|
STILLWELL AVENUE, FROM STREET GUNTHER AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the d/l.
|
2020-12-03
|
No data
|
WEST 150 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work observed at this time. Permit expired
|
2020-12-02
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must restore white lane markings on your permanent repair water Restoration located in the driving / parking lanes.
|
2020-12-01
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 47 in parking and driving lane, overdue for final water trench is present. Ramping material from where plates were is present.
|
2020-11-29
|
No data
|
CRESTON AVENUE, FROM STREET EAST 190 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-29
|
No data
|
MORRIS AVENUE, FROM STREET EAST 172 STREET TO STREET TELLER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade near Selwyn.
|
2020-11-29
|
No data
|
CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permittee O Grady Plumbing LLC found to be resurfaced under permit number X152019115A89 work done by NYC Dept Of Transportations house paving
|
2020-11-29
|
No data
|
EAST BURNSIDE AVENUE, FROM STREET ANTHONY AVENUE TO STREET RYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-28
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done under parked car
|
2020-11-28
|
No data
|
HERING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street joints resealed
|
2020-11-28
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO building 420, remove plastic caps and recess and seal expansion joints between the curb and sidewalk flags from work down around water caps
|
2020-11-28
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Has a perm cut in the driving lane need to be reseal completely I/F/O 2965.
|
2020-11-28
|
No data
|
EAST GUN HILL ROAD, FROM STREET COLDEN AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the bus stop lane.
|
2020-11-27
|
No data
|
ARNOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway in compliance.
|
2020-11-27
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-27
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-27
|
No data
|
TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-24
|
No data
|
TIEMANN AVENUE, FROM STREET DEAD END TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway and sidewalk in compliance.
|
2020-11-24
|
No data
|
CEDAR AVENUE, FROM STREET WEST 182 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-24
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET WEST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-24
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/4/2020. Respondent failed to obtain a confirmation number
|
2020-11-22
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The Street is milled.
|
2020-11-20
|
No data
|
CEDAR AVENUE, FROM STREET WEST 182 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-20
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to perform proper cut back on their plumbers roadway cut made final measuring 2’10” in violation of DOT HIGHWAY ROADWAY SPECIFICATIONS 1042-d note 6 Corrective action request issued 7.25.20-CAR #20204560141
|
2020-11-20
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I/F/O 38, NOV issued for a perm Water cut that is pitting / cracking throughout wearing course. Respondent notified via CAR 20206390287 on 8/11/2020 and failed to comply with 34RCNY 2-11(e)(12)(xiii). Defective area adjacent to curb, NOT milled line.
|
2020-11-20
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the roadway and work done on the sidewalk
|
2020-11-18
|
No data
|
CANNON PLACE, FROM STREET BEND TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-17
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET FT INDEPENDENCE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-16
|
No data
|
ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 2072 perm to grade
|
2020-11-16
|
No data
|
WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration in parking lane flush to grade.
|
2020-11-15
|
No data
|
UNION AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2020-11-13
|
No data
|
EAST 179 STREET, FROM STREET ARTHUR AVENUE TO STREET LA FONTAINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 586 perm to grade
|
2020-11-12
|
No data
|
WARING AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Asphalt broken and cracked in permanent restoration street joint, street joint needs to be resealed.
|
2020-11-11
|
No data
|
3 AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must restore bike lane markers
|
2020-11-10
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to restore double yellow lines on the roadway over their permanent roadway restoration. Corrective action request issued 9.24.20-CAR #20204560196
|
2020-11-10
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-09
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Near 47 two steel plates remain in parking lane (truck parked on top). Active permit on file #M012020311A97.
|
2020-11-07
|
No data
|
BURKE AVENUE, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Has perm cut in the bike lane Opp 1044.
|
2020-11-07
|
No data
|
CRUGER AVENUE, FROM STREET ASTOR AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Has a perm trench in the driving lane, new concrete s/w flag.
|
2020-11-07
|
No data
|
WILSON AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass perm to grade
|
2020-11-06
|
No data
|
UTICA AVENUE, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water valve in s/w & new s/w flag, 3 perm restoration in the r/w
|
2020-11-06
|
No data
|
DELANOY AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the p/l.
|
2020-11-06
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-06
|
No data
|
TIEBOUT AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 188 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not done
|
2020-11-05
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored street resurfaced
|
2020-11-05
|
No data
|
DAVIDSON AVENUE, FROM STREET WEST 184 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-11-05
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to repair portion of their water roadway restoration that has sunken approximately 2 inches. Wearing course currently not flush with surrounding area. Corrective action request issued 8.22.20-CAR #20204560158
|
2020-11-05
|
No data
|
EAST 238 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
strip repaved
|
2020-11-04
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Nov issued to the respondent for having two restorations in the roadway; however, they failed to plate one of two cuts left 2 inches below grade in the driving/parking lane.
|
2020-11-04
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Contractor applied cold patch temp restoration is temp to grade.
|
2020-11-04
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found Street resurfaced.
|
2020-11-04
|
No data
|
ADEE AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the parking, driving lanes.
|
2020-11-02
|
No data
|
PIERCE AVENUE, FROM STREET WILLIAMSBRIDGE ROAD TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
cut plated in the roadway and sidewalk
|
2020-11-02
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-02
|
No data
|
OLIVER PLACE, FROM STREET DECATUR AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-11-01
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Nov issued to the respondent for having two restorations in the roadway; however, the respondent has failed to make one of the cuts flush with the surrounding roadway surface, which was left 2 inches below grade in the driving/parking lane.
|
2020-10-30
|
No data
|
POPLAR STREET, FROM STREET LURTING AVENUE TO STREET ROSELLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-10-28
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Active permit on file M012020283A26.
|
2020-10-28
|
No data
|
WEST 183 STREET, FROM STREET AMSTERDAM AVENUE TO STREET AUDUBON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration brought to grade in front of 515
|
2020-10-27
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk defect free at this time
|
2020-10-26
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Near 47 in parking lane, 2 "OGRADY" marked steel plates are present. Container on portion of plates. Permit remains active at this time.
|
2020-10-25
|
No data
|
WEST 14 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration perm flush.
|
2020-10-25
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass perm to grade sw and rw
|
2020-10-25
|
No data
|
EAST 198 STREET, FROM STREET CRESTON AVENUE TO STREET GRAND CONCOURSE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-23
|
No data
|
GROSVENOR AVENUE, FROM STREET DELAFIELD AVENUE TO STREET WEST 250 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaved r/w
|
2020-10-23
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored with concrete panel in roadway.
|
2020-10-21
|
No data
|
RHINELANDER AVENUE, FROM STREET AMETHYST STREET TO STREET VICTOR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-10-20
|
No data
|
EAST 14 STREET, FROM STREET AVENUE A TO STREET AVENUE B
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At the time of inspection, I could not inspect the water restoration due to multiple vehicles parked over the area in the parking lane.
|
2020-10-20
|
No data
|
STILLWELL AVENUE, FROM STREET GUNTHER AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-10-16
|
No data
|
ROBINSON AVENUE, FROM STREET HARDING AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced.
|
2020-10-15
|
No data
|
9 AVENUE, FROM STREET WEST 37 STREET TO STREET LINCOLN TUNNEL ENTRANCE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 480, perm 2018 cut is flush to grade within floating parking / green painted Bike Lanes. Cut is flush to grade with newer Con Ed 2018 work over portion of cut. Lane markings restored in Kind.
|
2020-10-15
|
No data
|
DECATUR AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaved r/w
|
2020-10-15
|
No data
|
MELVILLE STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New flag on the sidewalk
|
2020-10-15
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm roadway restoration found in compliance
|
2020-10-15
|
No data
|
MAGAW PLACE, FROM STREET WEST 181 STREET TO STREET WEST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flushed to grade , no defects.
|
2020-10-14
|
No data
|
EAST 206 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET PERRY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-10-14
|
No data
|
HERING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fine cracks developing in street joint.
|
2020-10-14
|
No data
|
HERING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway and also behind property line
|
2020-10-14
|
No data
|
GRACE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in roadway in compliance
|
2020-10-14
|
No data
|
UNIONPORT ROAD, FROM STREET AMETHYST STREET TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-10-14
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm roadway restoration found to be in compliance (I/F/O 1096)
|
2020-10-13
|
No data
|
WHITE PLAINS ROAD, FROM STREET CRUGER AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway and sidewalk
|
2020-10-12
|
No data
|
GLENMORE AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass,,street cut perm ....
|
2020-10-11
|
No data
|
FOWLER AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-11
|
No data
|
LURTING AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET POPLAR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-11
|
No data
|
WILLIAMSBRIDGE ROAD, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-10-11
|
No data
|
BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-11
|
No data
|
MULINER AVENUE, FROM STREET BRONXDALE AVENUE TO STREET NEILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-11
|
No data
|
CROTONA PARK NORTH, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2020-10-10
|
No data
|
STILLWELL AVENUE, FROM STREET BEND TO STREET EASTCHESTER ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the parking lane
|
2020-10-08
|
No data
|
ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done
|
2020-10-08
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to perform proper cut back on their plumbers roadway cut made final measuring 2’10” in violation of DOT HIGHWAY ROADWAY SPECIFICATIONS 1042-d note 6 Corrective action request issued 7.25.20-CAR #20204560141
|
2020-10-05
|
No data
|
PERRY AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-10-05
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
steel plates have been reset.
|
2020-10-05
|
No data
|
LELAND AVENUE, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-05
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There are two steel plates in the parking lane shifted 3"
|
2020-10-05
|
No data
|
DECATUR AVENUE, FROM STREET EAST 207 STREET TO STREET EAST 209 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaved r/w
|
2020-10-05
|
No data
|
BEACH AVENUE, FROM STREET GUERLAIN STREET TO STREET MANSION STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-05
|
No data
|
TAYLOR AVENUE, FROM STREET ARCHER STREET TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-10-04
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in roadway.
|
2020-10-04
|
No data
|
EAST 238 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm rd/w cut , driving lane
|
2020-10-03
|
No data
|
3 AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plated pinned and ramped on the roadway an sidewalk
|
2020-10-02
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I found the respondent maintaining 2 steel plates on a cobblestone roadway with no NYC DOT permit on file for opening the street. I.D respondent by cited permit for repair water work expired on 9/6/2020.
|
2020-10-02
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I/F/O 38, permanent 2020 cut has been painted Red to match existing BUS lane in kind. Cut appears to have larger aggregate / paved in cold weather and is acceptable at this time. Wearing course to be closely monitored throughout life of guarantee.
|
2020-10-01
|
No data
|
HERING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak, one cut on roadway, the rest behind property line
|
2020-10-01
|
No data
|
ST NICHOLAS AVENUE, FROM STREET DONNELLON SQUARE TO STREET WEST 148 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk found defect free at this time
|
2020-09-30
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway.
|
2020-09-30
|
No data
|
UNIONPORT ROAD, FROM STREET BEND TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak flooding basement one cut on sidewalk one cut one the roadway.
|
2020-09-30
|
No data
|
UNIONPORT ROAD, FROM STREET BEND TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber backfill cut, also did 6" cut back, epoxy use on existing concrete base, fresh concrete poured out of electric mixer.
|
2020-09-29
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
see dep permit # X012019019a01 also sub contractor Triumph Const X012019052a17 for water repair.
|
2020-09-29
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
work was done by DEP contractor
|
2020-09-28
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to repair portion of their water roadway restoration that has sunken approximately 2 inches. Wearing course currently not flush with surrounding area. Corrective action request issued 8.22.20-CAR #20204560158
|
2020-09-27
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done
|
2020-09-27
|
No data
|
STADIUM AVENUE, FROM STREET COUNTRY CLUB ROAD TO STREET POLO PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass sidewalk to grade and seal
|
2020-09-26
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
N.O.V was issued for this location in June 2020
|
2020-09-25
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I/F/O 38, NOV issued for a permanent Water cut that is pitting / cracking throughout wearing course. Respondent notified via CAR 20206390287 on 8/11/2020 and failed to comply with 34RCNY 2-11(e)(12)(xiii).
|
2020-09-24
|
No data
|
GLENMORE AVENUE, FROM STREET MILLER AVENUE TO STREET VAN SICLEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass,, new sprinkler svc ...
|
2020-09-24
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water restoration in p/l is ok
|
2020-09-24
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Yellow lane markings need to be restored
|
2020-09-23
|
No data
|
PIERCE AVENUE, FROM STREET WILLIAMSBRIDGE ROAD TO STREET YATES AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cut in the roadway and sidewalk
|
2020-09-22
|
No data
|
WEST 73 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut resurfaced by Con Ed-M012020230A84
|
2020-09-21
|
No data
|
LONGFELLOW AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-09-20
|
No data
|
EAST MOSHOLU PARKWAY SOUTH, FROM STREET BRIGGS AVENUE TO STREET EAST 204 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2020-09-16
|
No data
|
GUNTHER AVENUE, FROM STREET GIVAN AVENUE TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Measured if restoration mounded. Slightly mounded
|
2020-09-16
|
No data
|
BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-09-16
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Near 47, 2 O'grady marked steel plates remain in the parking lane without a valid permit on file.
|
2020-09-15
|
No data
|
MORRIS AVENUE, FROM STREET EAST 172 STREET TO STREET TELLER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
I observed a temporary asphalt water restoration in the driving lane i/f/o 1502 Morris Avenue
|
2020-09-15
|
No data
|
CROES AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-09-15
|
No data
|
RHINELANDER AVENUE, FROM STREET AMETHYST STREET TO STREET VICTOR STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
a plated cut found in parking lane.
|
2020-09-14
|
No data
|
BRYANT AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-09-13
|
No data
|
VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2020-09-13
|
No data
|
EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
perm to grade
|
2020-09-12
|
No data
|
SEXTON PLACE, FROM STREET ADEE AVENUE TO STREET FISH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane I/F/O 2795.
|
2020-09-12
|
No data
|
PAULDING AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass sidewalk and roadway to grade
|
2020-09-11
|
No data
|
WILSON AVENUE, FROM STREET GIVAN AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1 of 2 cuts made perm, other temp to grade in the roadway
|
2020-09-09
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Near 47, two plates remain in the parking lane. No new permit or application are on file. No summons will be issued at this time due to container on top of cart obstructing view of plates. Will check back.
|
2020-09-09
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration flush to grade. sidewalk flags in compliance
|
2020-09-09
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects
|
2020-09-09
|
No data
|
CONCORD AVENUE, FROM STREET EAST 144 STREET TO STREET EAST 145 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak in s/w, two cuts on rd/w, one on s/w.
|
2020-09-08
|
No data
|
CONTINENTAL AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-09-08
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-09-08
|
No data
|
EAST 196 STREET, FROM STREET CONTINENTAL AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-09-06
|
No data
|
WILSON AVENUE, FROM STREET GIVAN AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Homeowner issued 3 day notice. Two excavations in roadway at this time
|
2020-09-06
|
No data
|
BEACH AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GUION PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2020-09-05
|
No data
|
JACKSON AVENUE, FROM STREET EAST 141 STREET TO STREET EAST 142 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak in the Roadway & Inside the Property. 3 Day Dep Notice Issued.
|
2020-09-05
|
No data
|
CARPENTER AVENUE, FROM STREET EAST 241 STREET TO STREET EAST 242 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced X152018298A31
|
2020-09-04
|
No data
|
WHITE PLAINS ROAD, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, low to no pressure to home, 3 day notice present.
|
2020-09-04
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
L3’10 W2’1 D3’0Compaction 96.9Pass
|
2020-09-03
|
No data
|
ELY AVENUE, FROM STREET DEAD END TO STREET NEREID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in parking lane in compliance
|
2020-09-03
|
No data
|
TILDEN AVENUE, FROM STREET EAST 53 STREET TO STREET EAST 54 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration on the roadway and new sidewalk flag installed near corner of TILDEN Av & E. 54 ST ( AKA 418 E. 54 St)
|
2020-09-03
|
No data
|
HILL AVENUE, FROM STREET EAST 241 STREET TO STREET NEREID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in driving/parking lane in compliance
|
2020-09-03
|
No data
|
EAST TREMONT AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET ST RAYMONDS CEMETERY BOUNDARY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not found
|
2020-09-02
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to perform proper cut back on their plumbers roadway cut made final measuring 2’10” in violation of DOT HIGHWAY ROADWAY SPECIFICATIONS 1042-a note 3. Corrective action request issued 7.25.20-CAR #20204560141
|
2020-09-02
|
No data
|
EAST 226 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak on service line, water seeping through sidewalk and rd/w. closure ok Operator 93.
|
2020-09-02
|
No data
|
PUGSLEY AVENUE, FROM STREET HAVILAND AVENUE TO STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the parking lane and new concrete sidewalk flags flush and sealed
|
2020-09-02
|
No data
|
CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-09-01
|
No data
|
ELSMERE PLACE, FROM STREET MARMION AVENUE TO STREET SOUTHERN BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak on rd/w and s/w, 860-856, currently two cuts in rd/w.
|
2020-09-01
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Near 47 in parking lane, two steel plates are pinned and ramped. Permit remains active at this time.
|
2020-09-01
|
No data
|
TIEBOUT AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 188 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
on the tiebut side of street, cuts on rd/w and sidewalk
|
2020-08-30
|
No data
|
ODELL STREET, FROM STREET STARLING AVENUE TO STREET UNIONPORT ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Gas cut, cutting over water cut
|
2020-08-30
|
No data
|
MERRICK BOULEVARD, FROM STREET 233 STREET TO STREET 234 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At this time roadway has been resurfaced.
|
2020-08-30
|
No data
|
BRYANT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2020-08-30
|
No data
|
BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass sidewalk and roadway to grade and sealed
|
2020-08-30
|
No data
|
BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass Sidewalk and Rodeway perm to grade
|
2020-08-29
|
No data
|
VICTOR STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-08-29
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2020-08-29
|
No data
|
KINSELLA STREET, FROM STREET BRONXDALE AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-08-28
|
No data
|
POST AVENUE, FROM STREET 10 AVENUE TO STREET WEST 207 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one roadway and 2 sidewalk opening, broken sprinkler valve
|
2020-08-27
|
No data
|
SOUTHERN BOULEVARD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2020-08-26
|
No data
|
HOBART AVENUE, FROM STREET EAST 194 STREET TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-08-26
|
No data
|
SOUNDVIEW AVENUE, FROM STREET BOLTON AVENUE TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-08-25
|
No data
|
EAST 97 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
IFO 143, backfill pass; clean fill; 98.0 compaction.
|
2020-08-25
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane Opp 2700 Hering Ave.
|
2020-08-25
|
No data
|
BATHGATE AVENUE, FROM STREET EAST 191 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
X012019179A02 up to date permit on file
|
2020-08-25
|
No data
|
EAST 97 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in roadway (visibly confirmed) one excavation made on roadway and one excavation made on sidewalk at time of inspection.
|
2020-08-24
|
No data
|
WEST 136 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak in basement. crew on site . one excavation on rdwy & one excavation on swk repairing leak i/f/o 212. rdwy closed verified by DOT op 62.
|
2020-08-24
|
No data
|
TINTON AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
p/l perm to grade
|
2020-08-23
|
No data
|
WESTCHESTER AVENUE, FROM STREET ELDER AVENUE TO STREET WHEELER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-08-23
|
No data
|
TRINITY AVENUE, FROM STREET EAST 160 STREET TO STREET EAST 161 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
shut off valve blown out heavy flooding in basement (confirmed with homeowner), one excavation made on roadway at time of inspection.
|
2020-08-23
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-08-23
|
No data
|
BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plb cut perm to grade and sealed ...Keep an eye on the DEP adjacent to it starting to sink
|
2020-08-23
|
No data
|
112 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in p/l of roadway.
|
2020-08-23
|
No data
|
WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-08-22
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumb restoration in front of 3228 in sunken approximately 2 inches.Cut located over the speed bump
|
2020-08-22
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration acceptable
|
2020-08-22
|
No data
|
HUNT AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-08-21
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-08-21
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects
|
2020-08-21
|
No data
|
BELMONT AVENUE, FROM STREET EAST FORDHAM ROAD TO STREET FORDHAM UNIV BOUNDARY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one freshly paved roadway cut
|
2020-08-20
|
No data
|
VAN NEST AVENUE, FROM STREET MELVILLE STREET TO STREET TAYLOR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-08-18
|
No data
|
VIRGIL PLACE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Steel plate has been removed
|
2020-08-18
|
No data
|
WILSON AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak in rd/w.
|
2020-08-18
|
No data
|
VYSE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored to grade
|
2020-08-18
|
No data
|
WEST FARMS ROAD, FROM STREET BRYANT AVENUE TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2020-08-17
|
No data
|
WEST 114 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, street leak, 3day notice, closure ok Op#75
|
2020-08-17
|
No data
|
HARROD AVENUE, FROM STREET BRP SOUTHBOUND EXIT 3 TO STREET EAST 172 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2020-08-13
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Long water cut temp to grade, in parking lane. opposite side
|
2020-08-12
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Steel plate has been removed, temp to grade in the roadway has updated permit X012020217A69
|
2020-08-12
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp cut opp 3736 flush to grade
|
2020-08-12
|
No data
|
CLARENCE AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Resurfaced buoy con Edison major gas throughout segment
|
2020-08-12
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the Respondent failed to apply the proper plastic color with year and ibm# as permCAR #20203690058.
|
2020-08-12
|
No data
|
5 AVENUE, FROM STREET EAST 129 STREET TO STREET EAST 130 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
street leak, crew on site, cut in driving lane.
|
2020-08-12
|
No data
|
WEST 73 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ATPO the respondent failed to reseal expansion joints on the sidewalk in front of 260 CAR 20206790123 was issued on 3-7-20
|
2020-08-11
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV failed to restore the asphalt/wearing course mounded about 1’’ above grade within their permanent water restoration as requested. Respondent was previously notified to correct this condition Via CAR#(20206040111) on 4/22/2020. In front of 38.
|
2020-08-11
|
No data
|
WEST 164 STREET, FROM STREET ANDERSON AVENUE TO STREET WOODYCREST AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
made perm to grade
|
2020-08-11
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
parking lane which has asphalt broken out ½ -1’’ below grade and the wearing course needs to be milled and reinstalled. White lane marking starting to fade from roadway. In front of 38.
|
2020-08-11
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
parking lane which has asphalt broken out ½ -1’’ below grade and the wearing course needs to be milled and reinstalled. White lane marking starting to fade from roadway. In front of 38.
|
2020-08-10
|
No data
|
18 STREET, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored backfill from 4:03pm to 4:47pm two cuts in the parking lane cut 1 length 7ft width 4ft depth 4ft 5inches second cut length 5ft width 3ft depth 3ft 5inches
|
2020-08-10
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Red lane marking restored to bus lane.
|
2020-08-10
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
In parking lane, two steel plates are present at this time. Permit remains valid at this time. Photos taken.
|
2020-08-10
|
No data
|
DECATUR AVENUE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work ndone
|
2020-08-09
|
No data
|
EAST 146 STREET, FROM STREET BEND TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 359 sidewalk and roadway restored
|
2020-08-09
|
No data
|
EAST 149 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-08-09
|
No data
|
EAST 148 STREET, FROM STREET COLLEGE AVENUE TO STREET COURTLANDT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 334 perm to grade
|
2020-08-08
|
No data
|
EAST 93 STREET, FROM STREET 5 AVENUE TO STREET MADISON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Excavations in the Roadway & Sidewalk Steel Plate in Compliance
|
2020-08-07
|
No data
|
EAST 193 STREET, FROM STREET JEROME AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
The respondent has fail to begin emergency work within the allotted 2hr. after authorization, no cut(s) found on roadway and or sidewalk.
|
2020-08-05
|
No data
|
NAPIER AVENUE, FROM STREET EAST 233 STREET TO STREET EAST 235 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street resurfaced
|
2020-08-03
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane marking has been restored in front of 138
|
2020-08-03
|
No data
|
GREENE STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started at this time. Mark-out area is where a Verizon restoration is currently. Verizon work done under (#M012019193B00). Photos taken of location.
|
2020-08-01
|
No data
|
EAST 93 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No water cuts located at the provided footage
|
2020-07-31
|
No data
|
BARKER AVENUE, FROM STREET BURKE AVENUE TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the driving lane opp #3058
|
2020-07-31
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 84, Permanent Restoration in the middle of driving lane.
|
2020-07-31
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/IO 223, perm 2018 cut within Driving Lane and work within 1 sidewalk flags restored in Kind.
|
2020-07-30
|
No data
|
GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-07-30
|
No data
|
LOGAN AVENUE, FROM STREET DEWEY AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-07-30
|
No data
|
WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2020-07-29
|
No data
|
WEST 131 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM WATER RESTORATION; UNABLE TO INSPECT DUE TO PARKED VEHICLES.
|
2020-07-29
|
No data
|
FTELEY AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
low pressure in building, crew on site, two cuts in rd/w and one on property.
|
2020-07-29
|
No data
|
FTELEY AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Low pressure in house basement, crew on site, two cuts in the parking lane/and one on property. Training with Mr. Angel Roman with E number
|
2020-07-28
|
No data
|
GLEBE AVENUE, FROM STREET ROWLAND STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway. opp 2402
|
2020-07-28
|
No data
|
EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration I/F/O 1036 sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the guarantee period. In accordance with the section 34RCNY 2-11)(12)(viii):
|
2020-07-28
|
No data
|
UTICA AVENUE, FROM STREET AVENUE M TO STREET AVENUE N
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site finalizing rwy cut perm to grade, ifo 2082, sprinkler work.
|
2020-07-28
|
No data
|
DORIS STREET, FROM STREET HAVEMEYER AVENUE TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-07-28
|
No data
|
ZEREGA AVENUE, FROM STREET DORSEY STREET TO STREET MACLAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk
|
2020-07-27
|
No data
|
WICKHAM AVENUE, FROM STREET EAST 233 STREET TO STREET EDENWALD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site 2 roadway cut, 3 day notice
|
2020-07-26
|
No data
|
BEAUMONT AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 188 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site excavating parking lane ifo #2405, water leak repair, basement, 3day. Confirmed.
|
2020-07-26
|
No data
|
BEAUMONT AVENUE, FROM STREET EAST 187 STREET TO STREET EAST 188 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
monitored site from 1250-1320pm
|
2020-07-25
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers restoration made final measuring approximately 2’ 10” in width. No proper cut back done as per highways 1042 specifications
|
2020-07-23
|
No data
|
9 AVENUE, FROM STREET WEST 37 STREET TO STREET LINCOLN TUNNEL ENTRANCE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 480 permanent water restoration is in compliance
|
2020-07-22
|
No data
|
SUMMIT PLACE, FROM STREET HEATH AVENUE TO STREET KINGSBRIDGE TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane.
|
2020-07-22
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w & r/w ok
|
2020-07-22
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2020-07-22
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-07-22
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-07-22
|
No data
|
FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET SOUTHERN BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, cut in parking lane. 3 day was issued. closure ok op#26.
|
2020-07-22
|
No data
|
FAIRMOUNT PLACE, FROM STREET MARMION AVENUE TO STREET SOUTHERN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
flagger posted at corner
|
2020-07-20
|
No data
|
LURTING AVENUE, FROM STREET ESPLANADE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Gas work done
|
2020-07-19
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service. Water was Shut Off After 3 Day Dep Notice Issued. Work Currently Contained in the Roadway
|
2020-07-16
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway under DDC construction
|
2020-07-16
|
No data
|
SEMINOLE AVENUE, FROM STREET NARRAGANSETT AVENUE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
newly paved roadway
|
2020-07-14
|
No data
|
EAST 170 STREET, FROM STREET COLLEGE AVENUE TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-07-14
|
No data
|
GRANT AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done
|
2020-07-14
|
No data
|
SHERMAN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade on Sherman Avenue
|
2020-07-14
|
No data
|
TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-07-14
|
No data
|
FINDLAY AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 1259 sidewalk restored
|
2020-07-14
|
No data
|
UNDERHILL AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, currently on s/w and on property.
|
2020-07-13
|
No data
|
EAST 234 STREET, FROM STREET EAST 233 STREET TO STREET KATONAH AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, parking cut in parking lane and on property.
|
2020-07-13
|
No data
|
CLARENCE AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Car on file
|
2020-07-13
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 sidewalk flag in front of property is in compliance
|
2020-07-12
|
No data
|
TELLER AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-07-10
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway and sidewalk
|
2020-07-09
|
No data
|
PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass, speed bump
|
2020-07-09
|
No data
|
WEST 37 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found.
|
2020-07-08
|
No data
|
EDSON AVENUE, FROM STREET BOSTON ROAD TO STREET DEAD END
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
perm cut on rd/w, at the dead end/ parking lane.
|
2020-07-08
|
No data
|
PRESIDENT STREET, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
I observed a OGrady Plumbing Water & Sewer crew, in a temporary excavated water restoration repairing a broken pipe i/f/o 1086 President street
|
2020-07-08
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade opp 960 flush and sealed
|
2020-07-07
|
No data
|
MEAGHER AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in the roadway
|
2020-07-06
|
No data
|
TIEBOUT AVENUE, FROM STREET BEND TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-07-03
|
No data
|
LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-07-03
|
No data
|
EDISON AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-07-03
|
No data
|
SULLIVAN PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done
|
2020-07-03
|
No data
|
REVERE AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-07-03
|
No data
|
STILLWELL AVENUE, FROM STREET GUNTHER AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-07-02
|
No data
|
STILLWELL AVENUE, FROM STREET GUNTHER AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
The above respondent is doing non-emergency work with an emergency authorization number. Respondent is installing a shut off valve in basement of empty house being completely renovated. No emergency exist, Plumber should've obtain a regular permit.
|
2020-07-02
|
No data
|
LORILLARD PLACE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-07-02
|
No data
|
STORY AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final color coded
|
2020-07-02
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-07-02
|
No data
|
HOBART AVENUE, FROM STREET EAST 194 STREET TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
very low pressure in the house in a new line. cut opposite the address
|
2020-07-01
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER - SEWER: New permit #: M012020183A03 for Final restoration
|
2020-07-01
|
No data
|
BRIGGS AVENUE, FROM STREET BEND TO STREET EAST 194 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-07-01
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance parking lane
|
2020-06-30
|
No data
|
HOLLAND AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-30
|
No data
|
WHITTIER STREET, FROM STREET LAFAYETTE AVENUE TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 811 Repair water relay service line.
|
2020-06-30
|
No data
|
EAST 235 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the roadway flush and sealed
|
2020-06-30
|
No data
|
WEEKS AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w ok
|
2020-06-30
|
No data
|
EAST 231 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the parking lane and new concrete sidewalk flags flush and sealed IFO 823
|
2020-06-29
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Short water cut has been made final. Sidewalk flag I/F/O 345 has been fully replaced. No defects to report
|
2020-06-29
|
No data
|
WHITE PLAINS ROAD, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in compliance 1 cut on the sidewalk and 1 cut on the roadway
|
2020-06-29
|
No data
|
WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not found in roadway.
|
2020-06-27
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Has updated permit X012020157A91 (active) plated restoration in the parking lane
|
2020-06-27
|
No data
|
PRATT AVENUE, FROM STREET CONNER STREET TO STREET MAROLLA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the roadway flush and sealed
|
2020-06-26
|
No data
|
WHITE PLAINS ROAD, FROM STREET EAST GUN HILL ROAD TO STREET MAGENTA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration no defects
|
2020-06-26
|
No data
|
SEXTON PLACE, FROM STREET ADEE AVENUE TO STREET FISH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects
|
2020-06-26
|
No data
|
HOBART AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-06-26
|
No data
|
WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 410 permanent water restoration is in compliance
|
2020-06-26
|
No data
|
EAST 235 STREET, FROM STREET VIREO AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New concrete flags.
|
2020-06-25
|
No data
|
WEST 130 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration flushed to grade in the parking lane in front of building 45
|
2020-06-25
|
No data
|
EDISON AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-06-25
|
No data
|
5 AVENUE, FROM STREET EAST 127 STREET TO STREET EAST 128 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permittee out of business
|
2020-06-25
|
No data
|
TURNEUR AVENUE, FROM STREET NORTON AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
inspect and in compliance
|
2020-06-24
|
No data
|
EAST 223 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New concrete sidewalk flags flush and sealed
|
2020-06-24
|
No data
|
EAST 169 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done
|
2020-06-24
|
No data
|
EAST 224 STREET, FROM STREET BEND TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the parking lane flush and sealed
|
2020-06-24
|
No data
|
HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-24
|
No data
|
CROSBY AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
broken sewer roadway/sidewalk cuts
|
2020-06-24
|
No data
|
EAST 149 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 sw flags in compliance.
|
2020-06-24
|
No data
|
CROSBY AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber on site excavating the sidewalk and roadway, spoke to Scheme.
|
2020-06-24
|
No data
|
SIEGFRIED PLACE, FROM STREET COUNTRY CLUB ROAD TO STREET VALHALLA DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seems con Edison paved over plumber cut
|
2020-06-23
|
No data
|
PARK DRIVE, FROM STREET GERTLAND PLACE TO STREET SPLIT ROCK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the parking lane flush and sealed (new building)
|
2020-06-23
|
No data
|
EAST 237 STREET, FROM STREET MARTHA AVENUE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the parking lane.
|
2020-06-23
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in parking lane
|
2020-06-23
|
No data
|
EAST 241 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut was resurfaced I/F/O 282 E 241 St.
|
2020-06-23
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-23
|
No data
|
EAST 214 STREET, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects
|
2020-06-23
|
No data
|
LAFAYETTE AVENUE, FROM STREET VINCENT AVENUE TO STREET WILCOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-23
|
No data
|
8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut in front of 293 is up to grade in parking lane.
|
2020-06-23
|
No data
|
WEST 133 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street found re- surfaced at this time no restoration observed
|
2020-06-23
|
No data
|
AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER : Work was done within the ECS trench
|
2020-06-22
|
No data
|
SUMMIT AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-22
|
No data
|
FTELEY AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, no water/ to low pressure in home.
|
2020-06-22
|
No data
|
3 AVENUE, FROM STREET EAST 120 STREET TO STREET EAST 121 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permittee out of business.
|
2020-06-22
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-22
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber steel that is countersink needs more ramping materials around edges
|
2020-06-22
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ATPO I observed the respondents failure to permanently restore temporary cut in roadway within required time prior to permit expiration date on 3/8/2020
|
2020-06-22
|
No data
|
EAST 220 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to properly inspect due to vehicles throughout segment
|
2020-06-22
|
No data
|
COUNTRY CLUB ROAD, FROM STREET LOHENGRIN PLACE TO STREET STADIUM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm restoration in the roadway
|
2020-06-22
|
No data
|
PURITAN AVENUE, FROM STREET LA SALLE AVENUE TO STREET WATERBURY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved
|
2020-06-22
|
No data
|
EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-21
|
No data
|
DR M L KING JR BOULEVARD, FROM STREET FEATHERBED LANE TO STREET WEST 175 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-06-21
|
No data
|
WEST TREMONT AVENUE, FROM STREET ANDREWS AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2020-06-20
|
No data
|
WATERBURY AVENUE, FROM STREET EDISON AVENUE TO STREET GILLESPIE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Portion of plumber restoration, paved over by Con Edison
|
2020-06-19
|
No data
|
LUCERNE STREET, FROM STREET BEND TO STREET RADIO DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-18
|
No data
|
JEFFERSON PLACE, FROM STREET BOSTON ROAD TO STREET CLINTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-18
|
No data
|
KEPLER AVENUE, FROM STREET EAST 236 STREET TO STREET EAST 237 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
leak appear to be at "goose-neck", crew on site, cut in parking lane.
|
2020-06-18
|
No data
|
GRAND AVENUE, FROM STREET WEST 188 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-18
|
No data
|
HARDING AVENUE, FROM STREET BALCOM AVENUE TO STREET GRAFF AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak on service in grassy area, may not need to open rd/w.
|
2020-06-18
|
No data
|
GRAND AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-18
|
No data
|
CALHOUN AVENUE, FROM STREET COLLIS PLACE TO STREET HARDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2020-06-18
|
No data
|
DEVOE TERRACE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-17
|
No data
|
CONVENT AVENUE, FROM STREET WEST 149 STREET TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration flush to grade, sidewalk flags sealed and no defects
|
2020-06-17
|
No data
|
MAHAN AVENUE, FROM STREET BUHRE AVENUE TO STREET WILLOW LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway at crosswalk
|
2020-06-17
|
No data
|
FISH AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in compliance
|
2020-06-17
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-17
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
FINAL RESTORATION ONLY: Latest permit# M012020114A37 expired 5/12020. Work in progress.
|
2020-06-17
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER: Latest permit# M012020114A37 expired 5/1/2020. Final restoration permit # M012020153A21 expires 6/30/2020. Steel plates in driving &parking lane. Work not finished.
|
2020-06-16
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
re-apply your color with the proper year and IBM#, this blank color is unacceptable
|
2020-06-16
|
No data
|
EAST 143 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak in basement, crew on site, now digging on s/w, and may open rd/w soon.
|
2020-06-15
|
No data
|
NELSON AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET WEST 172 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-15
|
No data
|
OGDEN AVENUE, FROM STREET BEND TO STREET DR M L KING JR BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed under later permit
|
2020-06-15
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-14
|
No data
|
TINTON AVENUE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
not found
|
2020-06-12
|
No data
|
EAST 240 STREET, FROM STREET BOROUGH BOUNDARY TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, on the east 240st side, short water.
|
2020-06-12
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit is for active CAR under permit M012020056A20.
|
2020-06-11
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-11
|
No data
|
PARK AVENUE, FROM STREET CYRUS PLACE TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-06-11
|
No data
|
HOBART AVENUE, FROM STREET BUHRE AVENUE TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, cut in the parking lane.
|
2020-06-11
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags in compliance in front of 420
|
2020-06-11
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flag in front of 887 in compliance, roadway resurfaced
|
2020-06-10
|
No data
|
CINCINNATUS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final color coded in the parking lane
|
2020-06-09
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag on south curb has been replaced by Spectrum.
|
2020-06-09
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent Restoration in the parking lane.
|
2020-06-09
|
No data
|
167 STREET, FROM STREET 43 AVENUE TO STREET 45 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in roadway ,one excavation made on roadway and one excavation made in grass area at time of inspection 3 day notice issued from DEP
|
2020-06-09
|
No data
|
WEST 119 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permittee out of business.
|
2020-06-09
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on sidewalk, no cut in the roadway
|
2020-06-08
|
No data
|
WEST 86 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
permanent restoration in the D/L and P/L in compliance...
|
2020-06-08
|
No data
|
GLEBE AVENUE, FROM STREET DORIS STREET TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, no water in home. Cuts in parking lane and sidewalk.
|
2020-06-07
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR previously issued for sunken cut
|
2020-06-07
|
No data
|
WEST 164 STREET, FROM STREET ANDERSON AVENUE TO STREET WOODYCREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
On Woodycrest Avenue - In Parking Lane perm rest and asphalt adjacent to joint sunken 2" or more
|
2020-06-05
|
No data
|
MULLEN PLACE, FROM STREET PENNYFIELD AVENUE TO STREET PRENTISS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-04
|
No data
|
WEST 135 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work found
|
2020-06-04
|
No data
|
EAST 221 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the roadway flush and sealed
|
2020-06-03
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
okay.
|
2020-06-03
|
No data
|
PILGRIM AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-03
|
No data
|
EAST 220 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 cuts in the roadway flush and sealed
|
2020-06-03
|
No data
|
SCOTT PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-06-02
|
No data
|
OLINVILLE AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 216 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New concrete sidewalk flags flush and sealed
|
2020-05-31
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a permanent repair water restoration that is flushed to grade in the driving lane.
|
2020-05-30
|
No data
|
WEST 86 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
perm roadway cut in compliance at time of inspection
|
2020-05-29
|
No data
|
MACON STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water cut in the roadway and sidewalk
|
2020-05-28
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flushed to grade .
|
2020-05-27
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 1135 the restoration sealant need to be re-sealed at the edges of the wearing course be properly maintained throughout the guarantee period. In accordance with the section 34RCNY 2-11)(12)(viii):The wearing course shall be properly sealed.
|
2020-05-21
|
No data
|
WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut ifo 419 is flush/ color coded
|
2020-05-20
|
No data
|
ARNOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber perm restoration in the center of 2 DEP temp cuts.
|
2020-05-19
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Long water cut plated in the parking lane, opposite side
|
2020-05-19
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
long water cut plated, updated permit on file
|
2020-05-19
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, working in the parking.
|
2020-05-15
|
No data
|
TILDEN AVENUE, FROM STREET EAST 53 STREET TO STREET EAST 54 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak in the Roadway. 3 Day Dep Notice Issued.
|
2020-05-13
|
No data
|
EAST 77 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags good
|
2020-05-09
|
No data
|
WEST 150 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done under permit
|
2020-05-09
|
No data
|
WILDER AVENUE, FROM STREET CRANFORD AVENUE TO STREET EAST 241 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-05-08
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BO in progress
|
2020-05-08
|
No data
|
ARNOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on-site, one cut made by O'Grady plumbing in front 1967 A 2 other cuts made by DEP, NOT plumber
|
2020-05-08
|
No data
|
ARNOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Plumber on site, repairing water leak, spoke to foreman schme
|
2020-05-08
|
No data
|
GUNTHER AVENUE, FROM STREET BARNES AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the roadway
|
2020-05-05
|
No data
|
EAST GUN HILL ROAD, FROM STREET COLDEN AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A small area at plumber perm street joint slightly sinking
|
2020-05-03
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed I/F/O 1421 sidewalk flag was restored In kind
|
2020-04-29
|
No data
|
SHERIDAN EXPRESSWAY, FROM STREET BEND TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, working on sidewalk area, main on the sidewalk.
|
2020-04-29
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Confirmation provided
|
2020-04-28
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Repaired
|
2020-04-25
|
No data
|
WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
color code has been applied
|
2020-04-23
|
No data
|
BAY 30 STREET, FROM STREET BESSEMUND AVENUE TO STREET DWIGHT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken domestic water service. One excavation in roadway at this time
|
2020-04-23
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The condition remains the same and a new CAR will be reissued.
|
2020-04-23
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I found a permanent restoration the parking/driving which has asphalt broken out ½ -1’’ below grade and the wearing course needs to be milled and reinstalled.
|
2020-04-22
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The red paint needs to be restored and the wearing course has asphalt broken out ½’’ below grade in the bus lane. Also, the wearing course is mounded 1’’ above grade and the entire wearing course needs to be milled and reinstalled.
|
2020-04-22
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The steel plates were removed and the restoration was made permanent to grade in the bus/parking lane.
|
2020-04-22
|
No data
|
GREENE AVENUE, FROM STREET BEND TO STREET PATCHEN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Leak on the Roadway. 3 Day Dep Notice.
|
2020-04-21
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The mounded trench was restored flushed to grade with the adjacent roadway surface.
|
2020-04-20
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street opening joints has been sealed.
|
2020-04-20
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane markings need to be restored .
|
2020-04-20
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Lane markings need to be restored .
|
2020-04-19
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permanent water cut acceptable
|
2020-04-16
|
No data
|
EAST 225 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-04-16
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2020-04-14
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber foreman Mohamed, has cut in the parking lane, adjacent to the curb, also on the sidewalk to replace broken 1" water pipe. INCOMPLIANCE
|
2020-04-14
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber onsite, 1 cut on sidewalk 1 on roadway.
|
2020-04-14
|
No data
|
BOLLER AVENUE, FROM STREET CRAWFORD AVENUE TO STREET NEEDHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-04-03
|
No data
|
WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is good unable to inspect roadway due to parked cars.
|
2020-04-02
|
No data
|
WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration in front of 415 W 50th street P/L
|
2020-04-02
|
No data
|
MORTON STREET, FROM STREET BEND TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 54, work within 1 sidewalk flag around Water Valve. No roadway work observed at this time.
|
2020-03-29
|
No data
|
FT WASHINGTON AVENUE, FROM STREET WEST 185 STREET TO STREET WEST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration flush to grade in front of 590
|
2020-03-28
|
No data
|
NEWBOLD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-03-27
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
travel lane markings and red bus lane paint missing on permanent restoration I/F/O 38
|
2020-03-23
|
No data
|
PARK DRIVE, FROM STREET GERTLAND PLACE TO STREET SPLIT ROCK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway in compliance.
|
2020-03-21
|
No data
|
ROBINSON AVENUE, FROM STREET HARDING AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-03-20
|
No data
|
LONGFELLOW AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in the driving lane
|
2020-03-20
|
No data
|
WILCOX AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Balkan takes over O'Grady cut
|
2020-03-18
|
No data
|
BEACH AVENUE, FROM STREET GUERLAIN STREET TO STREET MANSION STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street resurfaced
|
2020-03-18
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 1365 perm to grade
|
2020-03-18
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
ogrady marked steel plates in the roadway loose and noisy I/F/O 38
|
2020-03-18
|
No data
|
UNION AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 1228 sidewalk and roadway restored
|
2020-03-17
|
No data
|
HOBART AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-03-16
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects
|
2020-03-13
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
One sidewalk flag replace on south side of street. Restoration in parking lane adjacent to sidewalk flag.
|
2020-03-13
|
No data
|
MELVILLE STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, currently on the sidewalk, sewage back up in basement.
|
2020-03-13
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In compliance
|
2020-03-13
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway and sidewalk are in compliance .
|
2020-03-11
|
No data
|
SCHLEY AVENUE, FROM STREET HOLLYWOOD AVENUE TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-03-11
|
No data
|
BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2020-03-10
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The permanent repair water trench in the driving lane wearing course is mounded 1’’ above grade and it needs to be milled and repave.
|
2020-03-10
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in driving lane.
|
2020-03-09
|
No data
|
WHITE PLAINS ROAD, FROM STREET CRUGER AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, several leak in service line, Cuts on rd/w, w/w, within property.
|
2020-03-07
|
No data
|
WEST 73 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration is missing color code and portions of restoration is broken out and needs to made flush with surrounding roadway.Sidewalk flags expansion joints are exposed and need to be re-sealed IFO 260.
|
2020-03-06
|
No data
|
EAST 150 STREET, FROM STREET CEDAR LANE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
protest accepted . valid permit for DEP shut off service under permit X012020056A95
|
2020-03-06
|
No data
|
BOGART AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
leak in basement, crew on site, rd/w s/w and property cut. Closure verified.
|
2020-03-04
|
No data
|
WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-03-03
|
No data
|
67 AVENUE, FROM STREET QUEENS BOULEVARD TO STREET SAUNDERS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade cut in the parking lane. Water valved sidewalk flag restored in kind (50ft S/O Queens Blvd).
|
2020-03-02
|
No data
|
EAST 14 STREET, FROM STREET AVENUE A TO STREET AVENUE B
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew excavating rwy, repairing water leak, leak in basement
|
2020-03-02
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plated work site
|
2020-03-02
|
No data
|
EAST 14 STREET, FROM STREET AVENUE A TO STREET AVENUE B
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR WATER: Crew on site. I went to location to mark out for 6" & 12" cut backs
|
2020-03-01
|
No data
|
KELLY STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2020-03-01
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration on rd/w believed to be under gas restoration. S/w flush & sealed
|
2020-02-28
|
No data
|
OGDEN AVENUE, FROM STREET WEST 161 STREET TO STREET WEST 162 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-02-28
|
No data
|
CROTONA PARK NORTH, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
peerm to grade
|
2020-02-27
|
No data
|
WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found a permanent Restoration leading to the Curb.
|
2020-02-27
|
No data
|
HOLLAND AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Leak at elbow and in basement, crew on site.
|
2020-02-27
|
No data
|
HOLLAND AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
sheme, jumping jack, sand, 4' x 3' depth 2'6". Lab. Exclusive testing, Andrew, sand cone, (w)118.5 (d)107.6 (md)113.5 (am)9.9. test 97.1, Backfill Accepted, cut in the parking lane
|
2020-02-26
|
No data
|
CRESTON AVENUE, FROM STREET EAST 190 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-02-26
|
No data
|
EAST 196 STREET, FROM STREET CONTINENTAL AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fine cracks developing in street joint in the roadway
|
2020-02-26
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
street opening made temp to grade
|
2020-02-26
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
2 cuts in the roadway
|
2020-02-25
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site working in the bus / driving lane
|
2020-02-25
|
No data
|
EAST 197 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HUTCHINSON RIV PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in the parking lane
|
2020-02-25
|
No data
|
WEST 34 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, leak in basement, cut in bus lane.
|
2020-02-24
|
No data
|
EAST 150 STREET, FROM STREET CEDAR LANE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 141 Restoration needs to be re-sealedThe restoration has asphalt broken/cracked out in the driving lane
|
2020-02-22
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut okay on r/w & s/w.
|
2020-02-22
|
No data
|
EAST 116 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been milled and resurfaced.
|
2020-02-21
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plated work site
|
2020-02-21
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in parking lane with sidewalk flag restored curb side i/f/o #324.
|
2020-02-21
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
final restoration
|
2020-02-21
|
No data
|
ELLIS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass, sidewalk and roadway ok
|
2020-02-19
|
No data
|
BRONXDALE AVENUE, FROM STREET BEND TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass. Sidewalk and roadway ok
|
2020-02-19
|
No data
|
MAGAW PLACE, FROM STREET WEST 181 STREET TO STREET WEST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration flush in front of 30
|
2020-02-19
|
No data
|
CONTINENTAL AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-02-19
|
No data
|
HOBART AVENUE, FROM STREET MIDDLETOWN ROAD TO STREET ROBERTS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, leak at valve, cut in parking /driving lane.
|
2020-02-19
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Short water cut remains in acceptable condition. No defects to report
|
2020-02-19
|
No data
|
EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
opp 760 perm to grade
|
2020-02-19
|
No data
|
CEDAR AVENUE, FROM STREET WEST 182 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-02-18
|
No data
|
TURNEUR AVENUE, FROM STREET NORTON AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0114 - REPAIR SEWER /stick barricades around excavation on sidewalk at side of property
|
2020-02-18
|
No data
|
LAFAYETTE AVENUE, FROM STREET VINCENT AVENUE TO STREET WILCOX AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway, cut temp on the sidewalk
|
2020-02-18
|
No data
|
TURNEUR AVENUE, FROM STREET NORTON AVENUE TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Purpose: Sewer is backing up .Basement full of water/BACKFILL ON GRASS AREA AT ADDRESS 335
|
2020-02-18
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed I/F/O 1421 sidewalk flags received patch work. All flags containing substantial defects shall be fully replaced PATCHING OF INDIVIDUAL FLAGS IS NOT PERMITTEDThe restoration need to be resealed in the parking lane.
|
2020-02-16
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failure to post a raise plow sign during the winter moratorium as is required, I/F/O 650
|
2020-02-14
|
No data
|
BOSTON ROAD, FROM STREET DYRE AVENUE TO STREET REEDS MILL LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway.
|
2020-02-14
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-02-13
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There is a permanent restoration that is flushed to grade in the parking lane and one sidewalk flag has been restored.
|
2020-02-12
|
No data
|
SOUTHERN BOULEVARD, FROM STREET EAST 156 STREET TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cars parked on location
|
2020-02-12
|
No data
|
SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
made perm to grade
|
2020-02-12
|
No data
|
EDISON AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
leak in basement, pin hole was found. cut on rd/w
|
2020-02-09
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp to grade, sidewalk made safe with plywood structure
|
2020-02-09
|
No data
|
LAFAYETTE AVENUE, FROM STREET VINCENT AVENUE TO STREET WILCOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating front lawn walkway, repairing sewer backing into house. Confirmed.
|
2020-02-09
|
No data
|
AVENUE A, FROM STREET EAST 6 STREET TO STREET EAST 7 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failure to provide identifying markings on 2 plates, I/F/O 99
|
2020-02-09
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2020-02-08
|
No data
|
DAWSON STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Leak in the Basement. Property Owner on Site
|
2020-02-06
|
No data
|
SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water cut found on roadway
|
2020-02-06
|
No data
|
WEST 45 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
LONG WATER CUT RD/W - S/W
|
2020-02-04
|
No data
|
3 AVENUE, FROM STREET EAST 75 STREET TO STREET EAST 76 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water restoration in d/l is good.
|
2020-01-31
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to inspect
|
2020-01-31
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-01-31
|
No data
|
EAST 238 STREET, FROM STREET MARTHA AVENUE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2020-01-31
|
No data
|
TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
made perm to grade
|
2020-01-30
|
No data
|
EAST 179 STREET, FROM STREET ARTHUR AVENUE TO STREET LA FONTAINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-01-30
|
No data
|
CROTONA AVENUE, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2020-01-30
|
No data
|
PAULDING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the driving lane flush and sealed
|
2020-01-29
|
No data
|
LACONIA AVENUE, FROM STREET EAST 217 STREET TO STREET EAST 218 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site leak under tap, 3 day notice verified.
|
2020-01-29
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 4428 perm to grade
|
2020-01-28
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the driving lane OPP 2700, Flush and sealed
|
2020-01-28
|
No data
|
WEST 153 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag is sealed around water valve IFO 270.
|
2020-01-27
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2020-01-24
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-01-23
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2020-01-23
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut in roadway is up to grade sidewalk flag restored in kind. In front of 223.
|
2020-01-23
|
No data
|
TIEMANN AVENUE, FROM STREET BEND TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in compliance
|
2020-01-23
|
No data
|
EAST GUN HILL ROAD, FROM STREET COLDEN AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must repair 1’X1’ area within perm restoration that is sunken an Inch and a half below grade, in the parking lane IFO 963, Also must reseal street opening joints.
|
2020-01-22
|
No data
|
HONE AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the roadway flush and sealed
|
2020-01-18
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the middle of the roadway flush and sealed
|
2020-01-17
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber made flush sunken area adjacent, to perm restoration
|
2020-01-16
|
No data
|
WESTCHESTER AVENUE, FROM STREET HERSCHELL STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2020-01-16
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew working on s/w
|
2020-01-14
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, two cuts IFO 716 work in compliance to stips.
|
2020-01-12
|
No data
|
PUGSLEY AVENUE, FROM STREET HAVILAND AVENUE TO STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2020-01-12
|
No data
|
CLARENCE AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in roadway street joints must be completely resealed, 2 IBM tags were placed in trench with incorrect permitee info. Current IBM tag #06215 OGrady must be replaced with #50285 , year 2019.
|
2020-01-10
|
No data
|
HUNTER AVENUE, FROM STREET ERSKINE PLACE TO STREET STILLWELL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew is making cut final. cut opposite of 2205.
|
2020-01-09
|
No data
|
EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway.
|
2020-01-09
|
No data
|
WHITE PLAINS ROAD, FROM STREET GLEASON AVENUE TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, cut on rd/w, s/w. leak in basement.
|
2020-01-08
|
No data
|
WEST FARMS ROAD, FROM STREET BRYANT AVENUE TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2020-01-08
|
No data
|
CONTINENTAL AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew digging in driving lane, sewer is backed up.
|
2020-01-08
|
No data
|
EAST 211 STREET, FROM STREET BOSTON ROAD TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumber restoration under park car in the parking lane.
|
2020-01-08
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A 1' x 1' area, adjacent to plumber restoration sunken 2-3" below grade. 2716
|
2020-01-08
|
No data
|
9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut is up to grade in the roadway/ bike lane. In front of 132.
|
2020-01-07
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in the roadway
|
2020-01-07
|
No data
|
SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no water done
|
2020-01-06
|
No data
|
VIRGIL PLACE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- In Parking Lane - Steel Plate(s) Serving no Purpose
|
2020-01-06
|
No data
|
BEACH AVENUE, FROM STREET GUERLAIN STREET TO STREET MANSION STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, replacing sewer.
|
2020-01-04
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2020-01-03
|
No data
|
MURDOCK AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway
|
2020-01-02
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
13 ft oval shape depression on rd/w, crew currently in sidewalk
|
2020-01-02
|
No data
|
GRAHAM AVENUE, FROM STREET MC KIBBIN STREET TO STREET SEIGEL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed on sidewalk
|
2019-12-31
|
No data
|
GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in compliance.
|
2019-12-31
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in basement (visibly confirmed),one excavation made on roadway at time of inspection.
|
2019-12-31
|
No data
|
EAST 104 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
At this time tunneling was done but no fee was documented on permit. Permit needs to be amended. 3ft 9 x 3ft 4 x 3ft 8
|
2019-12-31
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Asphalt broken out and down 1 1/2" below Roadway surface with your wearing course surface raveling and not smooth as required by 34 RCNY 2-11 (e) (12) ( xiii).
|
2019-12-31
|
No data
|
EAST 6 STREET, FROM STREET AVENUE B TO STREET AVENUE C
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor actively working on site. Notified contractor to remove non commercial vehicle from work zone. Contractor complied
|
2019-12-29
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in the roadway is good/ sw ifo 551 is flush with sealed expansion joint
|
2019-12-27
|
No data
|
LORILLARD PLACE, FROM STREET EAST 188 STREET TO STREET EAST 189 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site, water leak
|
2019-12-23
|
No data
|
SUMMIT AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
0113 - REPAIR WATER /temp mack on roadway and restored sidewalk flag/in compliance
|
2019-12-19
|
No data
|
WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flag surrounding water valve in compliance i.f.o 41
|
2019-12-19
|
No data
|
WEST 142 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut remains in acceptable condition.
|
2019-12-18
|
No data
|
WEST 73 STREET, FROM STREET BROADWAY TO STREET WEST END AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in driving lane in compliance i/f/o 260
|
2019-12-14
|
No data
|
JEFFERSON PLACE, FROM STREET BOSTON ROAD TO STREET CLINTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Permanent restoration in roadway to grade. Sidewalk flags restored
|
2019-12-11
|
No data
|
EAST 214 STREET, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2019-12-11
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration street opening joints need to be resealed IFO 218.
|
2019-12-10
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flush in the roadway IFO 181.
|
2019-12-08
|
No data
|
BARNES AVENUE, FROM STREET BRONXDALE AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade, s.w good.
|
2019-12-07
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street resurfaced.
|
2019-12-06
|
No data
|
VYSE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 1145 perm to grade
|
2019-12-05
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 40 STREET TO STREET EAST 41 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR WATER: Crew is on site. traffic is flowing smoothly.
|
2019-12-04
|
No data
|
5 AVENUE, FROM STREET EAST 127 STREET TO STREET EAST 128 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in roadway,one excavation made on roadway at time of inspection, 3 day notice issued.
|
2019-12-04
|
No data
|
WILLETT AVENUE, FROM STREET EAST 213 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-12-01
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2019-11-30
|
No data
|
STRANG AVENUE, FROM STREET MONTICELLO AVENUE TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm long water restoration in the roadway
|
2019-11-30
|
No data
|
MURDOCK AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp cut in the roadway and behind property line of MT ST Michael Academy( opposite house # 4363)
|
2019-11-30
|
No data
|
GUNTHER AVENUE, FROM STREET GIVAN AVENUE TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway, street joints resealed
|
2019-11-29
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade OPP 2528, Flush and sealed.
|
2019-11-29
|
No data
|
GEORGE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm Water Cut in Compliance
|
2019-11-29
|
No data
|
CROES AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-11-27
|
No data
|
WEST 164 STREET, FROM STREET ANDERSON AVENUE TO STREET WOODYCREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w & r/w ok
|
2019-11-27
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Repaired, found a permanent Restoration to grade in the driving / parking lanes, also two Restorations were made into one Restoration. Unable to view parking lane portion.
|
2019-11-27
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-11-26
|
No data
|
TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in good condition.
|
2019-11-26
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, excavated s/w & rwy, repairing water, basement flooded in building 84 which cause flooding in building 82. Confirmed.
|
2019-11-26
|
No data
|
BURKE AVENUE, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in bike lane good.
|
2019-11-25
|
No data
|
DECATUR AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2019-11-25
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
One sidewalk flag replace on s/s of street. Restoration in parking lane adjacent to s/w flag partially observed.
|
2019-11-22
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-11-22
|
No data
|
WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been milled and resurfaced. No defects to report
|
2019-11-22
|
No data
|
VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-11-22
|
No data
|
BRYANT AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-11-21
|
No data
|
CONVENT AVENUE, FROM STREET WEST 149 STREET TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Short water cut remains in acceptable condition
|
2019-11-20
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints have been properly recessed and sealed.
|
2019-11-19
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Color code installed to water cut.
|
2019-11-18
|
No data
|
EAST 214 STREET, FROM STREET BARNES AVENUE TO STREET HOLLAND AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site completing wearing course on roadway opposite address
|
2019-11-18
|
No data
|
OGDEN AVENUE, FROM STREET BEND TO STREET DR M L KING JR BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass
|
2019-11-18
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass
|
2019-11-17
|
No data
|
MACON STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temporary restoration in roadway to grade
|
2019-11-15
|
No data
|
DECATUR AVENUE, FROM STREET EAST 211 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
A/T/P/O I observed the above respondent had failed to begin emergency work within 2 hours after obtaining a permit on 11/14/19 at 8:25 AM. no excavations was found on the existing roadway or sidewalk.
|
2019-11-15
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2019-11-15
|
No data
|
MACON STREET, FROM STREET PATCHEN AVENUE TO STREET MALCOLM X BOULEVARD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wet-Den-112.5, Dry-Den-104.6, Max. Dry-Den-108.6, Act. Moist- 7.5, Material- Clean fill, Test- Sand cone, Lab - Exclusive Testing Labs, Lab tech- Joel, Compaction Results - (2-Cuts) Cut-1-(96.2), Cut-2-(97.0, 97.8)
|
2019-11-14
|
No data
|
WEEKS AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST 175 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site, cut opposite side of street.
|
2019-11-13
|
No data
|
LELAND AVENUE, FROM STREET ARCHER STREET TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site water leak, one roadway cut
|
2019-11-11
|
No data
|
VIRGIL PLACE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water service leaking inside of property
|
2019-11-11
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored with concrete panel in roadway.
|
2019-11-10
|
No data
|
ANTHONY AVENUE, FROM STREET EAST 180 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut i/f/o 2072
|
2019-11-09
|
No data
|
WESTCHESTER AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the parking lane and new sidewalk flags flush and sealed.
|
2019-11-09
|
No data
|
WASHINGTON AVENUE, FROM STREET EAST 179 STREET TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street re-surfaced
|
2019-11-09
|
No data
|
WEST 135 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work observed on r/w, s/w okay.
|
2019-11-08
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-11-08
|
No data
|
WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
color code missing.
|
2019-11-08
|
No data
|
GRAND AVENUE, FROM STREET RESERVOIR AVENUE TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane, new sidewalk flag.
|
2019-11-08
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-11-08
|
No data
|
COLDEN AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work found or visible at this time permit expired
|
2019-11-08
|
No data
|
EAST 77 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags in compliance. Roadway resurfaced.
|
2019-11-07
|
No data
|
VICTOR STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed and acceptable in the roadway IFO 1743
|
2019-11-07
|
No data
|
NAPIER AVENUE, FROM STREET EAST 233 STREET TO STREET EAST 235 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one permanent roadway cut opposite side of the street
|
2019-11-07
|
No data
|
VICTOR STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site, roadway/sidewalk cut side of 670 Morris Park Ave on Victor St
|
2019-11-06
|
No data
|
ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-11-02
|
No data
|
EAST 220 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm restoration in the roadway
|
2019-11-02
|
No data
|
EAST TREMONT AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET ST RAYMONDS CEMETERY BOUNDARY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to locate restoration
|
2019-11-01
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
p/l perm to grade
|
2019-11-01
|
No data
|
WARD AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work in progress, stipulated start
|
2019-11-01
|
No data
|
EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done behind property line
|
2019-10-30
|
No data
|
DECATUR AVENUE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-10-29
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 164 STREET TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to locate cut
|
2019-10-29
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane markings not restored.
|
2019-10-28
|
No data
|
SEXTON PLACE, FROM STREET ADEE AVENUE TO STREET FISH AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site, one cut opposite 2796
|
2019-10-27
|
No data
|
WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-10-27
|
No data
|
WESTCHESTER AVENUE, FROM STREET ELDER AVENUE TO STREET WHEELER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-10-26
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired
|
2019-10-26
|
No data
|
STILLWELL AVENUE, FROM STREET BEND TO STREET EASTCHESTER ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-10-26
|
No data
|
PAULDING AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
In compliance
|
2019-10-26
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-10-25
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
milled r/w
|
2019-10-24
|
No data
|
CINCINNATUS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
p/l-d/l perm to grade
|
2019-10-24
|
No data
|
STORY AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-10-24
|
No data
|
ALBANY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm restoration in r/w
|
2019-10-23
|
No data
|
EAST 223 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site, broken sewer one cut on sidewalk.
|
2019-10-23
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2019-10-22
|
No data
|
EAST 148 STREET, FROM STREET COLLEGE AVENUE TO STREET COURTLANDT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2019-10-21
|
No data
|
WEST 119 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Apparently plumber out of business
|
2019-10-21
|
No data
|
112 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
back fill complete
|
2019-10-21
|
No data
|
112 STREET, FROM STREET 34 AVENUE TO STREET 37 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water service leaking in sidewalk. Homeowner issued 3 day notice
|
2019-10-21
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been milled and resurfaced. Sidewalk flags I/F/O 322 have been fully replaced. No defects to report
|
2019-10-20
|
No data
|
BARKER AVENUE, FROM STREET BURKE AVENUE TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-10-18
|
No data
|
WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Tech on Location, Material(SAND)passed. Wet Density: 117.6, Dry Density: 108.2, Max Dry Density: 110.8, Actual Moisture: 8.7%. Excavation is 6'10"X3'1"X3'10" - Deep. 1 Lift 1 Test, 97.6. BAC was saw cut and chipped out for BSE.
|
2019-10-18
|
No data
|
WEST 50 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak in Basement Went in to Verify
|
2019-10-18
|
No data
|
MORRISON AVENUE, FROM STREET HARROD PLACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done
|
2019-10-18
|
No data
|
WESTCHESTER AVENUE, FROM STREET MORRISON AVENUE TO STREET STRATFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-10-17
|
No data
|
NEREID AVENUE, FROM STREET EDSON AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pin holes sealed
|
2019-10-16
|
No data
|
PUGSLEY AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-10-16
|
No data
|
STORY AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-10-16
|
No data
|
LUCERNE STREET, FROM STREET BEND TO STREET RADIO DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm in roadway I/F/O 3261
|
2019-10-16
|
No data
|
STADIUM AVENUE, FROM STREET AGAR PLACE TO STREET RAWLINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway Resurfaced.
|
2019-10-16
|
No data
|
CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway Resurfaced.
|
2019-10-15
|
No data
|
OLMSTEAD AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-10-15
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane paint installed
|
2019-10-15
|
No data
|
BRYANT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
street milled and repaved
|
2019-10-14
|
No data
|
FISH AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-10-14
|
No data
|
EAST 86 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored at time of inspection.
|
2019-10-12
|
No data
|
EASTCHESTER ROAD, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-10-11
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurfaced
|
2019-10-11
|
No data
|
TIEMANN AVENUE, FROM STREET DEAD END TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm restoration in the roadway
|
2019-10-10
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Water cut has sunken at street opening joint (edge) adjacent to south parking lane. So, it's part of your cut. Cuts are less then 10' apart and will need to be joint together as one as per DOT drawing H-1042D, note #9, regardless. Protest is denied.
|
2019-10-10
|
No data
|
NOBLE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-10-10
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Protest denied. It's park of their cut and it's less than 10' apart. Must restore both cuts as one continues cut.
|
2019-10-06
|
No data
|
EAST 228 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in parking lane in compliance
|
2019-10-05
|
No data
|
WEST 131 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no defects found on roadway/sdwk
|
2019-10-05
|
No data
|
BRUNER AVENUE, FROM STREET BUSSING AVENUE TO STREET EDENWALD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut in compliance
|
2019-10-05
|
No data
|
SOUNDVIEW AVENUE, FROM STREET BOLTON AVENUE TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
not found
|
2019-10-04
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in roadway and sidewalk
|
2019-10-02
|
No data
|
WHITTIER STREET, FROM STREET LAFAYETTE AVENUE TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp to grade
|
2019-10-02
|
No data
|
WHITTIER STREET, FROM STREET LAFAYETTE AVENUE TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work completed under later permit
|
2019-10-01
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued to the Respondent for failing to comply and conform to 1042A note 9. As per standard details of construction When cuts are 10ft or less apart wearing course shall be joined. Cuts are currently 5ft apart from their street joints.
|
2019-10-01
|
No data
|
HOLLYWOOD AVENUE, FROM STREET BARKLEY AVENUE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
two perm. roadway cuts, one perm. sidewalk cut
|
2019-09-29
|
No data
|
WEST 183 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut is flush and color coded
|
2019-09-28
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to install 1 of the 2 perm cuts on the driving lane is still missing yellow lane marking i/f/o 5450, 5447. As per C.A.R # 20194170111 date issued on 6/4/19. Permit expired on 2/25/19.
|
2019-09-28
|
No data
|
KINGSLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by DOT
|
2019-09-27
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not found permit expired
|
2019-09-27
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent water restoration IFO 218 is in compliance
|
2019-09-26
|
No data
|
ST NICHOLAS AVENUE, FROM STREET DONNELLON SQUARE TO STREET WEST 148 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag restored and expansion joints sealed.
|
2019-09-26
|
No data
|
PITMAN AVENUE, FROM STREET BRUNER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site making street opening opposite 1810, 3 day notice
|
2019-09-26
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-09-25
|
No data
|
WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At the time of inspection, I found a permanent restoration that is flushed to grade in the bus lane and one sidewalk flags was restored.
|
2019-09-25
|
No data
|
ST NICHOLAS AVENUE, FROM STREET WEST 154 STREET TO STREET WEST 155 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
According to Building GC Work Crew Hit the Water Line during Renovation Construction.
|
2019-09-24
|
No data
|
TIEBOUT AVENUE, FROM STREET BEND TO STREET EAST 180 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
two cuts made on the sidewalk only
|
2019-09-24
|
No data
|
SOUNDVIEW AVENUE, FROM STREET BOLTON AVENUE TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-09-23
|
No data
|
WEST 131 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
M012019070A06-Latest permit
|
2019-09-21
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag restored and expansion joints sealed. Roadway was resurfaced.
|
2019-09-21
|
No data
|
WEST 150 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Wrong address for permit.
|
2019-09-20
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic water service leaking in basement.
|
2019-09-20
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flush in the driving lane.
|
2019-09-20
|
No data
|
117 STREET, FROM STREET 133 AVENUE TO STREET 135 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill complete and acceptable. Cut size 4'x3'x3' Tests w/d 123.6, d/d 113.7, m/d/d 117.5, a/m 8.7 % and Lift 97.9
|
2019-09-19
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration is missing color code 84.
|
2019-09-19
|
No data
|
GLEASON AVENUE, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-09-19
|
No data
|
OGDEN AVENUE, FROM STREET BEND TO STREET DR M L KING JR BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 1426 restore two (2) solid yellow lines In Driving Lane
|
2019-09-18
|
No data
|
WHITTIER STREET, FROM STREET LAFAYETTE AVENUE TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
A/T/P/O The above respondent has a temporary roadway cut sunken approximately 2 inches with chunks of discarded asphalt debris and not flush with surrounding area.
|
2019-09-17
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway repaired
|
2019-09-17
|
No data
|
WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut okay
|
2019-09-16
|
No data
|
FT WASHINGTON AVENUE, FROM STREET WEST 185 STREET TO STREET WEST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut is good in the bike lane
|
2019-09-15
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut in compliance
|
2019-09-15
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to restore water cut to grade; flush with surrounded area. wearing course left mounded 2 inches. corrective action request issued 5.9.19-CAR #20194560218
|
2019-09-14
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Between 2 and partially on 1 of your permanent repair water Restoration sunken 2" below Roadway surface. Also Restorations measured 9' 8" from each other. H 1042D note 9 requires 10' or less from each other must be made into 1 continuous Cut.
|
2019-09-13
|
No data
|
WATERBURY AVENUE, FROM STREET EDISON AVENUE TO STREET GILLESPIE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber on site 3 openings 2 on the roadway T intersection working at intersection of Gillespie ave over newly paved con-ed cut.
|
2019-09-12
|
No data
|
BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-09-12
|
No data
|
PAULDING AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Sidewalk restoration not in kind. Full flag restoration needed - Expansion joints need to be installed - Sidewalk expansion joints need to be sealed
|
2019-09-11
|
No data
|
MEAGHER AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-09-11
|
No data
|
WEST 130 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
4'.3'' x 4' x 3' PLO'Grady Plumbing Foreman Shamus Monitored back fill it pass.
|
2019-09-11
|
No data
|
MILTON PLACE, FROM STREET EAST TREMONT AVENUE TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-09-11
|
No data
|
REVERE AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-09-10
|
No data
|
WEST 130 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, excavating parking lane & s/w ifo #45, repair to fire sprinkler.
|
2019-09-09
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the driving lane, also 1 sidewalk flag around a valve has been restored and is free of defects.
|
2019-09-09
|
No data
|
CLARENCE AVENUE, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done
|
2019-09-08
|
No data
|
GLEBE AVENUE, FROM STREET GLOVER STREET TO STREET MANNING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-09-08
|
No data
|
MELVILLE STREET, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced by DEP
|
2019-09-08
|
No data
|
VAN NEST AVENUE, FROM STREET MELVILLE STREET TO STREET TAYLOR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-09-07
|
No data
|
WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIdewalk flag in compliance.
|
2019-09-07
|
No data
|
EAST 233 STREET, FROM STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Permit # x012019199A36 on file for house # 1032a, long water perm restoration done in T shape intersection of Wickham Avenue
|
2019-09-07
|
No data
|
EAST 233 STREET, FROM STREET BRUNER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
long water Perm restoration in the roadway, in front of address given, work done in the T shape intersection of wickham Ave,
|
2019-09-07
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flush in the parking lane with sidewalk flags restored and expansion joints sealed.
|
2019-09-07
|
No data
|
NELSON AVENUE, FROM STREET EDWARD L GRANT HIGHWAY TO STREET WEST 172 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
perm cut on roadway in compliance at time of inspection
|
2019-09-03
|
No data
|
EAST 169 STREET, FROM STREET COLLEGE AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water shut off 10 day notice issued from DEP,one excavation made on roadway in front of 283 east 169 street.
|
2019-08-30
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
failed to conform to 1042A note 9. As per standard details of construction When cuts are 10ft or less apart wearing course shall be joined. Cuts are currently 5ft apart from their street joints. CAR#20195010184 issued 5-32-19 remains the same.
|
2019-08-30
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O The above reposndent failed to restore Lane markings for “Bump” in roadway indication. After CAR#20193690086 issued 3-22-19 Condition remains the same.
|
2019-08-30
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fill pin holes with a fine asphalt/concrete mix
|
2019-08-28
|
No data
|
FULLER STREET, FROM STREET SEDDON STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-08-28
|
No data
|
EAST 149 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not done
|
2019-08-27
|
No data
|
MORTON STREET, FROM STREET BEND TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At the time of inspection, I found a permanent cut that is flushed to grade in the driving lane.
|
2019-08-23
|
No data
|
EAST 93 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work visible in front of or in the proximity of 315 E. 93rd St. Verified
|
2019-08-22
|
No data
|
STRANG AVENUE, FROM STREET MONTICELLO AVENUE TO STREET SETON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
perm cut on roadway in compliance at time of inspection
|
2019-08-21
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J
|
2019-08-21
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
white lane marking has been applied
|
2019-08-20
|
No data
|
EAST 93 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Owner cancelled the job for this address, NO WORK DONE.
|
2019-08-20
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Green bike lane paint needs to be restored to permanent restoration.
|
2019-08-20
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane markings restored to Bike lane.
|
2019-08-20
|
No data
|
EAST 93 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Owner cancelled the job for this address, NO WORK DONE.
|
2019-08-19
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
In compliance joints sealed
|
2019-08-19
|
No data
|
LURTING AVENUE, FROM STREET ESPLANADE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J
|
2019-08-16
|
No data
|
EAST 116 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flush in the driving lane IFO 219.
|
2019-08-16
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration flush in the driving lane IFO 2127.
|
2019-08-14
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2019-08-14
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane markings have been applied
|
2019-08-14
|
No data
|
BRONXDALE AVENUE, FROM STREET BEND TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-08-12
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-08-12
|
No data
|
DR M L KING JR BOULEVARD, FROM STREET FEATHERBED LANE TO STREET WEST 175 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
8'' domestic sanitary sewer broken,one excavation made on the sidewalk at time of inspection,crew will trench to city sewer.
|
2019-08-11
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ARROW LANE MARKING RESTORED
|
2019-08-10
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE TO STREET WESTERLY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved & re-surfaced restored in kind.
|
2019-08-10
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration flushed to grade in the roadway on Colonial Court & Harbor View terr
|
2019-08-10
|
No data
|
ADEE AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-08-10
|
No data
|
BRONXWOOD AVENUE, FROM STREET CHESTNUT STREET TO STREET SOUTH OAK DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-08-09
|
No data
|
WHITE PLAINS ROAD, FROM STREET EAST GUN HILL ROAD TO STREET MAGENTA STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
street leak, plumber on site
|
2019-08-08
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Found Street repaved.
|
2019-08-07
|
No data
|
JEROME AVENUE, FROM STREET EAST 208 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Not done
|
2019-08-05
|
No data
|
BEACH AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET GUION PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
one roadway cut made perm. no one on site, no debris
|
2019-08-04
|
No data
|
TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
made perm to grade
|
2019-08-04
|
No data
|
GARFIELD STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-08-03
|
No data
|
TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass
|
2019-08-02
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active Cobblestone restoration at location.
|
2019-08-01
|
No data
|
MAHAN AVENUE, FROM STREET BUHRE AVENUE TO STREET WILLOW LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
spoke to foreman sheme, sewer excavation at willow lane and Mahan Avenue, local law schedule for 2:30 pm
|
2019-07-31
|
No data
|
DORIS STREET, FROM STREET HAVEMEYER AVENUE TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Opp 1418, perm to grade
|
2019-07-30
|
No data
|
VAN NEST AVENUE, FROM STREET BOGART AVENUE TO STREET RADCLIFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
FOUND RESURFACED
|
2019-07-30
|
No data
|
OGDEN AVENUE, FROM STREET WEST 161 STREET TO STREET WEST 162 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No issuance needed
|
2019-07-30
|
No data
|
NEREID AVENUE, FROM STREET EDSON AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to remove pin next to perm trench in the driving lane I/F/O 1929 Nereid Ave. As per C.A.R # 20194560285 issued on 6/20/19.
|
2019-07-26
|
No data
|
EAST 149 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started
|
2019-07-25
|
No data
|
WARD AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-07-25
|
No data
|
NOBLE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-07-24
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass
|
2019-07-22
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent repair water restoration flushed to grade in the roadway, in compliance. 324-326
|
2019-07-21
|
No data
|
EAST 216 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work seen on sidewalk
|
2019-07-20
|
No data
|
EAST 233 STREET, FROM STREET BRUNER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
I observed the above respondent with no cut within segement at time of inspection after calling in emergency permit at 7/18/2019 10:00:34 AM.Respondent failed to begin emergency work in segment within 2 hours after authorization.
|
2019-07-20
|
No data
|
EAST 220 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
perm cut on roadway in compliance at time of inspection.
|
2019-07-20
|
No data
|
EAST 233 STREET, FROM STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
cut in the intersection.Respondent failed to have an active permit for use of the roadway.Respondent id by permit X012019199A36 for use of segment,respondent should have called in intersection permit.
|
2019-07-19
|
No data
|
LONGFELLOW AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-07-18
|
No data
|
EAST 149 STREET, FROM STREET COURTLANDT AVENUE TO STREET MORRIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2019-07-17
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RESPONDENT IS ACTIVELY WORKING ON SIDEWALK WATER REPAIR RESTORATION AT LOCATION WITHOUT A VALID NYCDOT PERMIT. CONTRACTOR PERMIT M012019197A22 ISSUED FOR ROADWAY USE ONLY USED FOR IDENTIFICATION PURPOSE ONLY
|
2019-07-16
|
No data
|
CLARKSON STREET, FROM STREET GREENWICH STREET TO STREET WASHINGTON STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service water visible within cut
|
2019-07-15
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
2016 sidewalk flag restored with expansion joint applied.
|
2019-07-14
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-07-13
|
No data
|
GUNTHER AVENUE, FROM STREET GIVAN AVENUE TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
re sealed
|
2019-07-13
|
No data
|
WICKHAM AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-07-13
|
No data
|
EAST 146 STREET, FROM STREET BEND TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass
|
2019-07-13
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk expansion joint sealed.
|
2019-07-12
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to install 1 of the 2 perm cuts on the driving lane is still missing yellow lane marking i/f/o 5450. As per C.A.R # 20194170111 date issued on 6/4/19. Permit expired on 2/25/19.
|
2019-07-12
|
No data
|
LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
protest denied and repaired. sidewalk sealed now.n KR
|
2019-07-10
|
No data
|
TIFFANY STREET, FROM STREET EAST 163 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
made perm to grade
|
2019-07-10
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent water restoration in he roadway and the sidewalk is in compliance
|
2019-07-09
|
No data
|
DEVOE TERRACE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway in compliance.
|
2019-07-08
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
At the time of inspection, there was no work found in the roadway.
|
2019-07-07
|
No data
|
LOGAN AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joint needs to be sealed for the new sidewalk flag.
|
2019-07-07
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BEND TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flag and permanent cut with new con ed gas cut overlapping existing plumbers cut
|
2019-07-07
|
No data
|
VYSE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-07-07
|
No data
|
TENBROECK AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-07-07
|
No data
|
HERING AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
long water cut
|
2019-07-04
|
No data
|
UNIONPORT ROAD, FROM STREET AMETHYST STREET TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut i/f/o church in compliance
|
2019-07-03
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR WATER
|
2019-06-30
|
No data
|
CROTONA PARK NORTH, FROM STREET MARMION AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-06-29
|
No data
|
MULLEN PLACE, FROM STREET PENNYFIELD AVENUE TO STREET PRENTISS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Required cut back done, new building, no new sidewalk as yet,sidewalk needs to fully develop
|
2019-06-29
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to restore water cut to grade; flush with surrounded area. wearing course left mounded 2 inches. corrective action request issued 5.9.19-CAR #20194560218
|
2019-06-29
|
No data
|
GRACE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
resealed
|
2019-06-28
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued to the Respondent for failing to restore the bike lane in kind by not applying green paint. The Respondent was notified by CAR 20185010141 issued on 7/31/18. The Respondent was identified by permit above M012018169A14 expired 7/17/18.
|
2019-06-27
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O The above reposndent failed to restore Lane markings for “Bump” in roadway indication. After CAR#20193690086 issued 3-22-19 Condition remains the same.
|
2019-06-27
|
No data
|
WEST 153 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Equipment removed.
|
2019-06-27
|
No data
|
SHERMAN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-06-27
|
No data
|
SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-06-27
|
No data
|
EAST 170 STREET, FROM STREET COLLEGE AVENUE TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
made perm to grade
|
2019-06-27
|
No data
|
WEST FARMS ROAD, FROM STREET BRYANT AVENUE TO STREET HOME STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cuts in parking and driving lane
|
2019-06-26
|
No data
|
ALBANY CRESCENT, FROM STREET BAILEY AVENUE TO STREET HEATH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
on s/s of 3036, perm to grade
|
2019-06-26
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints not sealed.
|
2019-06-25
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20194510121-FAILED TO RESTORE WHITE ARROW LANE MARKINGS IN KIND ON ROADWAY OVER PERMANENT O'GRAY PLUMBING RESTORATION IN ROADWAY.
|
2019-06-24
|
No data
|
TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent with a permanent restoration currently broken along edges. Permittee notified by corrective Action Request 5/16/2019/07/24AM # 20192380096 to restore liquid asphalt cement along edges.
|
2019-06-22
|
No data
|
HONE AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-06-20
|
No data
|
NEREID AVENUE, FROM STREET EDSON AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel pins adjacent to your restoration need to be removed from roadway.once pin removed, pinhole needs to be filled with fine asphalt/concrete mix.roadway scaring adjacent to restoration also needs to be brought to grade
|
2019-06-20
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
the 2 Cuts have been finalized and are Flush to grade, I/F/O 38
|
2019-06-19
|
No data
|
GRANT AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2019-06-19
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET FT INDEPENDENCE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-06-19
|
No data
|
CANNON PLACE, FROM STREET BEND TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-06-18
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration needs to be restored in concrete as well
|
2019-06-18
|
No data
|
ROBINSON AVENUE, FROM STREET HARDING AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
plumber restore cut
|
2019-06-17
|
No data
|
OGDEN AVENUE, FROM STREET WEST 161 STREET TO STREET WEST 162 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 911 Restoration needs to be re-sealed
|
2019-06-17
|
No data
|
9 AVENUE, FROM STREET WEST 18 STREET TO STREET WEST 19 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm WATER repair acceptable
|
2019-06-16
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
previously inspected
|
2019-06-14
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Short water cut has been made final. No defects to report at this time
|
2019-06-12
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench OPP 2110, Flush and sealed
|
2019-06-09
|
No data
|
CROTONA AVENUE, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-06-09
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent with a permanent restoration currently broken along edges. Permittee notified by corrective Action Request 5/2/2019/13:07 PM # 20192380081 to restore liquid asphalt cement along edges.
|
2019-06-09
|
No data
|
WASHINGTON TERRACE, FROM STREET DEAD END TO STREET WEST 186 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to locate street
|
2019-06-07
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway and sidewalk good
|
2019-06-06
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag restored.
|
2019-06-06
|
No data
|
CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-06-06
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent Restoration in the parking lane.
|
2019-06-05
|
No data
|
DELAFIELD AVENUE, FROM STREET DELAFIELD PLACE TO STREET WEST 261 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm cuts in the driving lanes.
|
2019-06-05
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Respondent failed to apply white lane markings ifo 2400
|
2019-06-05
|
No data
|
SOUTHERN BOULEVARD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
not found
|
2019-06-05
|
No data
|
MAGAW PLACE, FROM STREET WEST 181 STREET TO STREET WEST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Short water cut remains in acceptable condition.
|
2019-06-04
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm cuts on the driving lane missing yellow lane marking i/f/o 5450. Has 2011 color code. Need to reapply I/B/M #, Year 2019 color code.
|
2019-06-03
|
No data
|
GLEBE AVENUE, FROM STREET ROWLAND STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway. opposite 2402
|
2019-06-03
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2019-06-02
|
No data
|
EAST BURNSIDE AVENUE, FROM STREET ANTHONY AVENUE TO STREET RYER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Restoration sealed.
|
2019-06-02
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
the 2 Cuts have been finalized and are Flush to grade, I/F/O 38.... (CAR Re-inspection Pass)
|
2019-06-02
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Restoration sealed.
|
2019-06-01
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to seal sidewalk expansion joints C.A.R # 20190690078 issued on 4/15/19. permit expired on 3/2/19.
|
2019-05-31
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
As per standard details of construction your cut shall conform to 1042A note 9. When cuts are 10ft or less apart wearing course shall be joined. Cuts are currently 5ft apart from their street joints. Also please seal you sidewalk expansion joints.
|
2019-05-30
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-05-30
|
No data
|
3 AVENUE, FROM STREET EAST 152 STREET TO STREET EAST 152 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaved r/w ok
|
2019-05-30
|
No data
|
WILCOX AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Balkan takes over plumber cut, as per previous inspection 2 pipes was leaking for house # 999 & 930, active permit on file X012019136A23
|
2019-05-30
|
No data
|
CHATTERTON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced as per dot permit X152019144A18
|
2019-05-29
|
No data
|
CALHOUN AVENUE, FROM STREET COLLIS PLACE TO STREET HARDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane
|
2019-05-29
|
No data
|
WEST 142 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
L shape restoration in roadway driving lane and sidewalk flag in complaince ifo of 542
|
2019-05-28
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent failed to seal sidewalk expansion joints I/F/O 5768 Mosholu Ave. As per C.A.R # 20190690078 issue on 4/15/19.
|
2019-05-25
|
No data
|
DELANOY AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance in parking lane
|
2019-05-25
|
No data
|
GUNTHER AVENUE, FROM STREET GIVAN AVENUE TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration cracked at the edges, needs to be re-sealed.
|
2019-05-25
|
No data
|
EAST 146 STREET, FROM STREET BEND TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the green plastic color code on a permanent restoration not having the year or IBM# as per CAR #20194560130 Issued 4/14/2019
|
2019-05-23
|
No data
|
MIDDLETOWN ROAD, FROM STREET WATERSTONE DRIVE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on sidewalk and roadway
|
2019-05-23
|
No data
|
EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET SANTO DONATO PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on sidewalk, roadway resurfaced
|
2019-05-22
|
No data
|
TULFAN TERRACE, FROM STREET DEAD END TO STREET OXFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the parking lane i/f/o 511.
|
2019-05-22
|
No data
|
WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No roadway restorations found
|
2019-05-20
|
No data
|
NEREID AVENUE, FROM STREET EDSON AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
restoration taken over from DEP. cut made final. info added to email for DEP survey
|
2019-05-20
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
respondent failed to seal sidewalk expansion joints at location.
|
2019-05-20
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Sidewalk flag restored, and Street restoration IFO 324 is permanently restored and flushed to grade grade with surrounding surface pavement. No asphalt broke out or cave-in observed. Sidewalk flag needs Caution tape removed. Permit is still active.
|
2019-05-19
|
No data
|
MULLEN PLACE, FROM STREET PENNYFIELD AVENUE TO STREET PRENTISS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water Cut Sidewalk expansion joints needs to be sealed along with re-sealing street opening joints.
|
2019-05-19
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to restore crosswalk & bike directional arrows lane markings over their permanent water restoration as per CAR #20195010064 issued 2/27/19
|
2019-05-19
|
No data
|
GRAHAM AVENUE, FROM STREET MC KIBBIN STREET TO STREET SEIGEL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags in compliance
|
2019-05-18
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I believe restoration at building # 65 belongs to DEP, Plumber permit is for building # 66.
|
2019-05-18
|
No data
|
HOLLYWOOD AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET PHILIP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-05-18
|
No data
|
NEREID AVENUE, FROM STREET EDSON AVENUE TO STREET GRACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
restoration made final
|
2019-05-17
|
No data
|
GRACE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to properly re seal their water restoration. corrective action request issued 3.30.19-CAR #20191220001
|
2019-05-16
|
No data
|
EAST 170 STREET, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NYC Dept Of Transportation DOT IN HOUSE PAVING
|
2019-05-16
|
No data
|
UNION AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-05-16
|
No data
|
CAMBRIDGE AVENUE, FROM STREET WEST 235 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street resurfaced
|
2019-05-16
|
No data
|
TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 1330 Restoration needs to be re-sealed
|
2019-05-16
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-05-16
|
No data
|
DE REIMER AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk work
|
2019-05-15
|
No data
|
CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-05-15
|
No data
|
TINTON AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-05-15
|
No data
|
GRAND AVENUE, FROM STREET WEST 188 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2019-05-14
|
No data
|
MACE AVENUE, FROM STREET EASTCHESTER ROAD TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DOT recently paved street
|
2019-05-14
|
No data
|
EAST MOSHOLU PARKWAY SOUTH, FROM STREET BRIGGS AVENUE TO STREET EAST 204 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1 cut on s.w 1 in r.w crew on site.
|
2019-05-13
|
No data
|
MERRICK BOULEVARD, FROM STREET 227 STREET TO STREET 228 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Leak in the Roadway. 3 Day Dep Notice Issued.
|
2019-05-12
|
No data
|
GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut re sealed
|
2019-05-11
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20194510121-FAILED TO RESTORE WHITE ARROW LANE MARKINGS IN KIND ON ROADWAY OVER PERMANENT O'GRAY PLUMBING RESTORATION IN ROADWAY.
|
2019-05-11
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work is good
|
2019-05-11
|
No data
|
BRYANT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed respondents permanent restoration on the roadway did not conform with Standard Detail Drawing 1042 D, note 6.
|
2019-05-11
|
No data
|
FENTON AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Color code in place
|
2019-05-09
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent water restoration in parking lane mounded 2 inches.
|
2019-05-08
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the driving lanes.
|
2019-05-07
|
No data
|
WEST 135 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defects ifo address at times of inspection
|
2019-05-07
|
No data
|
EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
WET: 122.1DRY: 116MAX: 120.5MOISTURE: 5.3First Lift: 96.8Last Lift: 96.2
|
2019-05-06
|
No data
|
EVELYN PLACE, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service
|
2019-05-04
|
No data
|
WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane markings have been restored
|
2019-05-04
|
No data
|
SCHLEY AVENUE, FROM STREET HOLLYWOOD AVENUE TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade OPP 3010, Flush and sealed
|
2019-05-04
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade in the roadway
|
2019-05-04
|
No data
|
KING AVENUE, FROM STREET BEACH STREET TO STREET BOWNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work is ok.
|
2019-05-04
|
No data
|
WEST 153 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Equipment on the street without a valid permit
|
2019-05-03
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-05-03
|
No data
|
MERRICK BOULEVARD, FROM STREET 233 STREET TO STREET 234 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in basement (visibly confirmed) one excavation made on roadway at time of inspection.
|
2019-05-03
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the parking lane flush and sealed
|
2019-05-02
|
No data
|
GUNTHER AVENUE, FROM STREET BARNES AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-05-02
|
No data
|
CONVENT AVENUE, FROM STREET WEST 149 STREET TO STREET WEST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Short water cut has been made final and is in compliance.
|
2019-05-02
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 Temporary Cuts - Driving & Parking Lane I/F/O 38, active permit maintained on file... (M012019114C03)
|
2019-05-02
|
No data
|
NELSON AVENUE, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to locate cute
|
2019-05-02
|
No data
|
SCOTT PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the parking lane new Concrete sidewalk flag OPP 2900, Flush and sealed.
|
2019-05-02
|
No data
|
SULLIVAN PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 Perm restorations In The parking lane On Sullivan PL AKA 3587
|
2019-05-02
|
No data
|
OGDEN AVENUE, FROM STREET WEST 161 STREET TO STREET WEST 162 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-05-02
|
No data
|
EAST TREMONT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SULLIVAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut not visible, unable to locate at this time.
|
2019-05-01
|
No data
|
EAST 222 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the parking lane.
|
2019-05-01
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 2444 Restoration needs to be re-sealed
|
2019-05-01
|
No data
|
WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway restoration ifo 45 no defects
|
2019-05-01
|
No data
|
ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced.
|
2019-04-30
|
No data
|
WEST FARMS ROAD, FROM STREET BRYANT AVENUE TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed the respondents with 2 permanent restoration on the roadway that did not conform with standard detail drawing H-1042D note # 6
|
2019-04-30
|
No data
|
VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in the driving lane
|
2019-04-30
|
No data
|
EDISON AVENUE, FROM STREET GREENE PLACE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the driving lane flush and sealed IFO 1055
|
2019-04-29
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
DEP water shut off confirmed with residence, long water p/l at IFO and d/l OP being excavated along with behind property line
|
2019-04-29
|
No data
|
VYSE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 cut in the driving lane and 1 cut on the sidewalk
|
2019-04-28
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water repair in compliance
|
2019-04-28
|
No data
|
SOUTHERN BOULEVARD, FROM STREET BOSTON ROAD TO STREET CROTONA PARK EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-04-28
|
No data
|
FORDHAM STREET, FROM STREET BROWN PLACE TO STREET MINNIEFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work is ok here
|
2019-04-27
|
No data
|
HOLLYWOOD AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade adjacent to curb and new concrete sidewalk flags flush and sealed
|
2019-04-27
|
No data
|
VINCENT AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the p/d lane
|
2019-04-27
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass 1 cut in the parking lane and sidewalk in compliance
|
2019-04-26
|
No data
|
BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in compliance
|
2019-04-26
|
No data
|
SOUTHERN BOULEVARD, FROM STREET INTERVALE AVENUE TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done crossing temporary electrical trench / temp to grade
|
2019-04-25
|
No data
|
PARK AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-04-25
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration within speed bump no defects.
|
2019-04-25
|
No data
|
BALCOM AVENUE, FROM STREET BEND TO STREET LATTING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the parking lane and new concrete sidewalk flag flush and sealed
|
2019-04-25
|
No data
|
RHINELANDER AVENUE, FROM STREET AMETHYST STREET TO STREET VICTOR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in r.w, new s.w flag.
|
2019-04-24
|
No data
|
EAST BURNSIDE AVENUE, FROM STREET ANTHONY AVENUE TO STREET RYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/0 288 Restoration needs to be re-sealed
|
2019-04-24
|
No data
|
DAVIDSON AVENUE, FROM STREET WEST 184 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-04-24
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-04-24
|
No data
|
EAST 150 STREET, FROM STREET CEDAR LANE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to inspect due to school has street closed
|
2019-04-24
|
No data
|
BRYANT AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM FINAL IN THE PARKING LANE AND DRIVING LANE
|
2019-04-23
|
No data
|
GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CORE SAMPLES DONE ON PERM CUT IN D/L THAT PASS.
|
2019-04-23
|
No data
|
WEST 190 STREET, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CORE SAMPLES DONE ON PERM CUT IN D/L THAT PASS.
|
2019-04-23
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CORE SAMPLE WAS DONE ON PERM CUT IN P/L THAT PASS.
|
2019-04-23
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CORE SAMPLES DONE TO PERM RESTORATION IN D/L THAT PASSED INSPECTION.
|
2019-04-23
|
No data
|
BOOTH MEMORIAL AVENUE, FROM STREET 163 STREET TO STREET 164 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic sanitary sewer collapsed in sidewalk,one excavation made on sidewalk at time of inspection.
|
2019-04-22
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new work done
|
2019-04-22
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 2030 Restoration needs to be re-sealed
|
2019-04-21
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET WEST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-21
|
No data
|
CINCINNATUS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM FINAL IN THE PARKING LANE
|
2019-04-21
|
No data
|
PUGSLEY AVENUE, FROM STREET HAVILAND AVENUE TO STREET POWELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in r/w, new s/w flag good.
|
2019-04-20
|
No data
|
EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk, roadway paved
|
2019-04-19
|
No data
|
EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in the driving lane
|
2019-04-19
|
No data
|
TINTON AVENUE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 cut in the driving lane in compliance
|
2019-04-19
|
No data
|
EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-04-18
|
No data
|
EAST 179 STREET, FROM STREET ARTHUR AVENUE TO STREET LA FONTAINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-18
|
No data
|
CLARENCE AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the roadway IFO 711, Flush and sealed
|
2019-04-17
|
No data
|
EAST 239 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm in the parking lane
|
2019-04-17
|
No data
|
ROBINSON AVENUE, FROM STREET HARDING AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent has a temporary water restoration in the driving lane OPP 256. Respondent failed to permanently restore cut within required time, permit expired on 3/31/19.
|
2019-04-17
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-04-16
|
No data
|
FINDLAY AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on the sidewalk pass
|
2019-04-16
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-15
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must seal expansion joints on the sidewalk
|
2019-04-15
|
No data
|
GLEASON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Resurfaced
|
2019-04-15
|
No data
|
CEDAR AVENUE, FROM STREET WEST 182 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 cut in the driving lane
|
2019-04-15
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 cut in driving lane in compliance
|
2019-04-15
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 cut in the parking lane in compliance
|
2019-04-15
|
No data
|
WEST 190 STREET, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water cut opposite 39 in compliance
|
2019-04-15
|
No data
|
CLAY AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to locate cut due to alternate side of street parking
|
2019-04-15
|
No data
|
STORY AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Spray restoration for core run
|
2019-04-14
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut on sidewalk and roadway in compliance
|
2019-04-14
|
No data
|
EAST 146 STREET, FROM STREET BEND TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
current color code does not reflect permittee nor year.please replace with proper color code tab.
|
2019-04-14
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent failed to restore the bike lane in kind by not applying green paint. CAR20185010141 was issued 7-31-18
|
2019-04-13
|
No data
|
WESTCHESTER AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2019-04-12
|
No data
|
EAST 213 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-04-12
|
No data
|
UNIONPORT ROAD, FROM STREET AMETHYST STREET TO STREET BEND
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway /sidewalk cut to repair water leak to water service dep three day notice on file water visible observed within cut and coming from basement
|
2019-04-12
|
No data
|
SHERMAN AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok & repaved r/w
|
2019-04-12
|
No data
|
TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-12
|
No data
|
OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane Opp 3232.
|
2019-04-11
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-11
|
No data
|
OLMSTEAD AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flag restored at 421.
|
2019-04-11
|
No data
|
GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-10
|
No data
|
TINTON AVENUE, FROM STREET EAST 147 STREET TO STREET EAST 149 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration mid roadway in compliance
|
2019-04-10
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-10
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESURFACED CURB TO CURB
|
2019-04-09
|
No data
|
LURTING AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET POPLAR STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
2 cuts, P/L 5x2.8 down 3.5'.... D/L- 5x2.8 down 3'.
|
2019-04-09
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the Respondent failed to apply the proper plastic color with year and ibm# as permCAR #20196500031 Issued 3/3/2019.
|
2019-04-09
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-08
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2019-04-08
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane markings not restored.
|
2019-04-08
|
No data
|
LURTING AVENUE, FROM STREET ESPLANADE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair sewer main break
|
2019-04-08
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-04-08
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-07
|
No data
|
HUGHES AVENUE, FROM STREET EAST 186 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-04-07
|
No data
|
CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-06
|
No data
|
GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2018 sewer cut street joints needs to be re-sealed.
|
2019-04-06
|
No data
|
EDSON AVENUE, FROM STREET BUSSING AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak in the Roadway & Sidewalk 3 Day Dep Notice Issued
|
2019-04-06
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NOV issued for failure to permanently restore two temporary overdue for final Restorations in the driving / parking lanes within the required time. Cited permit for repair water expired on 3/17/2019.
|
2019-04-06
|
No data
|
EDSON AVENUE, FROM STREET BUSSING AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
6" cut back made, portable electric concrete mixer uses for concrete, Concrete base job accepted
|
2019-04-06
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR pass, repairs were made to broken out Asphalt however Restoration is now sunken 2" below grade. both Restoration is still overdue for final NOV and CAR will be issued under permit # M012019050A98 expired on 3/17/2019.
|
2019-04-05
|
No data
|
BRYANT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
condition remains the same will reissue CAR with correct narrative
|
2019-04-05
|
No data
|
BRYANT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water cut 7' by 3'.9" in size failed to comply with standard detail drawing # H-1042D NOTE # 6 All permanent restorations should have be a minimum of 54"
|
2019-04-04
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT/RESPONDENT'S SUB-CONTRACTOR FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20194510121-FAILED TO RESTORE WHITE ARROW LANE MARKINGS ON ROADWAY OVER PERMANENT O'GRAY PLUMBING RESTORATION IN ROADWAY.
|
2019-04-04
|
No data
|
PARK AVENUE, FROM STREET CYRUS PLACE TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-04
|
No data
|
BATHGATE AVENUE, FROM STREET EAST 191 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-04-03
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints sealed
|
2019-04-02
|
No data
|
WEST 75 STREET, FROM STREET CENTRAL PARK WEST TO STREET COLUMBUS AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Spoke with site foreman in regards to the cones placed. Cones placed for purpose of re directing traffic and maintaining the driving lane. Full width of the roadway will be open to traffic at end of day
|
2019-04-02
|
No data
|
WEST 131 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration flushed to grade in the PL/ DL , IFO 265
|
2019-04-02
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Rdwy restoration flushed to grade in the PL, SW flag flushed and sealed around water valve.
|
2019-04-02
|
No data
|
EAST 185 STREET, FROM STREET PARK AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-03-31
|
No data
|
WEST 168 STREET, FROM STREET NELSON AVENUE TO STREET OGDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in driving lane of roadway at this time.
|
2019-03-30
|
No data
|
GRACE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Restoration needs to be re-sealed3perm restorations cracked at the edges and need to be re-sealed.
|
2019-03-27
|
No data
|
FENTON AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New perm plumber restoration has color code unable to be read, needs to be replaced with current 2019 color code to reflect permittee, In the driving lane OPP 2316.
|
2019-03-26
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-03-25
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-03-25
|
No data
|
WEST 119 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition remains the same.
|
2019-03-25
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET ALBANY CRESCENT TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm to grade
|
2019-03-23
|
No data
|
CLARENCE AVENUE, FROM STREET PHILIP AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit has been updated as per permit X012019077A40 (active)
|
2019-03-22
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restore "BUMP" marking.Your smaller water cut measures 3' 3"X 4'8", proper cut backs were not done.
|
2019-03-22
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2019-03-21
|
No data
|
221 STREET, FROM STREET 106 AVENUE TO STREET 107 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway perm
|
2019-03-20
|
No data
|
MORGAN AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 long water cuts flush and sealed
|
2019-03-17
|
No data
|
PERRY AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-03-17
|
No data
|
DECATUR AVENUE, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-03-17
|
No data
|
DECATUR AVENUE, FROM STREET EAST 207 STREET TO STREET EAST 209 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-03-16
|
No data
|
STORY AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final color coded in the parking lane / not properly rolled but no action at this time will follow up
|
2019-03-16
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade in the parking lane flush and sealed
|
2019-03-15
|
No data
|
CHRISTOPHER STREET, FROM STREET 7 AVENUE SOUTH TO STREET BLEECKER STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on fille
|
2019-03-14
|
No data
|
ELY AVENUE, FROM STREET BUSSING AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by Dot
|
2019-03-14
|
No data
|
ALBANY AVENUE, FROM STREET PARK PLACE TO STREET STERLING PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 day notice confirmed, rdwy OP IFO being excavated at this time
|
2019-03-13
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete bus lane flag restored at #1352 at this time.
|
2019-03-12
|
No data
|
WEST 153 STREET, FROM STREET 8 AVENUE TO STREET MACOMBS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Place the proper color code on your water trench, do not use alter color codes.Remove all cones, barricade, fiber glass plates, which were place over sidewalk portion of your water cut.
|
2019-03-11
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary Water cut in the driving lane I/F/O 324
|
2019-03-11
|
No data
|
BAINBRIDGE AVENUE, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-03-11
|
No data
|
BAINBRIDGE AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-03-09
|
No data
|
MICKLE AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Con Edison paved over plumber restoration
|
2019-03-06
|
No data
|
EAST 224 STREET, FROM STREET BEND TO STREET SCHIEFFELIN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2019-03-05
|
No data
|
WEST 131 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Parking lane plated. Plate marked O.G.
|
2019-03-04
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
We have a Temporary Water Cut which has broken away and is down 3+ inches in the Driving Lane, Cut needs to made flush ASAP... I/F/O 324
|
2019-03-04
|
No data
|
EAST 61 STREET, FROM STREET 1 AVENUE TO STREET QUEENSBORO BRDG EXIT
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cut has been brought to grade with temporary asphalt, NICA has passed re-inspection
|
2019-03-03
|
No data
|
WESTCHESTER SQUARE, FROM STREET FINK AVENUE TO STREET LANE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New perm restoration in driving lane has worn out and incorrect IBM number and need to be corrected IFO 65 E Tremont.
|
2019-03-01
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored to grade
|
2019-03-01
|
No data
|
BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service
|
2019-03-01
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-02-28
|
No data
|
EAST 86 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored at this time.
|
2019-02-27
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
backfilled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the backfill. Permit expired 10-19-18. Respondent failed to obtain a confirmation number from the department
|
2019-02-26
|
No data
|
EAST 160 STREET, FROM STREET FOREST AVENUE TO STREET TINTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water repair work on going: Water cut along driving lane, O’Grady Plumbing LLC & NYC DEP on location
|
2019-02-25
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There is a permanent repair water restoration flushed to grade in the driving lane.
|
2019-02-23
|
No data
|
20 AVENUE, FROM STREET 124 STREET TO STREET 125 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration to grade
|
2019-02-21
|
No data
|
PRATT AVENUE, FROM STREET CONNER STREET TO STREET MAROLLA PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service
|
2019-02-19
|
No data
|
IRWIN AVENUE, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flag. Street resurfaced
|
2019-02-19
|
No data
|
WEST 131 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not started at time of inspection. Permit expired.
|
2019-02-19
|
No data
|
42 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill passed and completed at 430PM. 4'6" x 2'8" 5' x 2'6"
|
2019-02-19
|
No data
|
42 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic water leaking in basement (visibly confirmed) one 1'' lead line ,2 excavations to be made on roadway.
|
2019-02-16
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Base cut back was done. Measures 9ft in Length and 5ft 11 inches in width. Sidewalk IFO 420 curing as well as the roadway.
|
2019-02-15
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Asphalt broken out and down 2" below Roadway surface with 1 of 2 temporary Restorations, also your 2 temporary overdue for final restorations were not permanently restored within the required time.
|
2019-02-15
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cut is 8ft X 4ft 7inches, cut back marked and being cut. Advised plumber not to pour asphalt over the wet concrete.
|
2019-02-15
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Repairs were made with temp Asphalt, however repairs were not properly made,there're is an area left broken out and down 2" below grade. Car will be issued.
|
2019-02-14
|
No data
|
WEST 154 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 day notice confirmed, p/l and s/w excavated
|
2019-02-14
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 Temporary overdue for final restorations in the driving/parking lanes were not permanently restored within the required time.
|
2019-02-13
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Upon inspection, I found a permanent repair water restoration flushed to grade in the driving lane.
|
2019-02-08
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 perm cuts on the driving lane missing yellow lane marking i/f/o 5450.
|
2019-02-08
|
No data
|
ZEREGA AVENUE, FROM STREET DORSEY STREET TO STREET MACLAY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work found
|
2019-02-08
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Has update permit # X012019027A02.
|
2019-02-08
|
No data
|
WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
lane markings.
|
2019-02-08
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm cut in the driving lane, 2 new sidewalk I/F/O 5768.
|
2019-02-07
|
No data
|
PAULDING AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service dep three day notice on file
|
2019-02-07
|
No data
|
EAST GUN HILL ROAD, FROM STREET PERRY AVENUE TO STREET PUTNAM PLACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed and acceptable 3'.3" by 2'.5"
|
2019-02-07
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
two cuts found, 1 temp flush, 1 final w/ deface color code, no action taken permit still active.
|
2019-02-07
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
updated permit found.
|
2019-02-06
|
No data
|
EAST 103 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 12-16-18. Respondent failed to obtain a confirmation number from the department.
|
2019-02-05
|
No data
|
SEDGWICK AVENUE, FROM STREET STEVENSON PLACE TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2019-02-05
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-02-05
|
No data
|
SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-02-04
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rdwy restoration flushed and sealed to grade , SW flushed and sealed IFO 2127
|
2019-02-04
|
No data
|
WARING AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair sewer main break
|
2019-02-01
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee on site has a open excavation in the driving lane, sidewalk with 2 flagman directing traffic. E#.
|
2019-02-01
|
No data
|
MOSHOLU AVENUE, FROM STREET HUXLEY AVENUE TO STREET POST ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak in the Roadway Currently Being Pumped out. 3 Day Dep Notice Issued
|
2019-01-30
|
No data
|
OLIVER PLACE, FROM STREET DECATUR AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restored to grade
|
2019-01-30
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2019-01-30
|
No data
|
EAST KINGSBRIDGE ROAD, FROM STREET VALENTINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-01-29
|
No data
|
BRIDGE STREET, FROM STREET CITY ISLAND AVENUE TO STREET MINNIEFORD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file
|
2019-01-29
|
No data
|
BRIDGE STREET, FROM STREET CITY ISLAND AVENUE TO STREET MINNIEFORD AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Foreman Sheme, 8' x 2'7" depth 2'6" Blend. LAB Exclusive testing, Abel, Sand cone, (w)126.3 (d)116.2 (md)122.5 ( am) 8.7 Backfill accepted, cut temp to grade.
|
2019-01-29
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
W.C Rescheduled / 6FHD.
|
2019-01-29
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done
|
2019-01-29
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2019-01-28
|
No data
|
EAST 146 STREET, FROM STREET BEND TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work started at this time.
|
2019-01-26
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-01-25
|
No data
|
WEST 38 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak Currently Being Pumped out. 3 Day Dep Notice Issued.
|
2019-01-25
|
No data
|
EAST 206 STREET, FROM STREET BAINBRIDGE AVENUE TO STREET PERRY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm to grade
|
2019-01-24
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Updated permit on file...D1B project.
|
2019-01-23
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
1 cut in the center of the driving lane, properly tamped and backfilled.
|
2019-01-23
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM RESTORATION & NEW SWK FLAGS
|
2019-01-22
|
No data
|
LACONIA AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair sewer main break
|
2019-01-18
|
No data
|
SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM RESTORATION IN RWY AND NEW SWK FLAG
|
2019-01-17
|
No data
|
WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At the time of inspection, I found a permanent repair water restoration flushed to grade in the bus lane and there is also one sidewalk flag that has been restored.
|
2019-01-17
|
No data
|
WEST 40 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file
|
2019-01-15
|
No data
|
WEST 23 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water repair work ongoing along parking/bus lane.
|
2019-01-11
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Arrived 10:55 am- 2:05 pm 6'x7'x3' driving lane. E#.
|
2019-01-11
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2019-01-10
|
No data
|
GROSVENOR AVENUE, FROM STREET DELAFIELD AVENUE TO STREET WEST 250 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cuts in the roadway.
|
2019-01-10
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started yet
|
2019-01-08
|
No data
|
PALISADE AVENUE, FROM STREET LADD ROAD TO STREET PRIVATE DRIVEWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file
|
2019-01-07
|
No data
|
ELY AVENUE, FROM STREET DEAD END TO STREET NEREID AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service dep three day notice on file
|
2019-01-07
|
No data
|
EDWARD L GRANT HIGHWAY, FROM STREET JEROME AVENUE TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not done
|
2019-01-06
|
No data
|
WEST 190 STREET, FROM STREET DAVIDSON AVENUE TO STREET GRAND AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm Water Cut in the Roadway in Compliance
|
2019-01-03
|
No data
|
COUNTRY CLUB ROAD, FROM STREET LOHENGRIN PLACE TO STREET STADIUM AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
2 cuts in p/l, 6x2.10 down 3.5.
|
2019-01-02
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SOUTH PARKING LANE NO DEFECTS
|
2018-12-30
|
No data
|
MILTON PLACE, FROM STREET EAST TREMONT AVENUE TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in r/w.
|
2018-12-26
|
No data
|
BRYANT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed a permanent water cut in the parking lane of roadway with a width of 47". Respondent failed to make proper cut backs of 6" and 12". All perm restorations should have a minim of 54" once cut backs are made.
|
2018-12-26
|
No data
|
STILLWELL AVENUE, FROM STREET BEND TO STREET EASTCHESTER ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
domestic sanitary clay sewer broken to be restored with cast iron in roadway,one excavation on roadway made at time of inspection.
|
2018-12-24
|
No data
|
DEVOE TERRACE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service dep three day notice on file found roadway closed upon arrival dot operator 95 advised of closure
|
2018-12-20
|
No data
|
EAST 235 STREET, FROM STREET VIREO AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Emergency permit taken out due to Sewer is backing up, Basement full of water, plywood stacked on top of 2 new concrete sidewalk flags, and has been properly barricaded with cones and caution tape all around for concrete curing I/F/O 513.
|
2018-12-17
|
No data
|
MEAGHER AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/ sidewalk cut to repair sewer main break
|
2018-12-11
|
No data
|
NOBLE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Cut in driving lane opposite of # 742. Arrived to location after 10 am due to late notice. 1'-2' of excavation was back filled when arrived. Unable to see if there were any voids within cut. Cut #1: 4' x 3' x 4'
|
2018-12-10
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
update permit found.
|
2018-12-10
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp flush on rd/w, s/w ok, if/fo 2400
|
2018-12-07
|
No data
|
SOUTH PORTLAND AVENUE, FROM STREET DE KALB AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
FIBERGLASS PLATED SIDEWALK- TALKED TO ALL GENERAL CONTRACTORS IN A MEETING TO MOVE DOUBLE PARKED VEHICLES- THEY ARE BEING MOVED.
|
2018-12-06
|
No data
|
BRIGGS AVENUE, FROM STREET BEND TO STREET EAST 194 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway /sidewalk cut to repair water leak to water service
|
2018-12-04
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file crew in process of bakfill upon arrival
|
2018-12-04
|
No data
|
MAGAW PLACE, FROM STREET WEST 181 STREET TO STREET WEST 183 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service dep three day notice on file
|
2018-12-03
|
No data
|
EAST 103 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Repair Water/Contractor on site /excavation on roadway
|
2018-12-03
|
No data
|
WEST 157 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site i/f/o 551, 2 rd/w, 1 s/w. permit still under emergency.
|
2018-12-01
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10-5-18. Respondent failed to obtain a confirmation number from the department.
|
2018-11-30
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, cover concrete base cut with truck, Time stips are till 3:00pm, advised worker to recess plate( no plates on site).
|
2018-11-30
|
No data
|
TIEMANN AVENUE, FROM STREET BEND TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to reapir water leak to water service
|
2018-11-30
|
No data
|
NOBLE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found roadway restoration left in temporary state flushed with roadway surface
|
2018-11-28
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
full panel concrete & red bus paint restored.
|
2018-11-27
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The respondent failed to seal sidewalk expansion joints from their "repair water" job on sidewalk. CORRECTIVE ACTION REQUEST issued 8.27.18-CAR #20184340124
|
2018-11-27
|
No data
|
WEST 142 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavatingopen roadway/sidewalk cut to repair water leak to water service dep three day notice on file
|
2018-11-19
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass
|
2018-11-19
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wet: 126.6Dry: 117.7Max: 122.5Moisture: 7.5First/Last Lift: 97.3
|
2018-11-15
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site saw cutting 12inch cut backs.
|
2018-11-15
|
No data
|
WEST 137 STREET, FROM STREET 8 AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
DEP issued a 3 day notice, 2 Excavations made in the roadway.
|
2018-11-14
|
No data
|
CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane markings restored
|
2018-11-14
|
No data
|
CEDAR AVENUE, FROM STREET WEST 182 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
d1j issued.
|
2018-11-14
|
No data
|
GRAHAM AVENUE, FROM STREET MC KIBBIN STREET TO STREET SEIGEL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/22/2018.
|
2018-11-14
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ATPO I observed the respondents failure to install sidewalk expansion as per subsection. Respondent notified of missing expansion in CAR 20184170197 but failed to install expansion joints
|
2018-11-13
|
No data
|
FINDLAY AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
d1b issued.
|
2018-11-11
|
No data
|
SOUNDVIEW AVENUE, FROM STREET BOLTON AVENUE TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1B issued.
|
2018-11-10
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
2 cuts in the driving lane and one sidewalk flag .
|
2018-11-09
|
No data
|
WEST 144 STREET, FROM STREET CONVENT AVENUE TO STREET HAMILTON TERRACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway/sidewalk cut to repair water leak to water service dep three day notice on file
|
2018-11-08
|
No data
|
EAST TREMONT AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET ST RAYMONDS CEMETERY BOUNDARY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed and acceptable 6.7" by 4'
|
2018-11-02
|
No data
|
GRAND AVENUE, FROM STREET WEST 188 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR SEWER - PROTECTED crew on site
|
2018-11-02
|
No data
|
GRAND AVENUE, FROM STREET WEST 188 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR SEWER - PROTECTED
|
2018-11-01
|
No data
|
PURITAN AVENUE, FROM STREET LA SALLE AVENUE TO STREET WATERBURY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found roadway restoration in permanent state flushed with roadway surface no crew on site
|
2018-11-01
|
No data
|
GRAND AVENUE, FROM STREET WEST 188 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway trench to repair sewer main break roadway closed dot operator 88 advised of closeure
|
2018-10-31
|
No data
|
67 AVENUE, FROM STREET QUEENS BOULEVARD TO STREET SAUNDERS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm roadway and sidewalk cuts.
|
2018-10-28
|
No data
|
SIEGFRIED PLACE, FROM STREET COUNTRY CLUB ROAD TO STREET VALHALLA DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in r/w.
|
2018-10-28
|
No data
|
STADIUM AVENUE, FROM STREET COUNTRY CLUB ROAD TO STREET POLO PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/W resurfaced by DOT.
|
2018-10-26
|
No data
|
CROTONA AVENUE, FROM STREET EAST 179 STREET TO STREET OAKLAND PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking excavation in the driving lane ( 3 day notice on site. )
|
2018-10-26
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Resurfaced
|
2018-10-26
|
No data
|
TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-10-26
|
No data
|
KENT AVENUE, FROM STREET SOUTH 4 STREET TO STREET SOUTH 5 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2018-10-24
|
No data
|
KATONAH AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
flag on sidewalk in compliance
|
2018-10-24
|
No data
|
EAST 238 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass 2 cuts in the roadway in compliance
|
2018-10-23
|
No data
|
WEST TREMONT AVENUE, FROM STREET ANDREWS AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-10-23
|
No data
|
WEST 131 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
temp excavation in the roadway with color code IFO address
|
2018-10-22
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
M012018120D01-Latest permit
|
2018-10-22
|
No data
|
EAST BURNSIDE AVENUE, FROM STREET ANTHONY AVENUE TO STREET RYER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, 2 Excavation in the driving lane and 1 on the sidewalk ( 3 day notice on site. )
|
2018-10-20
|
No data
|
BRUCKNER BOULEVARD, FROM STREET EAST 133 STREET TO STREET ST ANNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2018-10-19
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water leaking on the service, Excavation in the driving / parking lane ( 3 day notice on site. )
|
2018-10-18
|
No data
|
TAYLOR AVENUE, FROM STREET ARCHER STREET TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm restoration in the roadway
|
2018-10-15
|
No data
|
SULLIVAN PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in r/w, 1 new s/w flag.
|
2018-10-14
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration in the parking/driving lane, also there's one sidewalk flag that has been restored.
|
2018-10-14
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work is good
|
2018-10-13
|
No data
|
WOODHULL AVENUE, FROM STREET FIELDING STREET TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street resurfaced
|
2018-10-13
|
No data
|
EAST 179 STREET, FROM STREET ARTHUR AVENUE TO STREET LA FONTAINE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service dep three day notice on file
|
2018-10-12
|
No data
|
EAST 217 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed and acceptable 4' by 3' and 5' by 3'
|
2018-10-12
|
No data
|
TAYLOR AVENUE, FROM STREET ARCHER STREET TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
monitored BF from 1309-1422 pm, BF acceptable
|
2018-10-12
|
No data
|
SOUTHERN BOULEVARD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-10-06
|
No data
|
WEST 37 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew was on location preparing to work special events advised contractor no work to be done due to parade route
|
2018-09-29
|
No data
|
DELANOY AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Gas cut in complaince
|
2018-09-29
|
No data
|
WICKHAM AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work is good
|
2018-09-28
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm flush to grade in roadway.
|
2018-09-28
|
No data
|
GLEBE AVENUE, FROM STREET ROWLAND STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
cut temp to grade in roadway
|
2018-09-27
|
No data
|
TIEBOUT AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
5.5x3 down 2.5 in parking lane.
|
2018-09-24
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed an area within a permanent restoration with green plastic color code sunken 2" in the parking lane adjacent to the curb as per CAR #20184110222 issued 3/31/2018.
|
2018-09-22
|
No data
|
PURDY STREET, FROM STREET STARLING AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm restoration in roadway
|
2018-09-22
|
No data
|
KINGSLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street being milled
|
2018-09-21
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water cut in the parking lane.
|
2018-09-21
|
No data
|
EAST 236 STREET, FROM STREET NAPIER AVENUE TO STREET ONEIDA AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Permanent final color coded in the driving lane. cut on sidewalk curing and waiting seal.
|
2018-09-21
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Contractor will re-schedule.
|
2018-09-20
|
No data
|
SEDGWICK AVENUE, FROM STREET BEND TO STREET WEST 183 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plated wated excavation in the parking lane .
|
2018-09-19
|
No data
|
EAST 236 STREET, FROM STREET NAPIER AVENUE TO STREET ONEIDA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking in the basement, Excavation in the driving lane and on the sidewalk. Street closure notified by orp #44.
|
2018-09-17
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk flag repaired.
|
2018-09-16
|
No data
|
EAST 211 STREET, FROM STREET BOSTON ROAD TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway and sidewalk ut to repair water leak to water service dep ten day notice on file
|
2018-09-16
|
No data
|
FOWLER AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Gas cut in compliance
|
2018-09-14
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
restoration within speed bump 9x7x4 tested 97.5
|
2018-09-13
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
emergency permit doing emergency work in middle of roadway
|
2018-09-13
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
3 day noticed issued. operator 88 for street closure. sprinkler water leak. Excavation on sidewalk and middle of driving lane on speed bump in front of 524
|
2018-09-13
|
No data
|
CLARENCE AVENUE, FROM STREET RANDALL AVENUE TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration under gas restoration.
|
2018-09-10
|
No data
|
KINSELLA STREET, FROM STREET BRONXDALE AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-09-09
|
No data
|
BATHGATE AVENUE, FROM STREET EAST 191 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm Water Cut in Compliance
|
2018-09-08
|
No data
|
AMSTERDAM AVENUE, FROM STREET WEST 179 STREET TO STREET WEST 180 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
A/T/P/O I observed the Respondent had Failed to Begin Emergency Work within 2 Hours After Obtaining Permit. No Excavations were Found on the Existing Roadway or Sidewalk at the Specific Location Provided.
|
2018-09-07
|
No data
|
BARKER AVENUE, FROM STREET BURKE AVENUE TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-09-06
|
No data
|
BRONXDALE AVENUE, FROM STREET BEND TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-09-04
|
No data
|
WEST 143 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
street closure operator 88. one excavation in parking lane and second excavation being prepared to be excavated in driving lane. DEP issued 3 day notice. Water leak.
|
2018-09-03
|
No data
|
WEST FARMS ROAD, FROM STREET BRYANT AVENUE TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in the driving and parking lane
|
2018-09-03
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-09-02
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumb restoration resurfaced with a speed bump recently installed
|
2018-09-02
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in roadway opp 2110.
|
2018-09-01
|
No data
|
WEST 119 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut is overdue for final. Permittee is out of business.
|
2018-09-01
|
No data
|
EAST 231 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found crew on site excavating open roadway cut to repair water leak to water service
|
2018-09-01
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-08-31
|
No data
|
CALHOUN AVENUE, FROM STREET COLLIS PLACE TO STREET HARDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-08-30
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-08-30
|
No data
|
HOLLYWOOD AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-08-29
|
No data
|
WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumb restoration in p/l and d/l in compliance
|
2018-08-29
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-08-27
|
No data
|
VAN NEST AVENUE, FROM STREET BOGART AVENUE TO STREET RADCLIFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-08-27
|
No data
|
BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-08-27
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration in the roadway and on the sidewalk is good. Inspected /In Compliance
|
2018-08-27
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints on the sw where work was done needs to be sealed.
|
2018-08-25
|
No data
|
GLOVER STREET, FROM STREET GLEBE AVENUE TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway newly paved by dot
|
2018-08-25
|
No data
|
GLEBE AVENUE, FROM STREET GLOVER STREET TO STREET MANNING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane
|
2018-08-24
|
No data
|
MULINER AVENUE, FROM STREET BRONXDALE AVENUE TO STREET NEILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-08-23
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Next permit M012018120D01 renews 4-30-18. This permit expired 4-27-18
|
2018-08-22
|
No data
|
CARPENTER AVENUE, FROM STREET EAST 241 STREET TO STREET EAST 242 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J ISSUED
|
2018-08-22
|
No data
|
EAST 231 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1B ISSUED
|
2018-08-22
|
No data
|
HUNT AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2018-08-21
|
No data
|
BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm in roadway flush to grade.
|
2018-08-21
|
No data
|
FINDLAY AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site,Sewer is backing up into basement, Excavation on the sidewalk only.
|
2018-08-21
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane and sidewalk
|
2018-08-21
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR WATER: Contractor has not applied the wearing course at this time, concrete base is still curing. They have a person posted on site.
|
2018-08-20
|
No data
|
EAST 116 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plumbers cut no defects
|
2018-08-20
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
223 West 20 streetL:6'4"W:3'5"D:3'3" Item 4 material used, WD:121.2 DD:112.7 MAX:119.5Moisture:7.5 LIFT#1:97.5 LIFT#2:98.66" cut back was completed.
|
2018-08-20
|
No data
|
SOUNDVIEW AVENUE, FROM STREET BOLTON AVENUE TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer is backing up into the basement, Excavation on the sidewalk and behind the property line i/f/o . #356
|
2018-08-20
|
No data
|
WEST 20 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation on the sidewalk and in the driving lane Street closure notified by orp #93 ( 3 day notice on site. )
|
2018-08-18
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water restoration in the roadway
|
2018-08-17
|
No data
|
GRAND AVENUE, FROM STREET WEST 190 STREET TO STREET WEST 192 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the driving lane ( 3 day noitce on site. ) Street closure notified by opr #93.
|
2018-08-15
|
No data
|
EAST 196 STREET, FROM STREET CONTINENTAL AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-08-15
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-08-15
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
one perm cut in driving lane and another in parking lane of roadway.
|
2018-08-14
|
No data
|
20 AVENUE, FROM STREET 124 STREET TO STREET 125 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to fully inspect due to cars in the p/l
|
2018-08-13
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew wasplacing steel plates up
|
2018-08-12
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water Cut in compliance
|
2018-08-09
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-08-08
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2018-08-08
|
No data
|
PERRY AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2018-08-08
|
No data
|
EAST 232 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service broken, Excavation on the sidewak and in the driving / parking lane.
|
2018-08-06
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
7x5 down 3' in driving/parking lane.
|
2018-08-06
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2018-08-05
|
No data
|
GLEASON AVENUE, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
found in parking lane.
|
2018-08-05
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
PASS ROADWAY
|
2018-08-04
|
No data
|
KING AVENUE, FROM STREET BEACH STREET TO STREET BOWNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work is good
|
2018-08-03
|
No data
|
OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
fine cracks developing in street joint
|
2018-08-03
|
No data
|
DAVIDSON AVENUE, FROM STREET WEST 184 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-08-02
|
No data
|
EAST 241 STREET, FROM STREET KATONAH AVENUE TO STREET VAN CORTLANDT PARK EAST
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plated sewer excavation in the parking lane i/f/o #282 and in the crosswalk of Katonah avenue.
|
2018-08-02
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The above respondent has failed to restore the red paint in the bus lane upon completion of permanent water restoration . Permit expired 5/21/18. Respondent was notified via CAR #20185180417 dated 6/20/18.
|
2018-08-02
|
No data
|
EDISON AVENUE, FROM STREET GREENE PLACE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-08-02
|
No data
|
ELDER AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2018-08-02
|
No data
|
WEST 133 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
long water rdwy OP address excavated, 3 day notice confirmed
|
2018-07-31
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please restore all lane markers on roadway where 2 cuts were finalized ifo 2257
|
2018-07-31
|
No data
|
CROES AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2018-07-31
|
No data
|
GRACE AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Only monitored 5 lifts at this time, had crew do full trenching to curb, and remove void, 15' x 3'6" x down 9' Sewer excavation in progress, On duty inspector will relieve me from my shift, to monitor the rest of the backfill.
|
2018-07-29
|
No data
|
BYRON AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2018-07-29
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
the above respondent has a 1'6"x1'3" area within their permanent sewer restoration sunken 2" in the driving lane I/F/O 3306. Respondent was notified as per CAR #20184110222 on 3/31/18 and has failed to correct condition, Therefore NOV issued.
|
2018-07-28
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed a sidewalk surrounding a water valve cover is broken and cracked down 1.2"-2" as per CAR #20184170155 issued 4/25/2018.
|
2018-07-28
|
No data
|
NEWBOLD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Short water cut and swk
|
2018-07-28
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed permittee failed to seal sidewalk expansion joints. As per C.A.R # X20184170197 date 6/6/18.
|
2018-07-28
|
No data
|
CRESTON AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street milled for re pave
|
2018-07-27
|
No data
|
GRACE AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service broken, Excavation in the parking / driving lane and behind the property line.
|
2018-07-26
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water leak on service. Full street closure from DOT # 93. Two excavations in the roadway and one on the sidewalk behind property line.
|
2018-07-26
|
No data
|
BURKE AVENUE, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration n the bike lane OPP 1044, flush to grade.
|
2018-07-26
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill completed and acceptable cut # 1 D/L 4.4"by 3.2" cut # 2 p/l 3.9" by 3'
|
2018-07-26
|
No data
|
HONE AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade.
|
2018-07-25
|
No data
|
BECK STREET, FROM STREET BEND TO STREET EAST 156 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done by Con Edison
|
2018-07-25
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2018-07-23
|
No data
|
WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work believe to be done within property, no 2016 cut found on rd/w.
|
2018-07-23
|
No data
|
FISH AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench partially permed over and new sidewalk flag flush and sealed.
|
2018-07-21
|
No data
|
ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in driving lane of roadway.
|
2018-07-20
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-07-20
|
No data
|
EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET SANTO DONATO PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pas, sidewalk ok, street resurfaced
|
2018-07-18
|
No data
|
EDISON AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Resurfaced
|
2018-07-17
|
No data
|
EAST 197 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HUTCHINSON RIV PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration ok
|
2018-07-16
|
No data
|
BALCOM AVENUE, FROM STREET BEND TO STREET LATTING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-07-14
|
No data
|
CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-07-14
|
No data
|
SOUTHERN BOULEVARD, FROM STREET BOSTON ROAD TO STREET CROTONA PARK EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work on sidewalk
|
2018-07-14
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway and sidewalk
|
2018-07-14
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-07-13
|
No data
|
EAST 229 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water excavation in the grass area and binder base sealed and color coded excavation in the parking / driving lane i/f/o #859.
|
2018-07-13
|
No data
|
MIDDLETOWN ROAD, FROM STREET WATERSTONE DRIVE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2018-07-12
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Plumber had to cut out voids. FOREMAN Zenun, jumping jack, clean fill/ Lab Exclusive Testing, Barbara, sand cone, cf(w)125.4 (d)115.4 (md)120.0 (am)8.7/ blend(w)121.8(d)114.5 (md)120.5 (am)6.4 Back fill accepted
|
2018-07-12
|
No data
|
CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
failed to restore in kind all the pavement lanes and bike marking has 2 perm cuts with I/B/M # 50285, Year 2018. On the bus stop lane with white spray can marking. Section 34 RCNY 2-11(e)(12)(ix). As per C.A.R # 20184170181 date issued 5/26/18.
|
2018-07-11
|
No data
|
MULLEN PLACE, FROM STREET PENNYFIELD AVENUE TO STREET PRENTISS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cutbacks not done. In front of a building operation, street will potentially be repaved via BPP.
|
2018-07-11
|
No data
|
OLIVER PLACE, FROM STREET DECATUR AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint sealed between curb and sidewalk flag
|
2018-07-11
|
No data
|
WALTON AVENUE, FROM STREET EAST 184 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation on the sidewalk and in the driving lane ( 3 day notice on site. ) street closure notified by orp #61.
|
2018-07-11
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plated water excavation in the parking lane i/f/o #1147.
|
2018-07-10
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water leak on service. Dep tree day notice on site. Excavation in the driving lane Opp. above location I/F/O # 961.
|
2018-07-09
|
No data
|
WHEELER AVENUE, FROM STREET WATSON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR WATER - PROTECTED in the parking lane
|
2018-07-08
|
No data
|
WHEELER AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water cut in the parking lane i/f/o #1488.
|
2018-07-08
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut i/f/o 3840 in compliance
|
2018-07-07
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration has been made final. No defects to report.
|
2018-07-07
|
No data
|
REVERE AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Pass. No issuance needed.
|
2018-07-02
|
No data
|
VYSE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flag near property line.
|
2018-07-01
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade with some cracking
|
2018-07-01
|
No data
|
PUGSLEY AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET STORY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in parking/driving lane close to bruckner.
|
2018-06-27
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site and water leak on grooseneck. Excavation in the driving lane Opp. above location I/F/O # 2229.
|
2018-06-27
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 182 STREET TO STREET EAST 183 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR WATER - PROTECTED
|
2018-06-26
|
No data
|
WOODWARD AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Line was Damaged During Installation of an Tree Pit by Contractor.
|
2018-06-25
|
No data
|
SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2018-06-25
|
No data
|
UNION AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-06-23
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
8" to10" adjacent permanent restoration roadway(driving lane) cave-in (undermine area 3' x 3' x 18" ).
|
2018-06-23
|
No data
|
SEDGWICK AVENUE, FROM STREET STEVENSON PLACE TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-06-22
|
No data
|
EAST 62 STREET, FROM STREET MADISON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Excavation made for water connection. No repairs made at this time. L-3ft 5,W-3ft, D-3ft 5. Cut backs was made.
|
2018-06-22
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-06-21
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site leak in basement confirmed
|
2018-06-21
|
No data
|
EAST 64 STREET, FROM STREET 3 AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
one sidewlk flag and one cut in the parking lane
|
2018-06-21
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
respondent has a 1'6"x1'3" area within their permanent sewer restoration sunken 2" in the driving lane I/F/O 3306. Respondent was notified as per CAR #20184110222 on 3/31/18 and has failed to correct condition, Therefore NOV issued.
|
2018-06-21
|
No data
|
BRONXWOOD AVENUE, FROM STREET EAST 230 STREET TO STREET EAST 231 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water leak. DEP turned off water to house. Excavation in the roadway and on the sidewalk.
|
2018-06-20
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Red Paint for the Bus Lane needs to be restored on your permanently repair water Restoration in the Bus Lane.
|
2018-06-20
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
restoration re sealed
|
2018-06-20
|
No data
|
EAST 231 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing broken sewer line. Excavation on the sidewalk
|
2018-06-18
|
No data
|
1 AVENUE, FROM STREET EAST 115 STREET TO STREET EAST 116 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing broken sewer line. Excavation on the sidewalk and two in the roadway I/F/O # 2257.
|
2018-06-15
|
No data
|
WEST 153 STREET, FROM STREET AMSTERDAM AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sprinkler service leaking, Excavation on the sidewalk and in the driving lane.Street closure notified by orp #55 ( Ten day notice on site. )
|
2018-06-12
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
seal joints and repair graffiti markings and imprints on flag causing a trip hazard 1/2" deep
|
2018-06-11
|
No data
|
GUNTHER AVENUE, FROM STREET GIVAN AVENUE TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. sewer line backed up. Excavation in the roadway and on the sidewalk behind property.
|
2018-06-10
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-06-08
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
condition was corrected
|
2018-06-08
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Restoration made flush with surrounding areas
|
2018-06-08
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
FAILED CAR RE-INSPECTION
|
2018-06-08
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
condition pass
|
2018-06-07
|
No data
|
PARK AVENUE, FROM STREET CYRUS PLACE TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
PASS
|
2018-06-07
|
No data
|
ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Foreman Zenun, Jack Hammer, Blend, cut 5' x3'3' depth 4' Lab. Exclusive Testing, Barbara, Sand Cone. (w)119.7 (d)110.4 (md)116.0 (am) 8.7 TEST 97.2 / 96.1. Backfill Accepted.
|
2018-06-06
|
No data
|
WEST 135 STREET, FROM STREET BROADWAY TO STREET RIVERSIDE DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work only seen in sidewalk located where water valve in compliance
|
2018-06-06
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed to seal sidewalk expansion joints between the concrete sidewalk flag and the curb I/F/O 413 E 187 St.
|
2018-06-06
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
PASS
|
2018-06-05
|
No data
|
PARK AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut restored
|
2018-06-05
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed a sidewalk surrounding a water valve cover is broken and cracked down 1.2"-2" as per CAR #20184170155 issued 4/25/2018.
|
2018-06-04
|
No data
|
ST LAWRENCE AVENUE, FROM STREET MANSION STREET TO STREET MERRILL STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water leak on service. DEP three day notice on site. Full roadway closure from DOT # 69. Excavation in the roadway and on the sidewalk.
|
2018-06-02
|
No data
|
SHERMAN AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2018-06-02
|
No data
|
WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-06-01
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water cut in the driving lane 227
|
2018-06-01
|
No data
|
BOSTON ROAD, FROM STREET DYRE AVENUE TO STREET REEDS MILL LANE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site repairing water leak on service. Excavation in the roadway I/F/O the Bus Stop. Trench on the sidewalk behind property line.
|
2018-05-31
|
No data
|
MILTON PLACE, FROM STREET EAST TREMONT AVENUE TO STREET HOLLYWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service broken, Excavation in the driving / parking lane street closure notified by orp #93,
|
2018-05-30
|
No data
|
SUMMIT PLACE, FROM STREET HEATH AVENUE TO STREET KINGSBRIDGE TERRACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Crew on site, Excavation Backfill pass in the driving lane
|
2018-05-30
|
No data
|
SUMMIT PLACE, FROM STREET HEATH AVENUE TO STREET KINGSBRIDGE TERRACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, Water main repaired, Excavation in the driving lane
|
2018-05-28
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-05-26
|
No data
|
CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed to restore in kind all the pavement lanes and bike marking has 2 perm cuts with I/B/M # 50285, Year 2018. On the bus stop lane with white can spray marking. Section 34 RCNY 2-11(e)(12)(ix)
|
2018-05-26
|
No data
|
BYRON AVENUE, FROM STREET EAST 234 STREET TO STREET EAST 235 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water cut in the parking lane sealed and color coded with one sidewalk flag behind the property.
|
2018-05-24
|
No data
|
SUMMIT PLACE, FROM STREET HEATH AVENUE TO STREET KINGSBRIDGE TERRACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water main broken, Excavation in the driving lane.
|
2018-05-24
|
No data
|
UNDERCLIFF AVENUE, FROM STREET SEDGWICK AVENUE TO STREET WEST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade.
|
2018-05-24
|
No data
|
3 AVENUE, FROM STREET EAST 120 STREET TO STREET EAST 121 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site and water leak on service. DEP three day notice on site. Excavation on the sidewalk and in the roadway
|
2018-05-24
|
No data
|
3 AVENUE, FROM STREET EAST 120 STREET TO STREET EAST 121 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
3.2 x 3 x 4.3 tested 97 97.6
|
2018-05-24
|
No data
|
SUMMIT PLACE, FROM STREET HEATH AVENUE TO STREET KINGSBRIDGE TERRACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill cancal Re-Scheduled i/f/o 151 Summit Pl.
|
2018-05-23
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W in good condition, flush and sealed.
|
2018-05-21
|
No data
|
3 AVENUE, FROM STREET EAST 152 STREET TO STREET EAST 152 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken service line. DEP three day notice on site. Excavation on the sidewalk and in the roadway.
|
2018-05-20
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plated...new active permit for location
|
2018-05-19
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plated
|
2018-05-18
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-05-18
|
No data
|
SOUTHERN BOULEVARD, FROM STREET EAST 156 STREET TO STREET LEGGETT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working in front of location to repair a service leak
|
2018-05-16
|
No data
|
WEST 168 STREET, FROM STREET NELSON AVENUE TO STREET OGDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-05-16
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 218 perm restoration flush to grade in the parking lane.
|
2018-05-12
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. permit expired 2/11/2018. Respondent failed to obtain a confirmation number
|
2018-05-10
|
No data
|
NELSON AVENUE, FROM STREET WEST 166 STREET TO STREET WEST 167 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the driving lane and behind the property line ( 3 day notice on site. )
|
2018-05-09
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO building #1342, Temp water cut is flushed to grade in the bus lane. Active permit M012018120D01 on file.
|
2018-05-09
|
No data
|
REVERE AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
-I/F/O 237 Restoration needs to be re-sealed
|
2018-05-09
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
IFO building #1342, Temp water cut is flushed to grade in the bus lane. Active permit
|
2018-05-09
|
No data
|
EAST 185 STREET, FROM STREET PARK AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking in the basement, Excavation in the driving lane (3 day notice on site. )
|
2018-05-08
|
No data
|
OLIVER PLACE, FROM STREET DECATUR AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joint between curb and sidewalk flag, needs to be sealed, that has in water valve box cover.
|
2018-05-08
|
No data
|
9 AVENUE, FROM STREET WEST 37 STREET TO STREET LINCOLN TUNNEL ENTRANCE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restoration with paving marker and sprayed lane marking , in-compliance at this time
|
2018-05-07
|
No data
|
LUCERNE STREET, FROM STREET BEND TO STREET RADIO DRIVE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation behind the property line on the sidewalk and in the parking/driving lane ( 3 day notice on site.)
|
2018-05-05
|
No data
|
CLAY AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done by CE
|
2018-05-03
|
No data
|
SHERMAN AVENUE, FROM STREET EAST 167 STREET TO STREET EAST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-05-03
|
No data
|
OGDEN AVENUE, FROM STREET WEST 161 STREET TO STREET WEST 162 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-05-03
|
No data
|
CLAY AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-05-03
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm Restoration in the parking lane, however unable to see entire work due to park van.
|
2018-05-02
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SEWER
|
2018-05-02
|
No data
|
EAST 187 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2018-05-01
|
No data
|
MICKLE AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2018-04-30
|
No data
|
DE REIMER AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/17/18. Respondent failed to obtain a confirmation number from the department.
|
2018-04-30
|
No data
|
WILLIAMSBRIDGE ROAD, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 4/20/18 Respondent failed to obtain a confirmation number from the department.
|
2018-04-30
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-04-29
|
No data
|
SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-04-28
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
fine cracks developing in street joint
|
2018-04-27
|
No data
|
STADIUM AVENUE, FROM STREET AGAR PLACE TO STREET RAWLINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the parking lane.
|
2018-04-27
|
No data
|
SCOTT PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane Opp 2900.
|
2018-04-26
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in roadway good.
|
2018-04-26
|
No data
|
CROTONA AVENUE, FROM STREET EAST 183 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed and acceptable
|
2018-04-26
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in roadway.
|
2018-04-26
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 permanent water cuts in the roadway need to be resealed
|
2018-04-25
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete sidewalk flag broken, crack down 1/2'' not flush with water cap hardware, need to be repair i/f/o 3006. Has perm trench in the parking lane need to remove 1 of the 2 I/B/M # 06215, Year 2015. Replace it with I/B/M 50285, YEAR 2016.
|
2018-04-24
|
No data
|
EAST 150 STREET, FROM STREET CEDAR LANE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-04-23
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in the parking lane and driving lane color coded
|
2018-04-23
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2018-04-23
|
No data
|
HILL AVENUE, FROM STREET EAST 241 STREET TO STREET NEREID AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working in front of location to repair a leak in street..
|
2018-04-23
|
No data
|
CARPENTER AVENUE, FROM STREET EAST 241 STREET TO STREET EAST 242 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working in front of location to repair a broken sewer
|
2018-04-22
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade color coded no action for the seal at this time will monitor next inspection
|
2018-04-22
|
No data
|
EAST 220 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2018-04-22
|
No data
|
EAST 221 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2018-04-19
|
No data
|
PAULDING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-04-18
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Back fill Ifo 1352 complete: Start at 11:20am L=5' W=2' D=3'O'GRADY PLUMBING LLC FOREMAN ZENUNLAB TESTER ANDRE FROM E/T/L TEST 97.7 6'" CUT BACKS COMPLETED.
|
2018-04-18
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2018-04-17
|
No data
|
ST NICHOLAS AVENUE, FROM STREET DONNELLON SQUARE TO STREET WEST 148 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flag ok
|
2018-04-15
|
No data
|
SETON AVENUE, FROM STREET DEAD END TO STREET EAST 233 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plated...house under construction
|
2018-04-14
|
No data
|
WEST 183 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
long water cut in driving lane in compliance
|
2018-04-14
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Color code applied
|
2018-04-13
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Double yellow lane markings need to be restored on permanent restoration with green plastic color code.
|
2018-04-13
|
No data
|
BARKER AVENUE, FROM STREET BURKE AVENUE TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken sewer line. Excavation in the roadway in front of parking lot, Opp. # 3058
|
2018-04-13
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Double yellow lane markings need to be restored on permanent restoration with green plastic color code.
|
2018-04-12
|
No data
|
WEST TREMONT AVENUE, FROM STREET ANDREWS AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken water valve in basement. Excavation in the roadway
|
2018-04-12
|
No data
|
WEST TREMONT AVENUE, FROM STREET ANDREWS AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR WATER - PROTECTED
|
2018-04-12
|
No data
|
TULFAN TERRACE, FROM STREET DEAD END TO STREET OXFORD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
private property/pass
|
2018-04-11
|
No data
|
DE REIMER AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done on sidewalk
|
2018-04-10
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permanent restoration needs to be resealed at in front of address.Previously issued CAR #20186500123.
|
2018-04-10
|
No data
|
PARK AVENUE, FROM STREET CYRUS PLACE TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumbers restoration needs to be resealed in parking lane.Previously issued CAR #20176500171.
|
2018-04-10
|
No data
|
PARK AVENUE, FROM STREET CYRUS PLACE TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers restoration needs to be resealed in parking lane.Previously issued CAR #20176500171.
|
2018-04-10
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration needs to be resealed at in front of address.Previously issued CAR #20186500123.
|
2018-04-10
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane and turn markings restored
|
2018-04-10
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass
|
2018-04-07
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
COLOR CODE NEEDS TO BE RE-APPLIED TO ROADWAY RESTORATION, PREVIOUS CAR # 20173140072
|
2018-04-07
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
COLOR CODE NEEDS TO BE RE-APPLIED TO ROADWAY RESTORATION, PREVIOUS CAR # 20173140072
|
2018-04-06
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumber permanent restoration, sunken 1-2 inches below grade, in the roadway.
|
2018-04-06
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
made perm to grade
|
2018-04-06
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber permanent restoration, sunken 1-2 inches below grade, in the roadway.
|
2018-04-05
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR issued under another permit.
|
2018-04-05
|
No data
|
TELLER AVENUE, FROM STREET EAST 169 STREET TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR WATER - PROTECTED
|
2018-04-05
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please fully replace one defective sidewalk flag as defacement has occurred during the concrete curing process. Original CAR 20175010150 issued 11-29-17
|
2018-04-02
|
No data
|
CRUGER AVENUE, FROM STREET ASTOR AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Plumber had Emergency permit to do water repair, perm restoration in the roadway and sidewalk. incompliance
|
2018-04-01
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm to grade
|
2018-03-31
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A 2' x 2' area of plumber perm restoration, sunken 2 inches below grade, adjacent to the curb.
|
2018-03-31
|
No data
|
PARK DRIVE, FROM STREET GERTLAND PLACE TO STREET SPLIT ROCK ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work
|
2018-03-31
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A 2' x 2' area of plumber perm restoration, sunken 2 inches below grade, adjacent to the curb.
|
2018-03-31
|
No data
|
BRONXWOOD AVENUE, FROM STREET CHESTNUT STREET TO STREET SOUTH OAK DRIVE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Restoration ok, nor issuance needed at time of inspection.
|
2018-03-29
|
No data
|
CRUGER AVENUE, FROM STREET ASTOR AVENUE TO STREET PELHAM PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service backing up into basement. Excavation behind property and on the sidewalk.
|
2018-03-28
|
No data
|
ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Ok
|
2018-03-26
|
No data
|
WILLIAMSBRIDGE ROAD, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service broken, Excavation on the sidewalk and behind the property line.
|
2018-03-25
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire restoration needs to be resealed.
|
2018-03-23
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm to grade
|
2018-03-22
|
No data
|
EAST 235 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking. Excavation in the parking/driving lane and behind the property line. ( 3 day notice on site. )
|
2018-03-22
|
No data
|
EAST 86 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken sewer line. Excavation on the sidewalk.
|
2018-03-21
|
No data
|
PARK AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent 5' by 3' restoration not properly cut back as per H-1042 A-D specification
|
2018-03-21
|
No data
|
PARK AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permanent 5' by 3' restoration not properly cut back as per H-1042 A-D specification
|
2018-03-20
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
roadway and sidewalk restored
|
2018-03-20
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done in grass area, on the sidewalk
|
2018-03-20
|
No data
|
1 AVENUE, FROM STREET EAST 72 STREET TO STREET EAST 73 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water shut off to building..Tap still leaking..
|
2018-03-19
|
No data
|
DE REIMER AVENUE, FROM STREET NEREID AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service blocked. Excavation on the sidewalk only.
|
2018-03-19
|
No data
|
WESTCHESTER AVENUE, FROM STREET ELDER AVENUE TO STREET WHEELER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
repair water
|
2018-03-18
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in driving lane opp 2762.
|
2018-03-18
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET ALBANY CRESCENT TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Long water cut in roadway.
|
2018-03-18
|
No data
|
EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-03-17
|
No data
|
MORTON STREET, FROM STREET BEND TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut/ sidewalk acceptable.
|
2018-03-16
|
No data
|
TENBROECK AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done, fine cracks developing in street joint
|
2018-03-16
|
No data
|
PAULDING AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DOT paved roadway
|
2018-03-16
|
No data
|
EAST 170 STREET, FROM STREET COLLEGE AVENUE TO STREET FINDLAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-03-15
|
No data
|
EAST GUN HILL ROAD, FROM STREET COLDEN AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber on site, doing final restoration on 2 cuts in the roadway, spoke to foreman Shemus
|
2018-03-13
|
No data
|
HUGHES AVENUE, FROM STREET EAST 186 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored, street paved
|
2018-03-12
|
No data
|
8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber on site. Emergency repair being done for sewer backing up in basemant.
|
2018-03-11
|
No data
|
KELLY STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
-I/F/O 741 Restoration needs to be re-sealed
|
2018-03-11
|
No data
|
8 AVENUE, FROM STREET WEST 29 STREET TO STREET WEST 30 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Domestic Sanitary Sewer Backing up into Property. Homeowner on Site
|
2018-03-10
|
No data
|
PAULDING AVENUE, FROM STREET EAST 231 STREET TO STREET EAST 232 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in complaince
|
2018-03-10
|
No data
|
CROSBY AVENUE, FROM STREET BAISLEY AVENUE TO STREET PAINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cut was resurfaced.
|
2018-03-10
|
No data
|
MORGAN AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane
|
2018-03-10
|
No data
|
EAST 225 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2018-03-07
|
No data
|
MACE AVENUE, FROM STREET EASTCHESTER ROAD TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2018-03-07
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent "Water" restoration flush to grade in the driving lane.
|
2018-03-06
|
No data
|
RIVERDALE AVENUE, FROM STREET FIELDSTON ROAD TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street repaved
|
2018-03-06
|
No data
|
WEST 263 STREET, FROM STREET DELAFIELD PLACE TO STREET DELAFIELD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced, sidewalk restored
|
2018-03-05
|
No data
|
EAST GUN HILL ROAD, FROM STREET COLDEN AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking ( 3 day notice on site. ) Excavation on the sidewalk and in the driving/parking lane & driving lane i/f/o #986.
|
2018-03-05
|
No data
|
EAST GUN HILL ROAD, FROM STREET COLDEN AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed and acceptable, 2 cuts 1 I/F/O 986 & I/F/O 963 driving lane, One cut on the sidewalk.
|
2018-03-04
|
No data
|
DELAFIELD AVENUE, FROM STREET DELAFIELD PLACE TO STREET WEST 261 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-03-04
|
No data
|
BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street cut ok
|
2018-03-03
|
No data
|
EASTCHESTER ROAD, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done, updated permit on file
|
2018-03-02
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
A/T/P/O I observed the above respondent has used the roadway with a steel plate pinned, ramped in the parking lane w/o a D.O.T permit expired on 2/22/17. On a protected street.
|
2018-03-02
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent has a steel plate in the parking lane w/o a D.O.T permit # X012017024A46. Failed to countersink, post raise plow signs during the winter moratorium.
|
2018-03-01
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill Complete, Parking Lane Cut I/F/O 113 - 1 S/W Flag was also restoredDimensions: 3'8" X 4'10" - Depth: 3'6"WD: 131.1, DD: 120.6, Max: 123.5, M: 8.7 - Compaction: 96.7/97.04O'Grady: Shemus - Exclusive: TonyArrival: 11:50Depart: 1:55
|
2018-03-01
|
No data
|
BAINBRIDGE AVENUE, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in parking lane
|
2018-03-01
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- In Driving Lane - Restoration Missing Color Code
|
2018-02-28
|
No data
|
EAST 39 STREET, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, water leak on sprinkler. DEP three day notice on site. Excavation on the sidewalk and in the parking lane.
|
2018-02-27
|
No data
|
MONTICELLO AVENUE, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Fine cracks developing in street joint
|
2018-02-26
|
No data
|
WESTCHESTER AVENUE, FROM STREET ELDER AVENUE TO STREET WHEELER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, water leak on service. Excavation on the sidewalk and in the driving lane.
|
2018-02-25
|
No data
|
DELANOY AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done in the parking lane
|
2018-02-25
|
No data
|
IRWIN AVENUE, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2018-02-24
|
No data
|
TULFAN TERRACE, FROM STREET DEAD END TO STREET OXFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- In Parking Lane - Restoration Missing Color Code
|
2018-02-24
|
No data
|
GRAND AVENUE, FROM STREET WEST BURNSIDE AVENUE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm Water Cut in Compliance & Sidewalk Flag Barricaded & Currently Concrete Curing
|
2018-02-24
|
No data
|
CAMBRIDGE AVENUE, FROM STREET WEST 235 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-02-22
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 184 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must restore yellow lane markings in the center of the roadway I/F/O 2414.
|
2018-02-21
|
No data
|
WHITE PLAINS ROAD, FROM STREET CRANFORD AVENUE TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-02-21
|
No data
|
EAST 170 STREET, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done on the sidewalk and roadway in front of T mobile
|
2018-02-21
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent has back filled an opening on a protected street but failed to obtain a confirmation number at least two hours prior to the commencement of the back fill. permit expired 12/1/2017. Respondent failed to .
|
2018-02-20
|
No data
|
HERING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken sewer line (Insurance job). Excavation on the sidewalk and two behind property line.
|
2018-02-20
|
No data
|
DECATUR AVENUE, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done in parking lane
|
2018-02-19
|
No data
|
PELHAM PARKWAY, FROM STREET FISH AVENUE TO STREET SEYMOUR AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
DEP issued a 3 day notice , service water leak. Parking lane cut next to the curb and sidewalk flag .
|
2018-02-18
|
No data
|
WOODHULL AVENUE, FROM STREET FIELDING STREET TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit could not see water cut due to snow
|
2018-02-17
|
No data
|
EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2018-02-17
|
No data
|
EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-02-17
|
No data
|
DECATUR AVENUE, FROM STREET EAST 207 STREET TO STREET EAST 209 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Perm cut in the parking lane.
|
2018-02-16
|
No data
|
FT WASHINGTON AVENUE, FROM STREET WEST 185 STREET TO STREET WEST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permanent restoration in compliance bike lane
|
2018-02-15
|
No data
|
SEMINOLE AVENUE, FROM STREET NARRAGANSETT AVENUE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
temp to grade
|
2018-02-15
|
No data
|
EVERGREEN AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET WATSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site,Sewer service backing up in the basement, Excavation behind the property line no excavation on the roadway as yet.
|
2018-02-14
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
At My Time Of Re-Inspection I Observed Unsafe Condition Corrected Plates Reset
|
2018-02-14
|
No data
|
ST NICHOLAS AVENUE, FROM STREET DONNELLON SQUARE TO STREET WEST 148 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
DEP issued a 3 day notice , service water leak. Sidewalk flag next to curb being excavated .
|
2018-02-14
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street joints around perm plumbers restoration must be completely resealed in roadway I/F/O 413.
|
2018-02-14
|
No data
|
CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-02-14
|
No data
|
EAST TREMONT AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SULLIVAN PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
car on perm cut
|
2018-02-14
|
No data
|
TENBROECK AVENUE, FROM STREET ADEE AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
work was left temporary asphalt on roadway
|
2018-02-13
|
No data
|
TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-02-13
|
No data
|
EAST 30 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 steel plates in the roadway Marked "OG" and "M-CS" Counter sunken in the roadway Shifting and Tipping over several inches in height depending on the type of vehicle driving over it, causing large vehicles to slightly fall in.
|
2018-02-13
|
No data
|
MELVILLE STREET, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-02-13
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expasion joint on sidewalk at the curb line needs to be resealed . IFO 13
|
2018-02-12
|
No data
|
VAN NEST AVENUE, FROM STREET MELVILLE STREET TO STREET TAYLOR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-02-12
|
No data
|
WEST 119 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Monitored Backfill. Backfill pass & complete. 6'3"x3'x3'11" Arrival: 10AM Departure: 12:05PM
|
2018-02-10
|
No data
|
HARPER AVENUE, FROM STREET HARPER COURT TO STREET VARIAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration good
|
2018-02-09
|
No data
|
DELANOY AVENUE, FROM STREET ASTOR AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the parking lane and behind the property line ( 3 day notice. )
|
2018-02-08
|
No data
|
NOBLE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition is good. Inspected / In Compliance
|
2018-02-08
|
No data
|
BARKER AVENUE, FROM STREET BURKE AVENUE TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken sewer line. Excavation in the driving lane
|
2018-02-07
|
No data
|
9 AVENUE, FROM STREET WEST 37 STREET TO STREET LINCOLN TUNNEL ENTRANCE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plated water cut in the parking lane.
|
2018-02-06
|
No data
|
VYSE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-02-05
|
No data
|
CLAY AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work done over cut
|
2018-02-05
|
No data
|
WARD AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition is good. Inspection / In Compliance.
|
2018-02-04
|
No data
|
FULLER STREET, FROM STREET SEDDON STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-02-02
|
No data
|
EAST 196 STREET, FROM STREET CONTINENTAL AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Arrival Time 13:00 Departure 15:45 to cuts in the both parking lane
|
2018-02-02
|
No data
|
SCHLEY AVENUE, FROM STREET HOLLYWOOD AVENUE TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-01-31
|
No data
|
PERRY AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber has 1 temp cut in the roadway and 1 cut on sidewalk.
|
2018-01-31
|
No data
|
PERRY AVENUE, FROM STREET EAST 209 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation behind the property and in the driving lane and on the sidewalk (3 day notice on site. )
|
2018-01-31
|
No data
|
CLAY AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent with a steel plate recessed on the roadway. Respondent failed to post âSteel Plates Aheadâ or âRaise Plowâ signs during the 2017-18 winter moratorium . permit number used for ID
|
2018-01-30
|
No data
|
CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-01-30
|
No data
|
HILLSIDE AVENUE, FROM STREET 169 STREET TO STREET 170 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
DEP issued a 3 day notice , crew excavating the driving lane , outside the concrete Bus pad currently
|
2018-01-29
|
No data
|
GLEASON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET CROSS BRONX EXPRESSWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation on the sidewalk and in the parking lane ( 3 day notice. ).
|
2018-01-28
|
No data
|
LURTING AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street re paved curb to curb
|
2018-01-28
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 cuts perm to grade and new sidewalk flag flush and sealed.
|
2018-01-27
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway, DDC work in progress
|
2018-01-27
|
No data
|
FOWLER AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-01-27
|
No data
|
CINCINNATUS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site, excavation flushed in the parking lane
|
2018-01-27
|
No data
|
CLAY AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent with a steel plate recessed on the roadway. Respondent failed to post âSteel Plates Aheadâ or âRaise Plowâ signs. permit number used for ID
|
2018-01-26
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Lab Company Exclusive Testing Lab Technician: Mr. Anthony Rendo on site. The restoration length 8 Ft / 6 inches Width 3 Ft 3 inches Depth 3 Feet in the parking lane.
|
2018-01-26
|
No data
|
REVERE AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2018-01-25
|
No data
|
ADEE AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane
|
2018-01-25
|
No data
|
BRONXWOOD AVENUE, FROM STREET CHESTNUT STREET TO STREET SOUTH OAK DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Asphalt broken and cracked, in permanent restoration street joint, street joint needs to resealed
|
2018-01-25
|
No data
|
BRYANT AVENUE, FROM STREET BEND TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leak in basement, Excavation behind the property line no excavation on the roadway at this time.
|
2018-01-24
|
No data
|
CROES AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service backing up into the basement, Excavation on the sidewalk. ( Insurance. )
|
2018-01-22
|
No data
|
BRYANT AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking in the basement, Excavation in the parking/driving lane and behind the property line ( Insurance. )
|
2018-01-22
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the driving lane ( 3 day notice on site ).
|
2018-01-20
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm Water Cut & Sidewalk Flag Concrete Currently Curing
|
2018-01-20
|
No data
|
WOODHULL AVENUE, FROM STREET FIELDING STREET TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Water Coming up from Sidewalk. Property Owner on Site
|
2018-01-20
|
No data
|
WILDER AVENUE, FROM STREET CRANFORD AVENUE TO STREET EAST 241 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway
|
2018-01-20
|
No data
|
ODELL STREET, FROM STREET STARLING AVENUE TO STREET UNIONPORT ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak in the Sidewalk. 3 Day Dep Notice Issued
|
2018-01-19
|
No data
|
WEST 119 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken service line. DEP three day notice on site. Excavation in the roadway & two on sidewalk behind property line.
|
2018-01-18
|
No data
|
EAST 196 STREET, FROM STREET CONTINENTAL AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation on the sidewalk and in the parking/driving lane. ( 3 day notice. )
|
2018-01-18
|
No data
|
EAST 196 STREET, FROM STREET CONTINENTAL AVENUE TO STREET MAYFLOWER AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill is rescheduled the excavation has tunneling condition and the crew refuses to remove
|
2018-01-18
|
No data
|
EAST KINGSBRIDGE ROAD, FROM STREET VALENTINE AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill 12:35pm-2:15pm 5'x4'x3' & 6'x3'x2.5'' driving, parking lane i/f/o 290 East Kingsbridge Rd.
|
2018-01-18
|
No data
|
STADIUM AVENUE, FROM STREET COUNTRY CLUB ROAD TO STREET POLO PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the parking lane and behind the property line. ( Insurance. )
|
2018-01-16
|
No data
|
EAST KINGSBRIDGE ROAD, FROM STREET VALENTINE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service broken, Excavation on the sidewalk and in the parking/driving lane ( 3 day notice on site ) ...Specific Location: as per permit office cut on east kings bridge road between Briggs avenue & East 192 street. i/f/o #290.
|
2018-01-15
|
No data
|
ELY AVENUE, FROM STREET BUSSING AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-01-14
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm water cuts in the driving lane O.K.
|
2018-01-14
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Temporary Restoration in the Roadway opposite 218 is currently flush with the surrounding Roadway, also concrete is curing on the Sidewalk I/F/O 218, Area has been found in compliance.
|
2018-01-13
|
No data
|
EAST 62 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew on site; water service has been cut off by DEP---10 day notice verified with contractor--working in r/w excavation
|
2018-01-10
|
No data
|
PARK AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, (3 day notice ) Excavation in the driving lane.
|
2018-01-10
|
No data
|
BURKE AVENUE, FROM STREET HONE AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Turning on water service to the building, Excavation in the opposite parking lane.
|
2018-01-02
|
No data
|
EAST 159 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to locate cut due to roadway being chalky
|
2018-01-02
|
No data
|
GUNTHER AVENUE, FROM STREET BARNES AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2018-01-02
|
No data
|
EAST 222 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-12-29
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A 2' x 2' area of plumber perm restoration, sunken 2 inches below grade, adjacent to the curb. unable to attach photos system malfuctioning
|
2017-12-28
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration flush to grade
|
2017-12-28
|
No data
|
WESTCHESTER AVENUE, FROM STREET HERSCHELL STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-12-27
|
No data
|
BAINBRIDGE AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm cuts in the roadway i/f/o 2970,2971.
|
2017-12-27
|
No data
|
221 STREET, FROM STREET 106 AVENUE TO STREET 107 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in p/l
|
2017-12-27
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, water leak on service. DEP Ten day notice on site. One Excavation in the roadway and one on the sidewalk behind property line.
|
2017-12-26
|
No data
|
EAST 239 STREET, FROM STREET CARPENTER AVENUE TO STREET MATILDA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-12-26
|
No data
|
PILGRIM AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-12-24
|
No data
|
HOLLYWOOD AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET PHILIP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and roadway restored
|
2017-12-24
|
No data
|
PARK AVENUE, FROM STREET CYRUS PLACE TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers restoration street joints need to be completely resealed I/F/O 4691.
|
2017-12-24
|
No data
|
BOLLER AVENUE, FROM STREET CRAWFORD AVENUE TO STREET NEEDHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut in compliance
|
2017-12-23
|
No data
|
WILLETT AVENUE, FROM STREET EAST 213 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway
|
2017-12-20
|
No data
|
MORRISON AVENUE, FROM STREET HARROD PLACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2017-12-20
|
No data
|
GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
per final color coded
|
2017-12-18
|
No data
|
KINSELLA STREET, FROM STREET BRONXDALE AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken sewer line. Excavation on the sidewalk and in the street
|
2017-12-18
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, work in progress
|
2017-12-18
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in parking lane
|
2017-12-18
|
No data
|
BRUCKNER BOULEVARD, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, broken water valve. Excavation in the driving lane.
|
2017-12-17
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-12-17
|
No data
|
EASTCHESTER ROAD, FROM STREET FOX TERRACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in driveway in compliance
|
2017-12-17
|
No data
|
CHATTERTON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-12-15
|
No data
|
UNION AVENUE, FROM STREET EAST 168 STREET TO STREET EAST 169 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on file. Excavation in the roadway and two on the sidewalk, which one of the two is behind the property line.
|
2017-12-13
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 temporary restorations backfill only . Respondent failed to install the required 4" temporary pavement asphalt immediately after backfilling which violates the above section rule and DOT winter moratorium policy.
|
2017-12-13
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cuts made safe with backfill flush with surrounding area
|
2017-12-13
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SEWER -
|
2017-12-12
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
IFO 2127 3 ave b/t E 116 st & E 117 st found 2 temporary restorations (4'6" x 4') (7'6" x 4') sunken 3 " down at driving lane and bus stop posing dangerous condition to the public.
|
2017-12-12
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Back fill pass,
|
2017-12-12
|
No data
|
WESTCHESTER AVENUE, FROM STREET MORRISON AVENUE TO STREET STRATFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2017-12-11
|
No data
|
BEACH AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street resurfaced
|
2017-12-11
|
No data
|
3 AVENUE, FROM STREET EAST 116 STREET TO STREET EAST 117 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking in the basement, Excavation on the sidewalk and 2 cuts in the driving lane.
|
2017-12-09
|
No data
|
STILLWELL AVENUE, FROM STREET BOLLER AVENUE TO STREET PALMER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut in compliance
|
2017-12-09
|
No data
|
COLDEN AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
taken over by 2017 Con-Edison trench.
|
2017-12-08
|
No data
|
ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- In Driving Lane, area of long water restoration sunken 2" or more in roadway
|
2017-12-08
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-12-07
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-12-06
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber permanent restoration, sunken 1-2 inches below grade, in the roadway.
|
2017-12-06
|
No data
|
PARK AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent 5' by 3' restoration not properly cut back as per H-1042 A-D specification
|
2017-12-05
|
No data
|
WILLETT AVENUE, FROM STREET EAST 216 STREET TO STREET EAST 219 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-12-04
|
No data
|
EAST 237 STREET, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-12-04
|
No data
|
OLMSTEAD AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2017-12-04
|
No data
|
WEST 150 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
wrong address called in for bF.. foreman took out another permit with correct address ,,,, no work done under this permit
|
2017-12-04
|
No data
|
WEST 150 STREET, FROM STREET AMSTERDAM AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
wrong address..new permit obtained
|
2017-12-04
|
No data
|
EAST 239 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
con ed work over plumber restoration
|
2017-12-02
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please Reinstall ( IBM Tag) Color Code in the Roadway at Tap Connection.
|
2017-12-02
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE TO STREET WESTERLY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work Permfored @ the Intersection to Repair Water Leak @ Tap.
|
2017-11-29
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
please seal joints and repair graffiti markings and imprints on flag causing a trip hazard 1/2" deep
|
2017-11-29
|
No data
|
EAST 217 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway and sidewalk
|
2017-11-28
|
No data
|
ELLIS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w and r/w restored to grade
|
2017-11-27
|
No data
|
HONE AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
IFO 1589, perm to grade
|
2017-11-27
|
No data
|
GARFIELD STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-11-27
|
No data
|
WESTCHESTER AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w and s/w restored
|
2017-11-27
|
No data
|
VAN CORLEAR PLACE, FROM STREET FT CHARLES PLACE TO STREET WEST 227 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/W has been resurfaced.
|
2017-11-24
|
No data
|
VINCENT AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-11-24
|
No data
|
EAST 213 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-11-24
|
No data
|
EAST 197 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HUTCHINSON RIV PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
unable to inspect
|
2017-11-22
|
No data
|
EDISON AVENUE, FROM STREET GREENE PLACE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-11-21
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-11-21
|
No data
|
EAST 116 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
At time of inspection, O'Grady had a manned vehicle parked on site monitoring 2 excavations one as deep as 20".
|
2017-11-20
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 long water cuts, flush and sealed.
|
2017-11-20
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint sealed
|
2017-11-17
|
No data
|
BALCOM AVENUE, FROM STREET BEND TO STREET LATTING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w and s/w restored to grade
|
2017-11-17
|
No data
|
EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET SANTO DONATO PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored
|
2017-11-16
|
No data
|
KATONAH AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 10/16/17.
|
2017-11-15
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-11-15
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
2 cut in parking lane and driving lane.
|
2017-11-15
|
No data
|
BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Con Ed trench covering restorations
|
2017-11-15
|
No data
|
DAVIDSON AVENUE, FROM STREET WEST 184 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill acceptable in the parking lane, 6" and 12" cut backs were done, concrete base, and one cut on the sidewalk.
|
2017-11-15
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONFIRMATION # ON FILE. INSPECTED / IN COMPLIANCE.
|
2017-11-14
|
No data
|
OLINVILLE AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 216 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired 9/21/17.
|
2017-11-14
|
No data
|
EAST 142 STREET, FROM STREET BROOK AVENUE TO STREET WILLIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking in the basement, Excavation on the sidewalk and in the driving/parking lane. i/f/o #412.
|
2017-11-13
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
plated site
|
2017-11-13
|
No data
|
CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Long water cuts and new sidewalk flag flush and sealed.
|
2017-11-13
|
No data
|
MIDDLETOWN ROAD, FROM STREET WATERSTONE DRIVE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade In the parking lane and sidewalk flag O.K.
|
2017-11-12
|
No data
|
CRESTON AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm to grade
|
2017-11-12
|
No data
|
DAVIDSON AVENUE, FROM STREET WEST 184 STREET TO STREET WEST FORDHAM ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Excavation flushed in the roadway and wood covering excavation on the sidewalk.
|
2017-11-12
|
No data
|
HOLLYWOOD AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade and new sidewalk flag O.K.
|
2017-11-12
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in the parking lane flush and sealed.
|
2017-11-11
|
No data
|
WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no defects found cut ifo 419 west 128 st
|
2017-11-09
|
No data
|
FISH AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plumber on site doing sewer repairs
|
2017-11-09
|
No data
|
MULINER AVENUE, FROM STREET BRONXDALE AVENUE TO STREET NEILL AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
foreman ZENUN. jumping jack. cut 3' 10" x 3' depth 4' / 4'5" x 2'9" depth 3'. LAB. Exclusive testing. Danny. sand cone. clean fill. (w)115.5 (d)106.3 (md)113.5 (am) 8.7. test 96.8 / 96.3/ 96.6 /96.2 backfill accepted
|
2017-11-09
|
No data
|
CALHOUN AVENUE, FROM STREET COLLIS PLACE TO STREET HARDING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
steel plate pin and ramp in the parking / driving lane I/F/O 186.
|
2017-11-09
|
No data
|
FISH AVENUE, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service block, Excavation in the roadway and on the sidewalk and behind the property line.
|
2017-11-09
|
No data
|
MULINER AVENUE, FROM STREET BRONXDALE AVENUE TO STREET NEILL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation behind the property line and in the driving lane. ( 3 day notice on site. )
|
2017-11-09
|
No data
|
CALHOUN AVENUE, FROM STREET COLLIS PLACE TO STREET HARDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plated sewer cut in the driving/parking lane.
|
2017-11-08
|
No data
|
OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut resealed
|
2017-11-07
|
No data
|
EASTCHESTER ROAD, FROM STREET BEND TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
one perm resoration in roadway. driving lane
|
2017-11-07
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with a permanent water cut in the driving lane. Respondent failed to restore Left turn only lane markings. CAR # 20174110100 was issued on 8/28/2017 but has yet to be corrected
|
2017-11-07
|
No data
|
EAST 239 STREET, FROM STREET CARPENTER AVENUE TO STREET MATILDA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cut backs made
|
2017-11-06
|
No data
|
TINTON AVENUE, FROM STREET EAST 158 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, No water service to the building, Excavation in the driving lane.
|
2017-11-05
|
No data
|
EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cut backs made
|
2017-11-04
|
No data
|
KING AVENUE, FROM STREET BEACH STREET TO STREET BOWNE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
restored
|
2017-11-04
|
No data
|
BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut made perm, also dep cut adjacent to plumber restoration made flush
|
2017-11-04
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ATPO I observed the respondents failure to install a permanent color coding marker at the end of the restorartion. This oversight was reported in CAR 20176490175 but the marker was never placed in the restoration.
|
2017-11-02
|
No data
|
OLINVILLE AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 216 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent obtained a street opening permit on a protected street but failed to obtain a confirmation number prior to the expiration of such permit as required. Permit expired [9/21/17].
|
2017-11-02
|
No data
|
WEST 143 STREET, FROM STREET BROADWAY TO STREET HAMILTON PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working on s/w to repair a broken valve.
|
2017-11-01
|
No data
|
EDISON AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration have been resurfaced with later work done.
|
2017-10-29
|
No data
|
EASTCHESTER ROAD, FROM STREET BEND TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active plated
|
2017-10-28
|
No data
|
KINGSLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut in compliance
|
2017-10-27
|
No data
|
EAST 214 STREET, FROM STREET MSGR CAHILL PLACE TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation in the roadway.
|
2017-10-26
|
No data
|
STADIUM AVENUE, FROM STREET AGAR PLACE TO STREET RAWLINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water restoration in the P/D lane , flush and sealed.
|
2017-10-25
|
No data
|
20 AVENUE, FROM STREET 124 STREET TO STREET 125 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm roadway cut to grade in d/l.
|
2017-10-24
|
No data
|
HUNT AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm restoration done in roadway and sidewalk
|
2017-10-20
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade water restoration
|
2017-10-20
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SEWER
|
2017-10-19
|
No data
|
HUNT AVENUE, FROM STREET MORRIS PARK AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Excavation on sidewalk and in the driving lane.
|
2017-10-17
|
No data
|
CRESTON AVENUE, FROM STREET EAST 181 STREET TO STREET EAST 182 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking excavation in the driving lane 3 day notice on site.
|
2017-10-16
|
No data
|
WALLACE AVENUE, FROM STREET ALLERTON AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work done on sidewalk.
|
2017-10-15
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2017-10-13
|
No data
|
EASTCHESTER ROAD, FROM STREET BEND TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak. DEP three day notice on site. Excavation in the roadway OPP. above location, on the side of Park.
|
2017-10-12
|
No data
|
FIELDSTON ROAD, FROM STREET BEND TO STREET WEST 245 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the driving lane.
|
2017-10-12
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent Restoration I/F/O 112
|
2017-10-11
|
No data
|
GLEASON AVENUE, FROM STREET LELAND AVENUE TO STREET THIERIOT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site and perm restoration flushed & sealed in the parking/driving lane.
|
2017-10-11
|
No data
|
EAST 238 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service line. DEP three day notice on site. Excavation in the roadway Opp. above location.
|
2017-10-11
|
No data
|
EAST 237 STREET, FROM STREET MARTHA AVENUE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Perm restoration flushed and sealed in the parking lane.
|
2017-10-09
|
No data
|
EAST 220 STREET, FROM STREET CARPENTER AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 Perm restoration in roadway
|
2017-10-09
|
No data
|
SCOTT PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 Cuts on the roadway and 1 on the sidewalk flush and sealed.
|
2017-10-08
|
No data
|
CITY ISLAND AVENUE, FROM STREET CAROLL STREET TO STREET SCHOFIELD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no visible work
|
2017-10-08
|
No data
|
DITMARS STREET, FROM STREET CITY ISLAND AVENUE TO STREET MINNIEFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
resurfaced...s/w is good.
|
2017-10-08
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut in rd/w and one on property.
|
2017-10-06
|
No data
|
FENTON AVENUE, FROM STREET BURKE AVENUE TO STREET GIVAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found in front of 3228 fenton ave crew on site excavating open roadway cut to repair water leak
|
2017-10-04
|
No data
|
SCOTT PLACE, FROM STREET EAST TREMONT AVENUE TO STREET EDISON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Three day DEP notice on site. Two excavations in the roadway and one on the sidewalk.
|
2017-09-30
|
No data
|
WICKHAM AVENUE, FROM STREET BURKE AVENUE TO STREET SEXTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work
|
2017-09-30
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Expansion joints need to be installed - Sidewalk expansion joints need to be sealed
|
2017-09-27
|
No data
|
WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to inspect do to parked car.
|
2017-09-26
|
No data
|
EAST 221 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm restoration in roadway
|
2017-09-24
|
No data
|
PROSPECT AVENUE, FROM STREET BECK STREET TO STREET EAST 150 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
resurfaced
|
2017-09-23
|
No data
|
EAST 237 STREET, FROM STREET MARTHA AVENUE TO STREET VIREO AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Service water leak ,sidewalk and parking lane being excavated , As per Owner , DEP issued a 3 day notice.
|
2017-09-23
|
No data
|
KING AVENUE, FROM STREET BEACH STREET TO STREET BOWNE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O, I observed the respondent failed to restore the sunken area of their perm restoration (sunken 1") as notified by CAR# 20171220013. Therefore a summons has been issued.
|
2017-09-23
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
ATPO I observed the respondents failure to apply permanent color code identifying permittee. Missing color code reported in CAR 2017649175 but respondent failed to place it.
|
2017-09-22
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w and r/w restored
|
2017-09-22
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Core run
|
2017-09-22
|
No data
|
MARMION AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Area is resurfaced
|
2017-09-21
|
No data
|
WEST FARMS ROAD, FROM STREET BRYANT AVENUE TO STREET HOME STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
found in front of 1160 west farms rd crew on site excavating open roadway cuts flag persons directing traiffic dep three day notice on file
|
2017-09-20
|
No data
|
BEACH AVENUE, FROM STREET GUERLAIN STREET TO STREET MANSION STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in parking lane
|
2017-09-20
|
No data
|
SHERMAN AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working on S/W to repair a broken sewer.
|
2017-09-20
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm water cut flushed to grade
|
2017-09-18
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-09-17
|
No data
|
KATONAH AVENUE, FROM STREET EAST 235 STREET TO STREET EAST 236 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working on S/W to repair a broken sewer.
|
2017-09-13
|
No data
|
OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane need to be resealed, must remove old I/B/M # 06215, apply correct I/B/M # 50285 match the permit i/f/o 3232.
|
2017-09-11
|
No data
|
BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
cut back made, 8'4" x 7'6" depth 2" 7f used for final restoration. (4' x 3' temp cut 1ft from plumber restoration, belongs to DEP)Wearing course accepted
|
2017-09-09
|
No data
|
PAULDING AVENUE, FROM STREET EAST 231 STREET TO STREET EAST 232 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
cut resealed
|
2017-09-09
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-09-09
|
No data
|
HONE AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition has been corrected. Inspected / In Compliance.
|
2017-09-09
|
No data
|
EAST 150 STREET, FROM STREET CEDAR LANE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-09-08
|
No data
|
BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Temporary Restoration Sunken 3" inches in the driving lane.
|
2017-09-08
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut plated
|
2017-09-07
|
No data
|
EAST 170 STREET, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
redig wearing course done. reflective membrane place on old on new concrete base joint. 8' x 7'4" cut, 7f wearing course done.
|
2017-09-06
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work in progress
|
2017-09-06
|
No data
|
BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service broken, Excavation in the parking/driving lane.
|
2017-09-06
|
No data
|
BOGART AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
6 inches cut back made, concrete used for base.
|
2017-09-05
|
No data
|
NEWBOLD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in p/l
|
2017-09-05
|
No data
|
GLEBE AVENUE, FROM STREET GLOVER STREET TO STREET MANNING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway
|
2017-09-04
|
No data
|
PAULDING AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water cut in compliance
|
2017-09-03
|
No data
|
CROSBY AVENUE, FROM STREET BAISLEY AVENUE TO STREET PAINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut in the parking/ driving lane flush and sealed.
|
2017-09-02
|
No data
|
BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-09-01
|
No data
|
EAST 170 STREET, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A 5'6" X 5' Depth 2'3" redig was done, backfill accepted, 10" of concrete base restored, cut will be plated. wearing course will be done at a later dater date.
|
2017-09-01
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-08-30
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition has been made safe. Inspected / n Compliance.
|
2017-08-30
|
No data
|
EAST 221 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water repairs ongoing( new pipe connection in progress ).
|
2017-08-29
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
- In Parking Lane, 8" diameter cave in of asphalt 2' deep above water service line. Investigate for possible leak on repair work
|
2017-08-28
|
No data
|
GLOVER STREET, FROM STREET GLEBE AVENUE TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint sealed
|
2017-08-28
|
No data
|
WEST 137 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
contractors are on site working
|
2017-08-28
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two permanent restorations with green color code missing bike lane marking and Left turn only lane markings.
|
2017-08-28
|
No data
|
MORTON STREET, FROM STREET BEND TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm to grade cut in the driving lane. One sidewalk flag restored in kind. Adjacent expansion joints sealed.
|
2017-08-27
|
No data
|
KELLY STREET, FROM STREET EAST 156 STREET TO STREET LONGWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2017-08-26
|
No data
|
EAST 225 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Heavy Leak in the Basement went into Basement to Verify.
|
2017-08-25
|
No data
|
SHERIDAN AVENUE, FROM STREET EAST 170 STREET TO STREET MARCY PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking in the basement. Excavation in the driving lane ( 3 day notice on site. )
|
2017-08-24
|
No data
|
CORLEAR AVENUE, FROM STREET WEST 236 STREET TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service backing up into basement, Excavation in the parking / driving lane. ( Insurance. )
|
2017-08-23
|
No data
|
OLINVILLE AVENUE, FROM STREET EAST 213 STREET TO STREET EAST 216 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service blocked. Excavation on the sidewalk only.
|
2017-08-21
|
No data
|
VAN NEST AVENUE, FROM STREET BOGART AVENUE TO STREET RADCLIFF AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
street joint sealed
|
2017-08-21
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-08-20
|
No data
|
WASHINGTON TERRACE, FROM STREET DEAD END TO STREET WEST 186 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Long water restoration flushed in the rd/w
|
2017-08-20
|
No data
|
TENBROECK AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut in compliance
|
2017-08-18
|
No data
|
EAST 239 STREET, FROM STREET CARPENTER AVENUE TO STREET MATILDA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with a wearing course that has not been cut back as required by standard drawing H-1042 D. Respondent failed to comply with DOT standard drawing as required in section 2-11 (e) (2) (vi). CAR #20170690133
|
2017-08-18
|
No data
|
WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
barricaded and cones was remove by someone who wanted a parking spot. concrete base only 3'' in parking lane
|
2017-08-17
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-08-16
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
monitored site from 1357-1500pm, BF acceptable
|
2017-08-15
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed the above respondent has 2 temp cuts 4'x4'x1''and 3'x2.5''x2'' in the driving lanes with asphalt broken,crack out not flush with the roadway i/f/o 3163 Sedgwick Ave. Permit expired on 8/12/17, was also I.D by green spray around cuts.
|
2017-08-14
|
No data
|
WEST 168 STREET, FROM STREET NELSON AVENUE TO STREET OGDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-08-14
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-08-14
|
No data
|
EAST 215 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
7' by 4' permanent restoration in the parking lane not properly cut back
|
2017-08-13
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration flush to grade.
|
2017-08-12
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-08-11
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp restorations on site
|
2017-08-11
|
No data
|
EAST 225 STREET, FROM STREET BARNES AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY RESURFACED / 2 FLAGS ON THE SIDEWALK PASS
|
2017-08-11
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET ALBANY CRESCENT TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J project
|
2017-08-11
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J project
|
2017-08-10
|
No data
|
WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking Excavation in the parking lane ( 3 day notice. ).
|
2017-08-10
|
No data
|
BECK STREET, FROM STREET BEND TO STREET EAST 156 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service broken, Excavation in the driving/parking lane ( Insurance. )
|
2017-08-10
|
No data
|
WALTON AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill completed and acceptable
|
2017-08-09
|
No data
|
EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill completed and acceptable
|
2017-08-09
|
No data
|
EAST 224 STREET, FROM STREET BARNES AVENUE TO STREET BRONXWOOD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the parking/driving lane and in the grass area. ( 3 day notice. )
|
2017-08-09
|
No data
|
EAST 170 STREET, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I OBSERVED A CORE SAMPLE OF THE RESPONDENTS PERMANENT RESTORATION IN THE BUS LANE WITH GREEN COLOR CODE MARKER IBM# 50285 ON IT THAT RESULTED WITH NO CONCRETE BASE INSTALLED NOT MATCHING THE EXISTING ROADWAY GRADE OF 9 INCHES OF CONCRETE BASE.
|
2017-08-08
|
No data
|
FOWLER AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J project
|
2017-08-07
|
No data
|
UNDERCLIFF AVENUE, FROM STREET SEDGWICK AVENUE TO STREET WEST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-08-07
|
No data
|
BRONXDALE AVENUE, FROM STREET BEND TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in roadway and sidewalk
|
2017-08-06
|
No data
|
MONTICELLO AVENUE, FROM STREET EDENWALD AVENUE TO STREET STRANG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut in compliance
|
2017-08-05
|
No data
|
KING AVENUE, FROM STREET BEACH STREET TO STREET BOWNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- In Driving Lane - Restoration Sunken - Restoration beginning to sink in the center of the restoration
|
2017-08-04
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water services leaking, Excavation in the parking lane. (3 day notice on site. )
|
2017-08-04
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET WEST 229 STREET TO STREET WEST KINGSBRIDGE ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
foreman Shamus. 3'6" x 2'5" depth 2' Clean fill. LAB. Exclusive testing. Chris. Sand cone. (W)123.0 (D)111.9 (MD)116.6 (AM)9.8 TEST 97.2 Backfill Accepted
|
2017-08-04
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 194 STREET TO STREET EAST 196 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
monitored site from 1450-1536pm.... BF acceptable
|
2017-08-03
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must restore Missing color code with year and IBM # on perm water cut I/F/O 1804.
|
2017-08-03
|
No data
|
CLAY AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut in the Parking lane flush and sealed.
|
2017-08-03
|
No data
|
EAST 170 STREET, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut in the Parking driving lane flush and sealed.
|
2017-08-02
|
No data
|
MELVILLE STREET, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-08-02
|
No data
|
VAN NEST AVENUE, FROM STREET MELVILLE STREET TO STREET TAYLOR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway
|
2017-08-01
|
No data
|
SCHLEY AVENUE, FROM STREET HOLLYWOOD AVENUE TO STREET LOGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut in the driving lane , flush and sealed.
|
2017-07-31
|
No data
|
BEACH AVENUE, FROM STREET GUERLAIN STREET TO STREET MANSION STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Nicole 5'9" x 3'4" depth 2'4" Blend. LAB. Exclusive Testing. Barbara. sand cone. (W)125.7 (D)116.9 (MD)121.5 (AM)7.5. TEST 97.4. Backfill Accepted
|
2017-07-31
|
No data
|
FT WASHINGTON AVENUE, FROM STREET WEST 185 STREET TO STREET WEST 187 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane making restored
|
2017-07-29
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumber reset all steel plates securely, i instruct plumber to removed plate with ECS markings, Excess steel plate that were not pinned, removed off the street. John O'Grady and crew on site.
|
2017-07-29
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint seal on sidewalk
|
2017-07-29
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Atpo The above responded failed to pin the ramp steel plates As per subsection iii There are eight steel plates in front of 1756 two plates serving no purpose. Plates need to be properly pinned-and ramped.
|
2017-07-26
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
I observed a O'Grady Plumbing LLC crew on site Over seeing the area i/f/o 1756Bartow Avenue
|
2017-07-21
|
No data
|
REVERE AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
14'.5'' by 4'.5'' backfill6'' cutback was done on site
|
2017-07-20
|
No data
|
EAST 170 STREET, FROM STREET TOWNSEND AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2017-07-19
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wet Density: 120.9Dry: 114.9Max: 124.5Moisture: 5.2Cut 1: 97.1/97.3Cut 2: 97.3
|
2017-07-19
|
No data
|
CAMBRIDGE AVENUE, FROM STREET WEST 235 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane 4'x5' opp 3512.
|
2017-07-19
|
No data
|
REVERE AVENUE, FROM STREET HARDING AVENUE TO STREET LAWTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service blocked, Excavation in the driving/parking lane. ( Insurance ).
|
2017-07-16
|
No data
|
EAST 187 STREET, FROM STREET PARK AVENUE TO STREET WEBSTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR WATER
|
2017-07-15
|
No data
|
FULLER STREET, FROM STREET SEDDON STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Slightly sunken at curb ifo 2433
|
2017-07-15
|
No data
|
GLOVER STREET, FROM STREET GLEBE AVENUE TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restoration needs expansion joints sealed
|
2017-07-15
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
sidewalk restored
|
2017-07-13
|
No data
|
EAST 239 STREET, FROM STREET CARPENTER AVENUE TO STREET MATILDA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failed proper cut backs on 2 cuts on the roadway. 3'.7" by 4'.9" cut in the driving lane and 5'.8" by 3' in the parking lane
|
2017-07-13
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Water trench in the driving lane sealed and color coded.
|
2017-07-12
|
No data
|
PROSPECT AVENUE, FROM STREET FREEMAN STREET TO STREET RITTER PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
I observed a O'Grady Plumbing LLC. crew on site working to repair a broken pipe i/f/o 1365 Prospect Avenue
|
2017-07-12
|
No data
|
EAST 84 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
M152017159A23-Street resurfaced
|
2017-07-11
|
No data
|
WESTCHESTER AVENUE, FROM STREET HERSCHELL STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
12" cut back made for wearing course, reflective membrane place on joint of concrete base, 7F used for wearing course. wearing course accepted, street joint sealed. re dig completed and accepted
|
2017-07-10
|
No data
|
WESTCHESTER AVENUE, FROM STREET HERSCHELL STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plumber re dig 5' x4' cut to depth 4', 16"5000 & 4000 concrete mix used for base
|
2017-07-09
|
No data
|
PAULDING AVENUE, FROM STREET EAST 231 STREET TO STREET EAST 232 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent 3'.10" by 3'.4" failed to do proper cut backs opposite 4168
|
2017-07-08
|
No data
|
WARD AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration
|
2017-07-07
|
No data
|
NOBLE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-07-05
|
No data
|
LURTING AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm sewer restoration in the roadway, Spoke to John O'GRADY at site.
|
2017-07-04
|
No data
|
WICKHAM AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2017-07-04
|
No data
|
MICKLE AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway
|
2017-07-03
|
No data
|
LURTING AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service blocked, Excavation in the driving/parking . ( Insurance ).
|
2017-07-03
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sewer work in progress, spoke to foreman SHEMUS, about removing excavated debris off the street, when site is unattended.
|
2017-07-03
|
No data
|
WHITE PLAINS ROAD, FROM STREET CRANFORD AVENUE TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in roadway
|
2017-07-01
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
cut plated in roadway
|
2017-06-30
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, No water going into the building, Excavation in the parking/driving lane and behind the property line.
|
2017-06-29
|
No data
|
ELY AVENUE, FROM STREET BUSSING AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-06-29
|
No data
|
EAST 222 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in parking lane.
|
2017-06-29
|
No data
|
BARTOW AVENUE, FROM STREET GUNTHER AVENUE TO STREET WICKHAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service broken, Excavation on the sidewalk and in the driving/parking lane ( Insurance ).
|
2017-06-28
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Plumber, cut out cave in condition and made it into one perm restoration.
|
2017-06-28
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
A 3' x 2' area , adjacent to plumber perm 2017 restoration, cave in down 1' or more in the parking lane. located in front of house # 2716
|
2017-06-26
|
No data
|
CLAY AVENUE, FROM STREET EAST 165 STREET TO STREET EAST 166 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service leaking into basement Excavation in the parking/driving lane ( Insurance )
|
2017-06-23
|
No data
|
MORTON STREET, FROM STREET BEND TO STREET HUDSON STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew excavating inside plumber cut , D.E.P issued a 3 day notice. Driving lane and sidewalk being excavated .
|
2017-06-22
|
No data
|
HONE AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
There is a 1' x 1' area adjacent to plumber restoration, down 2" or more in the driving lane.
|
2017-06-22
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street was resurfaced., Expansion joint seal on sidewalk.
|
2017-06-21
|
No data
|
WESTCHESTER AVENUE, FROM STREET HERSCHELL STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A CORE SAMPLE WAS TAKEN OF THE RESPONDENTS PERMANENT RESTORATION IN THE PARKING LANE WITH ONLY 6 INCHES OF WEARING COURSE AND NO CONCRETE BASE INSTALLED NOT MATCHING THE EXISTING ROADWAY GRADE OF 5 INCHES OF CONCRETE BASE.
|
2017-06-21
|
No data
|
WILDER AVENUE, FROM STREET CRANFORD AVENUE TO STREET EAST 241 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temp water cut in the driving lane and plated cut in the grass area.
|
2017-06-20
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Portion of trench cave-in 2'x 2' down 1' undermine in line with water service to house # 2022 3 hr notice to make safe.
|
2017-06-20
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition has been repaired O.K.
|
2017-06-19
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking , excavation in the parking/driving lane and behind the property line. 3 day notice .
|
2017-06-19
|
No data
|
WESTCHESTER AVENUE, FROM STREET HERSCHELL STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CORE SURVEY/ Perm water cut in the driving lane/ service road, flush and sealed.
|
2017-06-18
|
No data
|
WILLETT AVENUE, FROM STREET EAST 213 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers restoration in parking lane.
|
2017-06-18
|
No data
|
EAST 159 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
cut in parking lane, and on sidewalk behind property
|
2017-06-17
|
No data
|
VAN NEST AVENUE, FROM STREET BOGART AVENUE TO STREET RADCLIFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
reseal cut
|
2017-06-13
|
No data
|
MULINER AVENUE, FROM STREET LYDIG AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway newly paved
|
2017-06-13
|
No data
|
EAST 77 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent "Water" restoration flush to grade in the driving lane.
|
2017-06-12
|
No data
|
SEDGWICK AVENUE, FROM STREET FT INDEPENDENCE STREET TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site and no work was done. Supv. was notiftied and no N.O.V was issued.
|
2017-06-12
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm final in the driving lane
|
2017-06-11
|
No data
|
PILGRIM AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2017-06-11
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration flush to grade.
|
2017-06-10
|
No data
|
CLAY AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work in progress
|
2017-06-09
|
No data
|
FOWLER AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
7'.6'' by 4' backfillcutback was done on site
|
2017-06-08
|
No data
|
TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w ok
|
2017-06-08
|
No data
|
HOLLYWOOD AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET PHILIP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2017-06-06
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken gasket. DEP three day notice on site. Excavation in the parking lane
|
2017-06-06
|
No data
|
PILGRIM AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2017-06-05
|
No data
|
BAINBRIDGE AVENUE, FROM STREET BEDFORD PARK BOULEVARD TO STREET EAST 201 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Two excavations in the roadway and two on the sidewalk. One is behind property line.
|
2017-06-05
|
No data
|
FT WASHINGTON AVENUE, FROM STREET WEST 185 STREET TO STREET WEST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restore bike lane markings opp 587
|
2017-06-05
|
No data
|
COLDEN AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-06-04
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition has been corrected.
|
2017-06-04
|
No data
|
ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition previously reported, NOV issued based on CAR Re inspection.
|
2017-06-03
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2017-05-31
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Correct color code added.
|
2017-05-30
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed respondent failed to properly install,recess and seal expansion joints at the curb of newly replaced sidewalk flag. Thats causing tripping hazard
|
2017-05-28
|
No data
|
IRWIN AVENUE, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed
|
2017-05-26
|
No data
|
CLAY AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the parking lane. 3 day notice on site,
|
2017-05-26
|
No data
|
MACE AVENUE, FROM STREET EASTCHESTER ROAD TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 perm restoration in the roadeway
|
2017-05-25
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-05-24
|
No data
|
FT WASHINGTON AVENUE, FROM STREET WEST 185 STREET TO STREET WEST 187 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working on sidewalk and the parking lane opp. of location to repair a leak in street
|
2017-05-24
|
No data
|
FT WASHINGTON AVENUE, FROM STREET WEST 185 STREET TO STREET WEST 187 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Length: 4' 5" Width: 3' 8" Depth: 3' 5"First Lift: 97.0 Last Lift: 97.3
|
2017-05-24
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above respondent has failed to seal expansion joint bet curb & sidewalk as per CAR # 20172200025 date 4/4/17.
|
2017-05-21
|
No data
|
PARK AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway and sidewalk perm to grade
|
2017-05-20
|
No data
|
KINGSBRIDGE TERRACE, FROM STREET ALBANY CRESCENT TO STREET PEROT STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Water was Shut off by Dep After 3 Day Dep Notice Was Issued.
|
2017-05-18
|
No data
|
BEACH AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking. Excavation in parking/driving lane and behind the property line. 3 day notice
|
2017-05-18
|
No data
|
BEACH AVENUE, FROM STREET LACOMBE AVENUE TO STREET RANDALL AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
cut # 1 opposite 522 completed and acceptable / cut # 2 rescheduled in front of 522 adjacent to the curb because of water in the hole
|
2017-05-17
|
No data
|
ELLIS AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
CREW ON SITE WATER SERVICE LEAKING IN THE BASEMENT EXCAVATION ON THE SW & PARKING
|
2017-05-17
|
No data
|
BRONXWOOD AVENUE, FROM STREET CHESTNUT STREET TO STREET SOUTH OAK DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration
|
2017-05-17
|
No data
|
FORDHAM STREET, FROM STREET BROWN PLACE TO STREET MINNIEFORD AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
made perm to grade
|
2017-05-17
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Corner property 1 rd'wy cut on Harrison Ave center of road no one on site cut paved flush O.K.
|
2017-05-17
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-05-17
|
No data
|
VINCENT AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2017-05-13
|
No data
|
HONE AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
opp 1590 p/l pass
|
2017-05-10
|
No data
|
WEST 183 STREET, FROM STREET AUDUBON AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration to grade
|
2017-05-09
|
No data
|
PILGRIM AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water service leaking, Excavation in the parking lane and on the sidewalk and behind the property line.
|
2017-05-09
|
No data
|
PILGRIM AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Zenun. 4'6" x 3'3" depth 3' Blend. Jack Hammer,Exclusive Testing. Andre, sand cone, (W)117.3 (D)109.1 (MD)115.5 (AM) 7.5 test96.1/ 96.9BACKFILL pass . i spoke to foreman ZENUN, about wrong cross street Mildred Place/ santo Donato place it should
|
2017-05-09
|
No data
|
CASTLE HILL AVENUE, FROM STREET BRUCKNER BOULEVARD TO STREET QUIMBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm water cut in the driving lane flushed and sealed I/F/O 937.
|
2017-05-09
|
No data
|
EAST 77 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service line. DEP three day notice on site. Excavation in the driving lane OPP. above location.
|
2017-05-08
|
No data
|
FOX STREET, FROM STREET AVENUE ST JOHN TO STREET BEND
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the driving lane and on the sidewalk 3 day notice on site.
|
2017-05-07
|
No data
|
WESTCHESTER AVENUE, FROM STREET MORRISON AVENUE TO STREET STRATFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flag curing at this time on the north west corner , has stip 016 will monitor.
|
2017-05-07
|
No data
|
MORRISON AVENUE, FROM STREET HARROD PLACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flag curing at this time I/F/O 1618, Permits still active.
|
2017-05-06
|
No data
|
BRUCKNER BOULEVARD, FROM STREET BROOK AVENUE TO STREET ST ANNS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sewer backup , sidewalk and parking lane being excavated next to entrance doors, Family Bakery NYC
|
2017-05-04
|
No data
|
VYSE AVENUE, FROM STREET EAST 167 STREET TO STREET HOME STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temp water cut in the driving lane. flush.
|
2017-05-04
|
No data
|
WEST 119 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway is in compliance
|
2017-05-03
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERM RESTORATION IN R/W
|
2017-05-03
|
No data
|
WESTCHESTER AVENUE, FROM STREET MORRISON AVENUE TO STREET STRATFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, cant work until 9AM, Spoke to foremen for O'grady Zeun , working inside sewer.
|
2017-05-03
|
No data
|
SEDGWICK AVENUE, FROM STREET STEVENSON PLACE TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation on the sidewalk at this time (Insurance ).
|
2017-05-03
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration is in compliance
|
2017-05-02
|
No data
|
WEST 128 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS TERRACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Water leaking inside roadway excavation, service water leak . driving lane being excavated .
|
2017-05-01
|
No data
|
BAINBRIDGE AVENUE, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
roadway open in both directions to traffic, job almost complete. the works are cleaning the roadway.
|
2017-05-01
|
No data
|
BAINBRIDGE AVENUE, FROM STREET EAST MOSHOLU PARKWAY NORTH TO STREET ROCHAMBEAU AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
contractor will convert permit to perform backfill
|
2017-05-01
|
No data
|
EAST 197 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HUTCHINSON RIV PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Car parked over restoration
|
2017-04-30
|
No data
|
EAST 217 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
2 Temp Water Cuts in the Roadway Flush to Grade & Sidewalk Flag Currently Concrete Curing.
|
2017-04-29
|
No data
|
OGDEN AVENUE, FROM STREET BEND TO STREET DR M L KING JR BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permit expired
|
2017-04-28
|
No data
|
HARRISON AVENUE, FROM STREET MORTON PLACE TO STREET WEST TREMONT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP Ten day notice on site. Excavation in the roadway I/F/O # 1804
|
2017-04-27
|
No data
|
WEST 263 STREET, FROM STREET DELAFIELD PLACE TO STREET DELAFIELD PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken water line. DEP three day notice on site. Excavation in the roadway and two on sidewalk behind property line.
|
2017-04-27
|
No data
|
GRACE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
cut plated in the parking lane, on the opposite side there is a temp cut that is sunken, possible DEP.
|
2017-04-26
|
No data
|
FOWLER AVENUE, FROM STREET PIERCE AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
CREW ON SITE WORKING AT TIME
|
2017-04-25
|
No data
|
LURTING AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP notice on site. Excavation in the roadway and excavation on the sidewalk behind property line.
|
2017-04-25
|
No data
|
FORDHAM STREET, FROM STREET BROWN PLACE TO STREET MINNIEFORD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken water line. DEP three day notice on site. Two excavations in the roadway and two on the sidewalk behind property line.
|
2017-04-24
|
No data
|
EAST 213 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in r/w that has in core plug
|
2017-04-24
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in roadway
|
2017-04-24
|
No data
|
BOLLER AVENUE, FROM STREET CRAWFORD AVENUE TO STREET NEEDHAM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Excavation in the parking lane and two on the sidewalk, one is behind property line in grass area
|
2017-04-24
|
No data
|
BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done in p/l/ Con Edison cut into plumber perm restoration
|
2017-04-23
|
No data
|
CAMBRIDGE AVENUE, FROM STREET WEST 235 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2017-04-23
|
No data
|
GRACE AVENUE, FROM STREET BOSTON ROAD TO STREET TILLOTSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plated water excavation in the parking/driving lane and sidewalk cut was made final.
|
2017-04-23
|
No data
|
MORRISON AVENUE, FROM STREET HARROD PLACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Sewer service blocked, Excavation on the sidewalk.
|
2017-04-20
|
No data
|
DECATUR AVENUE, FROM STREET EAST 204 STREET TO STREET EAST MOSHOLU PARKWAY NORTH
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation in the parking lane.
|
2017-04-19
|
No data
|
BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Foreman ZENUN, jumping jack, 2 Types of BLEND material, LAB. Exclusive Testing, BASHIRI, SAND CONE. (W) 126.9/ 111.6 (D) 116.7/ 103.8 (MD)121.0/ 113.5 (AM) 8.7/ 7.5. TEST 96.9 / 95.5. Backfill Accepted.
|
2017-04-18
|
No data
|
GUNTHER AVENUE, FROM STREET BARNES AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Excavation in the roadway and on sidewalk behind property in grass area.
|
2017-04-18
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Failure to obtain a Confirmation number on a Protected Street
|
2017-04-18
|
No data
|
GUNTHER AVENUE, FROM STREET BARNES AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill completed and acceptable 7'.9" by 2'.9" in the parking lane
|
2017-04-16
|
No data
|
BRONX PARK EAST, FROM STREET THWAITES PLACE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Parking lane plated and also on property/sidewalk plated .
|
2017-04-14
|
No data
|
VAN CORLEAR PLACE, FROM STREET FT CHARLES PLACE TO STREET WEST 227 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation in the parking lane. Three excavations on the sidewalk, two are behind property line.
|
2017-04-13
|
No data
|
STILLWELL AVENUE, FROM STREET BOLLER AVENUE TO STREET PALMER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken water valve. Excavation in the driving/parking lane.
|
2017-04-13
|
No data
|
IRWIN AVENUE, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Sidewalk expansion joints need to be sealed
|
2017-04-13
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J issued
|
2017-04-12
|
No data
|
ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failed to maintain/ install color coding marker upon completion of the restoration on Permanent water cut I/F/O 723 in the roadway. Respondent was notified as per CAR#20176180050 issued on 1/26/17 and has yet to be corrected, Therefore NOV issued.
|
2017-04-12
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
D1J.
|
2017-04-11
|
No data
|
DELAFIELD AVENUE, FROM STREET DELAFIELD PLACE TO STREET WEST 261 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Two perm excavations in the roadway and two perm excavations on the sidewalk behind property line.
|
2017-04-08
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for failure to remove Con Edison blue incorrect Color Code Marker year 2017 on permanent Restoration in the Roadway and apply the correct Color Code Marker year 2017 with IBM # 50285. Car 20175180045 was previously issued on 2/24/2017.
|
2017-04-08
|
No data
|
EASTCHESTER ROAD, FROM STREET FOX TERRACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
water cut made final. 2inch below grade corrected.
|
2017-04-07
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints and pin holes has been sealed.
|
2017-04-06
|
No data
|
EAST 237 STREET, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plumber on site repairing broken sewer, spoke to foreman shamis
|
2017-04-05
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Install,recess and seal expansion joints. Repair defaced sidewalk flag
|
2017-04-05
|
No data
|
EAST 237 STREET, FROM STREET KATONAH AVENUE TO STREET KEPLER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken sewer line. Excavation on the sidewalk
|
2017-04-05
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Install,recess and seal expansion joints. Repair defaced sidewalk flag
|
2017-04-04
|
No data
|
EAST 222 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration in p/l
|
2017-04-04
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Cut was restored O.K.
|
2017-04-04
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joint bet curb & sidewalk are not sealed please seal all expansion around new work.
|
2017-04-03
|
No data
|
MORGAN AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
perm restoration in the parking lane, no dimension of cut given
|
2017-04-01
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm flush w/color code.
|
2017-04-01
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two water cuts in compliance
|
2017-03-30
|
No data
|
WILLETT AVENUE, FROM STREET EAST 213 STREET TO STREET EAST GUN HILL ROAD
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
foreman ZENUN. jumping jack. LAB. Exclusive testing. Denise. Sand cone. BLEND. (W)120.0 (D)111.1 (MD)117.5 (AM) 7.9 Backfill Accepted
|
2017-03-29
|
No data
|
FLINT AVENUE, FROM STREET BEND TO STREET ROPES AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Binder base water cut in the parking/driving lane flush.
|
2017-03-24
|
No data
|
BRONXWOOD AVENUE, FROM STREET CHESTNUT STREET TO STREET SOUTH OAK DRIVE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
10'x4' 9' deepWet:123.6Dry:113.7Max:118.5Moisture:8.7 First Lift: 96.5Last Lift: 96.7
|
2017-03-23
|
No data
|
WESTCHESTER AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2017-03-23
|
No data
|
ELDER AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER
|
2017-03-18
|
No data
|
221 STREET, FROM STREET 106 AVENUE TO STREET 107 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut to grade in the parking lane
|
2017-03-17
|
No data
|
OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CUT IN THE R/W
|
2017-03-17
|
No data
|
PAULDING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-03-17
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1 R/W Cut perm & 1 S/W Cut has snow O.K.
|
2017-03-13
|
No data
|
GRANT AVENUE, FROM STREET EAST 163 STREET TO STREET EAST 164 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-03-11
|
No data
|
HONE AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done
|
2017-03-08
|
No data
|
EASTCHESTER ROAD, FROM STREET FOX TERRACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Asphalt broken out 2 inches below grade in plumber cut, CAR notification issued to plumber .
|
2017-03-08
|
No data
|
CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-03-07
|
No data
|
EDISON AVENUE, FROM STREET GREENE PLACE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
PROTEST ACCEPTED DUE TO THE FLAG WAS NOT ORIGINALLY A FULL FLAG AND THERE WAS ALREADY AN EXISTING SEPARATE PANEL MADE. YOU WILL BE ABLE TO VERIFY ON GOOGLE MAPS OF THIS LOCATION.
|
2017-03-07
|
No data
|
EAST 215 STREET, FROM STREET LACONIA AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in p/l and dirt area of s/w
|
2017-03-05
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk flags, Water restoration in roadway I/F/O 2087.
|
2017-03-02
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill completed and acceptable but not monitored
|
2017-03-02
|
No data
|
UNIVERSITY AVENUE, FROM STREET WEST 167 STREET TO STREET WEST 168 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the parking /driving lane 3 day notice on site.
|
2017-03-02
|
No data
|
HONE AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done in r/w
|
2017-02-28
|
No data
|
NEWBOLD AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET HAVEMEYER AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill completed and acceptable
|
2017-02-25
|
No data
|
PAULDING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done in parking lane
|
2017-02-24
|
No data
|
WESTCHESTER AVENUE, FROM STREET EDISON AVENUE TO STREET PILGRIM AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation in the roadway and on the sidewalk.
|
2017-02-24
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Remove Con Edison blue incorrect Color Code Marker year 2017 on permanent Restoration in the driving and parking lane, and apply the correct Color Code Marker year 2017 with IBM # 50285.
|
2017-02-22
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 water cuts in the roadway I/F/O and OPP 2870 / PASS
|
2017-02-22
|
No data
|
RYER AVENUE, FROM STREET EAST 180 STREET TO STREET EAST 181 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill started at 1:30pm-2:30pm 2 truck, 2 test. 7'x3.5''x3' in the driving lane, 18'' saw cut done, I/F/O 2087. DENIS of Exclusive Testing Lad.
|
2017-02-22
|
No data
|
MIDDLETOWN ROAD, FROM STREET WATERSTONE DRIVE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2017-02-20
|
No data
|
KINGSLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done
|
2017-02-18
|
No data
|
BARNES AVENUE, FROM STREET BARNETT PLACE TO STREET MORRIS PARK AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Two excavations in the roadway and one on the sidewalk
|
2017-02-16
|
No data
|
HONE AVENUE, FROM STREET ARNOW AVENUE TO STREET BOSTON ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on tap. DEP three day notice on site. Excavation in the roadway Opp. location.
|
2017-02-14
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Length: 3' 4" Width: 2' 7" Depth: 4'--Wet Den: 122.1 Dry Den: 113.6 Max Dry: 119.5 Actual: 7.5 --First Lift: 97.2 Last Lift: 97.9
|
2017-02-14
|
No data
|
BRUCKNER BOULEVARD, FROM STREET EAST 133 STREET TO STREET ST ANNS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
one perm cut in driving lane of roadway and a second restoration in parking lane with 1 sidewalk flag restored.
|
2017-02-13
|
No data
|
PAULDING AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-02-13
|
No data
|
EASTCHESTER ROAD, FROM STREET FOX TERRACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Asphalt broken out 2 inches below grade in plumber temporary restoration, also cut overdue for final restoration.
|
2017-02-11
|
No data
|
EAST 183 STREET, FROM STREET CROTONA AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Leak @ Tap. 3 Day Dep Notice Issued.
|
2017-02-10
|
No data
|
PAULDING AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Still investigating water leak. DEP three day notice on site. Excavation in the roadway
|
2017-02-08
|
No data
|
STADIUM AVENUE, FROM STREET AGAR PLACE TO STREET RAWLINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp cut in the driving lane, Permit still active.
|
2017-02-08
|
No data
|
EAST 50 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SEWER with an active permit on file.
|
2017-02-07
|
No data
|
EASTCHESTER ROAD, FROM STREET FOX TERRACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Plumber made the necessary repair to broken service line on 2/6/17. 2 temp cut flush in the roadway and one on the sidewalk. leak condition repaired
|
2017-02-06
|
No data
|
3 AVENUE, FROM STREET EAST 75 STREET TO STREET EAST 76 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill complete
|
2017-02-06
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pass
|
2017-02-06
|
No data
|
3 AVENUE, FROM STREET EAST 75 STREET TO STREET EAST 76 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
back fill complete
|
2017-02-06
|
No data
|
EASTCHESTER ROAD, FROM STREET FOX TERRACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken service line. DEP three notice on site. Excavation in the roadway and on the sidewalk in the grass area.
|
2017-02-06
|
No data
|
EASTCHESTER ROAD, FROM STREET FOX TERRACE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber on site, shuts off water and in the process of doing repairs. 2 cuts in the r/w and one on the sidewalk. I spoke to foreman Shamis they are doing the repairs for 8 houses on fox terrace one service line for all.
|
2017-02-04
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-02-03
|
No data
|
EAST 150 STREET, FROM STREET CEDAR LANE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation on the sidewalk behind property line.
|
2017-02-03
|
No data
|
EAST 150 STREET, FROM STREET CEDAR LANE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
- REPAIR WATER - PROTECTED
|
2017-02-03
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill started at 11am-12pm 4'x3.5''x3' driving lane i/f/o 2784. Exclusive Testing Lab, Andrew Rosado. Chapman was on site.
|
2017-02-03
|
No data
|
ADEE AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane
|
2017-02-02
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR WATER - PROTECTED
|
2017-02-01
|
No data
|
VALENTINE AVENUE, FROM STREET EAST 188 STREET TO STREET EAST FORDHAM ROAD
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site and broken sprinkler line. DEP three day notice on site. Two excavations on the sidewalk and one in the street
|
2017-01-28
|
No data
|
EDISON AVENUE, FROM STREET GREENE PLACE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Portion of a sidewalk flag was patched please restore full flag sidewalk restoration in front of 1055
|
2017-01-28
|
No data
|
HUGHES AVENUE, FROM STREET EAST 186 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm to grade
|
2017-01-27
|
No data
|
UNDERCLIFF AVENUE, FROM STREET SEDGWICK AVENUE TO STREET WEST 176 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
worked not done
|
2017-01-27
|
No data
|
GLEBE AVENUE, FROM STREET GLOVER STREET TO STREET MANNING STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking, Excavation in the parking lane and behind the property ling. 3 day notice on site.
|
2017-01-27
|
No data
|
BALCOM AVENUE, FROM STREET BEND TO STREET LATTING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/W/-S/W CUTS OK
|
2017-01-27
|
No data
|
BRUCKNER BOULEVARD, FROM STREET EAST 133 STREET TO STREET ST ANNS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service broken, Excavation in the driving lane.
|
2017-01-26
|
No data
|
ROSEDALE AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET SEWARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 out of 2 perm cuts is missing IBM color code and has portion of cracked asphalt our of restoration.
|
2017-01-25
|
No data
|
OLMSTEAD AVENUE, FROM STREET LACOMBE AVENUE TO STREET NORTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flag restored at 421.
|
2017-01-25
|
No data
|
CHATTERTON AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in driving lane of roadway.
|
2017-01-23
|
No data
|
WEST 168 STREET, FROM STREET NELSON AVENUE TO STREET OGDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm Plumbers restoration in parking/driving lane, good.
|
2017-01-22
|
No data
|
MARMION AVENUE, FROM STREET EAST 175 STREET TO STREET EAST 176 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
later work in progress
|
2017-01-22
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Condition previously reported.
|
2017-01-21
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut IFO 223
|
2017-01-21
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Correct condition; Cut & seal EXPANSION JOINTS i/f/o bldg# 418. Also fill & seal Pinholes adjacent to cut on the roadway.
|
2017-01-20
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 temp restorations in parking lane of roadway.
|
2017-01-19
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp-restoration in the roadway aligned with main. No action taken at this time due to active permit.
|
2017-01-18
|
No data
|
COMMONWEALTH AVENUE, FROM STREET BRONX RIVER AVENUE TO STREET LACOMBE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Temp water cut in the parking lane fluch.
|
2017-01-17
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
1 R/W Cut temp flush & 1 S/W Flag done in concrete O.K.
|
2017-01-13
|
No data
|
MIDDLETOWN ROAD, FROM STREET WATERSTONE DRIVE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking. Excavation in the parkig lane and on the sidewalk. (3 day notice. )
|
2017-01-13
|
No data
|
MIDDLETOWN ROAD, FROM STREET WATERSTONE DRIVE TO STREET JARVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SIDEWALK AND ROADWAY CUT OK
|
2017-01-12
|
No data
|
RIVERDALE AVENUE, FROM STREET FIELDSTON ROAD TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm trench in the driving/parking lanes I/F/O 3726, 3717 Riverdale Ave, Missing color code with I/B/M # and year.
|
2017-01-12
|
No data
|
RIVERDALE AVENUE, FROM STREET FIELDSTON ROAD TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Incorrect date on photo
|
2017-01-12
|
No data
|
EAST 239 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in parking lane
|
2017-01-11
|
No data
|
WILLETT AVENUE, FROM STREET EAST 216 STREET TO STREET EAST 219 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm trench in the parking/driving lane of roadway.
|
2017-01-10
|
No data
|
EDISON AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CUTS OK
|
2017-01-10
|
No data
|
POND PLACE, FROM STREET EAST 197 STREET TO STREET EAST 198 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp cut in driving lane of roadway.
|
2017-01-10
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Updated permit on file M012017005E81.
|
2017-01-10
|
No data
|
CONVENT AVENUE, FROM STREET WEST 143 STREET TO STREET WEST 144 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Currently no indications of work done.
|
2017-01-06
|
No data
|
EASTCHESTER ROAD, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
6"base cutbacks monitored. L-3', W-3' 6", D 2'. Water appears to be leaking from an adjacent pipe. Supervisor Zenun
|
2017-01-06
|
No data
|
EASTCHESTER ROAD, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
check plumber working in r/w. spoke to Zenun. INS. S. GRIER ASSIGN to local law 14
|
2017-01-04
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed 4'x2'.6 parking lane, crew on site working foreman Shamus
|
2017-01-04
|
No data
|
MATTHEWS AVENUE, FROM STREET BRADY AVENUE TO STREET LYDIG AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water leak, Excavation in the parking lane and on the sidewalk. 3 day notice on site.
|
2017-01-02
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2017-01-02
|
No data
|
TENBROECK AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2016-12-31
|
No data
|
EASTCHESTER ROAD, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
cut temp to grade
|
2016-12-30
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 196 STREET TO STREET EAST 197 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Still investigating water leak in basement. DEP three day notice on site. No excavation on site at this time.
|
2016-12-29
|
No data
|
VYSE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 Plumbers cut in parking lane I/F/O 1935, good.
|
2016-12-27
|
No data
|
SOUTHERN BOULEVARD, FROM STREET ALDUS STREET TO STREET EAST 163 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken sewer line. DEP notice on site. Excavation on the sidewalk and in the roadway.
|
2016-12-27
|
No data
|
GARFIELD STREET, FROM STREET MORRIS PARK AVENUE TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plumber on site, work in progress
|
2016-12-23
|
No data
|
3 AVENUE, FROM STREET EAST 75 STREET TO STREET EAST 76 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, water service leaking, Excavation in the parking lane. 3 day notice on site.
|
2016-12-21
|
No data
|
20 AVENUE, FROM STREET 124 STREET TO STREET 125 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in opposite side D/L.
|
2016-12-16
|
No data
|
WARD AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation in the driving lane.
|
2016-12-15
|
No data
|
EASTCHESTER ROAD, FROM STREET MACE AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working in driving lane opp. of location searching for a service leak in roadway
|
2016-12-15
|
No data
|
TENBROECK AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Foreman LEO cuts 4'5" x 2'4" depth 2' & 4'9" x 3'4" depth 2' jack hammer. lab. Exclusive testing . Laura. sand cone. blend. (W) 116.7 (D) 109.7 (MD) 113.5 (AM) 6.3 . 98.1/ 97.9 Backfill accepted
|
2016-12-13
|
No data
|
FULLER STREET, FROM STREET SEDDON STREET TO STREET ZEREGA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Water leak verified. DEP three day notice not on site. Excavation in the parking lane.
|
2016-12-12
|
No data
|
MORGAN AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed a permanent cut in the driving lane of roadway without the 6" base and 12" wearing course. Respondent was notified per CAR #20164110250. Respondent failed to comply with DOT standard specifications.
|
2016-12-09
|
No data
|
CROSBY AVENUE, FROM STREET CODDINGTON AVENUE TO STREET DUDLEY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
crew at site working long cuts
|
2016-12-09
|
No data
|
WEST 150 STREET, FROM STREET CONVENT AVENUE TO STREET ST NICHOLAS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill now PASS, a void was found and was cut back. 1st lift 97.2, 2nd lift 97.4%, fire suppression line was installed. Details can be found on backfill sheet.
|
2016-12-08
|
No data
|
SOUTHERN BOULEVARD, FROM STREET BOSTON ROAD TO STREET CROTONA PARK EAST
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work not started
|
2016-12-08
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please Install Expansion Joints btwn Curb and New Sidewalk Flag and repair Graffitti markings causing a trip hazard.
|
2016-12-05
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Area adjacent to permanent water cut is sunken 2 inches with temporary asphalt caused by water leak. Must remove, replace and restore to grade.
|
2016-12-05
|
No data
|
ELDER AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service line. Two excavations in the roadway and one on the sidewalk behind property line.
|
2016-12-05
|
No data
|
GLOVER STREET, FROM STREET GLEBE AVENUE TO STREET LYON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Two excavations in the roadway, one on sidewalk and another one behind property line.
|
2016-12-02
|
No data
|
ELDER AVENUE, FROM STREET EAST 172 STREET TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water leaking on the service, Excavation in the parking/driving lane and behind the property line. 3 day notice on site.
|
2016-12-01
|
No data
|
VAN NEST AVENUE, FROM STREET BOGART AVENUE TO STREET RADCLIFF AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Spoke to ZENUN foreman at site in regards to backfill material in cut too high, i have contractor dig out excess fill
|
2016-12-01
|
No data
|
EDISON AVENUE, FROM STREET GREENE PLACE TO STREET OTIS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
foreman Shemis- cut 3'9" x 3' depth 4' Blend. Lab. EXCLUSIVE TESTING. BASHIRI. JACK HAMMER . (W)121.8 (D) 110.8 (MD) 116.0 (AM) 9.8 TEST. 97.2/ 97.5 Backfill Accepted
|
2016-12-01
|
No data
|
HARPER AVENUE, FROM STREET HARPER COURT TO STREET VARIAN AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
contractor on site working in excavation repairing goose neck connection
|
2016-11-28
|
No data
|
WASHINGTON TERRACE, FROM STREET DEAD END TO STREET WEST 186 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Met with O'Grady (plumbing company owner) and talked about the roadway which is not cobble stones but asphalt with cobble stones in-prints. He wasn't sure how to proceed. He will call for backfill & base procedure. Crew on site starting water repair
|
2016-11-23
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leaking in the basement ( I verified the leak ) Excavation behind the property line and in the parking/driving lane.
|
2016-11-22
|
No data
|
WHITE PLAINS ROAD, FROM STREET CRANFORD AVENUE TO STREET EAST 240 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Basement flooded. Excavation in the driving lane and two on the sidewalk.
|
2016-11-21
|
No data
|
HOLLYWOOD AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET PHILIP AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed 4'x3'longwater cut foreman Jakup
|
2016-11-18
|
No data
|
WICKHAM AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Back fill started at 12:45pm-1:30pm, 4'x4'x3.5'' opp 3010 Wickman Ave. Lab tech Laura form Exclusive Testing. Arrived at back fill 12:37pm was doing art complaint for Chapman.
|
2016-11-18
|
No data
|
WASHINGTON TERRACE, FROM STREET DEAD END TO STREET WEST 186 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started on water repair.
|
2016-11-17
|
No data
|
BRISTOW STREET, FROM STREET FREEMAN STREET TO STREET JENNINGS STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water service leak, Excavation in the parking lane. 3 day notice on site.
|
2016-11-17
|
No data
|
MACE AVENUE, FROM STREET EASTCHESTER ROAD TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2016-11-14
|
No data
|
MORRIS AVENUE, FROM STREET EAST 179 STREET TO STREET EAST BURNSIDE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water leaking into basement, Excavation on the sidewalk and in the driving lane.3 day notice on site.
|
2016-11-14
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Restoration made final
|
2016-11-10
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Wearing course completed and acceptable all cutbacks completed
|
2016-11-09
|
No data
|
PAULDING AVENUE, FROM STREET EAST 231 STREET TO STREET EAST 232 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water leaking on the service, Excavation in the driving lane. 3 day notice on site,
|
2016-11-09
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed, in progress upon arrival , cut 4'x3' crew on site working foreman Znun
|
2016-11-08
|
No data
|
TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in roadway
|
2016-11-08
|
No data
|
HOLLYWOOD AVENUE, FROM STREET LAFAYETTE AVENUE TO STREET PHILIP AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Sidewalk and driving lane being excavated , service water leak, 3 Day notice issued from D.E.P
|
2016-11-07
|
No data
|
COLDEN AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
active permit for plumber, perm restoration in the roadway
|
2016-11-06
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp in roadway with Green spray mark outs
|
2016-11-05
|
No data
|
RIVERDALE AVENUE, FROM STREET FIELDSTON ROAD TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
4 cuts in the roadway, steel plated, pinned, ramp i/f/o 3717.
|
2016-11-03
|
No data
|
TAYLOR AVENUE, FROM STREET DEAD END TO STREET VAN NEST AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, water service leaking, 3 day notice on site, Excavation on the sidewalk and on the roadway..
|
2016-11-02
|
No data
|
EAST 159 STREET, FROM STREET ELTON AVENUE TO STREET MELROSE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, Water leaking into the basement, Excavation in the parking lnae and behind the property line. ( insurance ) ,
|
2016-11-01
|
No data
|
RIVERDALE AVENUE, FROM STREET FIELDSTON ROAD TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
foreman ZENUN. 4'X4' DEPTH 3' / 3'9"X2'10"DEPTH 2'/ 3'8" X 2'8" DEPTH 2'/ 4'3" X 2'5" DEPTH 2' FOREMAN ZENUN. LAB EXCLUSIVE TESTING. BASHIRI. RAP. (W)117.9 (D)110.8(MD)120.5 (AM)6.3. BACK FILL accepted
|
2016-10-31
|
No data
|
WEST 119 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
long water cut back filled and pass. 6 inch cut back was done
|
2016-10-31
|
No data
|
BLACKROCK AVENUE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation in the driving lane and two on the sidewalk.
|
2016-10-31
|
No data
|
EAST 187 STREET, FROM STREET BATHGATE AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Perm restoration in the driving lane
|
2016-10-28
|
No data
|
CAMERON PLACE, FROM STREET JEROME AVENUE TO STREET WALTON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service line. DEP three day notice on site. Two excavations in the roadway and one on the sidewalk behind property line.
|
2016-10-27
|
No data
|
TULFAN TERRACE, FROM STREET DEAD END TO STREET OXFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Four steel plates with markings "OG" secured on the roadway I/F/O # 3726 going accross to # 3717 on Riverdale Ave and 1 coned off sidewalk flag i/f/o # 3717. This was work that was done on 10/25/16 for above location.
|
2016-10-27
|
No data
|
PARK AVENUE, FROM STREET EAST 159 STREET TO STREET EAST 160 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service line. Excavation on the sidewalk and parking lane.
|
2016-10-27
|
No data
|
RIVERDALE AVENUE, FROM STREET FIELDSTON ROAD TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Four steel plates with markings "OG" secured on the roadway I/F/O # 3726 going accross to # 3717 on Riverdale Ave and 1 coned off sidewalk flag i/f/o # 3717. This was work that was done on 10/25/16 for above location.
|
2016-10-26
|
No data
|
WEST 119 STREET, FROM STREET 7 AVENUE TO STREET LENOX AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
water leak..3 day notice
|
2016-10-26
|
No data
|
VINCENT AVENUE, FROM STREET BARKLEY AVENUE TO STREET LAYTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w and s/w cuts ok
|
2016-10-25
|
No data
|
TULFAN TERRACE, FROM STREET DEAD END TO STREET OXFORD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Respondent failed to begin emergency work within 2 hours after authorization at the above location. During inspection there was no excavation made in roadway, side walk or surrounding area of above location.
|
2016-10-24
|
No data
|
SEDGWICK AVENUE, FROM STREET WEST 197 STREET TO STREET WEST 229 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed X201629811 cut 7'x5' 6'' cutback in progress, crew on site foreman Shemes, & 1 sidewalk cut
|
2016-10-22
|
No data
|
MACE AVENUE, FROM STREET EASTCHESTER ROAD TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp cuts in r/w
|
2016-10-21
|
No data
|
COLDEN AVENUE, FROM STREET NEILL AVENUE TO STREET RHINELANDER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
work done, 2 perm restoration in r/w
|
2016-10-18
|
No data
|
WEST 120 STREET, FROM STREET LENOX AVENUE TO STREET MT MORRIS PARK WEST
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working i/f/o location to repair a leak in roadway
|
2016-10-17
|
No data
|
MORGAN AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
6 inch base cur back and 12 inch wearing course cut back not applied as per D.O.T. 1042
|
2016-10-15
|
No data
|
MULINER AVENUE, FROM STREET LYDIG AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Roadway repave by dot
|
2016-10-13
|
No data
|
MACE AVENUE, FROM STREET EASTCHESTER ROAD TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Plumber on site working to repair service line, 2 cuts in the roadway. spoke to plumber in regards to men working signs
|
2016-10-13
|
No data
|
MACE AVENUE, FROM STREET EASTCHESTER ROAD TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on water connection. DEP three day notice on site. One excavation in the roadway
|
2016-10-13
|
No data
|
WEST 165 STREET, FROM STREET AMSTERDAM AVENUE TO STREET EDGECOMBE AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site working i/f/o location to repair a leak in basement
|
2016-10-11
|
No data
|
BARNES AVENUE, FROM STREET BARTHOLDI STREET TO STREET CHESTNUT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sewer cut plated, mound of dirt in p/l. drain pipes place along curb. id signs within property line posted
|
2016-10-11
|
No data
|
SEDGWICK AVENUE, FROM STREET STEVENSON PLACE TO STREET WEST 238 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken water line. Excavation in the parking lane, one on sidewalk and two behind property line.
|
2016-10-08
|
No data
|
CAMBRIDGE AVENUE, FROM STREET WEST 235 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Two excavations in the parking and driving lane.
|
2016-10-07
|
No data
|
EAST 197 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HUTCHINSON RIV PARKWAY
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
back-fill pass sand cone 3 x 3 2.7
|
2016-10-07
|
No data
|
EAST 213 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A SAMPLE OF THE RESPONDENTS PERMANENT RESTORATION IN THE DRIVING LANE WITH 2016 GREEN COLOR CODE MARKER IBM# 50285 ON IT THAT HAS ONLY 8 INCHES OF BINDER BASE INSTALLED NOT MATCHING THE CORRECT RATIO FOR 7 1/2 INCHES OF THE EXISTING CONCRETE BASE.
|
2016-10-07
|
No data
|
HOLLAND AVENUE, FROM STREET ALLERTON AVENUE TO STREET ARNOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
perm restoration in r/w
|
2016-10-06
|
No data
|
EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET SANTO DONATO PLACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Two excavations in the roadway and one on the sidewalk.
|
2016-10-06
|
No data
|
EDISON AVENUE, FROM STREET ST THERESA AVENUE TO STREET SANTO DONATO PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTRACTOR ON SITE
|
2016-10-05
|
No data
|
EAST 84 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
plumber onsite with excavation new cooper pipe in excavation
|
2016-10-04
|
No data
|
EAST 197 STREET, FROM STREET CONTINENTAL AVENUE TO STREET HUTCHINSON RIV PARKWAY
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. DEP three day notice on site. Excavation in the parking lane and sidewalk behind property line.
|
2016-10-03
|
No data
|
BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass
|
2016-09-29
|
No data
|
EDISON AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
plumber on site repairing broken service line. mark out done for none protected street cut back
|
2016-09-27
|
No data
|
EAST 222 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
spoke to shamus in regards to cut backs on newly resurfaced roadway
|
2016-09-27
|
No data
|
EDISON AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
2 cuts left in temp asphalt and the other plated
|
2016-09-27
|
No data
|
EDISON AVENUE, FROM STREET MILDRED PLACE TO STREET WILKINSON AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
2 CUTS MADE TEMP 1 CUT PLATED SITE OK
|
2016-09-26
|
No data
|
VIRGIL PLACE, FROM STREET CASTLE HILL AVENUE TO STREET OLMSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new work done in this area roadway or sidewalk
|
2016-09-26
|
No data
|
EAST 222 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTRACTOR ON SITE
|
2016-09-23
|
No data
|
ADEE AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Perm Excavation in the parking/driving lane.
|
2016-09-23
|
No data
|
ADEE AVENUE, FROM STREET BARNES AVENUE TO STREET MATTHEWS AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
BACKFILL WAS COMPLETED UPON ARRIVAL
|
2016-09-21
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE TO STREET WESTERLY LANE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site making repair in parking lane.
|
2016-09-21
|
No data
|
COLONIAL COURT, FROM STREET HARBOR VIEW TERRACE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
D.E.P issued a 3 day notice, crew is excavating the intersection to locate the tap .
|
2016-09-16
|
No data
|
BARRETTO STREET, FROM STREET RANDALL AVENUE TO STREET SPOFFORD AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Broken water valve. DEP three notice on site. Cut in the parking/driving lane.
|
2016-09-14
|
No data
|
MORGAN AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Core survey
|
2016-09-13
|
No data
|
HONE AVENUE, FROM STREET PIERCE AVENUE TO STREET SACKETT AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. No DEP three day notice on site. Water leak verified. Excavation in the driving lane & two on sidewalk, one is behind property line.
|
2016-09-11
|
No data
|
INTERVALE AVENUE, FROM STREET CHISHOLM STREET TO STREET HOME STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2016-09-11
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary Restoration in the Driving Lane I/F/O 112 also 1 Sidewalk Flag has been restored around a Water Valve.
|
2016-09-09
|
No data
|
NOBLE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 174 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done in parking lane
|
2016-09-09
|
No data
|
IRWIN AVENUE, FROM STREET WEST 234 STREET TO STREET WEST 236 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumbers cut in the driving lane i/f/o 3414 , is flushed and sealed.
|
2016-09-06
|
No data
|
MULINER AVENUE, FROM STREET LYDIG AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plumber permanent restoration missing color code with year and i b m # as per dot section rules 2-11(e) 14.v
|
2016-09-04
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent water restoration flushed to grade on roadway.
|
2016-09-03
|
No data
|
ELY AVENUE, FROM STREET BUSSING AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Restoration combine into 1
|
2016-09-02
|
No data
|
CRUGER AVENUE, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration in parking lane
|
2016-08-29
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway and Sidewalk Plated I/F/O 114, Plates marked OG
|
2016-08-26
|
No data
|
HOLLYWOOD AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
4x3 cut pass ll-14
|
2016-08-26
|
No data
|
HOLLYWOOD AVENUE, FROM STREET THROGS NECK EXPRESSWAY TO STREET SCHLEY AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site, 3 day notice on site, Excavation in the parkink/driving lane and on the sidewalk.
|
2016-08-25
|
No data
|
221 STREET, FROM STREET 106 AVENUE TO STREET 107 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm restoration
|
2016-08-24
|
No data
|
LEXINGTON AVENUE, FROM STREET EAST 27 STREET TO STREET EAST 28 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Service water leak , D.E.P issued a 3 day notice , sidewalk and driving lane being excavated .
|
2016-08-18
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
water cut acceptable.
|
2016-08-15
|
No data
|
ANTHONY AVENUE, FROM STREET EAST TREMONT AVENUE TO STREET MT HOPE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street milled
|
2016-08-01
|
No data
|
PAULDING AVENUE, FROM STREET ADEE AVENUE TO STREET BURKE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
2 CUTS ON THE R/W OK
|
2016-08-01
|
No data
|
PRENTISS AVENUE, FROM STREET HARDING AVENUE TO STREET MULLEN PLACE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed 6'' cutback for Binder base in progress, crew on site foreman Sheme
|
2016-07-30
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Arrival time: 10:14am Departure time: 11:50am (cut size before cutbacks 4' 10" x 3' 4")
|
2016-07-26
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp restoration flushed to grade in roadway. I/F/O 223
|
2016-07-22
|
No data
|
ELY AVENUE, FROM STREET BUSSING AVENUE TO STREET PITMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 permanent plumber restoration 2' 6" apart each other needs to combine into one restoration, as per dot section rules 2-11 (e) 12-iv
|
2016-07-22
|
No data
|
HUGHES AVENUE, FROM STREET EAST 186 STREET TO STREET EAST 187 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service & basement flooded. Three day notice on site. Two excavations in the roadway & one excavation on the sidewalk.
|
2016-07-22
|
No data
|
EAST 223 STREET, FROM STREET BRONXWOOD AVENUE TO STREET PAULDING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2016-07-20
|
No data
|
MICKLE AVENUE, FROM STREET ADEE AVENUE TO STREET HAMMERSLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp cut in the Roadway
|
2016-07-19
|
No data
|
OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut in the driving lane opp 3232.
|
2016-07-11
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w & s/w ok
|
2016-07-11
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp restoration flushed to grade in parking lane IFO 223. (Inspector 646).
|
2016-07-06
|
No data
|
WEST 13 STREET, FROM STREET 7 AVENUE TO STREET GREENWICH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I OBSERVED RESPONDENT FAILED TO COMPLY WITH TERMS AND CONDITION OF NYCDOT PERMIT. STIP 086 STATES WORK 7 AM TO 3 PM MONDAY THROUGH FRIDAY. CONTRACTORS ARE ACTIVLY WORKING AT THIS TIME.
|
2016-07-05
|
No data
|
WEST 168 STREET, FROM STREET NELSON AVENUE TO STREET OGDEN AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
monitored site from 1145-1310pm, backfill acceptable
|
2016-07-01
|
No data
|
WILLETT AVENUE, FROM STREET EAST 216 STREET TO STREET EAST 219 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
Backfill completed, crew on site foreman Shamas, 1 cut driving lane 6'' cutback in progress, Longwater cut
|
2016-06-29
|
No data
|
WILLETT AVENUE, FROM STREET EAST 216 STREET TO STREET EAST 219 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Plated water excavation in the parking lane.
|
2016-06-23
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
REPAIR WATER - PROTECTED
|
2016-06-23
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
REPAIR WATER - PROTECTED
|
2016-06-23
|
No data
|
BUHRE AVENUE, FROM STREET CROSBY AVENUE TO STREET HOBART AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Three notice on site. Excavation in the roadway, one on the sidewalk & one on the square, Opp. # 3006.
|
2016-06-22
|
No data
|
OXFORD AVENUE, FROM STREET CAMBRIDGE AVENUE TO STREET WEST 235 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
7' by 4' backfill
|
2016-06-22
|
No data
|
EAST 239 STREET, FROM STREET KATONAH AVENUE TO STREET MARTHA AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
No crew on site. Temp water cut flushed in the parking lane.
|
2016-06-20
|
No data
|
BRIGGS AVENUE, FROM STREET EAST 198 STREET TO STREET EAST 199 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Crew on site. Water leak on service. Three day notice on site. Two excavations in the roadway & two excavations on the sidewalk behind property line.
|
2016-06-18
|
No data
|
EAST 58 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Broken Domestic Water Service Leak @ Tap. 3 Day Dep Notice Issued.
|
2016-06-13
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: LL14
|
Department of Transportation
|
backfill completed and acceptable
|
2016-06-08
|
No data
|
20 AVENUE, FROM STREET 124 STREET TO STREET 125 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
At time of inspection, crew on site, work in progress.
|
2016-06-08
|
No data
|
WOODYCREST AVENUE, FROM STREET WEST 165 STREET TO STREET WEST 166 STREET
|
No data
|
Street Construction Inspections: E-Number
|
Department of Transportation
|
Two water cuts flushed in the roadway & one on the sidewalk.
|