Search icon

I.I. CONTRACTING CO. INC.

Company Details

Name: I.I. CONTRACTING CO. INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 07 Jan 1997 (28 years ago)
Entity Number: 2099343
ZIP code: 11735
County: Suffolk
Place of Formation: New York
Address: 89 ALLEN BLVD., FARMINGDALE, NY, United States, 11735

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 89 ALLEN BLVD., FARMINGDALE, NY, United States, 11735

Chief Executive Officer

Name Role Address
ROBERT LACH Chief Executive Officer 89 ALLEN BLVD., FARMINGDALE, NY, United States, 11735

History

Start date End date Type Value
1997-01-07 1999-01-13 Address 89 ALLEN BLVD., FARMINGDALE, NY, 11735, USA (Type of address: Service of Process)

Filings

Filing Number Date Filed Type Effective Date
150114006391 2015-01-14 BIENNIAL STATEMENT 2015-01-01
110120002437 2011-01-20 BIENNIAL STATEMENT 2011-01-01
090102002820 2009-01-02 BIENNIAL STATEMENT 2009-01-01
070116003134 2007-01-16 BIENNIAL STATEMENT 2007-01-01
050209002135 2005-02-09 BIENNIAL STATEMENT 2005-01-01
021227002126 2002-12-27 BIENNIAL STATEMENT 2003-01-01
010118002286 2001-01-18 BIENNIAL STATEMENT 2001-01-01
990113002565 1999-01-13 BIENNIAL STATEMENT 1999-01-01
970107000141 1997-01-07 CERTIFICATE OF INCORPORATION 1997-01-07

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339641771 0214700 2014-03-19 ENGINEERING DR, STONY BROOK, NY, 11794
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2014-03-19
Emphasis L: FALL, P: FALL
Case Closed 2015-02-05

Related Activity

Type Referral
Activity Nr 877651
Safety Yes
Type Inspection
Activity Nr 964157
Safety Yes
Type Inspection
Activity Nr 964201
Safety Yes
Type Inspection
Activity Nr 964168
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260025 A
Issuance Date 2014-07-15
Abatement Due Date 2014-07-21
Current Penalty 1960.0
Initial Penalty 2800.0
Final Order 2014-08-07
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.25(a): During the course of construction, alteration, or repairs, debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures: a) Worksite, Interior, 3rd Flr - Material such as, but not limited to, sheetrock, metal studs, insulation, paper, tape and cardboard, was left on the floor of the atrium where employees were engaged in work activity; on, or about, 03/20/2014. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01002A
Citaton Type Serious
Standard Cited 19260502 B01
Issuance Date 2014-07-15
Abatement Due Date 2014-07-21
Current Penalty 1960.0
Initial Penalty 2800.0
Final Order 2014-08-07
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.502(b)(1): The top edge height of the top rails, or equivalent guardrail system members, was not 42 inches (1.1 m) plus or minus 3 inches (8 cm) above the walking/working level: a) Worksite, Interior; 3rd Flr, Southern Atrium Opening - Wire rope, used for top rails, hung between posts at a heights of approximately 38.5 inches to 37.25 inches; on, or about, 03/19/2014. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01002B
Citaton Type Serious
Standard Cited 19260502 B04
Issuance Date 2014-07-15
Abatement Due Date 2014-07-21
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2014-08-07
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.502(b)(4): When the 200 pound (890 N) test load specified in paragraph (b)(3) of this section was applied in a downward direction, the top edge of the guardrail deflected to a height less than 39 inches (1.0 m) above the walking/working level: a) Worksite, Interior; 3rd Flr, Southern Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 31.5 inches; on, or about, 03/20/2014. b) Worksite, Interior; 3rd Flr, Central Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 35 inches; on, or about, 03/20/2014. c) Worksite, Interior; 3rd Flr, North Atrium Opening - When force, not greater than 50lbs, was applied in a downward direction the wire rope deflected to a height of approximately 36 inches; on, or about, 03/20/2014. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01003
Citaton Type Other
Standard Cited 19260502 B06
Issuance Date 2014-07-15
Abatement Due Date 2014-07-21
Current Penalty 840.0
Initial Penalty 1200.0
Final Order 2014-08-07
Nr Instances 1
Nr Exposed 2
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.502(b)(6): Guardrail systems were not surfaced so as to prevent injury to an employee from punctures or lacerations, and to prevent snagging of clothing. a) Worksite, Interior; 3rd Flr, Atrium - Wire rope was used for top and mid-rails. The dead end of wire rope was not secured and extended into areas where employees walk and work; on, or about, 03/20/2014. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260502 B09
Issuance Date 2014-07-15
Abatement Due Date 2014-07-21
Current Penalty 1400.0
Initial Penalty 2000.0
Final Order 2014-08-07
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.502(b)(9): The employer failed to ensure that wire rope used as a top rail was flagged at 6-foot intervals with high-visibility material. a) Worksite, Interior; 3rd Flr, Atrium Openings - Wire rope was used for top and mid-rails without being flagged; on, or about, 03/20/2014. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Citation ID 01005
Citaton Type Serious
Standard Cited 19260416 B02
Issuance Date 2014-07-15
Abatement Due Date 2014-07-21
Current Penalty 1960.0
Initial Penalty 2800.0
Final Order 2014-08-07
Nr Instances 2
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.416(b)(2): Working spaces, walkways, and similar locations were not kept clear of cords which created a hazard to employees: a) Worksite, Interior, 3rd Flr - Extension cords laid throughout atrium work areas presented tripping hazards; on, or about, 02/20/2014. b) Worksite, Interior, 2rd Flr - Extension cords laid throughout atrium work areas presented tripping hazards; on, or about, 02/20/2014. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01006
Citaton Type Serious
Standard Cited 19261052 C04
Issuance Date 2014-07-15
Abatement Due Date 2014-07-21
Current Penalty 1960.0
Initial Penalty 2800.0
Final Order 2014-08-07
Nr Instances 3
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1052(c)(4): Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members were not provided between the top rail of the stairrail system and the stairway steps: a) Worksite, Interior, Stair A - Stair-rail system was constructed without mid-rails; on, or about; 03/19/22014. b) Worksite, Interior, Stair B - Stair-rail system was constructed without mid-rails; on, or about; 03/19/22014. c) Worksite, Interior, Stair C - Stair-rail system was constructed without mid-rails; on, or about; 03/19/22014. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.

Date of last update: 01 Apr 2025

Sources: New York Secretary of State