Name: | FIRST CLASS CONSTRUCTION CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Inactive |
Date of registration: | 22 Jan 1999 (26 years ago) |
Date of dissolution: | 29 Jul 2009 |
Entity Number: | 2337699 |
ZIP code: | 11229 |
County: | Kings |
Place of Formation: | New York |
Principal Address: | 2205 E 19TH ST, BROOKLYN, NY, United States, 11229 |
Address: | 2205 E. 19TH STREET, BROOKLYN, NY, United States, 11229 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 2205 E. 19TH STREET, BROOKLYN, NY, United States, 11229 |
Name | Role | Address |
---|---|---|
SHLOMI LEVI | Chief Executive Officer | 2205 EAST 19TH ST, BROOKLYN, NY, United States, 11229 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
DP-1765374 | 2009-07-29 | DISSOLUTION BY PROCLAMATION | 2009-07-29 |
010406002087 | 2001-04-06 | BIENNIAL STATEMENT | 2001-01-01 |
990122000468 | 1999-01-22 | CERTIFICATE OF INCORPORATION | 1999-01-22 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
338985849 | 0214700 | 2013-02-13 | 120 MURIEL ST., LAWRENCE, NY, 11559 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 280084 |
Safety | Yes |
Inspection Type | Prog Related |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2012-03-09 |
Emphasis | L: FALL |
Case Closed | 2015-09-28 |
Related Activity
Type | Inspection |
Activity Nr | 280087 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 C02 V |
Issuance Date | 2012-05-23 |
Abatement Due Date | 2012-05-24 |
Current Penalty | 300.0 |
Initial Penalty | 4200.0 |
Contest Date | 2012-06-20 |
Final Order | 2012-12-13 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(2)(v): Fork-lifts were used to support scaffold platforms while the entire platform was not attached to the fork and the fork-lift was moved horizontally while the platform was occupied: a) Worksite, exterior - An employee was being lifted by a Lull Rough Terrain Forklift,#844C-42, while standing on plywood placed on the forks. The employee was using lift to install plywood sheathing to the exterior of a residential home approximately 12ft above the ground below; on or about 3/9/12. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 G01 |
Issuance Date | 2012-05-23 |
Abatement Due Date | 2012-05-29 |
Current Penalty | 350.0 |
Initial Penalty | 4200.0 |
Contest Date | 2012-06-20 |
Final Order | 2012-12-13 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) Worksite, Exterior - Employees were using a Lull Rough Terrain Forklift, #844C-42, to install plywood on a two story residential home. The employees were standing on plywood placed on the forks approximately 12ft above the ground. There were no guardrails installed and employees were exposed to falling to the ground below; on or about 03/09/12. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260501 B13 |
Issuance Date | 2012-05-23 |
Current Penalty | 350.0 |
Initial Penalty | 4200.0 |
Contest Date | 2012-06-20 |
Final Order | 2012-12-13 |
Nr Instances | 2 |
Nr Exposed | 9 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems, nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502. a) Worksite, Exterior - Employees were not provided with fall protection while installing plywood sheathing to the roof of a residential home. Employees were exposed to a fall of approximately 25ft to the ground below; on or about 3/9/12. b) Worksite, Interior - Employees were walking and working around a floor opening into the basement. Employees were exposed to falling into the opening approximately 9ft to the ground below; on or about 3/9/12. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19. |
Date of last update: 31 Mar 2025
Sources: New York Secretary of State