Name: | PREMIER TILE & MARBLE INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 28 Jul 1999 (26 years ago) |
Entity Number: | 2402965 |
ZIP code: | 11218 |
County: | Kings |
Place of Formation: | New York |
Address: | 3377 12TH AVENUE, BROOKLYN, NY, United States, 11218 |
Principal Address: | 3377 12TH AVE, BROOKLYN, NY, United States, 11218 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
NUSRETA REDZEMATOVIC | Chief Executive Officer | 3377 12TH AVE, BROOKLYN, NY, United States, 11218 |
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 3377 12TH AVENUE, BROOKLYN, NY, United States, 11218 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
090922002695 | 2009-09-22 | BIENNIAL STATEMENT | 2009-07-01 |
050914002570 | 2005-09-14 | BIENNIAL STATEMENT | 2005-07-01 |
030805002609 | 2003-08-05 | BIENNIAL STATEMENT | 2003-07-01 |
990728000457 | 1999-07-28 | CERTIFICATE OF INCORPORATION | 1999-07-28 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
339647380 | 0215000 | 2014-03-26 | 6 PLATT STREET, KNICKERBOCKER, NY, 10002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 964735 |
Safety | Yes |
Type | Inspection |
Activity Nr | 964744 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260300 B01 |
Issuance Date | 2014-04-11 |
Current Penalty | 2800.0 |
Initial Penalty | 2800.0 |
Contest Date | 2014-05-13 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.300(b)(1): Employer did not ensure power operated tools designed to accommodate guards, were equipped with such guards when in use. a). 6 Platt Street, New York, NY 10003, 21st Floor South Side. Employees were installing new tiles in the Bathrooms on the 21st floor. Employee was using a Makita Brand 4" electric Grinder with an exposed tile cutting wheel to trim tiles to size for placement. NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASE FILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION OR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260404 F06 |
Issuance Date | 2014-04-11 |
Current Penalty | 2800.0 |
Initial Penalty | 2800.0 |
Contest Date | 2014-05-13 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(f)(6): Grounding path. Employer did not ensure the path to ground from circuits, equipment, and enclosures were permanent and continuous. A). 6 Platt Street, New York, NY 10003, 21st floor south side. Employee was utilizing a Makita Brand 4" grinder energized by a flexible extension chord plugged into temporary building electric. The extension chord utilized by the employee was not protetced from ground faults because the grounding pin had been broken off/removed. NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASE FILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION OR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260405 A02 II E |
Issuance Date | 2014-04-11 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Contest Date | 2014-05-13 |
Nr Instances | 8 |
Nr Exposed | 3 |
Related Event Code (REC) | Complaint |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(a)(2)(ii)(E): Employer did not ensure lamps for general illumination were protected from accidental contact or breakage. a). 6 Platt Street, New York, NY 21st Floor bathrooms. Employees were installing tile in the bathrooms on the south side of the 21st floor of the above project. Employees were not protected from electric shock by accidental contact with temporary lighting due to exposed unprotected bulbs. NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASE FILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION OR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19. |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260405 J01 I |
Issuance Date | 2014-04-11 |
Current Penalty | 2800.0 |
Initial Penalty | 2800.0 |
Contest Date | 2014-05-13 |
Nr Instances | 8 |
Nr Exposed | 3 |
Related Event Code (REC) | Complaint |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(j)(1)(i): Live parts. Employer did not ensure Fixtures, lampholders, lamps, rosettes, and receptacles had no live parts normally exposed to employee contact. a). 6 Platt Street, Ne York, NY 21st Floor bathrooms. Employees were expposed to electric shock hazards while installing tiles in the bathrooms of the project by exposed energized electric wires. NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASE FILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION OR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19. |
Date of last update: 31 Mar 2025
Sources: New York Secretary of State