Inspection Type |
Unprog Rel
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2016-03-11
|
Emphasis |
L: FALL
|
Case Closed |
2017-01-03
|
Related Activity
Type |
Referral |
Activity Nr |
1071392 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
1131941 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 C01 I |
Issuance Date |
2016-08-18 |
Abatement Due Date |
2016-08-24 |
Current Penalty |
1604.0 |
Initial Penalty |
1604.0 |
Final Order |
2016-09-20 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(1)(i): Guys, ties, and braces were not installed at locations where horixontal members support both inner and outer legs: a) Worksite, northwest corner of house: Employees were doing bricklaying work from a scaffold that was not provided with cross bracing on the inside (side closer to building) to provide support to the inner legs; on or about 3/11/16. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 C02 |
Issuance Date |
2016-08-18 |
Abatement Due Date |
2016-08-25 |
Current Penalty |
1604.0 |
Initial Penalty |
1604.0 |
Final Order |
2016-09-20 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) Worksite, northwest side of house: Employees were doing bricklaying work from a scaffold that stood on the ground without a base plate or other adequate firm foundation on the north inner leg; on or about 3/11/16. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19261051 A |
Issuance Date |
2016-08-18 |
Abatement Due Date |
2016-08-26 |
Current Penalty |
1604.0 |
Initial Penalty |
1604.0 |
Final Order |
2016-09-20 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided: a) Worksite, rear of house: Employees were accessing the interior of the new residential construction to do work and transport materials. The employees used a bucket to access the landing approximately 32 in. above the ground and were not provided with a stairway or its equivalent; on or about 3/11/16. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
Citation ID |
02001A |
Citaton Type |
Other |
Standard Cited |
19101200 E01 |
Issuance Date |
2016-08-18 |
Abatement Due Date |
2016-09-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2016-09-20 |
Nr Instances |
1 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met (Construction Reference: 1926.59): a) Worksite, northwest side of house: Employees were doing bricklaying work using chemicals such as, but not limited to, Portland cement. A written hazard communication program was not in place; on or about 3/11/16. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. ABATEMENT NOTE: The written Hazard Communication Program must include descriptions of how the following program elements, required by this regulation, will be developed, implemented, and conveyed to the employer's employee(s) who are exposed to hazardous materials: a. Labeling and other forms or warning: Labels shall include at least the identity of the hazardous chemical(s), the appropriate hazard warnings, the target organs, and the name and address of the chemical manufacturer, importer or other responsible party; b. A list or inventory of all hazardous materials known to be present in the workplace must be compiled and be maintained as part of the employer's written Hazard Communication Program; c. Material Safety Data Sheets (MSDSs) for all materials used by employee(s) in the workplace must be maintained and readily available all employee(s) on all shifts. d. The employer's Hazardous Materials Information and Training Program must be based upon the employer's written Hazard Communication Program. The training for employee(s) must include at least: Methods and observation that may be used to detect the presence or release of hazardous chemicals in the work area. The physical and health hazards of the chemicals in the work area. The measures employee(s) can take to protect themselves, such as, specific procedures, appropriate work practices, emergency procedures, and personal protective equipment to be used. The details of the employer's Hazard Communication Program including an explanation of the labeling systems used, Material Safety Data Sheets and how employees can obtain and use the appropriate hazard information; e. Methods used to inform employees of the hazards associated with non routine tasks must also be addressed in the employer's written program; and f. The employer's written Hazard Communication Program must be made available upon request. For Multi Employer Work places, the employer's Written Hazard Communication Program must also specifically address how: a. Material Safety Data Sheets for each hazardous material on the job site will be provided to other employers in the event the other employer's employee(s) may be exposed to these materials. b. The methods the employer will use to inform other employer(s) of any precautionary measures that need to be taken to protect employee(s) during normal operating conditions and in foreseeable emergencies. c. The methods the employer will use to inform the other employer(s) of the labeling system used in the workplace. |
|
Citation ID |
02001B |
Citaton Type |
Other |
Standard Cited |
19101200 G08 |
Issuance Date |
2016-08-18 |
Abatement Due Date |
2016-08-30 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2016-09-20 |
Nr Instances |
1 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1200(g)(8): The employer did not ensure that material safety data sheets were readily accessible to the employees in their work area during each work shift: a) Worksite, northwest side of house: Employees were doing bricklaying work using chemicals such as, but not limited to, Portland cement. Safety data sheets were not made available; on or about 3/11/16. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
Citation ID |
02001C |
Citaton Type |
Other |
Standard Cited |
19101200 H01 |
Issuance Date |
2016-08-18 |
Abatement Due Date |
2016-09-01 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2016-09-20 |
Nr Instances |
1 |
Nr Exposed |
3 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: a) Worksite, northwest side of house: Employees were doing bricklaying work using chemicals such as, but not limited to, Portland cement. A training program for hazard communication was not in place; on or about 3/11/16. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
|