Inspection Type |
Referral
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2019-04-08
|
Emphasis |
L: FALL
|
Case Closed |
2020-10-05
|
Related Activity
Type |
Referral |
Activity Nr |
1444422 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
1392018 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260100 A |
Issuance Date |
2019-08-16 |
Abatement Due Date |
2019-08-28 |
Current Penalty |
1848.0 |
Initial Penalty |
2842.0 |
Final Order |
2019-10-03 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a) Worksite, 879 1st Ave, Franklin Square, New York - Employee were walking directly under ongoing brick veneer removal work and did not have head protection; on or about 04/08/2019. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260850 A |
Issuance Date |
2019-08-16 |
Current Penalty |
2586.0 |
Initial Penalty |
3978.0 |
Final Order |
2019-10-03 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. a) Worksite, 879 1st Ave, Franklin Square, New York - An engineering survey to determine the structural integrity of the roof of the garage just above the roof line was not performed prior to the removal of the brick veneer from the second story on the East side of the residential building, on or about 04/02/2019. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260857 A |
Issuance Date |
2019-08-16 |
Current Penalty |
2586.0 |
Initial Penalty |
3978.0 |
Final Order |
2019-10-03 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.857(a): Storage of waste material and debris on the floor exceeded the allowable floor loads. a) Worksite, 879 1st Ave, Franklin Square, New York - Employees stored bricks and mortar from a demolition operation on the roof of a garage approximately 12ft. above the ground and caused a partial building collapse; on or about 04/02/2019. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19261053 B09 |
Issuance Date |
2019-08-16 |
Abatement Due Date |
2019-08-28 |
Current Penalty |
1848.0 |
Initial Penalty |
2842.0 |
Final Order |
2019-10-03 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1053(b)(9): The area around the top and/or bottom of (a) ladder(s) was not kept clear: a) Worksite, 879 1st Ave, Franklin Square, New York - The area around the base of the portable extension ladders were not kept clear of debris such as but not limited to bricks and mortar; on or about 04/08/2019. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
|