A SCIOTTO CONSTRUCTION COMPANY INC.

Company Details

Name: A SCIOTTO CONSTRUCTION COMPANY INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 05 Sep 2002 (23 years ago)
Entity Number: 2808162
ZIP code: 11778
County: Suffolk
Place of Formation: New York
Address: 27 WILDWOOD ROAD, ROCKY POINT, NY, United States, 11778

Shares Details

Shares issued 20000

Share Par Value 1

Type PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 27 WILDWOOD ROAD, ROCKY POINT, NY, United States, 11778

Agent

Name Role Address
SPIEGEL & UTRERA, P.A., P.C. Agent 45 JOHN STREET SUITE 711, NEW YORK, NY, 10038

Filings

Filing Number Date Filed Type Effective Date
020905000197 2002-09-05 CERTIFICATE OF INCORPORATION 2002-09-05

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
342979804 0214700 2018-02-27 67 DUNE RD., WEST HAMPTON DUNES, NY, 11978
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2018-02-27
Emphasis L: FALL, P: FALL
Case Closed 2019-09-04

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260102 A01
Issuance Date 2018-07-09
Current Penalty 1330.0
Initial Penalty 2217.0
Final Order 2018-07-19
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents: a) Worksite, 67 Dune Rd. West Hampton Dunes NY, 11978: Employees were using a BOSTITCH Pneumatic Coil Framing Nailer without eye protection; on or about 2/27/2018. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01002
Citaton Type Serious
Standard Cited 19261053 B01
Issuance Date 2018-07-09
Current Penalty 1330.0
Initial Penalty 2217.0
Final Order 2018-07-19
Nr Instances 2
Nr Exposed 4
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) Worksite - 67 Dune Rd. West Hampton Dunes, NY, 11978, first level construction: Employees were using an extension ladder to access the first level construction at approximately 11ft. from the ground below. The ladder side rails were extended approximately 30in. above the landing surface, on or about 2/27/2018. b) Worksite - 67 Dune Rd. West Hampton Dunes, NY, 11978, second level construction: Employees were using an extension ladder to access the second level construction at approximately 11ft. from the first level. the ladder side rails were extended approximately 3in. above the landing surface, on or about 2/27/2018. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.

Date of last update: 30 Mar 2025

Sources: New York Secretary of State