Name: | MARTINEZ CONSTRUCTION INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 11 Feb 2003 (22 years ago) |
Entity Number: | 2868726 |
ZIP code: | 11358 |
County: | Queens |
Place of Formation: | New York |
Address: | 108-30 51ST AVENUE, CORONA, NY, United States, 11358 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 108-30 51ST AVENUE, CORONA, NY, United States, 11358 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
030211000485 | 2003-02-11 | CERTIFICATE OF INCORPORATION | 2003-02-11 |
Fee Sequence Id | Fee type | Status | Date | Amount | Description |
---|---|---|---|---|---|
113137 | SV VIO | INVOICED | 2009-07-02 | 1000 | SV - Vehicle Seizure |
49937 | PL VIO | INVOICED | 2005-02-02 | 12500 | PL - Padlock Violation |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345333660 | 0215600 | 2021-05-27 | 37-48/50 95TH STREET, CORONA, NY, 11368 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260452 J03 |
Issuance Date | 2021-10-13 |
Current Penalty | 2926.0 |
Initial Penalty | 2926.0 |
Final Order | 2021-12-14 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.452(j)(3): When guardrails were used for fall protections, a workbench meeting the requirements was in use as the toprail only. The midrail was miss: A. On or about 05/27/21, on the ground of 37-48/50 95th Street. Corona, NY Employees installing siding on the exterior wall were exposed to the hazard of falling approximately 20 feet to the neighboring flat roof. The midrail of the pump jack scaffold was missing. ABATEMENT VERIFICATION IS NOT REQUIRED PURSUANT TO 29 CFR 1903.19. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19261053 B01 |
Issuance Date | 2021-10-13 |
Current Penalty | 2926.0 |
Initial Penalty | 2926.0 |
Final Order | 2021-12-14 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9m) above the upper landing surface to which the ladder was used to gain access: A. On or about 05/27/21, on the ground of 37-48/50 95th Street. Corona, NY Employees were using a portable ladder to gain access to a roof. The ladder side rails extended less than two foot above the upper landing surface. ABATEMENT VERIFICATION IS NOT REQUIRED PURSUANT TO 29 CFR 1903.19. |
Date of last update: 30 Mar 2025
Sources: New York Secretary of State