Search icon

STIVERS ENTERPRISES, INC.

Company Details

Name: STIVERS ENTERPRISES, INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 01 Aug 2003 (22 years ago)
Entity Number: 2938228
ZIP code: 14456
County: Ontario
Place of Formation: New York
Address: PO Box 1036, Geneva, NY, United States, 14456
Principal Address: 401 BOODYS HILL RD, WATERLOO, NY, United States, 13165

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent PO Box 1036, Geneva, NY, United States, 14456

Chief Executive Officer

Name Role Address
DONNA STIVERS Chief Executive Officer PO BOX 1036, GENEVA, NY, United States, 14456

History

Start date End date Type Value
2023-08-01 2023-08-01 Address PO BOX 1036, GENEVA, NY, 14456, USA (Type of address: Chief Executive Officer)
2023-08-01 2023-08-01 Address PO BOX 1036, GENEVA, NY, 14456, 8036, USA (Type of address: Chief Executive Officer)
2023-02-24 2023-02-24 Address PO BOX 1036, GENEVA, NY, 14456, 8036, USA (Type of address: Chief Executive Officer)
2023-02-24 2023-08-01 Address PO BOX 1036, GENEVA, NY, 14456, USA (Type of address: Chief Executive Officer)
2023-02-24 2023-08-01 Address PO BOX 1036, GENEVA, NY, 14456, 8036, USA (Type of address: Chief Executive Officer)
2023-02-24 2023-08-01 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-02-24 2023-08-01 Address PO Box 1036, Geneva, NY, 14456, USA (Type of address: Service of Process)
2023-02-24 2023-02-24 Address PO BOX 1036, GENEVA, NY, 14456, USA (Type of address: Chief Executive Officer)
2006-01-11 2023-02-24 Address PO BOX 1036, GENEVA, NY, 14456, 8036, USA (Type of address: Chief Executive Officer)
2003-08-01 2023-02-24 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0

Filings

Filing Number Date Filed Type Effective Date
230801001709 2023-08-01 BIENNIAL STATEMENT 2023-08-01
230224000644 2023-02-24 BIENNIAL STATEMENT 2021-08-01
170816006018 2017-08-16 BIENNIAL STATEMENT 2017-08-01
130820006044 2013-08-20 BIENNIAL STATEMENT 2013-08-01
110901003009 2011-09-01 BIENNIAL STATEMENT 2011-08-01
091202002656 2009-12-02 BIENNIAL STATEMENT 2009-08-01
070821002241 2007-08-21 BIENNIAL STATEMENT 2007-08-01
060111002678 2006-01-11 BIENNIAL STATEMENT 2005-08-01
030801000786 2003-08-01 CERTIFICATE OF INCORPORATION 2003-08-01

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339860827 0215800 2014-07-21 494 EXCHANGE STREET, GENEVA, NY, 14456
Inspection Type Complaint
Scope Complete
Safety/Health Safety
Close Conference 2014-07-21
Emphasis L: GUTREH, N: LEAD
Case Closed 2018-08-01

Related Activity

Type Complaint
Activity Nr 899058
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260025 A
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 3000.0
Initial Penalty 3600.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.25(a): During the course of construction, alteration, or repairs, debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures: a) Entire worksite, on or about 7-21-14: Five employees were working in a building while walking on and around large quantities of demolition debris, with nails protruding from boards and debris on stairways. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260028 A
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.28(a): The employer did not require the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions: a) Entire worksite, on or about 7-21-14: Five employees were working performing heavy demolition without foot protection. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01003A
Citaton Type Serious
Standard Cited 19260062 D01 I
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 1500.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(d)(1)(i): The employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 ug/m3) calculated as an 8-hour time-weighted average (TWA): a) Second and third floors, on or about 7-21-13: Employees performed manual demolition of painted walls and painted woodwork, and an assessment of employee exposure to lead was not performed. A bulk sample of paint collected by OSHA contained lead ranging from 0.0151% to 0.9581% lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01003B
Citaton Type Serious
Standard Cited 19260062 D01 III
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(d)(1)(iii): The employer did not collect personal samples representative of a full shift, including at least one sample for each job classification in each work area, either for each shift or for the shift with the highest exposure level: a) Second and third floors, on or about 7-21-14: Employees performed manual demolition of painted walls and painted woodwork, and the employer did not collect personal samples representative of a full shift. Bulk samples of paint collected by OSHA contained lead ranging from 0.0151% to 0.9581% lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01004A
Citaton Type Serious
Standard Cited 19260062 D02 V A
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 1500.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(d)(2)(v)(A): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with appropriate respiratory protection in accordance with 29 CFR 1926.62(f): a) Second and third floors, on or about 7-21-14: Where employees performed manual demolition of painted walls and painted woodwork and an exposure assessment had not been performed, the employer did not provide employees with respiratory protection. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01004B
Citaton Type Serious
Standard Cited 19260062 F02 I
Issuance Date 2014-12-09
Abatement Due Date 2015-01-11
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(f)(2)(i): The employer did not implement a respiratory protection program in accordance with 29 CFR 1910.134(b) through (d) (except (d)(1)(iii)), and (f) through (m) for each employee required by 29 CFR 1926.62 to use a respirator: a) Second and third floors, on or about 7-21-14: A Respiratory Protection Program was not developed where employees used filtering face pieces when performing manual demolition of painted walls and painted woodwork and an exposure assessment had not been performed. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01005A
Citaton Type Serious
Standard Cited 19260062 D02 V B
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 1500.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(d)(2)(v)(B): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with appropriate personal protective clothing and equipment in accordance with 29 CFR 1926.62(g): a) Second and third floors, on or about 7-21-14: Protective work clothing and equipment was not provided as interim protection to employees who performed manual demolition of painted walls and painted woodwork and an assessment had not been conducted to determine employee exposure to lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01005B
Citaton Type Serious
Standard Cited 19260062 G01
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(g)(1): Where employees were exposed to lead above the permissible exposure limit, without regard to the use of respirators; where employees were exposed to lead compounds which may cause skin or eye irritation (e.g. lead arsenate, lead azide); and as interim protection for employees performing tasks as specified in 29 CFR 1926.62(d)(2), the employer did not provide at no cost to the employee and ensure that each employee used appropriate protective work clothing and equipment that prevented contamination of the employee and the employee's garments: a) Second and third floors, on or about 7-21-14: When an exposure assessment had not been performed, protective work clothing was not provided as interim protection to employees who performed manual demolition of painted walls and painted woodwork. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01006A
Citaton Type Serious
Standard Cited 19260062 D02 V E
Issuance Date 2014-12-09
Abatement Due Date 2015-01-28
Current Penalty 1500.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(d)(2)(v)(E): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with biological monitoring in accordance with 1926.62(j)(1)(i), to consist of blood sampling and analysis for lead and zinc protoporphyrin levels: a) Second and third floors, on or about 7-21-14: When an initial exposure assessment had not been conducted, employees who performed manual demolition of painted walls and painted woodwork did not have biological monitoring made available. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01006B
Citaton Type Serious
Standard Cited 19260062 J01 I
Issuance Date 2014-12-09
Abatement Due Date 2015-01-11
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(j)(1)(i): The employer did not make available initial medical surveillance, consisting of biological monitoring in the form of blood sampling and analysis for lead and zinc protoporphyrin levels, to employees occupationally exposed on any day to lead at or above the action level: a) Second and third floors, on or about 7-21-14: Where employees performed manual demolition of painted walls and painted trim and an initial exposure assessment had not been conducted, initial medical surveillance, in the form of biological monitoring/blood sampling was not made available. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01007A
Citaton Type Serious
Standard Cited 19260062 D02 V F
Issuance Date 2014-12-09
Abatement Due Date 2015-01-11
Current Penalty 1500.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(d)(2)(v)(F): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing the tasks described in 29 CFR 1926.62(d)(2)(i), (d)(2)(ii), (d)(2)(iii), and (d)(2)(iv) with training as required under 29 CFR 1926.62(l)(1)(i) regarding 29 CFR 1926.59, Hazard Communication: a) Second and third floors, on or about 7-21-14: Where an exposure assessment had not been conducted, employees who performed manual demolition of painted walls and painted trim were not provided with training on lead. Bulk samples of paint collected by OSHA contained lead ranging from 0.0151% to 0.9581% lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01007B
Citaton Type Serious
Standard Cited 19260062 L01 I
Issuance Date 2014-12-09
Abatement Due Date 2015-01-11
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(l)(1)(i): The employer did not include lead in the program established to comply with the Hazard Communication Standard (HCS) (� 1910.1200). The employer did not ensure that each employee was trained in accordance with the provisions of HCS and paragraph (l) of this section. a) Second and third floors, on or about 7-21-14: Employees who performed manual demolition of painted walls and painted trim were not provided with training on lead. Bulk samples of paint collected by OSHA contained lead ranging from 0.0151% to 0.9581% lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01007C
Citaton Type Serious
Standard Cited 19101200 E01
Issuance Date 2014-12-09
Abatement Due Date 2015-01-11
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59) a) Second and third floors, on or about 7-21-14: A written Hazard Communication Program was not developed where employees were exposed to hazardous substances, including, but not limited to lead. Bulk samples of paint collected by OSHA contained lead ranging from 0.0151% to 0.9581% lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01008A
Citaton Type Serious
Standard Cited 19260062 H01
Issuance Date 2014-12-09
Abatement Due Date 2014-12-19
Current Penalty 1500.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(h)(1): The employer did not maintain all surfaces as free as practicable of accumulations of lead. a) Second and third floors, on or about 7-21-14: Floors and work surfaces were not maintained as free as practicable from accumulations of lead. Visible accumulations of paint chips and paint dust were observed throughout the worksite. Bulk samples of paint collected by OSHA contained lead ranging from 0.0151% to 0.9581% lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01008B
Citaton Type Serious
Standard Cited 19260062 H03
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.62(h)(3): The employer used shoveling, dry or wet sweeping, and brushing when vacuuming or other equally effective methods were effective: a) Second and third floors, on or about 7-21-14: Dry sweeping was used to clean up paint chips, when vacuum operations would have been an effective method. Bulk samples of paint collected by OSHA contained lead ranging from 0.0151% to 0.9581% lead. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01009
Citaton Type Other
Standard Cited 19260150 C01 VIII
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 2700.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.150(c)(1)(viii): Portable fire extinguishers were not inspected periodically and maintained in accordance with maintenance and use of portable fire extinguishers, N.F.P.A. No. 10A-1970: a) First floor, on or about 7-21-14: Five employees were performing selective demolition in a 3-story building with a fire extinguisher that was not maintained and was discharged. b) Third floor, on or about 7-21-14: Five employees were performing selective demolition in a 3-story building with a fire extinguisher that was not maintained and was discharged. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01010
Citaton Type Serious
Standard Cited 19260300 B01
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 1000.0
Initial Penalty 3600.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use: a) First floor, west end, on or about 7-21-14: Employees were using a hand held portable angle grinder to cut various metal items during demolition, which was not equipped with a protective guard. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01011A
Citaton Type Serious
Standard Cited 19260403 B02
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 1000.0
Initial Penalty 3600.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) First floor, west end, on or about 7-21-14: Employees were operating power tools and equipment that were plugged into a relocatable power tap (RPT) that was not being used in accordance with the manufacturers recommendations or as "listed and labeled". b) Second floor, on or about 7-21-14: Employees were getting power from a galvanized "quad" receptacle box that was not being used in accordance with the manufacturers recommendations or as "listed and labeled". ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01011B
Citaton Type Serious
Standard Cited 19260403 I02 I
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosures, nor by any of the means listed in subparagraphs (A) through (D) of this paragraph: a) West end of building, first floor, north wall of corridor, on or about 7-21-14: Employees were working/walking in the vicinity of an energized power panel that had no cover on it. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01011C
Citaton Type Serious
Standard Cited 19260404 B01 II
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection: a) First floor, west end, on or about 7-21-14: Employees were operating power tools and equipment that were powered through a relocatable power tap (RPT) that was not protected by a ground fault circuit interrupter (GFCI). b) Second floor, on or about 7-21-14: Employees were getting power from a galvanized "quad" receptacle box that was not protected by a ground fault circuit interrupter (GFCI). ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01011D
Citaton Type Serious
Standard Cited 19260404 F06
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) First floor, on or about 7-21-14: Five employees were operating various hand held power tools that were plugged into three separate extension cords that did not have a continuous path to ground due to missing ground pins. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01011E
Citaton Type Serious
Standard Cited 19260405 G02 III
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.405(g)(2)(iii): Flexible cords were not used in continuous lengths without splice or tap: a) Second floor, on or about 7-21-14: Five employees were working in an area where a cord used for a temporary power circuit was not continuous in length, with a splice that was not in a box. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01011F
Citaton Type Serious
Standard Cited 19260405 G02 IV
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws: a) First floor, on or about 7-21-14: Five employees were operating various hand held power tools that were plugged into an extension cord that exhibited a broken strain relief. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01012
Citaton Type Serious
Standard Cited 19260501 B01
Issuance Date 2014-12-09
Current Penalty 1000.0
Initial Penalty 3600.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems" a) West side of building, on or about 7-21-14: Employees were discarding demolition debris from a fire escape platform/landing, without fall protection, exposing the employees to a fall hazard of 8 feet.
Citation ID 01013A
Citaton Type Other
Standard Cited 19260850 A
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 0.0
Initial Penalty 3600.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations: a) Second and third floors of building, on or about 7-21-14: Employees were performing ceiling demolition without an engineering survey or demolition assessment conducted by a competent person. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM
Citation ID 01013B
Citaton Type Other
Standard Cited 19260851 B
Issuance Date 2014-12-09
Abatement Due Date 2014-12-17
Current Penalty 500.0
Initial Penalty 0.0
Contest Date 2014-12-15
Final Order 2016-01-08
Nr Instances 1
Nr Exposed 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.851(b): All stairs, passageways, ladders and incidental equipment thereto, which are covered by this section, were not periodically inspected and maintained in a clean and safe condition: (a) Entire worksite, on or about 7-21-14: Five employees were using two stairways that were strewn with demolition debris, without periodic inspection or being maintained in a clean safe condition. ABATEMENT CERTIFICATION MUST BE SUBMITTED FOR THIS ITEM

Date of last update: 29 Mar 2025

Sources: New York Secretary of State