2017-02-23
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced and sealed.
|
2016-07-14
|
No data
|
TROUTMAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINT INSTALLED AND SEALED IN COMPLIANCE
|
2016-07-06
|
No data
|
GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED IN COMPLIANCE
|
2016-06-17
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w in compliance
|
2016-05-24
|
No data
|
TROUTMAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed no expansion joints installed at start & end or at center of new concrete curb installation after previous notification by car # 20160920131 no repairs made at this time
|
2016-03-20
|
No data
|
TROUTMAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb portion of sidewalk made in concrete no expansion joints installed at this time none at start and end cracked in center install expansion joints
|
2016-03-06
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb restored.
|
2016-02-21
|
No data
|
DAVENPORT COURT, FROM STREET 104 STREET TO STREET PEDESTRIAN OVERPASS
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2016-02-20
|
No data
|
DE KALB AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2016-01-22
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset complete
|
2016-01-22
|
No data
|
DAVENPORT COURT, FROM STREET 104 STREET TO STREET PEDESTRIAN OVERPASS
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
reset repair curb complete
|
2016-01-22
|
No data
|
104 STREET, FROM STREET DUNTON COURT TO STREET WILLIAMS COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset complete location in compliance
|
2015-12-09
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2015-12-07
|
No data
|
GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2015-11-25
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2015-06-26
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass steel face curb
|
2015-05-30
|
No data
|
GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2015-03-21
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FAVE CURB INSTALLED IN COMPLIANCE
|
2015-01-11
|
No data
|
DAVENPORT COURT, FROM STREET 104 STREET TO STREET PEDESTRIAN OVERPASS
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed
|
2015-01-05
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
all sealed ok
|
2014-12-08
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
installed curb reset replace and repaired complete
|
2014-12-08
|
No data
|
104 STREET, FROM STREET DAVENPORT COURT TO STREET RAU COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no curb was reset replace or repairedno work done
|
2014-11-17
|
No data
|
GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOV’s issued for this defect. Permittee placed on hold.
|
2014-11-15
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
D69 failed to seal expansion joints in new sidewalk flags .
|
2014-11-15
|
No data
|
GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
all removed
|
2014-09-09
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB
|
2014-08-24
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
B/o no s/w done yet permit expired
|
2014-07-28
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REMOVE PLASTIC AND SEAL EXPANSION JOINTS ON SIDEWALK..
|
2014-07-27
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed
|
2014-07-27
|
No data
|
104 STREET, FROM STREET DUNTON COURT TO STREET WILLIAMS COURT
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed
|
2014-07-24
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO Mini Excavator
|
2014-07-22
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE
|
2014-07-22
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE
|
2014-07-18
|
No data
|
DE KALB AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE
|
2014-07-09
|
No data
|
TROUTMAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO EQUIPMENT OTHER THAN CRANE
|
2014-07-07
|
No data
|
GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REMOVE PLASTIC STRIP BETWEEN CURB AND SIDEWALK - Sidewalk expansion joints need to be sealed - Expansion joints need to be installed
|
2014-07-03
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO WORK DONE
|
2014-07-01
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE
|
2014-06-25
|
No data
|
DE KALB AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OKAY
|
2014-06-22
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OKAY
|
2014-06-21
|
No data
|
TROUTMAN STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB
|
2014-06-17
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints not sealed between curb and s/w
|
2014-06-17
|
No data
|
104 STREET, FROM STREET DUNTON COURT TO STREET WILLIAMS COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
please seal expansion joints i/f/o 162-02 near first st.
|
2014-05-27
|
No data
|
DODWORTH STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MATERIAL ON STREET
|
2014-05-16
|
No data
|
GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO TEMPORARY PEDESTRIAN WALK
|
2014-04-13
|
No data
|
104 STREET, FROM STREET DAVENPORT COURT TO STREET RAU COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass
|
2014-03-29
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2014-01-15
|
No data
|
104 STREET, FROM STREET DAVENPORT COURT TO STREET RAU COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not done
|
2014-01-15
|
No data
|
104 STREET, FROM STREET DUNTON COURT TO STREET WILLIAMS COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not done
|
2014-01-11
|
No data
|
104 STREET, FROM STREET 164 DRIVE TO STREET LOCKWOOD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-09-27
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material okay
|
2013-09-22
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb install
|
2013-09-04
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO MATERIAL AT TIME OF INSPECTION
|
2013-08-14
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-07-13
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-06-14
|
No data
|
MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2013-06-14
|
No data
|
MELROSE STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
resurf
|
2013-06-13
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no equipment on site at this time.
|
2013-03-11
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no materials o roadway
|
2013-02-22
|
No data
|
BARTOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-02-22
|
No data
|
ARNOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-02-18
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
material on street
|
2013-02-08
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Wooden fence on sidewalk no permit
|
2013-02-08
|
No data
|
PALMETTO STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no crossing sidewalk at time of inspection
|
2013-01-16
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-12-30
|
No data
|
WILSON AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb okay.
|
2012-12-15
|
No data
|
STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Wooden timber on roadway without a valid DOT permit.
|
2012-12-12
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP street paved in compliance.
|
2012-10-07
|
No data
|
WILSON AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok.
|
2012-09-18
|
No data
|
SARATOGA AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street re surfaced ....
|
2012-09-16
|
No data
|
24 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/p curb rest. is acceptable.
|
2012-09-11
|
No data
|
HALSEY STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-08-12
|
No data
|
HALSEY STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok.
|
2012-06-23
|
No data
|
23 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2012-04-12
|
No data
|
MELROSE STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2012-02-25
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No data
|
2011-12-08
|
No data
|
BARTOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-12-08
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints not Sealed,
|
2011-10-22
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Str paved
|
2011-10-07
|
No data
|
ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-08-23
|
No data
|
BRUNER AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-07-16
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
replace curb
|
2011-07-08
|
No data
|
MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-07-08
|
No data
|
MELROSE STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-06-23
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-12-05
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street paved
|
2010-11-27
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-11-27
|
No data
|
ARNOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-11-27
|
No data
|
BARTOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-11-14
|
No data
|
ARNOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-11-14
|
No data
|
BARTOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-10-13
|
No data
|
BARTOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-09-29
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-09-29
|
No data
|
ARNOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-08-12
|
No data
|
LINDEN STREET, FROM STREET MYRTLE AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-07-31
|
No data
|
ARNOW AVENUE, FROM STREET BRUNER AVENUE TO STREET ELY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-07-31
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-07-15
|
No data
|
ELY AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-07-14
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
material
|
2010-07-07
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
pass Material
|
2010-06-28
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass Material
|
2010-06-10
|
No data
|
PROSPECT PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-04-13
|
No data
|
WILSON AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-04-11
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-03-28
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-03-19
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-03-14
|
No data
|
LINDEN STREET, FROM STREET MYRTLE AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-03-10
|
No data
|
WILSON AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-03-10
|
No data
|
PUTNAM AVENUE, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-03-08
|
No data
|
LINDEN STREET, FROM STREET MYRTLE AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-02-28
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-20
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-02-20
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-02-06
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-01-28
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-01-25
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-25
|
No data
|
24 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w reconsructed
|
2009-12-25
|
No data
|
23 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w reconstucted
|
2009-12-11
|
No data
|
WILSON AVENUE, FROM STREET MADISON STREET TO STREET PUTNAM AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No data
|
2009-12-10
|
No data
|
24 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb replaced
|
2009-12-10
|
No data
|
23 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-10
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
paving done
|
2009-12-06
|
No data
|
23 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-12-06
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-10-08
|
No data
|
HALSEY STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-08-27
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-08-24
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-08-20
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-07-30
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-07-07
|
No data
|
24 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-07-07
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-06-17
|
No data
|
LINDEN STREET, FROM STREET MYRTLE AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-06-11
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
roadway & sidewalk are clear - no one on site
|
2009-06-09
|
No data
|
JEFFERSON STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-06-02
|
No data
|
ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-05-30
|
No data
|
24 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work at this time
|
2009-05-30
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-05-08
|
No data
|
24 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-04-18
|
No data
|
21 AVENUE, FROM STREET 23 STREET TO STREET 24 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2009-03-27
|
No data
|
BRUNER AVENUE, FROM STREET ARNOW AVENUE TO STREET BARTOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-02-01
|
No data
|
BERGEN STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2009-01-14
|
No data
|
SARATOGA AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-16
|
No data
|
ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-16
|
No data
|
ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-15
|
No data
|
PROSPECT PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-10
|
No data
|
BERGEN STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-10-08
|
No data
|
BERGEN STREET, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
sidewalk excavated & closed
|
2008-10-08
|
No data
|
SARATOGA AVENUE, FROM STREET BERGEN STREET TO STREET ST MARKS AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
sidewalk excavated & closed
|
2008-09-23
|
No data
|
ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started
|
2008-09-23
|
No data
|
ST MARKS AVENUE, FROM STREET HOWARD AVENUE TO STREET SARATOGA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2008-09-23
|
No data
|
PROSPECT PLACE, FROM STREET HOWARD AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started
|
2007-09-02
|
No data
|
POWELL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No data
|
2007-08-20
|
No data
|
BRUSH AVENUE, FROM STREET JAY PLACE TO STREET SENGER PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2007-06-17
|
No data
|
POWELL AVENUE, FROM STREET OLMSTEAD AVENUE TO STREET PUGSLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
seal all expansion joints.
|