X022025003B29
|
2025-01-03
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B21
|
2025-01-03
|
2025-03-31
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B22
|
2025-01-03
|
2025-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B23
|
2025-01-03
|
2025-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B24
|
2025-01-03
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B25
|
2025-01-03
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B26
|
2025-01-03
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B27
|
2025-01-03
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B28
|
2025-01-03
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022025003B30
|
2025-01-03
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022025002A73
|
2025-01-02
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A74
|
2025-01-02
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A75
|
2025-01-02
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A76
|
2025-01-02
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A77
|
2025-01-02
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A78
|
2025-01-02
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A70
|
2025-01-02
|
2025-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A71
|
2025-01-02
|
2025-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022025002A72
|
2025-01-02
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022024317A75
|
2024-11-12
|
2024-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A77
|
2024-11-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A74
|
2024-11-12
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A78
|
2024-11-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A79
|
2024-11-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A80
|
2024-11-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A81
|
2024-11-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A82
|
2024-11-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A76
|
2024-11-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024317A73
|
2024-11-12
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X002024316A03
|
2024-11-11
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B022024299B02
|
2024-10-25
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B05
|
2024-10-25
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B04
|
2024-10-25
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B10
|
2024-10-25
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B09
|
2024-10-25
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B08
|
2024-10-25
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B07
|
2024-10-25
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B06
|
2024-10-25
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024299B03
|
2024-10-25
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
M022024257C47
|
2024-09-13
|
2024-10-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C46
|
2024-09-13
|
2024-10-31
|
CROSSING SIDEWALK
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C50
|
2024-09-13
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C45
|
2024-09-13
|
2024-10-31
|
PLACE MATERIAL ON STREET
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C51
|
2024-09-13
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C52
|
2024-09-13
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C49
|
2024-09-13
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C48
|
2024-09-13
|
2024-10-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C55
|
2024-09-13
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C54
|
2024-09-13
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024257C53
|
2024-09-13
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M012024257A90
|
2024-09-13
|
2024-10-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024253A98
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M012024253B18
|
2024-09-09
|
2024-10-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M012024253B19
|
2024-09-09
|
2024-10-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M012024253B77
|
2024-09-09
|
2024-10-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253A83
|
2024-09-09
|
2024-10-31
|
CROSSING SIDEWALK
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A82
|
2024-09-09
|
2024-10-31
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A84
|
2024-09-09
|
2024-10-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A85
|
2024-09-09
|
2024-10-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A86
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A87
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A88
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A89
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A90
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A91
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A92
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024253A93
|
2024-09-09
|
2024-10-31
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024253A94
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024253A95
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024253A96
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024253A97
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024253A99
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024253B00
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024253B99
|
2024-09-09
|
2024-10-31
|
PLACE MATERIAL ON STREET
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C00
|
2024-09-09
|
2024-10-31
|
CROSSING SIDEWALK
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C01
|
2024-09-09
|
2024-10-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C02
|
2024-09-09
|
2024-10-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C03
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C04
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C05
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C06
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C07
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C08
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024253C09
|
2024-09-09
|
2024-10-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
X022024236A22
|
2024-08-23
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A17
|
2024-08-23
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A16
|
2024-08-23
|
2024-11-14
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A15
|
2024-08-23
|
2024-11-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A14
|
2024-08-23
|
2024-11-14
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A18
|
2024-08-23
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A21
|
2024-08-23
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A20
|
2024-08-23
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A19
|
2024-08-23
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024236A23
|
2024-08-23
|
2024-11-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
Q022024228A12
|
2024-08-15
|
2024-09-21
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024228A10
|
2024-08-15
|
2024-09-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024228A11
|
2024-08-15
|
2024-09-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024228A04
|
2024-08-15
|
2024-09-23
|
CROSSING SIDEWALK
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024228A05
|
2024-08-15
|
2024-09-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024228A06
|
2024-08-15
|
2024-09-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024228A07
|
2024-08-15
|
2024-09-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024228A08
|
2024-08-15
|
2024-09-21
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024228A09
|
2024-08-15
|
2024-09-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024228A15
|
2024-08-15
|
2024-09-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024228A14
|
2024-08-15
|
2024-09-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024228A13
|
2024-08-15
|
2024-09-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
B022024225C32
|
2024-08-12
|
2024-11-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C33
|
2024-08-12
|
2024-11-06
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C31
|
2024-08-12
|
2024-11-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C30
|
2024-08-12
|
2024-11-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C29
|
2024-08-12
|
2024-11-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C28
|
2024-08-12
|
2024-11-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C27
|
2024-08-12
|
2024-11-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C26
|
2024-08-12
|
2024-11-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024225C25
|
2024-08-12
|
2024-11-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022024215A28
|
2024-08-02
|
2024-08-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A30
|
2024-08-02
|
2024-08-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A27
|
2024-08-02
|
2024-08-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A26
|
2024-08-02
|
2024-08-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A25
|
2024-08-02
|
2024-08-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A24
|
2024-08-02
|
2024-08-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A23
|
2024-08-02
|
2024-08-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A22
|
2024-08-02
|
2024-08-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A29
|
2024-08-02
|
2024-08-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024215A21
|
2024-08-02
|
2024-08-26
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
Q022024198A62
|
2024-07-16
|
2024-08-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024198A60
|
2024-07-16
|
2024-08-22
|
CROSSING SIDEWALK
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024198A61
|
2024-07-16
|
2024-08-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024198A63
|
2024-07-16
|
2024-08-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024198A64
|
2024-07-16
|
2024-08-22
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024198A65
|
2024-07-16
|
2024-08-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024198A66
|
2024-07-16
|
2024-08-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024198A67
|
2024-07-16
|
2024-08-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024198A68
|
2024-07-16
|
2024-08-22
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024198A69
|
2024-07-16
|
2024-08-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024198A70
|
2024-07-16
|
2024-08-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024198A71
|
2024-07-16
|
2024-08-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
M022024197B95
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197B94
|
2024-07-15
|
2024-08-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197B93
|
2024-07-15
|
2024-08-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197B92
|
2024-07-15
|
2024-08-31
|
CROSSING SIDEWALK
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197C10
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C09
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C08
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C07
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C06
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C05
|
2024-07-15
|
2024-08-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197B91
|
2024-07-15
|
2024-08-31
|
PLACE MATERIAL ON STREET
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197C04
|
2024-07-15
|
2024-08-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C03
|
2024-07-15
|
2024-08-31
|
CROSSING SIDEWALK
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C12
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C11
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M012024197B43
|
2024-07-15
|
2024-08-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M012024197B44
|
2024-07-15
|
2024-08-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C02
|
2024-07-15
|
2024-08-31
|
PLACE MATERIAL ON STREET
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024197C01
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197C00
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197B99
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197B98
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197B97
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024197B96
|
2024-07-15
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024193A64
|
2024-07-11
|
2024-08-31
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024193A66
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M012024193A57
|
2024-07-11
|
2024-08-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M012024193A58
|
2024-07-11
|
2024-08-31
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A65
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024193A82
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A81
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A80
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A79
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A78
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A77
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A76
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A75
|
2024-07-11
|
2024-08-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A74
|
2024-07-11
|
2024-08-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A73
|
2024-07-11
|
2024-08-31
|
CROSSING SIDEWALK
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A72
|
2024-07-11
|
2024-08-31
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024193A71
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024193A70
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024193A69
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024193A68
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024193A67
|
2024-07-11
|
2024-08-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
B042024179A28
|
2024-06-27
|
2024-07-26
|
REPAIR SIDEWALK
|
HOPE STREET, BROOKLYN, FROM STREET HAVEMEYER STREET TO STREET MARCY AVENUE
|
Q022024177B13
|
2024-06-25
|
2024-07-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024177B00
|
2024-06-25
|
2024-07-23
|
CROSSING SIDEWALK
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024177B18
|
2024-06-25
|
2024-07-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024177B17
|
2024-06-25
|
2024-07-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024177B16
|
2024-06-25
|
2024-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024177B15
|
2024-06-25
|
2024-07-23
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022024177B14
|
2024-06-25
|
2024-07-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024177B12
|
2024-06-25
|
2024-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024177B11
|
2024-06-25
|
2024-07-23
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022024177B03
|
2024-06-25
|
2024-07-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024177B02
|
2024-06-25
|
2024-07-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
Q022024177B01
|
2024-06-25
|
2024-07-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
168 STREET, QUEENS, FROM STREET 93 AVENUE TO STREET LONG ISLAND RAILROAD
|
M022024141C34
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C32
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C31
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C30
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C29
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C28
|
2024-05-20
|
2024-06-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M012024141C34
|
2024-05-20
|
2024-06-15
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M012024141C33
|
2024-05-20
|
2024-06-15
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C25
|
2024-05-20
|
2024-06-15
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C26
|
2024-05-20
|
2024-06-15
|
CROSSING SIDEWALK
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C27
|
2024-05-20
|
2024-06-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C43
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C42
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C41
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C40
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C39
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C38
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C37
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C36
|
2024-05-20
|
2024-06-15
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024141C35
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024141C33
|
2024-05-20
|
2024-06-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
X022024123A75
|
2024-05-02
|
2024-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024123A76
|
2024-05-02
|
2024-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024123A77
|
2024-05-02
|
2024-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024123A78
|
2024-05-02
|
2024-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022024123B32
|
2024-05-02
|
2024-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024123B33
|
2024-05-02
|
2024-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024123B34
|
2024-05-02
|
2024-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022024123A79
|
2024-05-02
|
2024-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022024123B35
|
2024-05-02
|
2024-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022024123A73
|
2024-05-02
|
2024-08-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024123A81
|
2024-05-02
|
2024-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022024123B28
|
2024-05-02
|
2024-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024123B29
|
2024-05-02
|
2024-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024123B30
|
2024-05-02
|
2024-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024123B31
|
2024-05-02
|
2024-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022024123A80
|
2024-05-02
|
2024-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024123A74
|
2024-05-02
|
2024-08-02
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024123A72
|
2024-05-02
|
2024-08-02
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022024121A73
|
2024-04-30
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024121A66
|
2024-04-30
|
2024-05-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024121A67
|
2024-04-30
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024121A68
|
2024-04-30
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024121A69
|
2024-04-30
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024121A70
|
2024-04-30
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024121A71
|
2024-04-30
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024121A72
|
2024-04-30
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
M022024108B86
|
2024-04-17
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M012024108B31
|
2024-04-17
|
2024-05-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B78
|
2024-04-17
|
2024-05-04
|
PLACE MATERIAL ON STREET
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B79
|
2024-04-17
|
2024-05-04
|
CROSSING SIDEWALK
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B80
|
2024-04-17
|
2024-05-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B81
|
2024-04-17
|
2024-05-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B82
|
2024-04-17
|
2024-05-04
|
TOOL CART PLACEMENT
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B83
|
2024-04-17
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B84
|
2024-04-17
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B85
|
2024-04-17
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024108B87
|
2024-04-17
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 124 STREET TO STREET EAST 125 STREET
|
M022024106D29
|
2024-04-15
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D28
|
2024-04-15
|
2024-05-04
|
TOOL CART PLACEMENT
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D27
|
2024-04-15
|
2024-05-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D26
|
2024-04-15
|
2024-05-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D25
|
2024-04-15
|
2024-05-04
|
CROSSING SIDEWALK
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D24
|
2024-04-15
|
2024-05-04
|
PLACE MATERIAL ON STREET
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D33
|
2024-04-15
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M012024106C16
|
2024-04-15
|
2024-05-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D32
|
2024-04-15
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D31
|
2024-04-15
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024106D30
|
2024-04-15
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PARK AVENUE, MANHATTAN, FROM STREET EAST 125 STREET TO STREET EAST 126 STREET
|
M022024099C04
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C03
|
2024-04-08
|
2024-05-04
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C02
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099C01
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099C00
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B99
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B98
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B97
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B96
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B95
|
2024-04-08
|
2024-05-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B94
|
2024-04-08
|
2024-05-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B93
|
2024-04-08
|
2024-05-04
|
CROSSING SIDEWALK
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024099B92
|
2024-04-08
|
2024-05-04
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M012024099B15
|
2024-04-08
|
2024-05-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M012024099B16
|
2024-04-08
|
2024-05-04
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C10
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C09
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C08
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C07
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C06
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024099C05
|
2024-04-08
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
B022024088B22
|
2024-03-28
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024085A80
|
2024-03-25
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024085A79
|
2024-03-25
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024085A78
|
2024-03-25
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024085A77
|
2024-03-25
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024085A76
|
2024-03-25
|
2024-04-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022024085A97
|
2024-03-25
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A90
|
2024-03-25
|
2024-05-04
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A91
|
2024-03-25
|
2024-05-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A92
|
2024-03-25
|
2024-05-04
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A93
|
2024-03-25
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A94
|
2024-03-25
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A95
|
2024-03-25
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A96
|
2024-03-25
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A98
|
2024-03-25
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022024085A99
|
2024-03-25
|
2024-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022024085A83
|
2024-03-25
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024085A82
|
2024-03-25
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022024085A81
|
2024-03-25
|
2024-04-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
M022024046B50
|
2024-02-15
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M012024046A58
|
2024-02-15
|
2024-02-29
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B44
|
2024-02-15
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B40
|
2024-02-15
|
2024-02-29
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B41
|
2024-02-15
|
2024-02-29
|
CROSSING SIDEWALK
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B42
|
2024-02-15
|
2024-02-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B43
|
2024-02-15
|
2024-02-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B45
|
2024-02-15
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B46
|
2024-02-15
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B47
|
2024-02-15
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B48
|
2024-02-15
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024046B49
|
2024-02-15
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET MADISON AVENUE TO STREET METRO-NORTH RR
|
M022024039A01
|
2024-02-08
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024039A07
|
2024-02-08
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024039A06
|
2024-02-08
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024039A05
|
2024-02-08
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024039A04
|
2024-02-08
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M012024039A00
|
2024-02-08
|
2024-02-29
|
RAPID TRANSIT CONSTRUCT/ ALTERATION
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024039A03
|
2024-02-08
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024039A02
|
2024-02-08
|
2024-02-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
M022024039A00
|
2024-02-08
|
2024-02-29
|
PLACE MATERIAL ON STREET
|
EAST 125 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET METRO-NORTH RR
|
B042024024A40
|
2024-01-24
|
2024-02-27
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022023362B64
|
2023-12-28
|
2024-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023362B63
|
2023-12-28
|
2024-03-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022023362A18
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023362A19
|
2023-12-28
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023362A20
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023362A21
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023362A26
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022023362B67
|
2023-12-28
|
2024-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023362B65
|
2023-12-28
|
2024-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B042023362A00
|
2023-12-28
|
2024-01-28
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022023362B66
|
2023-12-28
|
2024-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023362B62
|
2023-12-28
|
2024-03-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023362B61
|
2023-12-28
|
2024-03-29
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023362B70
|
2023-12-28
|
2024-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023362B69
|
2023-12-28
|
2024-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023362B68
|
2023-12-28
|
2024-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022023362A22
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023362A23
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023362A25
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023362A24
|
2023-12-28
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A39
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A38
|
2023-12-26
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A40
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A41
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A42
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A43
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A44
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A45
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023360A46
|
2023-12-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B042023332A23
|
2023-11-28
|
2023-12-29
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
M022023311A24
|
2023-11-07
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M022023311A27
|
2023-11-07
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M022023311A26
|
2023-11-07
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
M022023311A25
|
2023-11-07
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
2 AVENUE, MANHATTAN, FROM STREET EAST 79 STREET TO STREET EAST 80 STREET
|
X022023304A63
|
2023-10-31
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B042023304A09
|
2023-10-31
|
2023-11-29
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X002023304A00
|
2023-10-31
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
X022023304A72
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A71
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A70
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A69
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A68
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A67
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A66
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A65
|
2023-10-31
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023304A64
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022023271A04
|
2023-09-28
|
2023-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A02
|
2023-09-28
|
2023-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A10
|
2023-09-28
|
2023-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A09
|
2023-09-28
|
2023-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A08
|
2023-09-28
|
2023-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A06
|
2023-09-28
|
2023-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B042023271A01
|
2023-09-28
|
2023-10-28
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A07
|
2023-09-28
|
2023-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A05
|
2023-09-28
|
2023-12-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023271A03
|
2023-09-28
|
2023-12-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
Q022023250A10
|
2023-09-07
|
2023-10-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023250A09
|
2023-09-07
|
2023-10-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023250A08
|
2023-09-07
|
2023-10-06
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023250A07
|
2023-09-07
|
2023-10-06
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023250A14
|
2023-09-07
|
2023-10-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023250A11
|
2023-09-07
|
2023-10-06
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023250A12
|
2023-09-07
|
2023-10-06
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023250A13
|
2023-09-07
|
2023-10-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
B042023240A11
|
2023-08-28
|
2023-09-28
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
Q022023220A25
|
2023-08-08
|
2023-09-05
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023220A32
|
2023-08-08
|
2023-09-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023220A26
|
2023-08-08
|
2023-09-05
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023220A30
|
2023-08-08
|
2023-09-05
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023220A29
|
2023-08-08
|
2023-09-05
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023220A28
|
2023-08-08
|
2023-09-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023220A27
|
2023-08-08
|
2023-09-05
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023220A31
|
2023-08-08
|
2023-09-05
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
X022023209B72
|
2023-07-28
|
2023-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B67
|
2023-07-28
|
2023-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B66
|
2023-07-28
|
2023-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B68
|
2023-07-28
|
2023-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B65
|
2023-07-28
|
2023-10-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B64
|
2023-07-28
|
2023-10-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B63
|
2023-07-28
|
2023-10-29
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B69
|
2023-07-28
|
2023-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023209B70
|
2023-07-28
|
2023-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B042023209A83
|
2023-07-28
|
2023-08-29
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022023209B71
|
2023-07-28
|
2023-10-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022023181C18
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C11
|
2023-06-30
|
2023-09-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C12
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C13
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C14
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
Q022023181E64
|
2023-06-30
|
2023-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023181E63
|
2023-06-30
|
2023-08-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023181E62
|
2023-06-30
|
2023-08-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023181E59
|
2023-06-30
|
2023-08-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023181E58
|
2023-06-30
|
2023-08-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023181E57
|
2023-06-30
|
2023-08-02
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023181E61
|
2023-06-30
|
2023-08-02
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023181E60
|
2023-06-30
|
2023-08-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
B042023181A01
|
2023-06-30
|
2023-07-30
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C19
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C27
|
2023-06-30
|
2023-09-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C15
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C16
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023181C17
|
2023-06-30
|
2023-09-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022023171C26
|
2023-06-20
|
2023-07-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C32
|
2023-06-20
|
2023-07-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C31
|
2023-06-20
|
2023-07-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C30
|
2023-06-20
|
2023-07-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C29
|
2023-06-20
|
2023-07-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C28
|
2023-06-20
|
2023-07-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C27
|
2023-06-20
|
2023-07-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C25
|
2023-06-20
|
2023-07-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C24
|
2023-06-20
|
2023-07-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023171C23
|
2023-06-20
|
2023-07-31
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B042023152A28
|
2023-06-01
|
2023-06-30
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
Q022023143A80
|
2023-05-23
|
2023-07-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023143A77
|
2023-05-23
|
2023-07-02
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023143A78
|
2023-05-23
|
2023-07-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023143A79
|
2023-05-23
|
2023-07-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023143A73
|
2023-05-23
|
2023-07-02
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023143A74
|
2023-05-23
|
2023-07-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023143A75
|
2023-05-23
|
2023-07-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023143A76
|
2023-05-23
|
2023-07-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
X022023116A72
|
2023-04-26
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023116A71
|
2023-04-26
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023116A70
|
2023-04-26
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023116A69
|
2023-04-26
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023116A68
|
2023-04-26
|
2023-05-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023116A67
|
2023-04-26
|
2023-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023116A66
|
2023-04-26
|
2023-05-23
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022023116B29
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023116B28
|
2023-04-26
|
2023-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023116B31
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023116B30
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B042023116A17
|
2023-04-26
|
2023-06-03
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022023116A75
|
2023-04-26
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023116A74
|
2023-04-26
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
B022023116B36
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023116B35
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023116B34
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023116B33
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023116B32
|
2023-04-26
|
2023-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
X022023116A73
|
2023-04-26
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
Q022023114B00
|
2023-04-24
|
2023-05-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023114B05
|
2023-04-24
|
2023-05-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023114A99
|
2023-04-24
|
2023-05-31
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023114B01
|
2023-04-24
|
2023-05-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023114B02
|
2023-04-24
|
2023-05-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023114B03
|
2023-04-24
|
2023-05-31
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023114B04
|
2023-04-24
|
2023-05-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023114B06
|
2023-04-24
|
2023-05-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
B022023101A24
|
2023-04-11
|
2023-05-04
|
PLACE MATERIAL ON STREET
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A26
|
2023-04-11
|
2023-05-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B042023101A01
|
2023-04-11
|
2023-05-04
|
REPLACE SIDEWALK
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A25
|
2023-04-11
|
2023-05-04
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A36
|
2023-04-11
|
2023-05-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A35
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A34
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A33
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A32
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A31
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A30
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A29
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A28
|
2023-04-11
|
2023-05-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
B022023101A27
|
2023-04-11
|
2023-05-04
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
4 STREET, BROOKLYN, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
Q022023082B76
|
2023-03-23
|
2023-04-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023082B77
|
2023-03-23
|
2023-04-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023082B75
|
2023-03-23
|
2023-04-28
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022023082B82
|
2023-03-23
|
2023-04-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023082B81
|
2023-03-23
|
2023-04-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023082B80
|
2023-03-23
|
2023-04-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023082B79
|
2023-03-23
|
2023-04-28
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022023082B78
|
2023-03-23
|
2023-04-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
X022023054B74
|
2023-02-23
|
2023-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B67
|
2023-02-23
|
2023-04-30
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B68
|
2023-02-23
|
2023-04-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B69
|
2023-02-23
|
2023-04-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B70
|
2023-02-23
|
2023-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B71
|
2023-02-23
|
2023-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B72
|
2023-02-23
|
2023-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B73
|
2023-02-23
|
2023-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B76
|
2023-02-23
|
2023-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023054B75
|
2023-02-23
|
2023-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A08
|
2023-01-06
|
2023-02-28
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A10
|
2023-01-06
|
2023-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A11
|
2023-01-06
|
2023-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A12
|
2023-01-06
|
2023-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A13
|
2023-01-06
|
2023-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A14
|
2023-01-06
|
2023-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A15
|
2023-01-06
|
2023-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A16
|
2023-01-06
|
2023-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A17
|
2023-01-06
|
2023-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022023006A09
|
2023-01-06
|
2023-02-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B26
|
2022-12-07
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B34
|
2022-12-07
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B33
|
2022-12-07
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B32
|
2022-12-07
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B25
|
2022-12-07
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B31
|
2022-12-07
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B30
|
2022-12-07
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B29
|
2022-12-07
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B28
|
2022-12-07
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022341B27
|
2022-12-07
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
Q022022308A20
|
2022-11-04
|
2022-12-12
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022308A26
|
2022-11-04
|
2022-12-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022308A25
|
2022-11-04
|
2022-12-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022308A24
|
2022-11-04
|
2022-12-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022308A23
|
2022-11-04
|
2022-12-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022308A22
|
2022-11-04
|
2022-12-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022308A21
|
2022-11-04
|
2022-12-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022308A19
|
2022-11-04
|
2022-12-12
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022293B22
|
2022-10-20
|
2022-11-11
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022293B23
|
2022-10-20
|
2022-11-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022293B30
|
2022-10-20
|
2022-11-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022293B26
|
2022-10-20
|
2022-11-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022293B25
|
2022-10-20
|
2022-11-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022293B24
|
2022-10-20
|
2022-11-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 168 STREET
|
Q022022285B43
|
2022-10-12
|
2022-11-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022285B42
|
2022-10-12
|
2022-11-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022285B40
|
2022-10-12
|
2022-11-11
|
CROSSING SIDEWALK
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
Q022022285B41
|
2022-10-12
|
2022-11-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
93 AVENUE, QUEENS, FROM STREET 168 PLACE TO STREET 170 STREET
|
M022022276D53
|
2022-10-03
|
2022-10-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022259B30
|
2022-09-16
|
2022-10-14
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B49
|
2022-09-13
|
2022-10-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B51
|
2022-09-13
|
2022-10-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B47
|
2022-09-13
|
2022-10-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B46
|
2022-09-13
|
2022-10-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B44
|
2022-09-13
|
2022-10-14
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B48
|
2022-09-13
|
2022-10-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B43
|
2022-09-13
|
2022-10-14
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022256A05
|
2022-09-13
|
2022-10-14
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B50
|
2022-09-13
|
2022-10-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022256B45
|
2022-09-13
|
2022-10-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
B002022249A03
|
2022-09-06
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
X022022245A11
|
2022-09-02
|
2022-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A05
|
2022-09-02
|
2022-11-29
|
PLACE MATERIAL ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A06
|
2022-09-02
|
2022-11-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A07
|
2022-09-02
|
2022-11-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A08
|
2022-09-02
|
2022-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A09
|
2022-09-02
|
2022-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A10
|
2022-09-02
|
2022-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A12
|
2022-09-02
|
2022-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A13
|
2022-09-02
|
2022-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X022022245A14
|
2022-09-02
|
2022-11-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 149 STREET, BRONX, FROM STREET MORRIS AVENUE TO STREET PARK AVENUE
|
X002022244A01
|
2022-09-01
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
M022022227B22
|
2022-08-15
|
2022-09-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B21
|
2022-08-15
|
2022-09-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B20
|
2022-08-15
|
2022-09-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B19
|
2022-08-15
|
2022-09-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B18
|
2022-08-15
|
2022-09-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B17
|
2022-08-15
|
2022-09-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B16
|
2022-08-15
|
2022-09-14
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B15
|
2022-08-15
|
2022-09-14
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022227A35
|
2022-08-15
|
2022-09-14
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022227B23
|
2022-08-15
|
2022-09-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A62
|
2022-07-22
|
2022-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A61
|
2022-07-22
|
2022-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A60
|
2022-07-22
|
2022-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A59
|
2022-07-22
|
2022-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022203A01
|
2022-07-22
|
2022-08-15
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A58
|
2022-07-22
|
2022-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A57
|
2022-07-22
|
2022-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A56
|
2022-07-22
|
2022-08-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A55
|
2022-07-22
|
2022-08-15
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022203A54
|
2022-07-22
|
2022-08-15
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022195A27
|
2022-07-14
|
2022-07-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022189A05
|
2022-07-08
|
2022-07-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189A07
|
2022-07-08
|
2022-07-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189A04
|
2022-07-08
|
2022-07-22
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022189A00
|
2022-07-08
|
2022-07-22
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189A08
|
2022-07-08
|
2022-07-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189A09
|
2022-07-08
|
2022-07-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189A10
|
2022-07-08
|
2022-07-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189A11
|
2022-07-08
|
2022-07-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189B36
|
2022-07-08
|
2022-07-22
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022189B37
|
2022-07-08
|
2022-07-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022189B38
|
2022-07-08
|
2022-07-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022189B39
|
2022-07-08
|
2022-07-22
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022189A03
|
2022-07-08
|
2022-07-22
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022189A06
|
2022-07-08
|
2022-07-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022188A62
|
2022-07-07
|
2022-07-22
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022179B11
|
2022-06-28
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022178B35
|
2022-06-27
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B80
|
2022-06-27
|
2022-07-11
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022178B79
|
2022-06-27
|
2022-07-11
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022178B32
|
2022-06-27
|
2022-07-11
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B66
|
2022-06-27
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022178B34
|
2022-06-27
|
2022-07-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B65
|
2022-06-27
|
2022-07-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022178B64
|
2022-06-27
|
2022-07-11
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022178B40
|
2022-06-27
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B39
|
2022-06-27
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B38
|
2022-06-27
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022178A06
|
2022-06-27
|
2022-07-11
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B33
|
2022-06-27
|
2022-07-11
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B37
|
2022-06-27
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022178B36
|
2022-06-27
|
2022-07-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B45
|
2022-06-14
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B44
|
2022-06-14
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B53
|
2022-06-14
|
2022-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022165B54
|
2022-06-14
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042022165A01
|
2022-06-14
|
2022-06-30
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B52
|
2022-06-14
|
2022-06-30
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022165B51
|
2022-06-14
|
2022-06-30
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022165B50
|
2022-06-14
|
2022-06-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022165B49
|
2022-06-14
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B48
|
2022-06-14
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B47
|
2022-06-14
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B46
|
2022-06-14
|
2022-06-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B43
|
2022-06-14
|
2022-06-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B42
|
2022-06-14
|
2022-06-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022165B41
|
2022-06-14
|
2022-06-30
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147C60
|
2022-05-27
|
2022-06-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042022147A00
|
2022-05-27
|
2022-06-20
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A32
|
2022-05-27
|
2022-06-20
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A33
|
2022-05-27
|
2022-06-20
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A34
|
2022-05-27
|
2022-06-20
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A35
|
2022-05-27
|
2022-06-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A36
|
2022-05-27
|
2022-06-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A37
|
2022-05-27
|
2022-06-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A38
|
2022-05-27
|
2022-06-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A39
|
2022-05-27
|
2022-06-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147A40
|
2022-05-27
|
2022-06-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022147B31
|
2022-05-27
|
2022-06-20
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022147B32
|
2022-05-27
|
2022-06-20
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022147C58
|
2022-05-27
|
2022-06-20
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022147C59
|
2022-05-27
|
2022-06-20
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022144A91
|
2022-05-24
|
2022-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144C02
|
2022-05-24
|
2022-06-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022144C03
|
2022-05-24
|
2022-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022144C04
|
2022-05-24
|
2022-05-31
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022144A93
|
2022-05-24
|
2022-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022144A01
|
2022-05-24
|
2022-06-01
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144C01
|
2022-05-24
|
2022-06-01
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022144C00
|
2022-05-24
|
2022-06-01
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022144A92
|
2022-05-24
|
2022-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144A85
|
2022-05-24
|
2022-06-01
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144A86
|
2022-05-24
|
2022-06-01
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144A87
|
2022-05-24
|
2022-06-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144A88
|
2022-05-24
|
2022-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144A89
|
2022-05-24
|
2022-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022144A90
|
2022-05-24
|
2022-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022123A82
|
2022-05-03
|
2022-05-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022123A83
|
2022-05-03
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022123A84
|
2022-05-03
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109E24
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042022109A24
|
2022-04-19
|
2022-05-24
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109E23
|
2022-04-19
|
2022-05-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022109E22
|
2022-04-19
|
2022-05-24
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022109E21
|
2022-04-19
|
2022-05-24
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022109D72
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109D71
|
2022-04-19
|
2022-05-24
|
TEMPORARY PEDESTRIAN WALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B88
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B87
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B86
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B85
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B84
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B83
|
2022-04-19
|
2022-05-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B82
|
2022-04-19
|
2022-05-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B81
|
2022-04-19
|
2022-05-24
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109B80
|
2022-04-19
|
2022-05-24
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022109E25
|
2022-04-19
|
2022-05-24
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022077A15
|
2022-03-18
|
2022-04-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A21
|
2022-03-18
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A20
|
2022-03-18
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A19
|
2022-03-18
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A18
|
2022-03-18
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A17
|
2022-03-18
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A16
|
2022-03-18
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022077A00
|
2022-03-18
|
2022-04-29
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A13
|
2022-03-18
|
2022-04-29
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022077A14
|
2022-03-18
|
2022-04-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D43
|
2022-02-25
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D37
|
2022-02-25
|
2022-03-31
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D38
|
2022-02-25
|
2022-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D39
|
2022-02-25
|
2022-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D40
|
2022-02-25
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D41
|
2022-02-25
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D42
|
2022-02-25
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D62
|
2022-02-25
|
2022-04-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022056D60
|
2022-02-25
|
2022-04-30
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022056D51
|
2022-02-25
|
2022-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D50
|
2022-02-25
|
2022-04-30
|
TEMPORARY PEDESTRIAN WALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D49
|
2022-02-25
|
2022-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022056D48
|
2022-02-25
|
2022-04-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022056D47
|
2022-02-25
|
2022-04-30
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022056D46
|
2022-02-25
|
2022-04-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022056D45
|
2022-02-25
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022056D44
|
2022-02-25
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022056A04
|
2022-02-25
|
2022-03-30
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
X022022024A23
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A24
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A25
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A17
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A43
|
2022-01-24
|
2022-02-15
|
PLACE MATERIAL ON STREET
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A27
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
M022022024B22
|
2022-01-24
|
2022-02-28
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
X022022024A44
|
2022-01-24
|
2022-02-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A26
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
M022022024B23
|
2022-01-24
|
2022-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
X022022024A18
|
2022-01-24
|
2022-02-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A19
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A20
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A21
|
2022-01-24
|
2022-02-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X042022024A01
|
2022-01-24
|
2022-02-15
|
REPAIR SIDEWALK
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022022024A22
|
2022-01-24
|
2022-02-15
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
M022022021A59
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042022021A01
|
2022-01-21
|
2022-02-28
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021B31
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022021B30
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022021B29
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022021B28
|
2022-01-21
|
2022-02-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022021B27
|
2022-01-21
|
2022-02-28
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022021B26
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021B25
|
2022-01-21
|
2022-02-28
|
TEMPORARY PEDESTRIAN WALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021B24
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022022021B14
|
2022-01-21
|
2022-02-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MORNINGSIDE AVENUE, MANHATTAN, FROM STREET WEST 118 STREET TO STREET WEST 119 STREET
|
M022022021A61
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021A60
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021A58
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021A57
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021A56
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021A55
|
2022-01-21
|
2022-02-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021A54
|
2022-01-21
|
2022-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021A53
|
2022-01-21
|
2022-02-28
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022022021B32
|
2022-01-21
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012022021A56
|
2022-01-21
|
2022-02-28
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
X022021361A35
|
2021-12-27
|
2022-01-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A33
|
2021-12-27
|
2022-01-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A32
|
2021-12-27
|
2022-01-31
|
PLACE MATERIAL ON STREET
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X042021361A04
|
2021-12-27
|
2022-01-30
|
REPAIR SIDEWALK
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A34
|
2021-12-27
|
2022-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A44
|
2021-12-27
|
2022-01-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A43
|
2021-12-27
|
2022-01-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A42
|
2021-12-27
|
2022-01-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A41
|
2021-12-27
|
2022-01-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A40
|
2021-12-27
|
2022-01-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A39
|
2021-12-27
|
2022-01-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A38
|
2021-12-27
|
2022-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A37
|
2021-12-27
|
2022-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021361A36
|
2021-12-27
|
2022-01-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
M022021356E72
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012021356A49
|
2021-12-22
|
2022-01-29
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021356A03
|
2021-12-22
|
2022-01-29
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356E69
|
2021-12-22
|
2022-01-29
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021356E70
|
2021-12-22
|
2022-01-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021356E71
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021356E73
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021356E74
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021356F20
|
2021-12-22
|
2022-01-29
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F21
|
2021-12-22
|
2022-01-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F22
|
2021-12-22
|
2022-01-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F23
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F24
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F25
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F26
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F27
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021356F28
|
2021-12-22
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021356A01
|
2021-12-22
|
2022-01-29
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021355E58
|
2021-12-21
|
2022-01-29
|
TEMPORARY PEDESTRIAN WALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021355E69
|
2021-12-21
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021355E59
|
2021-12-21
|
2022-01-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021354C05
|
2021-12-20
|
2022-01-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
X022021343A05
|
2021-12-09
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021343A04
|
2021-12-09
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021343A03
|
2021-12-09
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021343A07
|
2021-12-09
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X042021343A01
|
2021-12-09
|
2021-12-31
|
REPAIR SIDEWALK
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021343A06
|
2021-12-09
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
M022021340B61
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340B62
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340B63
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340B66
|
2021-12-06
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340B67
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340B68
|
2021-12-06
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340B69
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021340A23
|
2021-12-06
|
2021-12-31
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021340A25
|
2021-12-06
|
2021-12-31
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340A83
|
2021-12-06
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340A85
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340A86
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340A87
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340A88
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340A89
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340A90
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340B58
|
2021-12-06
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340B59
|
2021-12-06
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340B60
|
2021-12-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012021340A40
|
2021-12-06
|
2021-12-31
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M022021340A82
|
2021-12-06
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M022021340A84
|
2021-12-06
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
X022021337A29
|
2021-12-03
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021337A30
|
2021-12-03
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021337A25
|
2021-12-03
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021337A24
|
2021-12-03
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021337A23
|
2021-12-03
|
2021-12-31
|
PLACE MATERIAL ON STREET
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021337A26
|
2021-12-03
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021337A27
|
2021-12-03
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
X022021337A28
|
2021-12-03
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 144 STREET, BRONX, FROM STREET AJ GRIFFIN PLACE TO STREET GRAND CONCOURSE
|
M022021307B07
|
2021-11-03
|
2021-12-31
|
PLACE MATERIAL ON STREET
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021307A02
|
2021-11-03
|
2021-12-12
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021307A04
|
2021-11-03
|
2021-12-12
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021286A01
|
2021-10-13
|
2021-11-12
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021286A00
|
2021-10-13
|
2021-11-12
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021260A14
|
2021-09-17
|
2021-10-22
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021260A06
|
2021-09-17
|
2021-10-18
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021232A05
|
2021-08-20
|
2021-09-18
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021232A00
|
2021-08-20
|
2021-09-22
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021202A02
|
2021-07-21
|
2021-08-23
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021200A55
|
2021-07-19
|
2021-08-11
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021200A01
|
2021-07-19
|
2021-08-11
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021194A11
|
2021-07-13
|
2021-08-11
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012021174A71
|
2021-06-23
|
2021-07-24
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021174A11
|
2021-06-23
|
2021-07-24
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021165A00
|
2021-06-14
|
2021-07-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012021159A35
|
2021-06-08
|
2021-07-09
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021159A01
|
2021-06-08
|
2021-07-09
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021159A00
|
2021-06-08
|
2021-07-06
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M042021158A02
|
2021-06-07
|
2021-07-01
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012021154A66
|
2021-06-03
|
2021-06-24
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021154A06
|
2021-06-03
|
2021-06-24
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021140A08
|
2021-05-20
|
2021-06-01
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021140A01
|
2021-05-20
|
2021-06-01
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021130B26
|
2021-05-10
|
2021-05-24
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021130A18
|
2021-05-10
|
2021-05-24
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021113A20
|
2021-04-23
|
2021-05-14
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021113A00
|
2021-04-23
|
2021-05-14
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021112A17
|
2021-04-22
|
2021-05-24
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021112A07
|
2021-04-22
|
2021-05-24
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042021112A04
|
2021-04-22
|
2021-05-24
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021110A35
|
2021-04-20
|
2021-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012021095A02
|
2021-04-05
|
2021-04-27
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021095A00
|
2021-04-05
|
2021-04-27
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021083B29
|
2021-03-24
|
2021-04-29
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021083A12
|
2021-03-24
|
2021-04-29
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021081A42
|
2021-03-22
|
2021-04-29
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012021078A66
|
2021-03-19
|
2021-04-05
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021078A25
|
2021-03-19
|
2021-04-05
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021078A24
|
2021-03-19
|
2021-04-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M042021076A10
|
2021-03-17
|
2021-03-30
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M042021075A35
|
2021-03-16
|
2021-03-23
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021075A75
|
2021-03-16
|
2021-03-23
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021055A06
|
2021-02-24
|
2021-03-30
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021055A11
|
2021-02-24
|
2021-03-30
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012021055A00
|
2021-02-24
|
2021-03-30
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021047B25
|
2021-02-16
|
2021-03-23
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021025A06
|
2021-01-25
|
2021-02-28
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012021019A43
|
2021-01-19
|
2021-02-28
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021019A00
|
2021-01-19
|
2021-02-28
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M042021019A01
|
2021-01-19
|
2021-02-28
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042021013A06
|
2021-01-13
|
2021-02-21
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012021013C42
|
2021-01-13
|
2021-02-21
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020366A10
|
2020-12-31
|
2021-01-29
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042020364A03
|
2020-12-29
|
2021-01-29
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020364A10
|
2020-12-29
|
2021-01-29
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012020364A57
|
2020-12-29
|
2021-01-29
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020351A16
|
2020-12-16
|
2021-01-22
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020351B17
|
2020-12-16
|
2021-01-22
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020315A07
|
2020-11-10
|
2020-12-23
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020315A44
|
2020-11-10
|
2020-12-23
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020301A04
|
2020-10-27
|
2020-11-23
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020301A74
|
2020-10-27
|
2020-11-23
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020266A07
|
2020-09-22
|
2020-10-31
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020266B18
|
2020-09-22
|
2020-10-31
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020241A07
|
2020-08-28
|
2020-10-01
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012020241A43
|
2020-08-28
|
2020-10-01
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020241A55
|
2020-08-28
|
2020-09-30
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020241A08
|
2020-08-28
|
2020-09-30
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020241A06
|
2020-08-28
|
2020-10-01
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020226A01
|
2020-08-13
|
2020-09-13
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M042020226A02
|
2020-08-13
|
2020-09-13
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020226A28
|
2020-08-13
|
2020-09-13
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020216A36
|
2020-08-03
|
2020-09-01
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012020210B04
|
2020-07-28
|
2020-08-31
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020210A05
|
2020-07-28
|
2020-08-31
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020199A06
|
2020-07-17
|
2020-08-14
|
RESET, REPAIR OR REPLACE CURB
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020199A01
|
2020-07-17
|
2020-08-14
|
REPLACE SIDEWALK
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020199A00
|
2020-07-17
|
2020-08-14
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 26 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012020178B42
|
2020-06-26
|
2020-08-02
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020178A15
|
2020-06-26
|
2020-08-02
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M042020178A14
|
2020-06-26
|
2020-08-02
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042020178A13
|
2020-06-26
|
2020-08-02
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020160A34
|
2020-06-08
|
2020-07-03
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M042020160A33
|
2020-06-08
|
2020-07-03
|
REPLACE SIDEWALK
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M012020157B21
|
2020-06-05
|
2020-07-03
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020157A14
|
2020-06-05
|
2020-07-03
|
REPLACE SIDEWALK
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M042020143A14
|
2020-05-22
|
2020-06-01
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012020142A33
|
2020-05-21
|
2020-06-01
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020114A34
|
2020-04-23
|
2020-05-24
|
RESET, REPAIR OR REPLACE CURB
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042020114A36
|
2020-04-23
|
2020-05-24
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012020111A63
|
2020-04-20
|
2020-05-24
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020094A20
|
2020-04-03
|
2020-04-30
|
RESET, REPAIR OR REPLACE CURB
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042020094A00
|
2020-04-03
|
2020-04-30
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012020085A78
|
2020-03-25
|
2020-04-29
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020071B38
|
2020-03-11
|
2020-04-07
|
RESET, REPAIR OR REPLACE CURB
|
LEXINGTON AVENUE, MANHATTAN, FROM STREET EAST 25 STREET TO STREET EAST 26 STREET
|
M042020071A24
|
2020-03-11
|
2020-04-07
|
PED RAMP MODIFY/INSTALL GOVERNMENT
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE
|
M012020049A52
|
2020-02-18
|
2020-03-30
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012020024A29
|
2020-01-24
|
2020-02-29
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012019353A84
|
2019-12-19
|
2020-01-30
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012019346B40
|
2019-12-12
|
2019-12-31
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012019319A22
|
2019-11-15
|
2019-12-14
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012019280B02
|
2019-10-07
|
2019-11-14
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012019256A42
|
2019-09-13
|
2019-10-15
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|
M012019232C03
|
2019-08-20
|
2019-09-16
|
RESET, REPAIR OR REPLACE CURB
|
EAST 25 STREET, MANHATTAN, FROM STREET LEXINGTON AVENUE TO STREET PARK AVENUE SOUTH
|