Search icon

PRESTIGE CONSTRUCTION GROUP INC.

Company Details

Name: PRESTIGE CONSTRUCTION GROUP INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Inactive
Date of registration: 28 Mar 2007 (18 years ago)
Date of dissolution: 27 Mar 2014
Entity Number: 3496010
ZIP code: 11369
County: Queens
Place of Formation: New York
Address: 91-14 23RD AVE., EAST ELMHURST, NY, United States, 11369

Contact Details

Phone +1 718-429-0844

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 91-14 23RD AVE., EAST ELMHURST, NY, United States, 11369

Licenses

Number Status Type Date End date
1254187-DCA Inactive Business 2007-05-03 2011-06-30

Filings

Filing Number Date Filed Type Effective Date
140327000842 2014-03-27 CERTIFICATE OF DISSOLUTION 2014-03-27
120803000034 2012-08-03 ANNULMENT OF DISSOLUTION 2012-08-03
DP-2091941 2012-01-25 DISSOLUTION BY PROCLAMATION 2012-01-25
070328000455 2007-03-28 CERTIFICATE OF INCORPORATION 2007-03-28

Fine And Fees

Fee Sequence Id Fee type Status Date Amount Description
824574 CNV_TFEE INVOICED 2009-04-10 6 WT and WH - Transaction Fee
824575 TRUSTFUNDHIC INVOICED 2009-04-10 200 Home Improvement Contractor Trust Fund Enrollment Fee
926096 RENEWAL INVOICED 2009-04-10 100 Home Improvement Contractor License Renewal Fee
824578 LICENSE INVOICED 2007-05-03 125 Home Improvement Contractor License Fee
824576 TRUSTFUNDHIC INVOICED 2007-05-03 200 Home Improvement Contractor Trust Fund Enrollment Fee
824577 FINGERPRINT INVOICED 2007-05-03 75 Fingerprint Fee

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
335117784 0215600 2012-07-02 41-15 45TH STREET, SUNNYSIDE, NY, 11104
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2012-10-24
Emphasis L: FALL
Case Closed 2016-01-27

Related Activity

Type Referral
Activity Nr 441350
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260403 H
Issuance Date 2012-11-05
Current Penalty 500.0
Initial Penalty 1080.0
Final Order 2012-11-27
Nr Instances 1
Nr Exposed 3
Related Event Code (REC) Referral
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.403(h): Each disconnecting means for motors and appliances was not legibly marked to indicate its purpose, nor located and arranged so that the purpose is evident: A.) On or about Monday, July 2, 2012 at 41-15 45th Street, Sunnyside, NY 11104 The disconnects of an electrical panel box located in the basement of the building used by employees to power two (2) point suspension scaffold motors and additional equipment was observed missing labels indicating disconnect functions exposing employees to electrical hazards.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 D16
Issuance Date 2012-11-05
Current Penalty 1250.0
Initial Penalty 2520.0
Final Order 2012-11-27
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Referral
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(d)(16): The suspension scaffold power-operated hoist or manually operated hoist did not have, in addition to the normal operating brake, a braking device or locking pawl which engages automatically when a hoist makes either of the followin uncontrolled movements: an instantaneous change in momentum or an accelerated overspeed. A.) On or about Monday, July 2, 2012 at 41-15 45th Street, Sunnyside, NY 11104 A suspension scaffold erected approximately sixty (60) feet above the lower level used by employees during a brick pointing operation did not have an additional functional braking device in place that engaged automatically following an uncontrolled movement exposing employees to fall hazards.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 G03 IV
Issuance Date 2012-11-05
Current Penalty 1250.0
Initial Penalty 2520.0
Final Order 2012-11-27
Nr Instances 2
Nr Exposed 4
Related Event Code (REC) Referral
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(3)(iv): Vertical lifelines, independent support lines, and suspension ropes shall not be attached to each other, nor shall they be attached to or use the same point of anchorage, nor shall they be attached to the same point on the scaffold or personal fall arrest system. A.) On or about Monday, July 2, 2012 at 41-15 45th Street, Sunnyside, NY 11104 The vertical lifelines of a two point suspension scaffold erected approximately 60 feet above the lower level were observed attached to the same point of anchorage as the scaffold's suspension lines exposing employees to fall hazards.
Citation ID 02001
Citaton Type Other
Standard Cited 19100134 C02 I
Issuance Date 2012-11-05
Abatement Due Date 2013-01-02
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2012-11-27
Nr Instances 1
Nr Exposed 5
Related Event Code (REC) Referral
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.134(c)(2)(i): Respirator users were not provided with the information contained in Appendix D to 29 CFR 1910.134 when the employer determined that any voluntary respirator use was permissible: (SEE CONSTRUCTION REFERENCE 1926.103) A.) On or about Monday, July 2, 2012 at 41-15 45th Street, Sunnyside, NY 11104 The employer failed to provide employees that use respirators on a voluntary basis to perform their job duties Appendix D of the Respiratory Protection Program standard exposing employees to various hazards.
Citation ID 02002A
Citaton Type Other
Standard Cited 19101200 E01
Issuance Date 2012-11-05
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2012-11-27
Nr Instances 1
Nr Exposed 5
Related Event Code (REC) Referral
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (SEE CONSTRUCTION REFERENCE 1926.59) A.) On or about Monday, July 2, 2012 at 41-15 45th Street, Sunnyside, NY 11104 The employer failed to develop, implement and maintain at the workplace a written hazard communication program for employees that use hazardous chemicals such as but not limited too, Glen-Grey Color Mortar Blend on a daily basis to perform their job duties.
Citation ID 02002B
Citaton Type Other
Standard Cited 19101200 G08
Issuance Date 2012-11-05
Abatement Due Date 2013-01-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2012-11-27
Nr Instances 1
Nr Exposed 5
Related Event Code (REC) Referral
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(g)(8): The employer did not ensure that material safety data sheets were readily accessible to the employees in their work area during each work shift: (SEE CONSTRUCTION REFERENCE 1926.59) A.) On or about Monday, July 2, 2012 at 41-15 45th Street, Sunnyside, NY 11104 The employer failed to provide and maintain in the workplace the material safety data sheets for hazardous chemicals used by employees
Citation ID 02002C
Citaton Type Other
Standard Cited 19101200 H01
Issuance Date 2012-11-05
Abatement Due Date 2013-01-24
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2012-11-27
Nr Instances 1
Nr Exposed 5
Related Event Code (REC) Referral
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.1200(h)(1): The employer did not provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new physical or health hazard the employees had not previously been trained about was introduced into their work area A.) On or about Monday, July 2, 2012 at 41-15 45th Street, Sunnyside, NY 11104 The employer failed to provide employees that use hazardous substances such as but not limited to portland cement to perform their job duties effective information and training.

Date of last update: 28 Mar 2025

Sources: New York Secretary of State