Name: | SCHAFFNER CONSTRUCTION CO., INC. |
Jurisdiction: | New York |
Legal type: | FOREIGN BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 06 Sep 2007 (18 years ago) |
Entity Number: | 3564933 |
ZIP code: | 07446 |
County: | Orange |
Place of Formation: | New Jersey |
Address: | 74 WYCKOFF AVE, RAMSEY, NJ, United States, 07446 |
Principal Address: | 74 WYCKOFF AVENUE, RAMSEY, NJ, United States, 07446 |
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 74 WYCKOFF AVE, RAMSEY, NJ, United States, 07446 |
Name | Role | Address |
---|---|---|
EDWARD J SCHAFFNER | Chief Executive Officer | 74 WYCKOFF AVENUE, RAMSEY, NJ, United States, 07446 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
150903007054 | 2015-09-03 | BIENNIAL STATEMENT | 2015-09-01 |
130909006404 | 2013-09-09 | BIENNIAL STATEMENT | 2013-09-01 |
110920003041 | 2011-09-20 | BIENNIAL STATEMENT | 2011-09-01 |
090904002182 | 2009-09-04 | BIENNIAL STATEMENT | 2009-09-01 |
070906000884 | 2007-09-06 | APPLICATION OF AUTHORITY | 2007-09-06 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342340973 | 0216000 | 2017-05-19 | 70 NORTH 9W, CONGERS, NY, 10920 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1217627 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B05 I |
Issuance Date | 2017-08-16 |
Current Penalty | 3000.0 |
Initial Penalty | 4346.0 |
Final Order | 2017-09-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(5)(i): The end of a platform 10 feet or less in length, extended over its support more than 12 inches: On or about: 5/19/2017 Location: First floor interior, South West building corner a) Employee was engaged in masonry work on a tubular welded frame scaffold. The scaffold planking was cantilevered approximately 5 feet over its support. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 C01 III |
Issuance Date | 2017-08-16 |
Current Penalty | 2000.0 |
Initial Penalty | 2897.0 |
Final Order | 2017-09-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(c)(1)(iii): Ties, guys, braces, or outriggers were not installed to prevent the tipping of supported scaffolds in all circumstances where an eccentric load, such as a cantilevered work platform, was applied or was transmitted to the scaffold: On or about: 5/19/2017 Location: First floor interior, South West building corner a) Employee was engaged in masonry work on tubular welded frame scaffold. The scaffold planking was cantilevered approximately 5 feet over its support. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260451 E01 |
Issuance Date | 2017-08-16 |
Current Penalty | 2000.0 |
Initial Penalty | 2897.0 |
Final Order | 2017-09-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(e)(1): Scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. On or about: 5/19/2017 Location: First floor interior, South West building corner a) Employee was engaged in masonry work on a tubular welded frame scaffold. Cross braces were used as a means of access. |
Date of last update: 11 Mar 2025
Sources: New York Secretary of State