Search icon

KADAR ELITE CONSTRUCTION, INC.

Company Details

Name: KADAR ELITE CONSTRUCTION, INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 05 Oct 2007 (18 years ago)
Entity Number: 3576989
ZIP code: 11235
County: Kings
Place of Formation: New York
Address: 4081 OCEAN AVE, BROOKLYN, NY, United States, 11235
Principal Address: 4081 Ocean Ave, BROOKLYN, NY, United States, 11235

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 4081 OCEAN AVE, BROOKLYN, NY, United States, 11235

Chief Executive Officer

Name Role Address
MYKHAYLO KADAR Chief Executive Officer 4081 OCEAN AVENUE, BROOKLYN, NY, United States, 11235

Permits

Number Date End date Type Address
B012024298B21 2024-10-24 2024-11-22 PAVE STREET-W/ ENGINEERING & INSP FEE COLERIDGE STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
B042024242A19 2024-08-29 2024-09-27 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT COLERIDGE STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
B012024242C16 2024-08-29 2024-09-27 RESET, REPAIR OR REPLACE CURB COLERIDGE STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
B012024242C17 2024-08-29 2024-09-26 PAVE STREET-W/ ENGINEERING & INSP FEE COLERIDGE STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
B022024242B10 2024-08-29 2024-09-27 OCCUPANCY OF SIDEWALK AS STIPULATED COLERIDGE STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
B022024242B09 2024-08-29 2024-09-30 OCCUPANCY OF SIDEWALK AS STIPULATED COLERIDGE STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
B042024229A23 2024-08-16 2024-09-13 PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR FALMOUTH STREET, BROOKLYN, FROM STREET SHORE BOULEVARD
B042024229A24 2024-08-16 2024-09-13 PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR FALMOUTH STREET, BROOKLYN, FROM STREET SHORE BOULEVARD
B022023223A64 2023-08-11 2023-09-06 OCCUPANCY OF SIDEWALK AS STIPULATED ORIENTAL BOULEVARD, BROOKLYN, FROM STREET AMHERST STREET TO STREET BEAUMONT STREET
B012023223A65 2023-08-11 2023-09-06 RESET, REPAIR OR REPLACE CURB BEAUMONT STREET, BROOKLYN, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD

History

Start date End date Type Value
2023-10-30 2023-10-30 Address 4081 OCEAN AVENUE, BROOKLYN, NY, 11235, USA (Type of address: Chief Executive Officer)
2023-10-30 2023-10-30 Address 4747 BEDFORD AVE, BROOKLYN, NY, 11235, USA (Type of address: Chief Executive Officer)
2023-10-03 2023-10-30 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-10-02 2023-10-03 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-07-31 2023-10-02 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-01-12 2023-07-31 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2020-10-26 2023-10-30 Address 4081 OCEAN AVE, BROOKLYN, NY, 11235, USA (Type of address: Service of Process)
2009-10-19 2023-10-30 Address 4747 BEDFORD AVE, BROOKLYN, NY, 11235, USA (Type of address: Chief Executive Officer)
2009-10-19 2020-10-26 Address 4747 BEDFORD AVE, BROOKLYN, NY, 11235, USA (Type of address: Service of Process)
2007-10-05 2023-01-12 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0

Filings

Filing Number Date Filed Type Effective Date
231030016877 2023-10-30 BIENNIAL STATEMENT 2023-10-01
221123002773 2022-11-23 BIENNIAL STATEMENT 2021-10-01
201026000114 2020-10-26 CERTIFICATE OF CHANGE 2020-10-26
131031002314 2013-10-31 BIENNIAL STATEMENT 2013-10-01
111026002305 2011-10-26 BIENNIAL STATEMENT 2011-10-01
091019002683 2009-10-19 BIENNIAL STATEMENT 2009-10-01
071005000621 2007-10-05 CERTIFICATE OF INCORPORATION 2007-10-05

Inspections

Date Inspection Object Address Grade Type Institution Desctiption
2025-02-25 No data FALMOUTH STREET, FROM STREET SHORE BOULEVARD No data Street Construction Inspections: Post-Audit Department of Transportation If ramp running and landing were correct please submit new PRISM inspection to reflect these new conditions, thank you
2025-02-18 No data COLERIDGE STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD No data Street Construction Inspections: Post-Audit Department of Transportation BPP done for property in compliance
2025-02-01 No data COLERIDGE STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD No data Street Construction Inspections: Post-Audit Department of Transportation Sidewalk/curb reset for property in compliance
2024-12-12 No data FALMOUTH STREET, FROM STREET SHORE BOULEVARD No data Street Construction Inspections: Post-Audit Department of Transportation No work started. No work done.
2024-10-24 No data COLERIDGE STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD No data Street Construction Inspections: Active Department of Transportation BPP Pass - Length of roadway is 31ft, length milled was 22ft. 64ft width and 3in milled down. Half plus five in compliance.
2024-10-05 No data FALMOUTH STREET, FROM STREET SHORE BOULEVARD No data Street Construction Inspections: CAR Re-Inspect Department of Transportation Permit B042024229A23 completed tangent ramps in the SW1 corner found not to be ADA compliant due to excessive ramp running and left flares near catch basins. Measured & collected in Prism on 9/10/24.
2024-09-26 No data COLERIDGE STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD No data Street Construction Inspections: Active Department of Transportation No work started. No work done. No inspection found at this time.
2024-09-10 No data FALMOUTH STREET, FROM STREET SHORE BOULEVARD No data Street Construction Inspections: Active Department of Transportation Active permit. Newly completed tangent ramps in the SW1 corner found not to be ADA compliant due to excessive ramp running and left flares near catch basins. Measured & collected in Prism on 9/10/24.
2024-09-03 No data FALMOUTH STREET, FROM STREET SHORE BOULEVARD No data Street Construction Inspections: Active Department of Transportation Active permit. No work started. No work done.
2024-04-29 No data FALMOUTH STREET, FROM STREET SHORE BOULEVARD No data Street Construction Inspections: CAR Re-Inspect Department of Transportation Permittee failed to correct excessive ramp running slope in the SW1 even after a meeting with the contractor was conducted. In addition failed to complete the NW & SE corners .

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
344038633 0215000 2019-05-22 186 GIRARD STREET, BROOKLYN, NY, 11235
Inspection Type Planned
Scope NoInspection
Safety/Health Safety
Close Conference 2019-05-22
Emphasis L: LOCALTARG, P: LOCALTARG
Case Closed 2019-06-05
343977138 0215000 2019-05-01 4081 OCEAN AVENUE, BROOKLYN, NY, 11235
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2019-05-01
Emphasis P: LOCALTARG, L: LOCALTARG
Case Closed 2021-07-23

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260403 B02
Issuance Date 2019-07-11
Current Penalty 1500.0
Initial Penalty 2273.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification. Location: a) On second floor of the jobsite: On or about 05/01/19, employees used a power strip to energize electrical equipment and lighting. The power strip was not listed to be use in a construction work environment.
Citation ID 01005
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2019-07-11
Abatement Due Date 2019-07-17
Current Penalty 2700.0
Initial Penalty 3978.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. Location: a) Supported scaffold on the southeast side of the first floor of the jobsite: On or about 05/01/19, an employee was doing stucco and paint work on the second tier platform of a five-tier-high supported scaffold, and were not protected from falling approximately 12 feet to a lower level.
Citation ID 01007A
Citaton Type Serious
Standard Cited 19261052 C01 I
Issuance Date 2019-07-11
Current Penalty 1900.0
Initial Penalty 2842.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail. Location: a) On the stairway of the jobsite: On or about 05/01/19, employees used the stairway to access the upper level. The stairway was not equipped with at least one handrail. Employees were exposed to fall hazard.
Citation ID 01007B
Citaton Type Serious
Standard Cited 19261052 C01 II
Issuance Date 2019-07-11
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stairrail system along each unprotected side or edge. Location: a) On the stairway of the jobsite: On or about 05/01/19, employees used the stairway to access the upper level. The stairway was not equipped with a stairrail system along each unprotected side or edge. Employees were exposed to fall hazard.
Citation ID 01008A
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2019-07-11
Abatement Due Date 2019-07-17
Current Penalty 2700.0
Initial Penalty 3978.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) Location: a) Supported scaffold on the southeast side of the first floor of the jobsite: On or about 05/01/19, employee was doing stucco and paint work on the second tier platform of a five-tier-high supported scaffold. The platform that the employee working on was not fully planked or decked between front upright and the guardrail supports, and were exposed to falling approximately 12 feet to the lower level.
Citation ID 01008B
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2019-07-11
Abatement Due Date 2019-07-17
Current Penalty 0.0
Initial Penalty 3978.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Scaffold frames were used as a means of access. Location: a) Supported scaffold on the southeast side of the first floor of the jobsite: On or about 05/01/19, an employee climbed the scaffold frames as a mean of access from the second tier platform of a five-tier-high supported scaffold to the ground level.
Citation ID 01009A
Citaton Type Serious
Standard Cited 19260451 F07
Issuance Date 2019-07-11
Abatement Due Date 2019-07-17
Current Penalty 2700.0
Initial Penalty 3978.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. Location: a) Supported scaffold on the southeast side of the first floor of the jobsite: On or about 05/01/19, scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift. Employees were exposed to fall hazards due to deficiencies with the scaffold such as but not limited to: scaffold platform was not fully planked, safe means of access was not provided, employee was not protected from falls by use of personal fall arrest systems or guardrail systems, and falling objects protections was not provided.
Citation ID 01009B
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2019-07-11
Abatement Due Date 2019-07-17
Current Penalty 0.0
Initial Penalty 3978.0
Final Order 2019-07-24
Nr Instances 1
Nr Exposed 1
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. Location: a) Supported scaffold on the southeast side of the first floor of the jobsite: On or about 05/01/19, employer did not have employees who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards.
333911022 0215000 2012-04-14 123 COLERIDGE STREET, BROOKLYN, NY, 11235
Inspection Type Referral
Scope Complete
Safety/Health Safety
Close Conference 2012-04-14
Case Closed 2013-07-26

Related Activity

Type Referral
Activity Nr 313441
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260102 A01
Issuance Date 2012-06-15
Abatement Due Date 2012-06-22
Current Penalty 1000.0
Initial Penalty 2000.0
Final Order 2012-07-10
Nr Instances 2
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.102(a)(1): Employees shall be provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents. Location: 123 Coleridge Street Brooklyn NY, 11235. On or about 04/14/12. a) #1 employee was operating a Makita grinder serial #1177926Y cutting stones. The employee was not provided with eye/face protection. b) #2 employee was operating a Makita griinder serial # 166794A cutting tiles. The employee was not provided with eye/face protection.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260300 B01
Issuance Date 2012-06-15
Abatement Due Date 2012-06-22
Current Penalty 1000.0
Initial Penalty 2000.0
Final Order 2012-07-10
Nr Instances 2
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.300(b)(1): When power operated tools are designed to accommodate guards, they shall be equipped with such guards when in use. Location: 123 Coleridge Street Brooklyn NY, 11235. On or about 04/14/12. a) #1 employee was operating a Makita grinder serial # 1177926Y cutting stones. The grinder was not provided with a blade guard. b) #2 employee was operating a Makita grinder serial # 166794A cutting tiles. The grinder was not provided with a blade guard.

Paycheck Protection Program

Loan Number Loan Funded Date SBA Origination Office Code Loan Delivery Method Borrower Street Address
2759178305 2021-01-21 0202 PPP 4081 Ocean Ave, Brooklyn, NY, 11235-3714
Loan Status Date 2021-11-19
Loan Status Paid in Full
Loan Maturity in Months 60
SBA Guaranty Percentage 100
Loan Approval Amount (at origination) 25563
Loan Approval Amount (current) 25563
Undisbursed Amount 0
Franchise Name -
Lender Location ID 224478
Servicing Lender Name Signature Bank
Servicing Lender Address 565 5th Ave, 12th Fl, NEW YORK CITY, NY, 10017-2496
Rural or Urban Indicator U
Hubzone N
LMI N
Business Age Description Existing or more than 2 years old
Project Address Brooklyn, KINGS, NY, 11235-3714
Project Congressional District NY-08
Number of Employees 1
NAICS code 236115
Borrower Race White
Borrower Ethnicity Not Hispanic or Latino
Business Type Subchapter S Corporation
Originating Lender ID 224478
Originating Lender Name Signature Bank
Originating Lender Address NEW YORK CITY, NY
Gender Male Owned
Veteran Unanswered
Forgiveness Amount 25748.59
Forgiveness Paid Date 2021-10-20

Date of last update: 28 Mar 2025

Sources: New York Secretary of State