Name: | NU GENERAL CONTRACTING CO., INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 15 Nov 2007 (17 years ago) |
Entity Number: | 3593650 |
ZIP code: | 10502 |
County: | Westchester |
Place of Formation: | New York |
Address: | 597 SAW MILL RIVER RD., ARDSLEY, NY, United States, 10502 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 597 SAW MILL RIVER RD., ARDSLEY, NY, United States, 10502 |
Start date | End date | Type | Value |
---|---|---|---|
2022-03-29 | 2023-02-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2007-11-15 | 2022-03-29 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2007-11-15 | 2016-04-26 | Address | 38 CHESTER DRIVE, YONKERS, NY, 10710, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
160426000338 | 2016-04-26 | CERTIFICATE OF CHANGE | 2016-04-26 |
071115000089 | 2007-11-15 | CERTIFICATE OF INCORPORATION | 2007-11-15 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
344480538 | 0216000 | 2019-11-22 | 97 WAKEFIELS AVENUE, YONKERS, NY, 10704 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260100 A |
Issuance Date | 2020-01-23 |
Current Penalty | 2313.0 |
Initial Penalty | 2313.0 |
Final Order | 2020-03-09 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: A) Exterior on the ground: An employee was exposed to head injuries while working below siding activities. The employee was not protected by a hard hat or protective helmet, on or about November 22th, 2019. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 G01 |
Issuance Date | 2020-01-23 |
Current Penalty | 4048.0 |
Initial Penalty | 4048.0 |
Final Order | 2020-03-09 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Imminent Danger |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level. A) Exterior, Pump jack scaffold on the left side of the structure: Employees were exposed to fall hazards of approximately 27 feet while working on a pump jack scaffold that was not protected by a complete guardrail system (including end rails) or another means of fall protection in place, on or about November 22nd, 2019. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260452 J02 |
Issuance Date | 2020-01-23 |
Current Penalty | 4048.0 |
Initial Penalty | 4048.0 |
Final Order | 2020-03-09 |
Nr Instances | 1 |
Nr Exposed | 2 |
Related Event Code (REC) | Imminent Danger |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.452(j)(2): Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled. A) Exterior, Pump jack scaffold on the left side of the structure: Employees were exposed to fall hazards of approximately 27 feet while working on a pump jack scaffold that was not braced at the bottom, on or about November 22th, 2019. |
Date of last update: 28 Mar 2025
Sources: New York Secretary of State