Search icon

M & Z CONSTRUCTION CORP.

Company Details

Name: M & Z CONSTRUCTION CORP.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Inactive
Date of registration: 13 Jan 1975 (50 years ago)
Date of dissolution: 24 Jun 1981
Entity Number: 360021
ZIP code: 11230
County: Kings
Place of Formation: New York
Address: 4609 BAY PARKWAY, BROOKLYN, NY, United States, 11230

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
DOMINIC MELLO DOS Process Agent 4609 BAY PARKWAY, BROOKLYN, NY, United States, 11230

Filings

Filing Number Date Filed Type Effective Date
20080529025 2008-05-29 ASSUMED NAME CORP INITIAL FILING 2008-05-29
DP-20349 1981-06-24 DISSOLUTION BY PROCLAMATION 1981-06-24
A206687-5 1975-01-13 CERTIFICATE OF INCORPORATION 1975-01-13

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
332806371 0216000 2012-03-09 339 HEATHCOTE RD, SCARSDALE, NY, 10583
Inspection Type Prog Related
Scope Complete
Safety/Health Safety
Close Conference 2012-04-04
Emphasis L: FALL
Case Closed 2019-07-31

Related Activity

Type Inspection
Activity Nr 282544
Safety Yes
Type Inspection
Activity Nr 280554
Safety Yes
Type Inspection
Activity Nr 282564
Safety Yes
Type Inspection
Activity Nr 280834
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260021 B02
Issuance Date 2012-05-18
Abatement Due Date 2012-06-11
Current Penalty 900.0
Initial Penalty 1800.0
Final Order 2012-06-25
Nr Instances 4
Nr Exposed 4
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.21(b)(2): The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury. On or about 3/9/2012, Job Site a) The employees were installing exterior siding and not provided training as required by the standard.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260404 F06
Issuance Date 2012-05-18
Current Penalty 900.0
Initial Penalty 1800.0
Final Order 2012-06-25
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.404(f)(6): Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous. On or about 3/9/2012, Job Site a) The employee used an extension cord to energize his tool. The extension cord had the ground pin broken off.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260416 E01
Issuance Date 2012-05-18
Current Penalty 900.0
Initial Penalty 1800.0
Final Order 2012-06-25
Nr Instances 1
Nr Exposed 1
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables shall not be used. On or about 3/9/2012 a) The extension cord had the sheathing worn off.
Citation ID 01004A
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2012-05-18
Current Penalty 2100.0
Initial Penalty 4200.0
Final Order 2012-06-25
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. On or about 3/9/2012, Job Site a) The two employees worked on the pump jack scaffold without fall protection. They were exposed to falling 17' to the ground below.
Citation ID 01004B
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2012-05-18
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2012-06-25
Nr Instances 4
Nr Exposed 4
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer shall have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. The training shall include the following areas, as applicable: On or about 3/9/2012, Job Site a) The employees, who worked from a pump jack scaffold were not provided scaffold training as required by the standard.
Citation ID 01005
Citaton Type Serious
Standard Cited 19260452 J02
Issuance Date 2012-05-18
Current Penalty 1500.0
Initial Penalty 3000.0
Final Order 2012-06-25
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(j)(2): Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace re-installed. On or about 3/9/2012, Job Site a) The employees worked from a pump jack scaffold that did not have the triangular bracing at the bottom.

Date of last update: 18 Mar 2025

Sources: New York Secretary of State