Name: | M & Z CONSTRUCTION CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Inactive |
Date of registration: | 13 Jan 1975 (50 years ago) |
Date of dissolution: | 24 Jun 1981 |
Entity Number: | 360021 |
ZIP code: | 11230 |
County: | Kings |
Place of Formation: | New York |
Address: | 4609 BAY PARKWAY, BROOKLYN, NY, United States, 11230 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
DOMINIC MELLO | DOS Process Agent | 4609 BAY PARKWAY, BROOKLYN, NY, United States, 11230 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
20080529025 | 2008-05-29 | ASSUMED NAME CORP INITIAL FILING | 2008-05-29 |
DP-20349 | 1981-06-24 | DISSOLUTION BY PROCLAMATION | 1981-06-24 |
A206687-5 | 1975-01-13 | CERTIFICATE OF INCORPORATION | 1975-01-13 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
332806371 | 0216000 | 2012-03-09 | 339 HEATHCOTE RD, SCARSDALE, NY, 10583 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 282544 |
Safety | Yes |
Type | Inspection |
Activity Nr | 280554 |
Safety | Yes |
Type | Inspection |
Activity Nr | 282564 |
Safety | Yes |
Type | Inspection |
Activity Nr | 280834 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260021 B02 |
Issuance Date | 2012-05-18 |
Abatement Due Date | 2012-06-11 |
Current Penalty | 900.0 |
Initial Penalty | 1800.0 |
Final Order | 2012-06-25 |
Nr Instances | 4 |
Nr Exposed | 4 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.21(b)(2): The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury. On or about 3/9/2012, Job Site a) The employees were installing exterior siding and not provided training as required by the standard. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260404 F06 |
Issuance Date | 2012-05-18 |
Current Penalty | 900.0 |
Initial Penalty | 1800.0 |
Final Order | 2012-06-25 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(f)(6): Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous. On or about 3/9/2012, Job Site a) The employee used an extension cord to energize his tool. The extension cord had the ground pin broken off. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260416 E01 |
Issuance Date | 2012-05-18 |
Current Penalty | 900.0 |
Initial Penalty | 1800.0 |
Final Order | 2012-06-25 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables shall not be used. On or about 3/9/2012 a) The extension cord had the sheathing worn off. |
Citation ID | 01004A |
Citaton Type | Serious |
Standard Cited | 19260451 G01 VII |
Issuance Date | 2012-05-18 |
Current Penalty | 2100.0 |
Initial Penalty | 4200.0 |
Final Order | 2012-06-25 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(1)(vii): For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. On or about 3/9/2012, Job Site a) The two employees worked on the pump jack scaffold without fall protection. They were exposed to falling 17' to the ground below. |
Citation ID | 01004B |
Citaton Type | Serious |
Standard Cited | 19260454 A |
Issuance Date | 2012-05-18 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2012-06-25 |
Nr Instances | 4 |
Nr Exposed | 4 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.454(a): The employer shall have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. The training shall include the following areas, as applicable: On or about 3/9/2012, Job Site a) The employees, who worked from a pump jack scaffold were not provided scaffold training as required by the standard. |
Citation ID | 01005 |
Citaton Type | Serious |
Standard Cited | 19260452 J02 |
Issuance Date | 2012-05-18 |
Current Penalty | 1500.0 |
Initial Penalty | 3000.0 |
Final Order | 2012-06-25 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.452(j)(2): Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace re-installed. On or about 3/9/2012, Job Site a) The employees worked from a pump jack scaffold that did not have the triangular bracing at the bottom. |
Date of last update: 18 Mar 2025
Sources: New York Secretary of State