2025-03-29
|
No data
|
PLATTSBURG STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CURB WAS PROPERLY SEALED -OK
|
2025-03-29
|
No data
|
CROMWELL AVENUE, FROM STREET JEFFERSON STREET TO STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CURB WAS PROPERLY SEALED -OK
|
2025-03-26
|
No data
|
ANDERSON STREET, FROM STREET ST MARYS AVENUE TO STREET VIRGINIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE AT NEW BUILDING/HOME-BPP WORK-OK
|
2025-03-21
|
No data
|
ARTHUR KILL ROAD, FROM STREET CHEMICAL LANE TO STREET GRILLE COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD MILLED ROADWAY & WAS WORKING ON A PAVE STREET AT 11:51 AM ON FRIDAY 3/21/25;FAILED TO WORK 9 PM- 5 AM ONLY-FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION OCMC09.
|
2025-03-21
|
No data
|
GLEN AVENUE, FROM STREET BRIGHTON AVENUE TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset and in compliance
|
2025-03-19
|
No data
|
EDGEGROVE AVENUE, FROM STREET ELLSWORTH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NW2 corner newly constructed tangent ramps non ADA compliant. Excessive landing slopes remain the same. Work not started active permit.
|
2025-03-16
|
No data
|
HANCOCK STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD INSTALLED 35 FEET X 2 1/2 FEET OF NEW SIDEWALK FLAGS/DRIVEWAY APRON FLAGS-WITHOUT A VALID DOT PERMIT TO DO SO. SIDEWALK WORK-NO PERMIT. DOT PERMIT #S012025059A69 EXPIRES 3/28/25 FOR CURB ONLY WAS USED FOR ID ONLY.
|
2025-03-16
|
No data
|
EAST 153 STREET, FROM STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed tangent ramps in the NE3 corner quadrant are Ada compliant. Previously measured and collected in prism on 7/11/24. Spot checked on 3/16/25.
|
2025-03-13
|
No data
|
AVENUE W, FROM STREET EAST 5 STREET TO STREET OCEAN PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP roadwork started
|
2025-03-13
|
No data
|
3 AVENUE, FROM STREET EAST 153 STREET TO STREET EAST 154 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in place at time of inspection.
|
2025-03-12
|
No data
|
RICHMOND ROAD, FROM STREET AULTMAN AVENUE TO STREET WILDER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2025-03-09
|
No data
|
OCEAN PARKWAY, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM RESTORATION FOUND IN COMPLIANCE.
|
2025-03-07
|
No data
|
EAST 153 STREET, FROM STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file. Old existing single ramp is functional and accessible. Will need to be reinspected at a later date when work is complete.
|
2025-03-07
|
No data
|
HARVEY AVENUE, FROM STREET CASWELL AVENUE TO STREET MARBLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw replaced
|
2025-03-06
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2025-03-06
|
No data
|
AVENUE W, FROM STREET OCEAN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM RESTORATION FOUND FOR BPP, WORK DONE IN COMPLIANCE
|
2025-03-06
|
No data
|
OCEAN PARKWAY, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PERM RESTORATION FOUND FOR BPP, WORK DONE IN COMPLIANCE.
|
2025-03-05
|
No data
|
STAFFORD AVENUE, FROM STREET DELMAR AVENUE TO STREET HEENAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2025-03-04
|
No data
|
HANCOCK STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED RESPONDENT BREAKING DRIVEWAY APRONS TO REPLACE CURB WITH RAM HOE/ROCK BREAKER;WHICH IS A NON-APPROVED DOT EQUIPMENT USED TO CUT/BREAK CITY PROPERTY. PERMIT & CREW & RESPONDENT'S NAME ON EQUIPMENT WAS USED FOR ID.
|
2025-03-04
|
No data
|
RENSSELAER AVENUE, FROM STREET LENEVAR AVENUE TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2025-03-04
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NE3 corner newly constructed tangent ramps, non ADA compliant. Landing length 27” & 22” due to grass barrier. Measured and collected today on 8/5/24.
|
2025-03-02
|
No data
|
ALTER AVENUE, FROM STREET LACONIA AVENUE TO STREET MASON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW BUILDING / HOME
|
2025-02-28
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
This permit wi be used for SE4 corner. Newly constructed single ramp non ADA compliant. Left flare 11.4% which is not on the clear area due to grass barrier. Measured and collected on 01/14/24. No action taken.
|
2025-02-27
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NE3 corner newly constructed single ramp found to be ADA compliant. ADVANCED SITE CONTRACTORS INC. Measured and collected on 01/13/25. No further action is needed.
|
2025-02-24
|
No data
|
BURNSIDE AVENUE, FROM STREET FOREST AVENUE TO STREET SHAW PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site but not working until 9am advised to post signs asap sw being excavated
|
2025-02-24
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must renew the permit for the SE4 corner and restore areas with spalling concrete as per H-1011-1 note #3.
|
2025-02-22
|
No data
|
WESTCHESTER AVENUE, FROM STREET LELAND AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw flush to grade
|
2025-02-22
|
No data
|
OCEAN PARKWAY, FROM STREET AVENUE W TO STREET GRAVESEND NECK ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Street was paved in compliance.
|
2025-02-19
|
No data
|
RICHMOND ROAD, FROM STREET ANDREWS AVENUE TO STREET AULTMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb to curb BPP acceptable.
|
2025-02-18
|
No data
|
EXETER STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property in compliance
|
2025-02-18
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container along p/l
|
2025-02-14
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, ADA compliant. Measured and collected on 6/22/24. No action taken.
|
2025-02-14
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner newly constructed tangent ramps, non ADA compliant. Excessive flare slopes on both ramps. Measured and collected today on 6/19/24. No action taken. Active permit.
|
2025-02-14
|
No data
|
TILLMAN STREET, FROM STREET AREA PLACE TO STREET LA GUARDIA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection: Roadway width 38’1”Roadway width milled 24’4”Milled down 3 and a half inches.
|
2025-02-14
|
No data
|
ELMBANK STREET, FROM STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed tangent ramps found to be ADA compliant. Measured and collected in prism on 8/2/23. No further action is needed.
|
2025-02-13
|
No data
|
ANDREWS AVENUE, FROM STREET CENTER STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please re-seal BPP in front of address 7 Andrews Ave
|
2025-02-13
|
No data
|
CORBIN AVENUE, FROM STREET COUNTRY WOODS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the SW corner quadrant was found to be ADA compliant, measured and collected in Prism on 3/21/24.
|
2025-02-13
|
No data
|
SCHUBERT STREET, FROM STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to permit S042023136A27 for inspection remarks.
|
2025-02-13
|
No data
|
TILLMAN STREET, FROM STREET AREA PLACE TO STREET LA GUARDIA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SENT TO CHECK FOR BPP MILLING DEPTH - NO MILLING WAS DONE. MILLING TO BE DONE TOMORROW MORNING.
|
2025-02-13
|
No data
|
KNESEL STREET, FROM STREET DEAD END TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2025-02-11
|
No data
|
KNESEL STREET, FROM STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner newly constructed single ramp. Unable to measure today due to missing dot in Prism. Kerry has been notified. We will come back and measure when the location is available in Prism.
|
2025-02-11
|
No data
|
DEAD END, FROM STREET RADIGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NW2 corner. We are unable to measure this corner (Prism dot is missing). Kerry has been notified.
|
2025-02-11
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed single ramp in the NE3 corner found to be ADA compliant. Measured & collected on 2/3/24. No further action is needed.
|
2025-02-11
|
No data
|
ST JOHN'S AVENUE, FROM STREET ALTAVISTA COURT TO STREET WAGNER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE- PAVE OK AT NEW BUILDINGS/HOMES
|
2025-02-11
|
No data
|
SCHUBERT STREET, FROM STREET DEAD END TO STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE AT NEW BUILDINGS/HOMES
|
2025-02-11
|
No data
|
SCHUBERT STREET, FROM STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE AT NEW BUILDINGS/HOMES
|
2025-02-10
|
No data
|
SPRAGUE AVENUE, FROM STREET KEPPEL AVENUE TO STREET PETUNIA COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET.
|
2025-02-09
|
No data
|
NOME AVENUE, FROM STREET LEWISTON STREET TO STREET SHALE STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD A ADVANCED SITE CONTRACTORS INC. COMMERCIAL REFUSE CONTAINER ON STREET (ROADWAY)-WITHOUT A VALID DOT PERMIT TO DO SO. RESPONDENT'S NAME, PHONE NUMBER ON CONTAINER AT 2:56 PM ON FEBRUARY 9, 2025 & EXPIRED DOT
|
2025-02-06
|
No data
|
ASHLAND AVENUE, FROM STREET DEAD END TO STREET QUEENSDALE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Container on site in compliance.
|
2025-02-06
|
No data
|
LAREDO AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container found on roadway
|
2025-02-05
|
No data
|
SCARBORO AVENUE, FROM STREET ANDREASE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW BUILDING/HOME
|
2025-02-05
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Refer to S042024121A29
|
2025-02-03
|
No data
|
ALVERSON AVENUE, FROM STREET POND STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Location is within private property (original dead end area). Contractor paved roadway curb to curb for Builders Pavement Plan for new homes built (98-102)
|
2025-02-03
|
No data
|
SEACREST AVENUE, FROM STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the SW corner quadrant was found to be ADA compliant, ramp cross slope has a typo (9.0%) correct ramp cross slope is 0.9%. Prism updated on 2/3/25.
|
2025-02-03
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, ADA compliant by the City. Measured and collected today on 5/31/23. No further action is needed. Receiving corner for 1 Gridley Ave (BPP approval).
|
2025-01-31
|
No data
|
GREAT KILLS ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY BPP DONE IN COMPLIANCE
|
2025-01-31
|
No data
|
PLATTSBURG STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
re-pave on 3 segments at 3 new buildings
|
2025-01-29
|
No data
|
VERNON AVENUE, FROM STREET ALBOURNE AVENUE TO STREET AMBOY ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 46' X 35'3" of roadway milled curb to curb down 3". BPP acceptable.
|
2025-01-23
|
No data
|
VICTORY BOULEVARD, FROM STREET PERRY AVENUE TO STREET QUINLAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS INSTALLED
|
2025-01-17
|
No data
|
KATAN AVENUE, FROM STREET GIFFORDS LANE TO STREET RHETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found on Katan Ave
|
2025-01-17
|
No data
|
EUGENE STREET, FROM STREET ADELPHI AVENUE TO STREET AMBOY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new s/w ok.
|
2025-01-17
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 50'2" X 23'4" of roadway milled for 247 Gervil Street. BPP acceptable.
|
2025-01-16
|
No data
|
COLON AVENUE, FROM STREET BALTIMORE STREET TO STREET MARGARET STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags and apron are ok
|
2025-01-16
|
No data
|
ARDMORE AVENUE, FROM STREET NORTH GANNON AVENUE TO STREET PURDY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1 s/walk flag
|
2025-01-16
|
No data
|
LYNHURST AVENUE, FROM STREET ANDERSON STREET TO STREET LANGERE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS AT 94 LYNHURST AVENUE-OK
|
2025-01-15
|
No data
|
MASON BOULEVARD, FROM STREET HEMLOCK STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
crew on site- Advanced Site Contractors milling 130'X10' of roadway for a.k.a 247 Gervil Street (empty lot). On Mason Blvd between Gervil St and Maguire Ave. Permit active.
|
2025-01-15
|
No data
|
HEMLOCK STREET, FROM STREET CORRELL AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 54' X 24'8" of roadway milled down 3". BPP acceptable for 64 Hemlock Street
|
2025-01-15
|
No data
|
DEWEY AVENUE, FROM STREET GIFFORDS LANE TO STREET NORTH RHETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2025-01-15
|
No data
|
AMBOY ROAD, FROM STREET BEND TO STREET PENTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2025-01-15
|
No data
|
WOODVALE AVENUE, FROM STREET EXCELSIOR AVENUE TO STREET SHADYSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags/apron acceptable.
|
2025-01-15
|
No data
|
MASON BOULEVARD, FROM STREET HEMLOCK STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
130'X10' of roadway milled down 3". BPP acceptable for a.k.a 247 Gervil Street.
|
2025-01-14
|
No data
|
MARCY AVENUE, FROM STREET RENSSELAER AVENUE TO STREET SHELDON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2025-01-14
|
No data
|
MARCY AVENUE, FROM STREET SHELDON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done.
|
2025-01-14
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
This permit wi be used for SE4 corner. Newly constructed single ramp non ADA compliant. Left flare 11.4% which is not on the clear area due to grass barrier. Measured and collected today on 01/14/24. No further action is needed.
|
2025-01-14
|
No data
|
SHELDON AVENUE, FROM STREET DESERRE AVENUE TO STREET ELLSWORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done.
|
2025-01-14
|
No data
|
SHELDON AVENUE, FROM STREET DESERRE AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done.
|
2025-01-13
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NE3 corner newly constructed single ramp found to be ADA compliant. ADVANCED SITE CONTRACTORS INC. Measured and collected today on 01/13/25. No further action is needed. Active permit.
|
2025-01-13
|
No data
|
CROMWELL AVENUE, FROM STREET JEFFERSON STREET TO STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE WAS DONE CURB TO CURB
|
2025-01-13
|
No data
|
RICHMOND ROAD, FROM STREET ANDREWS AVENUE TO STREET AULTMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspection: Roadway milled curb to curbRoadway width 30’7”Roadway milled down 3 & a quarter inches
|
2025-01-13
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway BPP done in compliance within DOT specs.
|
2025-01-13
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway BPP done in compliance with DOT specs.
|
2025-01-13
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET TO STREET KINGHORN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway BPP done in compliance with DOT specs.
|
2025-01-13
|
No data
|
PLATTSBURG STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS AT NEW BUILDINGS
|
2025-01-13
|
No data
|
CROMWELL AVENUE, FROM STREET JEFFERSON STREET TO STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE SEAL EXPANSION JOINTS IN NEW CURB -AT 62 Cromwell Avenue.
|
2025-01-13
|
No data
|
GREAT KILLS ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installed in compliance
|
2025-01-13
|
No data
|
GREAT KILLS ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done in compliance.
|
2025-01-11
|
No data
|
SHALE STREET, FROM STREET NOME AVENUE TO STREET LEASON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container on location
|
2025-01-11
|
No data
|
GIFFORDS LANE, FROM STREET DEWEY AVENUE TO STREET KATAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The roadway BPP was done and finalized. 30'W x 22'L.
|
2025-01-10
|
No data
|
CLEARMONT AVENUE, FROM STREET AMBOY ROAD TO STREET BOYNTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2025-01-10
|
No data
|
ALTER AVENUE, FROM STREET LACONIA AVENUE TO STREET MASON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 53'X23'6" of roadway milled down 3". BPP acceptable.
|
2025-01-10
|
No data
|
VAN DUZER STREET, FROM STREET BEACH STREET TO STREET WRIGHT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
MULTIPLE S/WALK FLAGS INSTALLED
|
2025-01-10
|
No data
|
SPRAGUE AVENUE, FROM STREET KEPPEL AVENUE TO STREET PETUNIA COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
2025-01-09
|
No data
|
EAST 153 STREET, FROM STREET BERGEN AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel faced curb in place at time of inspection.
|
2025-01-09
|
No data
|
EDGEGROVE AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new s/w installed.
|
2025-01-08
|
No data
|
SLEIGHT AVENUE, FROM STREET AMBOY ROAD TO STREET PARADISE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags/apron acceptable.
|
2025-01-07
|
No data
|
WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET LENEVAR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2025-01-06
|
No data
|
ASHLAND AVENUE, FROM STREET DEAD END TO STREET QUEENSDALE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container on site acceptable
|
2025-01-06
|
No data
|
FREEDOM AVENUE, FROM STREET AMSTERDAM PLACE TO STREET RIVINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS INSTALLED
|
2025-01-03
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET HEMLOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
6 s/w flags acceptable
|
2025-01-03
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
4 s/w flags restored just before entrance to private lot
|
2025-01-03
|
No data
|
CORRELL AVENUE, FROM STREET HEMLOCK STREET TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done.
|
2024-12-30
|
No data
|
AUSABLE AVENUE, FROM STREET CONYINGHAM AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Open container on location
|
2024-12-29
|
No data
|
BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2024-12-28
|
No data
|
AVENUE U, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Pavement done in compliance.
|
2024-12-28
|
No data
|
AVENUE U, FROM STREET EAST 1 STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset and redone in compliance.
|
2024-12-28
|
No data
|
WEST STREET, FROM STREET AVENUE U TO STREET WHITNEY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Replacement and installation of curbs were done in compliance.
|
2024-12-27
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner newly constructed single ramp found to be ADA compliant. Measured and collected today on 12/27/24. No further action is needed.
|
2024-12-24
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY= 57 FEET 4 LANES (OFF ECL AT 2153-2175 RICHMOND AVENUE)- TOTAL LENGTH OF MILLED ROADWAY 256 FEET X TOTAL WIDTH OF MILLED ROADWAY= 57 FEET X DEPTH OF MILLED ROADWAY= 2-3 INCHES-OK
|
2024-12-24
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner is covered in snow. We will come back and re-inspect at a later date.
|
2024-12-23
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE & NO CREW ON SITE-We will be milling tomorrow, December 23 starting at 9 AM followed by Paving around 10:30 AM at 70 Plattsburgh St.
|
2024-12-23
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR closed, 0135 permit on file , S012024250A42.
|
2024-12-23
|
No data
|
PLATTSBURG STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE & NO CREW ON SITE-We will be milling tomorrow, December 23 starting at 9 AM followed by Paving around 10:30 AM at 70 Plattsburgh St.
|
2024-12-23
|
No data
|
HOPE STREET, FROM STREET BQE WB ENTRANCE METROPOLITAN AVE TO STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp restoration to grade located ifo property 66
|
2024-12-23
|
No data
|
CROMWELL AVENUE, FROM STREET JEFFERSON STREET TO STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE & NO CREW ON SITE-We will be milling tomorrow, December 23 starting at 9 AM followed by Paving around 10:30 AM at 70 Plattsburgh St.
|
2024-12-20
|
No data
|
GREAT KILLS ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspection: Roadway milled curb to curb total width 28’7”Roadway milled down 3 and a half inches
|
2024-12-20
|
No data
|
45 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
portion of r.w paved
|
2024-12-19
|
No data
|
45 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site with partial roadway closure. Reopened at inspector request.
|
2024-12-18
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed by ANTONIO'S CONCRETE LLC with (4’) ramps. Open CAR/NOV on permit# S042023052A41. No work started permit expired.
|
2024-12-17
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET TO STREET KINGHORN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 125’ X 32’3” of roadway milled down 3” for 69 Elmbank Street. BPP acceptable.
|
2024-12-17
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 106'X20'2" of roadway milled down 3". BPP acceptable for paving.
|
2024-12-17
|
No data
|
ARDEN AVENUE, FROM STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site 32’3”X23’ of intersection milled down 3”. BPP acceptable for paving.
|
2024-12-15
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above Respondent performed 45 feet x 3 feet-"FINAL RESTORATION" in roadway on Corrective Action Request#20243340235 (issued 6/28/24)without the noted permit listed as required a 0135 permit type.
|
2024-12-14
|
No data
|
AVENUE U, FROM STREET EAST 1 STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property in compliance
|
2024-12-14
|
No data
|
AVENUE U, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance for corner property #345 Ave U
|
2024-12-14
|
No data
|
WEST STREET, FROM STREET AVENUE U TO STREET WHITNEY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance for corner property #345 Ave U
|
2024-12-10
|
No data
|
KNESEL STREET, FROM STREET DEAD END TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Milled 142’x 28’ down 3in (inspected on 12/6)
|
2024-12-09
|
No data
|
GREAT KILLS ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
BPP will correct the condition.
|
2024-12-06
|
No data
|
ALVERSON AVENUE, FROM STREET POND STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Location is within private property (original dead end area was part of 52 Knesel St) advised Nick of Advanced. New homes built on private land
|
2024-12-06
|
No data
|
KNESEL STREET, FROM STREET DEAD END TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway milled under this expired permit, spoke with foreman Nick & ordered office to renew before paving city property (Knesel St).Note: new homes on Alverson Av from Knesel St towards Pond (original dead end is private)
|
2024-12-05
|
No data
|
GREAT KILLS ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done.
|
2024-12-03
|
No data
|
MASON BOULEVARD, FROM STREET HEMLOCK STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2024-12-02
|
No data
|
COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb has been replaced and incompliance.
|
2024-11-27
|
No data
|
COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration across the roadway from Bus Pad to OPP curb.
|
2024-11-22
|
No data
|
EDGEGROVE AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2024-11-20
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition remains the same. Permittee is on hold.
|
2024-11-15
|
No data
|
DEAD END, FROM STREET GERVIL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP at 1 new house added within the woods (new dead end side coming from Mason Blvd)Private street
|
2024-11-15
|
No data
|
BUTLER BOULEVARD, FROM STREET FAITH COURT TO STREET FLOWER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2024-11-15
|
No data
|
WOOLLEY AVENUE, FROM STREET GARRISON AVENUE TO STREET LATHROP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2024-11-14
|
No data
|
NEWBERRY AVENUE, FROM STREET BANK PLACE TO STREET WILSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2024-11-14
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Excessive right flare slope is located next to wooden utility pole. No action needed.
|
2024-11-14
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2024-11-14
|
No data
|
WOODS OF ARDEN ROAD, FROM STREET BATHGATE STREET TO STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2024-11-12
|
No data
|
HEMLOCK STREET, FROM STREET CORRELL AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
new to service to be installed soon roadway will be paved shortly after
|
2024-11-08
|
No data
|
COLUMBIA STREET, FROM STREET SACKETT STREET TO STREET UNION STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
• Roadway Curb to Curb width – 36’• Milled width – 25’• Depth of milled area – 3”• ½ +5’ milled (yes/no) – Yes• Waiver (yes/no)- NoProperty length – 20Property length Milled- 30
|
2024-11-08
|
No data
|
HERZL STREET, FROM STREET BLAKE AVENUE TO STREET SUTTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP restoration in roadway
|
2024-11-06
|
No data
|
AMHERST AVENUE, FROM STREET GUYON AVENUE TO STREET ISABELLA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2024-11-06
|
No data
|
SANFORD STREET, FROM STREET DEAD END TO STREET SPRAGUE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2024-11-06
|
No data
|
MELVIN AVENUE, FROM STREET DEAD END TO STREET WILD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE AT NEW BUILDING -OK
|
2024-11-06
|
No data
|
GUYON AVENUE, FROM STREET AMHERST AVENUE TO STREET RIGA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb to curb BPP acceptable.
|
2024-11-04
|
No data
|
YETMAN AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2024-11-03
|
No data
|
MEMPHIS AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway BPP done curb to curb.
|
2024-11-02
|
No data
|
HEMLOCK STREET, FROM STREET CORRELL AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
MILLED ROADWAY DOWN 1 INCH IN PROTECTED ROADWAY-OVERDUE FOR FINAL- PLEASE PERMANENTLY RESTORE AT 64 HEMLOCK STREET between CORRELL AVENUE and MASON BOULEVARD.
|
2024-11-01
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Northeast corner. Failed to correct excessive landing running slope 5.8% not to exceed 2% as per standard detail drawing H-1011-1 note #8 (Table 1). Notified on 5/25/24 - CAR# 20246890234. Condition remains the same.
|
2024-10-31
|
No data
|
HYLAN BOULEVARD, FROM STREET BACHE AVENUE TO STREET BURBANK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb acceptable
|
2024-10-31
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2024-10-31
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2024-10-31
|
No data
|
FOREST AVENUE, FROM STREET JEWETT AVENUE TO STREET LLEWELLYN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2024-10-30
|
No data
|
IONA STREET, FROM STREET QUINCY AVENUE TO STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb to curb BPP acceptable
|
2024-10-29
|
No data
|
EDGEGROVE AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp
|
2024-10-24
|
No data
|
BOMBAY STREET, FROM STREET DEAD END TO STREET SHIEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done within private property (originally woods)
|
2024-10-24
|
No data
|
MINTURN AVENUE, FROM STREET BRADFORD AVENUE TO STREET DRUMGOOLE ROAD EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb for apron installed
|
2024-10-24
|
No data
|
BOULDER STREET, FROM STREET CASTOR PLACE TO STREET ROSEDALE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP curb to curb
|
2024-10-23
|
No data
|
RADIGAN AVENUE, FROM STREET DEAD END TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP for new homes built in the woods past the dead end originally
|
2024-10-23
|
No data
|
DEAD END, FROM STREET RADIGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP for new homes built in the woods past the dead end originally
|
2024-10-20
|
No data
|
AVENUE U, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 10/18/24.
|
2024-10-19
|
No data
|
MINTURN AVENUE, FROM STREET BRADFORD AVENUE TO STREET DRUMGOOLE ROAD EAST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS WERE PROPERLY SEALED -OK-NO PERMIT REQUIRED
|
2024-10-18
|
No data
|
46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done for property in compliance Inspected.
|
2024-10-18
|
No data
|
AVENUE U, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner found to be ADA compliant. Measured & collected in Prism on 10/18/24.
|
2024-10-15
|
No data
|
PIAVE AVENUE, FROM STREET ARGONNE STREET TO STREET CAMBRIA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2024-10-11
|
No data
|
4 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Nat Grid upgraded corner using B042023332A26
|
2024-10-10
|
No data
|
GUYON AVENUE, FROM STREET AMHERST AVENUE TO STREET RIGA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection: Roadway milled curb to curbRoadway width 36’2”Roadway milled down 3 inches
|
2024-10-10
|
No data
|
AMHERST AVENUE, FROM STREET GUYON AVENUE TO STREET ISABELLA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection: Roadway has been milled curb to curb.Width of roadway is 29’7”.Milled down 3 inches.
|
2024-10-09
|
No data
|
BUTLER BOULEVARD, FROM STREET FAITH COURT TO STREET FLOWER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Rdwy milled 86'2x36'8 down 3in
|
2024-10-09
|
No data
|
SHALE STREET, FROM STREET NOME AVENUE TO STREET LEASON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no container on roadway -OK
|
2024-10-07
|
No data
|
KING STREET, FROM STREET RICHMOND AVENUE TO STREET RIDGECREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2024-10-07
|
No data
|
RIDGECREST AVENUE, FROM STREET HYLAN BOULEVARD TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2024-10-05
|
No data
|
SHALE STREET, FROM STREET NOME AVENUE TO STREET LEASON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON ROADWAY-OK
|
2024-10-03
|
No data
|
EDGEGROVE AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP paved-111'8x 34'7 photo sent to office
|
2024-10-02
|
No data
|
MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2024-09-25
|
No data
|
HEMLOCK STREET, FROM STREET CORRELL AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled (118’x13’ x3in) ready for paving
|
2024-09-25
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled (13’x13’ x3in) ready for paving
|
2024-09-25
|
No data
|
MASON BOULEVARD, FROM STREET HEMLOCK STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled (250’x13’ x3in) ready for paving
|
2024-09-23
|
No data
|
YETMAN AVENUE, FROM STREET CLERMONT AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw flags replaced
|
2024-09-19
|
No data
|
HYLAN BOULEVARD, FROM STREET MANHATTAN STREET TO STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw restored in kind at bus stop
|
2024-09-18
|
No data
|
ANDREWS AVENUE, FROM STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway BPP done in compliance: 32'L x 21'5”W x 3"Down.
|
2024-09-18
|
No data
|
ANDREWS AVENUE, FROM STREET CENTER STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway BPP done in compliance: 77'L x 20'W x 3"Down.
|
2024-09-18
|
No data
|
RICHMOND ROAD, FROM STREET ANDREWS AVENUE TO STREET AULTMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway BPP done in compliance: 152'L x 31”W x 3"Down.
|
2024-09-17
|
No data
|
BAY 11 STREET, FROM STREET BATH AVENUE TO STREET BENSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete Width of roadway:30ft Width of milled area:20ft Length of milled area:40ft Depth of milled area:3in
|
2024-09-17
|
No data
|
AKRON STREET, FROM STREET RICHMOND AVENUE TO STREET SAYBROOK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/walk flags
|
2024-09-16
|
No data
|
SEIDMAN AVENUE, FROM STREET DEAD END TO STREET OAKDALE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 64'6"X37'5" of roadway milled (curb to curb). BPP acceptable for paving.
|
2024-09-16
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw flags restored
|
2024-09-16
|
No data
|
CORRELL AVENUE, FROM STREET HEMLOCK STREET TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw flag replaced
|
2024-09-14
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must correct excessive flare slopes of 11.6%, 12.1%, 12.2% not to exceed 10% as per standard detail drawing H-1011-1 note #8 (Table 1) and H-1011-2 Case C1. CAR ISSUED.
|
2024-09-13
|
No data
|
BERGLUND AVENUE, FROM STREET BEND TO STREET FIRTH ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2024-09-12
|
No data
|
WINCHESTER AVENUE, FROM STREET HYLAN BOULEVARD TO STREET KING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway BPP done in compliance. The dimensions are 50'L x 30'W x 3"Down.
|
2024-09-12
|
No data
|
PETRUS AVENUE, FROM STREET POMPEY AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container placed on the roadway in compliance.
|
2024-09-11
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is ok
|
2024-09-07
|
No data
|
IRON MINE DRIVE, FROM STREET BEND TO STREET FLAGG PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Red container covered down with a blue tarp in front of 123 Ironmine Drive
|
2024-09-06
|
No data
|
MINTURN AVENUE, FROM STREET BRADFORD AVENUE TO STREET DRUMGOOLE ROAD EAST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & Driveway apron replaced in kind is missing expansion joint & sealer
|
2024-09-01
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above Respondent performed 45 feet x 3 feet -"FINAL RESTORATION" in roadway on Corrective Action Request#20243340235 (issued 6/28/24)without the noted permit listed as required a 0135 permit type. ROADWAY RESTORATION WORK-NO PERMIT
|
2024-08-26
|
No data
|
HENRY STREET, FROM STREET CARROLL STREET TO STREET SUMMIT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP IFO 566 Henry is incompliance.
|
2024-08-22
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent failed to install a five feet wide ramp (5’) on southwest corner as per BPP approval/ H-1011 detail drawings, 4’ feet wide ramp is not acceptable. Notified on 5/16/24 - CAR# 20246890199. Condition remains the same.
|
2024-08-22
|
No data
|
MELVIN AVENUE, FROM STREET DEAD END TO STREET WILD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY= 38 FEET X TOTAL WIDTH OF RE-PAVE ROADWAY= 32 FEET X TOTAL LENGTH OF RE-PAVED RWY = 51 FEET X DEPTH OF MILLED ROADWAY=2-3 INCHES (PHOTOS.)
|
2024-08-20
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Northeast corner. Failed to correct excessive landing running slope 5.7% not to exceed 2% as per standard detail drawing H-1011-1 note #8 (Table 1). Notified on 5/25/24 - CAR# 20246890234. Condition remains the same.
|
2024-08-11
|
No data
|
SHALE STREET, FROM STREET NOME AVENUE TO STREET LEASON PLACE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD A ADVANCED SITE CONTRACTORS INC. COMMERCIAL REFUSE CONTAINER ON STREET (ROADWAY)-WITHOUT A VALID DOT PERMIT TO DO SO. RESPONDENT'S NAME, PHONE NUMBER & BIC#504430 ON CONTAINER AT 7:08 AM ON AUGUST 11, 2024 &
|
2024-08-08
|
No data
|
SHALE STREET, FROM STREET NOME AVENUE TO STREET LEASON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON RWY-OK
|
2024-08-07
|
No data
|
MC ARTHUR AVENUE, FROM STREET BEND TO STREET VAN ALLEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET In compliance.
|
2024-08-07
|
No data
|
WOODS OF ARDEN ROAD, FROM STREET BATHGATE STREET TO STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2024-08-05
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NE3 corner newly constructed tangent ramps, non ADA compliant. Lending length 27” & 22” due to grass barrier. Measured and collected today on 8/5/24. No action taken.
|
2024-08-02
|
No data
|
AMBOY ROAD, FROM STREET FISHER AVENUE TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS INSTALLED
|
2024-07-31
|
No data
|
RICHMOND AVENUE, FROM STREET HILLTOP ROAD TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2024-07-28
|
No data
|
ANDERSON STREET, FROM STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK
|
2024-07-26
|
No data
|
DOLE STREET, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp pavered
|
2024-07-26
|
No data
|
ROBINSON AVENUE, FROM STREET HILLCREST STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled 83’x 29’11 down 3in arrived onsite earlier as per Ronnie to assess gas plated areas. After call w Ronnie & Joe, Advanced agreed to excavate & install 10in of binder for gas cuts instead of waiting for BUG. Stayed to observe & take pics
|
2024-07-26
|
No data
|
13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk and curb installed in compliance for new building 341
|
2024-07-25
|
No data
|
FR CAPODANNO BOULEVARD, FROM STREET CHEROKEE STREET TO STREET IONA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Rdwy milled curb to center median curb (73’x33’6 down 3in) prepping for paving
|
2024-07-25
|
No data
|
IONA STREET, FROM STREET QUINCY AVENUE TO STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Rdwy milled curb to curb (110’x21’6 down 3in)
|
2024-07-25
|
No data
|
IONA STREET, FROM STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Rdwy milled along driveway curb (22’x2’9 down 3in)
|
2024-07-23
|
No data
|
46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property in compliance
|
2024-07-19
|
No data
|
16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp in compliance in accordance with dot specs, roadway paved half+5’ ifo 186
|
2024-07-11
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2024-07-11
|
No data
|
WOODVALE AVENUE, FROM STREET EXCELSIOR AVENUE TO STREET SHADYSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. EXPANSION JOINTS & SEALER APPLIED
|
2024-07-11
|
No data
|
EAST 153 STREET, FROM STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quadrant are Ada compliant, Ramps was measured and collected in prism on 7/11/24.
|
2024-07-03
|
No data
|
LORETTO STREET, FROM STREET BILLOP AVENUE TO STREET CLERMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2024-07-02
|
No data
|
ALTER AVENUE, FROM STREET LACONIA AVENUE TO STREET MASON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway BPP done in compliance.
|
2024-06-28
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No curb cut back done when new curb was installed, concrete over asphalt is overdue for final
|
2024-06-27
|
No data
|
RICHMOND AVENUE, FROM STREET HILLTOP ROAD TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
311- C.A.R issued to Advanced Site Contractors Inc to make repairs to paved B.P.P. where area is raised, causing rain water ponding @ driveway of 4185 Richmond Av
|
2024-06-25
|
No data
|
RICHMOND AVENUE, FROM STREET HILLTOP ROAD TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Builders Pavement Plan milled and paved for new homes #4187 & 4189. Roadway to grade.
|
2024-06-24
|
No data
|
MAIN STREET, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS INSTALLED.
|
2024-06-24
|
No data
|
53 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property in compliance
|
2024-06-22
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, ADA compliant. Measured and collected today on 6/22/24. No action taken.
|
2024-06-22
|
No data
|
DEAD END, FROM STREET RADIGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner. Newly constructed single ramp. We are unable to measure this corner (Prism dot is missing). Kerry has been notified.
|
2024-06-21
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR re-inspection pass. Proper permit obtained S042024121A29
|
2024-06-20
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed tangent ramps, non ADA compliant. Excessive r/w counter slope of 5.4% on ramp# 123977 (right). Open CAR on previous permit# S042023037A05. M&C on 6/22/23.
|
2024-06-19
|
No data
|
RICHMOND AVENUE, FROM STREET HILLTOP ROAD TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY=50 FEET ; TOTAL WIDTH OF RE-PAVED ROADWAY=30 FEET X TOTAL LENGTH OF PAVED ROADWAY=75 FEET X TOTAL DEPTH OF MILLED ROADWAY= 2-3 INCHES (CREW PHOTOS)
|
2024-06-19
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NW2 corner newly constructed tangent ramps, non ADA compliant. 5 ’ Wide ramps installed, however excessive flare slopes on both ramps. Newer active permit #S042024164A12 exp: 7/11/24 on file. M&C today on 6/19/24. No action taken.
|
2024-06-19
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NW2 corner newly constructed tangent ramps, non ADA compliant. Excessive flare slopes on both ramps. Measured and collected today on 6/19/24. No action taken. Active permit.
|
2024-06-18
|
No data
|
16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New stone faces curb installed for new sidewalk ifo 186
|
2024-06-13
|
No data
|
55 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property Con Ed restoration overlapped BPP
|
2024-06-11
|
No data
|
SPRAGUE AVENUE, FROM STREET AMBOY ROAD TO STREET SANFORD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit check > 20 YD CONTAINER ON SITE
|
2024-06-10
|
No data
|
53 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done for property in compliance width of roadway:30ft width of milled area:20ft Length of milled area: 45ft 6in Depth of milled area: 3in
|
2024-06-10
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
4' wide pedestrian ramp approved on 3/20/24, forgot to update DASH.
|
2024-06-09
|
No data
|
SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Bpp done in compliance
|
2024-06-05
|
No data
|
DOLE STREET, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
3rd time coming to BPP issues with start of milling Roadway has been milled curb to curb (158’ x 14’ x 3in) paving to commence now…
|
2024-06-04
|
No data
|
45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done for property in compliance
|
2024-05-31
|
No data
|
WOODVALE AVENUE, FROM STREET EXCELSIOR AVENUE TO STREET SHADYSIDE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/walk flags & d/way apron
|
2024-05-30
|
No data
|
WOODROW ROAD, FROM STREET BELFIELD AVENUE TO STREET EVERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/walk flags installed
|
2024-05-30
|
No data
|
RICHARD AVENUE, FROM STREET FLOWER AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2024-05-25
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Southwest corner. Failed to install a 5' wide ramp per the approved BPP drawings, 4' wide not acceptable per BPP. Notified on 1/19/24 - CAR# 20246890018. Condition remains the same.
|
2024-05-25
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Must correct excessive landing running slope of (5.8%) not to exceed 2% as per H-1011-1 note #8 (Table 1) and H-1011-2 Case C1.
|
2024-05-25
|
No data
|
WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET LENEVAR AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON RWY-OK
|
2024-05-25
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must correct excessive landing running slope of (5.8%) not to exceed 2% as per H-1011-1 note #8 (Table 1) and H-1011-2 Case C1.
|
2024-05-23
|
No data
|
GOFF AVENUE, FROM STREET AMBOY ROAD TO STREET VOGEL PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2024-05-22
|
No data
|
ELMBANK STREET, FROM STREET KING STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SW1 corner has been re-constructed and found to be ADA compliant. Permit# S042023131A10 exp: 6/6/23. M&C on 8/2/23. No further action is needed.
|
2024-05-21
|
No data
|
LORETTO STREET, FROM STREET BILLOP AVENUE TO STREET CLERMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
52’ x 20’ AREA OF R/WAY IS MILLED OUT, DOWN 3”. *** checking for bpp milling depth as per @sihiqa ***
|
2024-05-21
|
No data
|
MAIN STREET, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2024-05-21
|
No data
|
MAIN STREET, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/walk flags & apron
|
2024-05-19
|
No data
|
WHITE PLAINS ROAD, FROM STREET GLEASON AVENUE TO STREET WESTCHESTER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in place
|
2024-05-19
|
No data
|
WESTCHESTER AVENUE, FROM STREET LELAND AVENUE TO STREET WHITE PLAINS ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in place
|
2024-05-17
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 54 STREET TO STREET 55 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done under this permit. Work done under permit #B012024008B52 exp. 2/6/2024.
|
2024-05-16
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Northeast corner. Failed to install a 5' wide ramps per the approved BPP & H-1011 standard detail drawings, 4' not acceptable. Notified on 1/8/24 - CAR# 20246890007. Condition remains the same.
|
2024-05-16
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 54 STREET TO STREET 55 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New steel face curb installed, pass.
|
2024-05-16
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner. Must install a 5' wide ramps per the approved BPP & H-1011 standard detail drawings, 4' not acceptable.
|
2024-05-15
|
No data
|
RADIGAN AVENUE, FROM STREET DEAD END TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2024-05-15
|
No data
|
54 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done under this permit. Work done under permit #B012024008B44 exp. 2/6/2024.
|
2024-05-15
|
No data
|
54 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done under this permit. Work was done under permit #B012024008B43 exp. 2/6/2024.
|
2024-05-07
|
No data
|
NORWAY AVENUE, FROM STREET APPLEBY AVENUE TO STREET NUGENT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 61'X27' of roadway milled down 3". BPP acceptable for paving.
|
2024-05-04
|
No data
|
MAIN STREET, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE WAS DONE AT NEW BUILDING-OK
|
2024-05-03
|
No data
|
WOODVALE AVENUE, FROM STREET EXCELSIOR AVENUE TO STREET SHADYSIDE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > 20 YD CONTAINER ON SITE
|
2024-05-02
|
No data
|
56 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent has closed off the entire roadway to traffic, with orange cones and "ROAD CLOSED" sign. Failed to comply with stipulation 023, Maintain one 11 foot lane for traffic. Cited permit used for ID.
|
2024-04-30
|
No data
|
54 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Wooden forms have been removed off sidewalk.
|
2024-04-27
|
No data
|
TURF ROAD, FROM STREET NOME AVENUE TO STREET STEPNEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON RWY-OK
|
2024-04-25
|
No data
|
TILSON PLACE, FROM STREET BUTLER PLACE TO STREET KALTENMEIER LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW RE-PAVE 96 FEET CURB TO CURB - WAS NYC DOT NOTIFIED FOR MILLING INSPECTION? REQUEST FOR INFORMATION WAS MADE-BRUNO#451
|
2024-04-24
|
No data
|
ALTER AVENUE, FROM STREET LACONIA AVENUE TO STREET MASON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY MILLED FOR RE-PAVE A PASS- TOTAL WIDTH OF ROADWAY= 33 FEET; TOTAL LENGTH OF MILLED ROADWAY=49 FEET X TOTAL WIDTH OF MILLED ROADWAY= 23 FEET X TOTAL DEPTH OF MILLED ROADWAY= 2-3 INCHES-OK -BPP WORK AT NEW BUILDING
|
2024-04-23
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent restored a new left flare on the Southwest corner without an active pedestrian ramp 410 permit on file. Permit S042023037A04 expired on 3/7/23. Upon re-inspection no ped ramp permit on file. (DG4 NOV issued as per Kerry).
|
2024-04-19
|
No data
|
16 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent had the street closed with barrel cones. Respondent is in violation of stipulation #023 MAINTAIN ONE 11 FOOT LANE FOR TRAFFIC. Cited permit used for ID.
|
2024-04-18
|
No data
|
RICHARD AVENUE, FROM STREET FLOWER AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 64'9"X25' of roadway milled down 3". BPP acceptable.
|
2024-04-17
|
No data
|
GOFF AVENUE, FROM STREET AMBOY ROAD TO STREET VOGEL PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 59'6" X 18' of roadway milled curb to curb. BPP acceptable.
|
2024-04-15
|
No data
|
CORBIN AVENUE, FROM STREET BARLOW AVENUE TO STREET COUNTRY WOODS LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
78’ x 40’ AREA OF R/WAY IS MILLED OUT, DOWN 3” *** CHECKING FOR BPP MILLING DEPTH AS PER @SIHIQA ***
|
2024-04-12
|
No data
|
SOUTH BRIDGE STREET, FROM STREET ARTHUR KILL ROAD TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable
|
2024-04-12
|
No data
|
RICHMOND VALLEY ROAD, FROM STREET MADSEN AVENUE TO STREET WEINER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2024-04-11
|
No data
|
AMBOY ROAD, FROM STREET FISHER AVENUE TO STREET WOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 154'2"X30' of roadway milled curb to curb. BPP acceptable for paving.
|
2024-04-10
|
No data
|
TYSENS LANE, FROM STREET HYLAN BOULEVARD TO STREET PRIMROSE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED. ALONG PROPERTY LINE OF STARBUCKS.
|
2024-04-08
|
No data
|
GRANTWOOD AVENUE, FROM STREET RATHBUN AVENUE TO STREET RENSSELAER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
10yd container placed along the p/l
|
2024-04-08
|
No data
|
BOMBAY STREET, FROM STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
crew on site. 78'X27' of r/w milled on side of #7 Radigan Ave. Street was a dead end and inaccessible to cars, now will be open. Crew dropping gravel and will continue to paving.
|
2024-04-05
|
No data
|
FLATBUSH AVENUE, FROM STREET AVENUE T TO STREET EAST 53 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W repaired, (next to Food Universe Supermarket).
|
2024-04-02
|
No data
|
EXETER STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Respondent complete1/2+5 paving restoration without making notification 4 hours prior. Street was paved at sited location. Respondent failed to comply with stipulation: 1/2+5 - PERMITTEE IS REQUIRED TO EMAIL THE NYC DOT HIQA BOROUGH OFFICE
|
2024-04-02
|
No data
|
AVENUE U, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner is functional & accessible. We’ll measure at a later date due to weather conditions (rain).
|
2024-04-02
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2024-03-29
|
No data
|
54 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by bpp
|
2024-03-29
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 54 STREET TO STREET 55 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by bpp
|
2024-03-29
|
No data
|
54 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP on fort Hamilton parkway.
|
2024-03-28
|
No data
|
57 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP
|
2024-03-27
|
No data
|
MEMPHIS AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP Paved curb to curb
|
2024-03-26
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2024-03-26
|
No data
|
LESTER STREET, FROM STREET JOSEPHINE STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The roadway was resurfaced by DOT.
|
2024-03-26
|
No data
|
WEST STREET, FROM STREET AVENUE U TO STREET WHITNEY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by bpp
|
2024-03-21
|
No data
|
BARLOW AVENUE, FROM STREET CORBIN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work observed from ADVANCED SITE CONTRACTORS INC within intersection. No need for ped ramp permit.
|
2024-03-21
|
No data
|
CORBIN AVENUE, FROM STREET COUNTRY WOODS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed tangent ramps, ADA compliant. ADVANCED SITE CONTRACTORS INC. Measured and collected today on 3/21/24. No action taken.
|
2024-03-20
|
No data
|
WOOLLEY AVENUE, FROM STREET GARRISON AVENUE TO STREET LATHROP AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2024-03-20
|
No data
|
EAST 2 STREET, FROM STREET AVENUE X TO STREET AVENUE Y
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP
|
2024-03-16
|
No data
|
54 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent failed to repair CAR #20246780080 issued on 2/7/2024. Respondent failed to remove wood forms, adjacent to newly installed sidewalk flags, upon expiration of permit. Cited permit used for ID.
|
2024-03-15
|
No data
|
HYLAN BOULEVARD, FROM STREET RENO AVENUE TO STREET TYSENS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/walk flags & d/way apron. I/f/o starbucks
|
2024-03-14
|
No data
|
EXETER STREET, FROM STREET ESPLANADE TO STREET ORIENTAL BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP complete width of roadway: 30 feet. Width of milled area: 25 feet. Length of milled area: 65 feet. Depth of milled area: 3 inches
|
2024-03-12
|
No data
|
13 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway was 29’ 10” Width milled is 29’ 10” & Length milled is 27' 10” & Depth is 2.5" before reaching the concrete base. Foreman on site.
|
2024-03-08
|
No data
|
3 AVENUE, FROM STREET EAST 153 STREET TO STREET EAST 154 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started at time of inspection
|
2024-03-08
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quad are accessible and functional but not Ada compliant. Measured and collected in Prism on 3/7/22.
|
2024-03-04
|
No data
|
SOUTH BRIDGE STREET, FROM STREET ARTHUR KILL ROAD TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
102’ x 34’ area of r/way was milled out, down 3”. *** checking for \bpp milling depth as per sihiqa ***
|
2024-03-04
|
No data
|
RICHMOND VALLEY ROAD, FROM STREET MADSEN AVENUE TO STREET WEINER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
267’ x 31’ AREA OF R/WAY WAS MILLED OUT, DOWN 3”. *** CHECKING FOR BPP MILLING DEPTH AS PER SIHIQA ***
|
2024-03-04
|
No data
|
TYSENS LANE, FROM STREET HYLAN BOULEVARD TO STREET PRIMROSE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED. ALONG PROPERTY LINE OF STARBUCKS.
|
2024-03-01
|
No data
|
AVENUE U, FROM STREET EAST 1 STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New Sidewalk flags and curb installed expansion joints sealed.
|
2024-03-01
|
No data
|
WEST STREET, FROM STREET AVENUE U TO STREET WHITNEY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags installed expansion joints sealed.
|
2024-03-01
|
No data
|
AVENUE U, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP
|
2024-02-29
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. EXPANSION JOINTS & SEALER APPLIED.@ #106
|
2024-02-28
|
No data
|
DRAKE AVENUE, FROM STREET MANOR ROAD TO STREET SMITH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
10 cubic yard refuse container on location
|
2024-02-27
|
No data
|
WEST STREET, FROM STREET AVENUE U TO STREET WHITNEY PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass
|
2024-02-27
|
No data
|
AVENUE U, FROM STREET WEST STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass
|
2024-02-27
|
No data
|
AVENUE U, FROM STREET EAST 1 STREET TO STREET WEST STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass.
|
2024-02-22
|
No data
|
SKILLMAN STREET, FROM STREET DE KALB AVENUE TO STREET WILLOUGHBY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Bpp inspection in compliance for property 212 skillman st roadway milled & paved half+5’ in compliance
|
2024-02-21
|
No data
|
CHANDLER AVENUE, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE WAS DONE BUT WAS IT CALLED IN ? AT NEW BUILDING
|
2024-02-21
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Per inspection on 1/30/2024, plastic has been removed
|
2024-02-18
|
No data
|
4 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Only one single ramp installed in the SE4 corner quadrant at the time of inspection. Restore ramps and missing elements.
|
2024-02-16
|
No data
|
4 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Inspector will return to measure Se4 corner, f/o 968 4 Ave
|
2024-02-14
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2024-02-14
|
No data
|
WEST STREET, FROM STREET AVENUE U TO STREET WHITNEY PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work was done on roadway
|
2024-02-12
|
No data
|
46 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
area in compliance wuth bpp
|
2024-02-12
|
No data
|
VICTORY BOULEVARD, FROM STREET PERRY AVENUE TO STREET QUINLAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk excavated crew on site working walkway provided against the property.
|
2024-02-09
|
No data
|
HOPE STREET, FROM STREET BQE WB ENTRANCE METROPOLITAN AVE TO STREET HAVEMEYER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a completed BPP at a work site. Respondent failed to comply with OCMC stipulation 1/2 + 5 HIQA to notify DOT 4 hours before completion of work. Roadway was to be paved by 1 pm, paving completed by this time. Respondent ID by cited permit.
|
2024-02-07
|
No data
|
54 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Construction of a new sidewalk was completed and is clear for pedestrians to walk, in front of 998 54 Street.
|
2024-02-07
|
No data
|
54 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Construction of a new sidewalk was completed and is clear for pedestrians to walk, in front of 998 54 Street.
|
2024-02-06
|
No data
|
FT HAMILTON PARKWAY, FROM STREET 54 STREET TO STREET 55 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No work started. No work done. No inspection found at this time of inspection.
|
2024-02-06
|
No data
|
54 STREET, FROM STREET 9 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No work started. No work done. No inspection found at this time of inspection.
|
2024-02-06
|
No data
|
54 STREET, FROM STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit. No work started. No work done. No inspection found at this time.
|
2024-02-03
|
No data
|
SEACREST AVENUE, FROM STREET HYLAN BOULEVARD TO STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. EXPANSION JOINTS & SEALER APPLIED.
|
2024-02-03
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NE3 corner newly constructed single ramp, ADA compliant. Measured and collected today on 02/03/2024. No further action is needed.
|
2024-02-03
|
No data
|
ALVINE AVENUE, FROM STREET BENNETT AVENUE TO STREET TENAFLY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
MULTIPLE S/WALK FLAGS FOR NEW BUILDING. EXPANSION JOINTS & SEALER APPLIED.
|
2024-02-03
|
No data
|
TENNYSON DRIVE, FROM STREET OCEANIC AVENUE TO STREET SEACREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. EXPANSION JOINTS & SEALER APPLIED.
|
2024-02-01
|
No data
|
WOOLLEY AVENUE, FROM STREET GARRISON AVENUE TO STREET LATHROP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection:Roadway width 29’7”Roadway width milled 20’7”Milled down 3 inches.
|
2024-02-01
|
No data
|
MC KEE AVENUE, FROM STREET BEND TO STREET MANSION AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2024-01-31
|
No data
|
MEMPHIS AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
86 X 35’ AREA OF R/WAY IS MILLED OUT, DOWN 3” *** CHECKING FOR BPP MILLING DEPTH AS PER @STATENISLANDBPP ***
|
2024-01-31
|
No data
|
VULCAN STREET, FROM STREET NUGENT AVENUE TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site ready to pave, 40'6" X 27' of roadway milled down 3" for BPP.
|
2024-01-30
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, ADA compliant by the City. Measured and collected today on 5/31/23. No further action is needed. Receiving corner for 1 Gridley Ave (BPP approval).
|
2024-01-30
|
No data
|
EAST 2 STREET, FROM STREET AVENUE X TO STREET AVENUE Y
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP 3 inches and 1/2 + 5 milled.Width of roadway: 30 feet. Width of roadway milled: 21 feet. Length of milled area:41 feet. Depth of milled area: 3 inches
|
2024-01-30
|
No data
|
DELMAR AVENUE, FROM STREET STAFFORD AVENUE TO STREET VINELAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. EXPANSION JOINTS & SEALER APPLIED. *** ON SIDE OF 399 STAFFORD ***
|
2024-01-29
|
No data
|
BROWNING AVENUE, FROM STREET BOGERT AVENUE TO STREET PERU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT 147 BROWNING- OFF PERU STREET
|
2024-01-29
|
No data
|
GLEN AVENUE, FROM STREET BRIGHTON AVENUE TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags ok.
|
2024-01-29
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit acquired to repair a previously sunken area within a BPP restoration, in front of 1227 58 Street. Pass.
|
2024-01-26
|
No data
|
ANDREASE STREET, FROM STREET SCARBORO AVENUE TO STREET WATERVIEW COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE -OK
|
2024-01-26
|
No data
|
SCARBORO AVENUE, FROM STREET NEW LANE TO STREET ANDREASE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK
|
2024-01-26
|
No data
|
NEW LANE, FROM STREET SCARBORO AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE -OK
|
2024-01-24
|
No data
|
SOMMER AVENUE, FROM STREET GRAHAM AVENUE TO STREET SPEEDWELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No open container on site
|
2024-01-24
|
No data
|
CAMBRIA STREET, FROM STREET DEAD END TO STREET PIAVE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
re-pave-ok
|
2024-01-19
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp. Left flare has been corrected. M&C on 10/11/22.
|
2024-01-18
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp. Landing slope has been restored. Unable to remeasure the corner today. Corner is covered with Ice and snow. We will measure at a later date.
|
2024-01-18
|
No data
|
MINTURN AVENUE, FROM STREET ASHLAND AVENUE TO STREET BRADFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no container observed, permit updated S162024015A01
|
2024-01-18
|
No data
|
KENNETH PLACE, FROM STREET CORDELIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner newly constructed single ramp by City Contractor DIFAZIO INDUSTRIES LLC permit # S042022350A01. ADVANCED SITE CONTRACTORS INC. No longer responsible for the corner.
|
2024-01-18
|
No data
|
MINTURN AVENUE, FROM STREET ASHLAND AVENUE TO STREET BRADFORD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no container observed at time of inspection.
|
2024-01-16
|
No data
|
NEWBERRY AVENUE, FROM STREET BANK PLACE TO STREET WILSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE-OK
|
2024-01-11
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new s/w acceptable.
|
2024-01-11
|
No data
|
BYRNE AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The curb was installed in compliance.
|
2024-01-09
|
No data
|
TITUS AVENUE, FROM STREET EBBITTS STREET TO STREET INA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2024-01-08
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner. Must install a 5' wide ramps per the approved BPP & H -1011 standard detail drawings, 4' not acceptable. We will measure when the ramp is installed correctly.
|
2024-01-03
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY AREA PAVED VIA BPP
|
2024-01-03
|
No data
|
EBBITTS STREET, FROM STREET MILL ROAD TO STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2024-01-02
|
No data
|
WOODROW ROAD, FROM STREET BELFIELD AVENUE TO STREET EVERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags acceptable
|
2023-12-27
|
No data
|
MARATHON PARKWAY, FROM STREET 60 AVENUE TO STREET 61 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb installed in front of 60-14.
|
2023-12-19
|
No data
|
MC KEE AVENUE, FROM STREET BEND TO STREET MANSION AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOATAL WIDTH OF ROADWAY= 28 FEET X TOTAL WIDTH OF MILLED ROADWAY= 28 FEET (CURB TO CURB) X TOTAL LENGTH OF MILLED ROADWAY= 50 FEET X TOTAL DEPTH OF MILLED ROADWAY= 2-3 INCHES-OK
|
2023-12-18
|
No data
|
WOODROW ROAD, FROM STREET BELFIELD AVENUE TO STREET EVERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags are ok
|
2023-12-14
|
No data
|
CAMBRIA STREET, FROM STREET DEAD END TO STREET PIAVE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-12-14
|
No data
|
KING STREET, FROM STREET RIDGECREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
HALF OF INTERSECTION WAS RE-PAVED - BPP WORK FOR 52-60 RIDGECREST AVENUE-OK
|
2023-12-14
|
No data
|
PIAVE AVENUE, FROM STREET ARGONNE STREET TO STREET CAMBRIA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. EXPANSION JOINTS & SEALER APPLIED
|
2023-12-13
|
No data
|
37 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Unable to ascertain.
|
2023-12-12
|
No data
|
CROMWELL AVENUE, FROM STREET HANCOCK STREET TO STREET HENRY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-12-08
|
No data
|
TITUS AVENUE, FROM STREET EBBITTS STREET TO STREET INA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY=36 FEET X TOTAL LENGTH OF MILLED ROADWAY=104 FEET X TOTAL WIDTH OF MILLED ROADWAY= 27 FEET X DEPTH OF MILLED ROADWAY= 2-3 INCHES
|
2023-12-08
|
No data
|
EBBITTS STREET, FROM STREET MILL ROAD TO STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY=36 FEET X TOTAL LENGTH OF MILLED ROADWAY=111 FEET X TOTAL WIDTH OF MILLED ROADWAY= 33 FEET X DEPTH OF MILLED ROADWAY= 2-3 INCHES
|
2023-12-08
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY=36 FEET X TOTAL LENGTH OF MILLED ROADWAY=27 FEET X TOTAL WIDTH OF MILLED ROADWAY= 33 FEET X DEPTH OF MILLED ROADWAY= 2-3 INCHES
|
2023-12-07
|
No data
|
EBBITTS STREET, FROM STREET MILL ROAD TO STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD A CONSTRUCTION CONTAINER ON ROADWAY-WITHOUT A VALID DOT PERMIT TO DO SO. CONSTRUCTION EQUIPMENT ON STREET-NO PERMIT. DOT PERMIT#S012023340B01 EXPIRES 1231/23 & ADVANCED SITE CONTRACTORS INC.
|
2023-12-07
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON SITE SEALING EXPANSIONS ON 2 PEDESTRIAN RAMPS - EXPLAINED TO CREW NOV WAS ISSUED FOR CONTAINER ON ROADWAY -NO PERMIT- 2 PREVIOUS WARNINGS GIVEN AT OTHER LOCATIONS
|
2023-12-07
|
No data
|
KINGS HIGHWAY, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full sidewalk restoration in compliance
|
2023-12-05
|
No data
|
NEWBERRY AVENUE, FROM STREET BANK PLACE TO STREET WILSON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
45’ X 30’ AREA OF R/WAY IS MILLED OUT, DOWN 3” *** CHECKING FOR BPP MILLING DEPTH AS PER @SIHIQA ***
|
2023-12-04
|
No data
|
EAST 12 STREET, FROM STREET AVENUE R TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind
|
2023-12-04
|
No data
|
57 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 30 feetWidth of milled area: 20 feetLength of milled area: 44 feetDepth of milled area: 3 inchesContractor is in compliance with required BPP measurements, pass.
|
2023-11-30
|
No data
|
NEW LANE, FROM STREET SCARBORO AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
30’ x 25’ AREA OF R/WAY WAS MILLED OUT, DOWN 3” *** CHECKING FOR BPP MILLING DEPTH AS PER @SIHIQA ***
|
2023-11-30
|
No data
|
NEW LANE, FROM STREET DEAD END TO STREET SCARBORO AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
125’ x 25’ AREA OF R/WAY WAS MILLED OUT, DOWN 3” *** CHECKING FOR BPP MILLING DEPTH AS PER @SIHIQA ***
|
2023-11-30
|
No data
|
SCARBORO AVENUE, FROM STREET NEW LANE TO STREET ANDREASE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
125’ x 30’ area of r/way was milled out, down 3”. *** checking for bpp milling depth as per sihiqa ***
|
2023-11-30
|
No data
|
ANDREASE STREET, FROM STREET SCARBORO AVENUE TO STREET WATERVIEW COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
25’ X 20’ AREA OF R/WAY WAS MILLED OUT, DOWN 3” *** CHECKING FOR BPP MILLING DEPTH AS PER @SIHIQA ***
|
2023-11-29
|
No data
|
CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS & DRIVEWAY APRON-OK
|
2023-11-25
|
No data
|
HEBERTON AVENUE, FROM STREET ALBION PLACE TO STREET ANDERSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container placed on the roadway in compliance.
|
2023-11-24
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Northeast corner. Failed to correct excessive landing running slope 5.8% not to exceed 2% as per standard detail drawing H-1011-1 note #8 (Table 1). Notified on 10/7/22 - CAR# 20226890337. Condition remains the same.
|
2023-11-24
|
No data
|
HEBERTON AVENUE, FROM STREET ALBION PLACE TO STREET ANDERSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container placed on the roadway in compliance.
|
2023-11-21
|
No data
|
CAMBRIA STREET, FROM STREET DEAD END TO STREET PIAVE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled 101’x 25’ down 3in, findings sent to office
|
2023-11-21
|
No data
|
CAMBRIA STREET, FROM STREET PIAVE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled 29’ x 25’ down 3in, findings sent to office
|
2023-11-21
|
No data
|
WEBSTER AVENUE, FROM STREET 47 STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm restoration due to BPP
|
2023-11-21
|
No data
|
PIAVE AVENUE, FROM STREET ARGONNE STREET TO STREET CAMBRIA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled 63’x 29’ down 3in, findings sent to office
|
2023-11-17
|
No data
|
SCHUBERT STREET, FROM STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newer permit S042023136A27 on file
|
2023-11-17
|
No data
|
45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed
|
2023-11-16
|
No data
|
ST MARYS AVENUE, FROM STREET TILSON PLACE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2023-11-16
|
No data
|
TILSON PLACE, FROM STREET KALTENMEIER LANE TO STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS INSTALLED
|
2023-11-13
|
No data
|
HYLAN BOULEVARD, FROM STREET RENO AVENUE TO STREET TYSENS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB & SWK - AT FRONT ENTRANCE/EXIT TO NEW STARBUCKS OR OLD BURGER KING-OK
|
2023-11-13
|
No data
|
TYSENS LANE, FROM STREET HYLAN BOULEVARD TO STREET PRIMROSE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB & SWK - AT SIDE ENTRANCE/EXIT TO NEW STARBUCKS OR OLD BURGER KING-OK
|
2023-11-09
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no show of crew or roadway milled at time of inspection. Contractor needs to call in for new date/time.
|
2023-11-09
|
No data
|
GARRETSON AVENUE, FROM STREET HYLAN BOULEVARD TO STREET MAGNOLIA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 61'8"X15'9" of roadway milled down 3". At time of inspection crew has starting paving.
|
2023-11-06
|
No data
|
WILLOWBROOK ROAD, FROM STREET DEVENS STREET TO STREET HOME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container placed on the roadway in compliance.
|
2023-11-02
|
No data
|
BROWNING AVENUE, FROM STREET BOGERT AVENUE TO STREET PERU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb was installed
|
2023-10-27
|
No data
|
HENRY STREET, FROM STREET CARROLL STREET TO STREET SUMMIT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-10-26
|
No data
|
TARGEE STREET, FROM STREET ROME AVENUE TO STREET VENICE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB INSTALLED
|
2023-10-23
|
No data
|
BYRNE AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb to curb final restoration acceptable
|
2023-10-22
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
UNDER FURTHER REVIEW - DOT FAILED TO NOTIFY BUILDER OR RESPONDENT THAT SPEED HUMP WAS INSTALLED BY CITY AFTER BPP WORK WAS SUBMITTED - AS PER SI HIQA DOT MANAGEMENT
|
2023-10-13
|
No data
|
HYLAN BOULEVARD, FROM STREET RENO AVENUE TO STREET TYSENS LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW INSTALLING NEW SWIDEWALK AT OLD DEAD BURGER KING - 5 FEET OPEN CLEAR SWK
|
2023-10-05
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permit obtained S012023060a01
|
2023-10-04
|
No data
|
PUTNAM STREET, FROM STREET AMBOY ROAD TO STREET WHITE COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-09-27
|
No data
|
CROMWELL AVENUE, FROM STREET HANCOCK STREET TO STREET HENRY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-09-27
|
No data
|
KINGS HIGHWAY, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
Active permit B042023221A43 on file
|
2023-09-26
|
No data
|
BROWNING AVENUE, FROM STREET BOGERT AVENUE TO STREET PERU STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspection: roadway width 33’2”Roadway width milled 21’6”Milled down 3 and a half inches.
|
2023-09-21
|
No data
|
FOXHOLM STREET, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb to curb BPP acceptable.
|
2023-09-21
|
No data
|
LIGHTHOUSE AVENUE, FROM STREET BEND TO STREET WINDSOR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-09-21
|
No data
|
NIXON AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESURFACED - NEW SWK OK AT 120 -NEW BUILDING/HOUSE -BPP WORK - NP#S042023039A07
|
2023-09-20
|
No data
|
BERGLUND AVENUE, FROM STREET BEND TO STREET FIRTH ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed in compliance.
|
2023-09-20
|
No data
|
PARK STREET, FROM STREET ANDREWS AVENUE TO STREET PINEWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2023-09-18
|
No data
|
DEAD END, FROM STREET RADIGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp. We will come back at later date to inspect this corner. Dot in Prism is missing. I have reached out to Kerry.
|
2023-09-16
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20234510973(ISSUED6/27/23)-DURING RE-PAVING ROADWAY FOR NEW TOMPKINS PLAZA-RESPONDENT MILLED ROADWAY(11/2/21) REMOVING 1 OF 2 NYC DOT SPEED BUMPS IN THE ROADWAY-FAILED TO RESTORE
|
2023-09-15
|
No data
|
YETMAN AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is ok
|
2023-09-15
|
No data
|
RATHBUN AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2023-09-12
|
No data
|
KNESEL STREET, FROM STREET DEAD END TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w resurfaced BPP using this permit
|
2023-09-12
|
No data
|
RIDGECREST AVENUE, FROM STREET HYLAN BOULEVARD TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT 39-45 RIDGECREST AVENUE
|
2023-09-11
|
No data
|
LORETTO STREET, FROM STREET BILLOP AVENUE TO STREET SURF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP is ok
|
2023-09-08
|
No data
|
PRESTON AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK RWY AND SWK RESURFACED AT NEW BUILDING- NP#S012023195A35
|
2023-09-07
|
No data
|
STILLWELL AVENUE, FROM STREET AVENUE Z TO STREET SHORE PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of the property the sidewalk had been repaved leading into the back of the property, after speaking to the people that is renting the lot space, the owner will give me a call.
|
2023-08-30
|
No data
|
WARWICK AVENUE, FROM STREET BEND TO STREET WESTWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON RWY ON SIDE OF 220 WARWICK AVE-OK
|
2023-08-26
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent repaired/installed 15 feet x 2 feet of wearing course in roadway on Corrective Action Request#20234510940 (issued 6/18/2023)without the noted permit listed as required a 0135 permit type. RESTORATION WORK-NO PERMIT.
|
2023-08-25
|
No data
|
PARKINSON AVENUE, FROM STREET KRAMER STREET TO STREET LEDYARD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Full r/way was resurfaced via dot in house paving
|
2023-08-22
|
No data
|
FOREST ROAD, FROM STREET DALEMERE ROAD TO STREET DUTCHESS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2023-08-22
|
No data
|
VINCENT AVENUE, FROM STREET COVERLY STREET TO STREET DALTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Apron and 3 sidewalk flags area ok
|
2023-08-22
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2023-08-13
|
No data
|
CORTLANDT STREET, FROM STREET KRAMER PLACE TO STREET SHARRETT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance.
|
2023-08-09
|
No data
|
KINGS HIGHWAY, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed opening of street without DOT permit. Crew are breaking sidewalk for repair without DOT permit. Company Truck License Plate : NEW YORK 68160~MM COMMERCIAL use for identification purpose only
|
2023-08-09
|
No data
|
ALVINE AVENUE, FROM STREET BENNETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work started. No work done. Old existing ramp is functional & accessible.
|
2023-08-05
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20234510973(ISSUED6/27/23)-DURING RE-PAVING ROADWAY FOR NEW TOMPKINS PLAZA-RESPONDENT MILLED ROADWAY(11/2/21) REMOVING 1 OF 2 NYC DOT SPEED BUMPS IN THE ROADWAY-
|
2023-08-02
|
No data
|
ELMBANK STREET, FROM STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed ramps within the SW1 corner quadrant are Ada compliant. Measured and collected in prism on 8/2/23.
|
2023-07-29
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Entire area was permanently restored to grade, condition corrected. Permit #B012023173B22 exp. 7/21/2023, acquired to repair CAR.
|
2023-07-28
|
No data
|
RIDGECREST AVENUE, FROM STREET HYLAN BOULEVARD TO STREET KING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection. Paved prior to arrival. Width of roadway 27’6” Width milled 21’
|
2023-07-28
|
No data
|
PRESTON AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
37'6"X34'6" of r/w milled (curb to curb). BPP acceptable.
|
2023-07-25
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY= 57 FEET 4 LANES (OFF ECL AT 2153-2175 RICHMOND AVENUE)- TOTAL LENGTH OF MILLED ROADWAY 256 FEET X TOTAL WIDTH OF MILLED ROADWAY= 57 FEET X DEPTH OF MILLED ROADWAY= 2-3 INCHES-OK
|
2023-07-23
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVE THE ABOVE RESPONDENT HAS FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST #20234510940 (ISSUED 6/16/23.) RESPONDENT HAS FAILED TO RESTORE ROADWAY WITH PROPER WEARING COURSE IN-KIND.EXPIRED DOT PERMIT#S042022167A15 EXPIRED 3/30/23 USED FOR ID.
|
2023-07-21
|
No data
|
YETMAN AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb excavated - barricaded & 2 signs
|
2023-07-21
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New restoration to correct previous Sunken CAR on permit # B012020317E11. Borough was notified.
|
2023-07-20
|
No data
|
45 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP COMPLETE Width of roadway: 30’1Width milled: 20’Length milled: 42’6Depth milled: 3”
|
2023-07-20
|
No data
|
EVERETT AVENUE, FROM STREET FINLAY AVENUE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2023-07-19
|
No data
|
SCHUBERT STREET, FROM STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp, ADA compliant. Measured and collected today on 7/19/23. No further action is required.
|
2023-07-19
|
No data
|
FOREST ROAD, FROM STREET DALEMERE ROAD TO STREET DUTCHESS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. EXPANSION JOINTS & SEALER APPLIED
|
2023-07-17
|
No data
|
CROMWELL AVENUE, FROM STREET HANCOCK STREET TO STREET HENRY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-07-14
|
No data
|
HENRY STREET, FROM STREET CARROLL STREET TO STREET SUMMIT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 30 feetWidth of milled area: 30 feet (curb to curb)Length of milled area: 35 feetDepth of milled area: 3 inchesIn compliance with required BPP measurements, pass.
|
2023-06-30
|
No data
|
SEACREST AVENUE, FROM STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SW1 corner. Newer permit on file # S042023130A14, corner has been reconstructed. We will measure the corner under the new ped ramp permit.
|
2023-06-30
|
No data
|
SEACREST AVENUE, FROM STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, ADA compliant. Measured and collected today on 6/30/2023. No further action is required.
|
2023-06-29
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
(Re-inspection) Sunken area within BPP restoration was not repaired. However the contractor has acquired a permit for this location. Permit #B012023172B22 exp. 7/21/2023.
|
2023-06-28
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD UNPROTECTED TEMPORARY PEDESTRIAN WALKWAY ON ROADWAY AROUND 35 FEET OF EXCAVATING OF SIDEWAK;FAILED TO HAVE WEIGHTED BARRICADES/TIMBER BARRICADES ON ROADWAY-FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION 014 OF DOT
|
2023-06-28
|
No data
|
LESTER STREET, FROM STREET JOSEPHINE STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK ON SIDE OF NEW SHELL GAS STATION/DUNKIN DONUTS -OK
|
2023-06-27
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE NYC DOT ROADWAY MAINTENANCE SPEED BUMP (REMOVED DURING RE-PAVE WORK)AT 415 TOMPKINS AVENUE BETWEEN CHESTNUT AVENUE & SHAUGHNESSY LANE. PLEASE RESTORE LANE MARKING WORD "BUMP" ON ROADWAY.
|
2023-06-27
|
No data
|
LORETTO STREET, FROM STREET BILLOP AVENUE TO STREET SURF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-06-26
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAVED CURB TO CURB AT NEW SHELL GAS STATION OFF LESTER STREET
|
2023-06-23
|
No data
|
BENNETT AVENUE, FROM STREET ALVINE AVENUE TO STREET ARCHWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO BPP WAS DONE ON BENNET IN REGARDS TO THIS PERMIT
|
2023-06-23
|
No data
|
ALVINE AVENUE, FROM STREET BENNETT AVENUE TO STREET TENAFLY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-06-23
|
No data
|
ALVINE AVENUE, FROM STREET BENNETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO BPP WAS DONE IN INTERSECTION
|
2023-06-22
|
No data
|
DEAD END, FROM STREET RADIGAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
THIS PORTION OF R/WAY WITHIN ACTIVE B/OP
|
2023-06-22
|
No data
|
HEMLOCK STREET, FROM STREET CORRELL AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS PAVED VIA BPP
|
2023-06-22
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
will reissue CAR code 83 has been updated
|
2023-06-22
|
No data
|
BOMBAY STREET, FROM STREET CORRELL AVENUE TO STREET SHIEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2023-06-22
|
No data
|
RADIGAN AVENUE, FROM STREET DEAD END TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS PAVED VIA BPP
|
2023-06-22
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Must obtain 410 permit for the SE4 corner (for record purposes only). Corner has been reconstructed without 410 permit on record. Permit# S042023037A05 used for I.D only. NP CAR issued as per Charles Davis.
|
2023-06-22
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SE4, corner has been re-constructed. NP CAR will be issued to obtai a new 410 permit type for record purposes only ( as per Charles Davis).
|
2023-06-22
|
No data
|
CORTLANDT STREET, FROM STREET KRAMER PLACE TO STREET SHARRETT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed in compliance.
|
2023-06-22
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WA WAS PAVED VIA BPP
|
2023-06-21
|
No data
|
CENTER STREET, FROM STREET ANDREWS AVENUE TO STREET KENSICO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site. Milling/paving roadway.
|
2023-06-21
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
(15ft. x 6ft.) area within a roadway restoration is sunken down 2 1/2 inches. A CAR was previously issued on 6/16/2023 for this condition. (CAR #20236780363)
|
2023-06-20
|
No data
|
BYRNE AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE DONE CURB TO CURB
|
2023-06-19
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD UNPROTECTED TEMPORARY PEDESTRIAN WALKWAY ON ROADWAY AROUND 40 FEET OF NEW SIDEWALK FLAGS;FAILED TO HAVE FILLED/WEIGHTED BARRICADES/TIMBER BARRICADES ON ROADWAY-FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION 014
|
2023-06-18
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE REMOVE CONCRETE OVERLAY IN ROADWAY ALONG NEW DRIVEWAY APRON CURB & SAW CUT ROADWAY,SQUARE OFF & INSTALL WEARING COURSE&SEAL AND RESTORE ROADWAY IN KIND- IN FRONT 106 CHAMPLAIN AVENUE BETWEEN PLATT STREET & HYLAN BLVD.
|
2023-06-18
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
close CAR re-issue
|
2023-06-18
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent repaired white lane marking "S" (WORD STOP) on roadway on Corrective Action Request #20233340019 (issued 2/2/2023)without the noted permit listed as required a 0135 permit type. RESTORATION WORK-NO PERMIT.
|
2023-06-16
|
No data
|
GLASCOE AVENUE, FROM STREET GARRISON AVENUE TO STREET MAINE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
While no work was done in this segment, across the street leading to the dead end a 65' x 19' portion of the roadway is milled down 2-3 inches
|
2023-06-16
|
No data
|
GLASCOE AVENUE, FROM STREET MAINE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 20' x 22' portion of the roadway milled down 2-3" inches for BPP
|
2023-06-16
|
No data
|
MAINE AVENUE, FROM STREET GLASCOE AVENUE TO STREET WOOLLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 84' x 22' milled down 2-3 inches for BPP
|
2023-06-16
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Depression, in the driving lane, within a BPP restoration. A CAR was previously issued to NYC DEP but they protested the CAR and said their sewer is structurally sound.
|
2023-06-15
|
No data
|
BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP work done
|
2023-06-14
|
No data
|
RATHBUN AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
AREA OF R/WAY PAVED VIA BPP
|
2023-06-14
|
No data
|
AMBOY ROAD, FROM STREET AVIVA COURT TO STREET HOPPING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-06-12
|
No data
|
ELMBANK STREET, FROM STREET WOODS OF ARDEN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-06-12
|
No data
|
RETFORD AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-06-12
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB -OK AT BUILDING OPERATION OFF SAXON AVE OFF ECL
|
2023-06-08
|
No data
|
TENNYSON DRIVE, FROM STREET OCEANIC AVENUE TO STREET SEACREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-06-08
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS PAVED VIA BPP
|
2023-06-08
|
No data
|
WIMAN AVENUE, FROM STREET DRIGGS STREET TO STREET PRESLEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable
|
2023-06-06
|
No data
|
GELDNER AVENUE, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
10 cubic yard container on location
|
2023-06-04
|
No data
|
SOUTH STREET, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP IFO 10 South Street in compliance.
|
2023-06-04
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR re-inspection: NOV has been issued on 5/16/23
|
2023-06-03
|
No data
|
RADIGAN AVENUE, FROM STREET DEAD END TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2023-06-03
|
No data
|
BOMBAY STREET, FROM STREET CORRELL AVENUE TO STREET SHIEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CB WAS INSTALLED
|
2023-05-31
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp. Must remove plastic covering from DWS mat as per standard detail drawing H-1011-1 note #3 and Highway Specifications 4.13DWS. M&C on 5/31/2023. CAR issued.
|
2023-05-24
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NOV has been issued on 5/16/23
|
2023-05-19
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: NOV Re-Inspect
|
Department of Transportation
|
BPP was done on permit # S012023123A58.
|
2023-05-19
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done in compliance for 1 Gridley Ave
|
2023-05-19
|
No data
|
DEAD END, FROM STREET RADIGAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active work. Corner is located inside the chain link. We will inspect at a later date when the corner is ready for full inspection.
|
2023-05-18
|
No data
|
BEDFORD AVENUE, FROM STREET NORTH 5 STREET TO STREET NORTH 6 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP IN COMPLIANCE DIMENSIONS (S30’L20’xW27’xD3”)
|
2023-05-16
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I observed the above respondent repaired the condition(s) on CAR #20233340019, 2/2/2023 without the noted permit listed as required.
|
2023-05-13
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SIDEWALK FLAGS OK ON BOTH SIDES OF BUILDING OPERATION AT 2175 RICHMOND AVENUE (OLD BARNES & NOBLE - SOON TO BE SCHOOL.)-OK
|
2023-05-12
|
No data
|
WEBSTER AVENUE, FROM STREET 47 STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Width of Roadway: 24'3Width Milled: 17'4Length Milled: 43'5Depth Milled 3"
|
2023-05-11
|
No data
|
WIMAN AVENUE, FROM STREET DRIGGS STREET TO STREET PRESLEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-05-11
|
No data
|
CORTLANDT STREET, FROM STREET KRAMER PLACE TO STREET SHARRETT PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY= 28 FEET. TOTAL LENGTH OF RE-PAVED/MILLED ROADWAY=53 FEET X TOTAL WIDTH OF RE-PAVED/MILLED ROADWAY= 20 FEET X DEPTH OF MILLED ROADWAY=? INCHES-OK- MIX UP WITH APPOINTMENT TIME SENT TO INSPECTOR NO DATE SENT ON 5/10/23
|
2023-05-10
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
The restoration was properly resealed, condition corrected. The depression within the BPP restoration needs to be referred to NYC DEP.
|
2023-05-10
|
No data
|
CORTLANDT STREET, FROM STREET KRAMER PLACE TO STREET SHARRETT PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO MILLING WORK DONE- NO DATE ON E-MAIL SENT FROM OFFICE
|
2023-05-08
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway overdue for final. After completion of drop curb, concrete was replaced. Please restore roadway in kind (asphalt)
|
2023-05-05
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done in compliance with DOT specs.
|
2023-05-05
|
No data
|
BRADFORD AVENUE, FROM STREET LENEVAR AVENUE TO STREET MINTURN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS 7 D/WAY APRON
|
2023-05-04
|
No data
|
STEINWAY AVENUE, FROM STREET SAXON AVENUE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Stop sign ahead sign has been re-installed and dirt/grass skirt area was filled in with more dirt.
|
2023-05-03
|
No data
|
LORETTO STREET, FROM STREET BILLOP AVENUE TO STREET SURF AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
40’ X 24’ AREA OF R/WAY IS MILLED OUT, DOWN 3”. *** CHECKING FOR BPP MILLING DEPTH AS PER SIHIQA ***
|
2023-05-03
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
58'8"X23'9" of r/w milled. Paved upon arrival.
|
2023-05-02
|
No data
|
HEMLOCK STREET, FROM STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NE3 corner newly constructed single ramp (corner is inside the chain link fence). Unable to do a full inspection. We will come back and inspect at a later date when the work is completed.
|
2023-05-02
|
No data
|
WILLOWBROOK ROAD, FROM STREET JAFFE STREET TO STREET LATHROP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container on roadway- ok at building operation
|
2023-05-02
|
No data
|
GRIDLEY AVENUE, FROM STREET BRABANT STREET TO STREET CONTINENTAL PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP pass done in compliance
|
2023-05-02
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET HARBOR ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
the location on the permit was pulled in error, wrong segment. Permit supposed to state Brabant St between Gridley Ave & Union Ave.
|
2023-05-02
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done in compliance
|
2023-04-29
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET HARBOR ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NEW CURB EXPANSION JOIBNTS INSTALLED & RE-PAVE OK NP#S012023116A12- WRONG CROSS STREETS & RIGHT ADDRESS
|
2023-04-28
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD RE-PAVED 90 FEET X 2 FEET OF PROTECTED STREET(ROADWAY)ALONG NEW CURB(NO PERMIT ALSO-2 PERMITS ARE REQUIRED)-WITHOUT A VALID DOT PERMIT TO DO SO. RE-PAVE PROTECTED ROADWAY-NO PERMIT. EXPIRED DOT PERMIT#S012023026A23 EXPIRED
|
2023-04-28
|
No data
|
GRIDLEY AVENUE, FROM STREET BRABANT STREET TO STREET CONTINENTAL PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NEW CURB IN FRONT OF NEW BUILDINGS -HAS EXPANSIONS JOINTS INSTALLED & SEALED PROPERLY
|
2023-04-27
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Curb was redone by 51969 - J. MOLFINO MASONRY INC. permit# S012022306A71Roadway was resurfaced under BPP- permit# S012022306A72
|
2023-04-27
|
No data
|
STILLWELL AVENUE, FROM STREET AVENUE Z TO STREET SHORE PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started. No work done. No inspection found at this time.
|
2023-04-25
|
No data
|
TENNYSON DRIVE, FROM STREET OCEANIC AVENUE TO STREET SEACREST AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SEALER WAS APPLIED TO EXPANSION JOINTS
|
2023-04-21
|
No data
|
21 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition repaired Power Concrete (DDC subcontractors completed intersection B042023053A19) this contractor never took a 410 permit out.
|
2023-04-20
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NE3 corner. Failed to correct excessive landing running slope 5.7% not to exceed 2% as per standard detail drawing H-1011-1 note #8 (Table 1). Notified on 10/7/22 - CAR# 20226890337. Condition remains the same.
|
2023-04-20
|
No data
|
ELMBANK STREET, FROM STREET KING STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SE corner. Failed to correct excessive slopes not to exceed limits per H-1011-1 note #8 (Table 1). Excessive slopes include roadway counter (9.8-7.0), flare (10.8-15.0), landing slopes (4.0). Notified on 12/29/22- CAR# 20226860177. Condition remains.
|
2023-04-17
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint has been sealed
|
2023-04-17
|
No data
|
PARK STREET, FROM STREET ANDREWS AVENUE TO STREET PINEWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2023-04-15
|
No data
|
SEACREST AVENUE, FROM STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Southwest corner. Failed to correct landing running slope (4.2%) & landing cross slope (2.3%) not to exceed 2% per standard detail drawing H-1011-1 note #8 (Table 1) and H-1011-2 Case C1. Notified on 8/31/22 - CAR# 20226890255. Condition remains.
|
2023-04-13
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Area of roadway against curb has been filled in flush to grade with surrounding roadway
|
2023-04-13
|
No data
|
RICHARD AVENUE, FROM STREET FLOWER AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2023-04-12
|
No data
|
VAN BUREN STREET, FROM STREET CLINTON AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK AT 768 RICHMOND TERRACE -IS THIS REAR SIDE NEW BUILDING 249-255 VAN BUREN STREET - NOT IN DOB
|
2023-04-11
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2023-04-06
|
No data
|
43 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permanent restoration on the roadway needs to be re-sealed at 1622 43 St
|
2023-04-05
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Lane markings not restored
|
2023-04-05
|
No data
|
VICTORY BOULEVARD, FROM STREET LESTER STREET TO STREET SOUTH GANNON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SW1 corner newly constructed single ramp, non ADA compliant. Permit obtained # S042023037A04. Measured and collected on 11/9/22. Action has been taken on the ped ramp permit.
|
2023-04-04
|
No data
|
MAGUIRE AVENUE, FROM STREET MC BAINE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR pass. BPP re-sealed.
|
2023-04-03
|
No data
|
MASON BOULEVARD, FROM STREET HEMLOCK STREET TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work started
|
2023-04-03
|
No data
|
WIMAN AVENUE, FROM STREET DRIGGS STREET TO STREET PRESLEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
57'3"X18'3" of r/w milled. BPP acceptable for paving.
|
2023-04-03
|
No data
|
HEMLOCK STREET, FROM STREET CORRELL AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work started
|
2023-04-03
|
No data
|
RADIGAN AVENUE, FROM STREET DEAD END TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2023-04-03
|
No data
|
RICHMOND AVENUE, FROM STREET SI RAPID TRANSIT TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags & apron restored next to dunkin donuts.
|
2023-03-29
|
No data
|
HEMLOCK STREET, FROM STREET CORRELL AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed.
|
2023-03-25
|
No data
|
TILSON PLACE, FROM STREET KALTENMEIER LANE TO STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w to grade new building construction
|
2023-03-25
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
the roadway around the BPP was not resealed.
|
2023-03-25
|
No data
|
EAST 9 STREET, FROM STREET AVENUE I TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb in compliance
|
2023-03-25
|
No data
|
ST MARYS AVENUE, FROM STREET TILSON PLACE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w constructed and joints sealed
|
2023-03-25
|
No data
|
TILSON PLACE, FROM STREET BUTLER PLACE TO STREET KALTENMEIER LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w to grade new building construction
|
2023-03-23
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET CENTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP final restoration is acceptable
|
2023-03-22
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm BPP restoration
|
2023-03-21
|
No data
|
MC DONALD AVENUE, FROM STREET KINGS HIGHWAY TO STREET WOODSIDE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags in place and in compliance in front of TD Bank.
|
2023-03-20
|
No data
|
PLATTSBURG STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
The roadway was resurfaced for BPP
|
2023-03-20
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w resurfaced
|
2023-03-18
|
No data
|
KINGS HIGHWAY, FROM STREET LAKE STREET TO STREET MC DONALD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags sealed and in compliance. Located in the driveway of TD bank
|
2023-03-16
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w resurfaced BPP
|
2023-03-16
|
No data
|
MARATHON PARKWAY, FROM STREET 60 AVENUE TO STREET 61 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP to grade
|
2023-03-16
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w resurfaced BPP
|
2023-03-15
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, non ADA compliant. Must correct curb reveal 3/4” to 0”, left flare (10.5%). Measured & collected on 11/9/22 under Np# SNP2022313A05. CAR issued.
|
2023-03-15
|
No data
|
ROSE AVENUE, FROM STREET 3 STREET TO STREET 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. EXPANSION JOINTS & SEALER APPLIED.
|
2023-03-09
|
No data
|
RIDGEWOOD AVENUE, FROM STREET GENESEE AVENUE TO STREET PATTY COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Met with Paul onsite to go over patchwork issued CAR. Sent office my report
|
2023-03-09
|
No data
|
CROMWELL AVENUE, FROM STREET HANCOCK STREET TO STREET HENRY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w resurfaced BPP
|
2023-03-09
|
No data
|
IONIA AVENUE, FROM STREET BELFIELD AVENUE TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2023-03-09
|
No data
|
RIDGEWOOD AVENUE, FROM STREET GENESEE AVENUE TO STREET PATTY COURT
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Met with Paul from Advanced he stated the transition would've made a trip hazard from 219 Ridgewood Av sidewalk flag & apron being defective- he said he did it this way for public safety. Google map from Aug 2022 shows trip
|
2023-03-08
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Metal faced curb installed
|
2023-03-07
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Currently CAR issued to permit under post audit
|
2023-03-07
|
No data
|
JACQUES AVENUE, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. EXPANSION JOINTS & SEALER APPLIED.
|
2023-03-06
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET HARBOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-ISSUED AFTER MISTAKENLY VOIDED
|
2023-03-05
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET HARBOR ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE INSTALL EXPANSION JOINTS IN 80 FEET OF NEW CURB & TEMPORARY CURB RESTORATION IN ROADWAY-OVERDUE FOR FINAL- AT BRABANT STREET BETWEEN GRIDLEY AVENUE & UNION AVENUE. PLEASE PERMANENTLY RESTORE ROADWAY.
|
2023-03-04
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INSPECTOR OBSERVED CREW WORKING ON SIDEWALK ON 3/3/23
|
2023-03-04
|
No data
|
BRABANT STREET, FROM STREET GRIDLEY AVENUE TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD CUT 90 FEET OF A PROTECTED STREET(ROADWAY) TO INSTALL A NEW CURB -WITHOUT A VALID DOT PERMIT. CURB INSTALLATION IN PROTECTED STREET-NO PERMIT. EXPIRED DOT PERMIT #S012023026A23 EXPIRED 2/23/2023 WAS USED FOR ID ONLY.
|
2023-03-04
|
No data
|
GRIDLEY AVENUE, FROM STREET BRABANT STREET TO STREET CONTINENTAL PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE INSTALL EXPANSION JOINTS IN 80 FEET OF NEW CURB & TEMPORARY CURB RESTORATION IN ROADWAY-OVERDUE FOR FINAL- IN FRONT OF 1-7 GRIDLEY AVENUE between BRABANT STREET and CONTINENTAL PLACE. PLEASE PERMANENTLY RESTORE ROADWAY.
|
2023-03-04
|
No data
|
55 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP found on the roadway in compliance
|
2023-03-03
|
No data
|
CHAMPLAIN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PLATT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > 10 YD CONTAINER ON SITE
|
2023-03-02
|
No data
|
RADIGAN AVENUE, FROM STREET DEAD END TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2023-03-02
|
No data
|
TENNYSON DRIVE, FROM STREET OCEANIC AVENUE TO STREET SEACREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS ALONG D/AY AON IS VOID OF SEALE. LEASE ALY SEALE TO EXISTING EXANSION JOINTS. @ #472
|
2023-03-01
|
No data
|
STEINWAY AVENUE, FROM STREET SAXON AVENUE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Curb sealed
|
2023-02-25
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2023-02-25
|
No data
|
7 AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Street opening joints sealed.
|
2023-02-25
|
No data
|
RETFORD AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. EXPANSION JOINTS & SEALER APPLIED.
|
2023-02-24
|
No data
|
MAGUIRE AVENUE, FROM STREET MC BAINE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failed to re-seal wearing course for BPP.
|
2023-02-24
|
No data
|
CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. EXPANSION JOINTS & SEALER APPLIED.
|
2023-02-22
|
No data
|
WILSON AVENUE, FROM STREET BAYARD STREET TO STREET CHESEBROUGH STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Segment was resurfaced
|
2023-02-18
|
No data
|
CONNECTICUT STREET, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-02-18
|
No data
|
GRIDLEY AVENUE, FROM STREET BRABANT STREET TO STREET CONTINENTAL PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian walkway
|
2023-02-16
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR already issued to permit
|
2023-02-15
|
No data
|
GRIDLEY AVENUE, FROM STREET BRABANT STREET TO STREET CONTINENTAL PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk occupancy in compliance
|
2023-02-14
|
No data
|
HYLAN BOULEVARD, FROM STREET BUTLER BOULEVARD TO STREET RICHARD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new s/w installed.
|
2023-02-11
|
No data
|
AMBOY ROAD, FROM STREET AVIVA COURT TO STREET HOPPING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed.
|
2023-02-11
|
No data
|
BEACHVIEW AVENUE, FROM STREET DEAD END TO STREET IDLEASE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-02-11
|
No data
|
BEDFORD AVENUE, FROM STREET NORTH 5 STREET TO STREET NORTH 6 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No street paving work has been done at this time
|
2023-02-10
|
No data
|
AMBOY ROAD, FROM STREET AVIVA COURT TO STREET HOPPING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-02-08
|
No data
|
RIDGEWOOD AVENUE, FROM STREET GENESEE AVENUE TO STREET PATTY COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Driveway of 219 Ridgewood Av was (patched) partly restored during permits sidewalk repair of 221 Ridgewood av, patchwork is unacceptable & must be restored completely in kind along with curb & expansion joint/sealer
|
2023-02-04
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-02-04
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PLEASE SEAL EXPANSION JOINTS BETWEEN NEW SIDEWALK FLAGS & NEW CURB - IN FRONT OF 2175 RICHMOND AVENUE between DRAPER PLACE and TRAVIS AVENUE.
|
2023-02-03
|
No data
|
STEINWAY AVENUE, FROM STREET SAXON AVENUE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb joints were sealed
|
2023-02-02
|
No data
|
WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable
|
2023-02-02
|
No data
|
55 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Location: 1568 55th StreetPermit: B012023032A82Width of Roadway: 30’Width of milled area: 20’Length of milled area: 22’Depth of milled area:4”
|
2023-02-02
|
No data
|
LINDEN STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved by BPP
|
2023-02-02
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP has been paved- line markings need to be fully replaced where paving partly removed them. Stop and stop line closest to Natick
|
2023-02-01
|
No data
|
MARATHON PARKWAY, FROM STREET 60 AVENUE TO STREET 61 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site, roadway not fully milled, will return @ 10:30 as per QueensBase
|
2023-01-31
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Rwy BPP restoration missing sealer & depression at middle portion of restoration.
|
2023-01-30
|
No data
|
RICHMOND AVENUE, FROM STREET DRAPER PLACE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I OBSERVED RESPONDENT DOING CURB WORK HAD A 200 FOOT UNPROTECTED TEMPORARY PEDESTRIAN WALKWAY ON ROADWAY;FAILED TO HAVE FILLED/WEIGHTED BARRICADES OR TIMBER BARRICADES ON ROADWAY-FAILED TO ADHERE TO TERMS&CONDITIONS OF STIPULATION 014 OF DOT PERMIT
|
2023-01-29
|
No data
|
44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP final restoration acceptable
|
2023-01-29
|
No data
|
52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP final restoration acceptable
|
2023-01-28
|
No data
|
YETMAN AVENUE, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-01-28
|
No data
|
CREAMER STREET, FROM STREET HICKS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway was milled and paved at the intersection.
|
2023-01-28
|
No data
|
HICKS STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
1/2 + 5 feet of the roadway was milled and paved.
|
2023-01-28
|
No data
|
HICKS STREET, FROM STREET CREAMER STREET TO STREET LORRAINE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done, permit expired.
|
2023-01-28
|
No data
|
CLERMONT AVENUE, FROM STREET MANHATTAN STREET TO STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-01-27
|
No data
|
SCHUBERT STREET, FROM STREET DEAD END TO STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w resurfaced BPP
|
2023-01-25
|
No data
|
PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractors BPP roadway restoration found to be in compliance
|
2023-01-25
|
No data
|
RICHMOND VALLEY ROAD, FROM STREET MADSEN AVENUE TO STREET WEINER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-01-24
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-01-21
|
No data
|
TITUS AVENUE, FROM STREET INA STREET TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2023-01-17
|
No data
|
ARTHUR KILL ROAD, FROM STREET WINANT PLACE TO STREET WINANT LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-01-14
|
No data
|
MC BAINE AVENUE, FROM STREET MAGUIRE AVENUE TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2023-01-14
|
No data
|
MAGUIRE AVENUE, FROM STREET MC BAINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please reseal street opening joints.
|
2023-01-14
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY PAVED VIA BPP
|
2023-01-14
|
No data
|
MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2023-01-12
|
No data
|
SCHUBERT STREET, FROM STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, non ADA compliant. Must correct landing running slope of 2.8% not to exceed 2% per H-1011-2 detail A (Elevation View). Remove plastic cover on DWS. M&C on 1/12/23. CAR issued.
|
2023-01-11
|
No data
|
RADIGAN AVENUE, FROM STREET DEAD END TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permits work is for an area which was once behind the dead end (wooded area/lot) private property
|
2023-01-11
|
No data
|
FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY PAVED VIA BPP
|
2023-01-11
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-10
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK NEW DUNKIN DONUTS / SHELL GAS STATION PLAZA-OK
|
2023-01-10
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
ROADWAY BEING RESTORED TO GRADE- RE-PAVING CREW ON SITE
|
2023-01-10
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE CREW HAS VICTORY BLVD HAS 2 -11 FOOT LANES FOR TRAFFIC OPEN AT TIME OF INSPECTION - INCOMPLIANCE.
|
2023-01-10
|
No data
|
LESTER STREET, FROM STREET JOSEPHINE STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE CREW HAS VICTORY BLVD HAS 2 -11 FOOT LANES FOR TRAFFIC OPEN AT TIME OF INSPECTION - INCOMPLIANCE.
|
2023-01-10
|
No data
|
LESTER STREET, FROM STREET JOSEPHINE STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS ON BOTH SIDES OF NEW DUNKIN DONUTS / SHELL GAS STATION PLAZA-OK
|
2023-01-09
|
No data
|
LESTER STREET, FROM STREET JOSEPHINE STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY=36 FT; TOTAL LENGTH OF MILLED RWY= 150 FT- CURB TO CURB ; TOTAL WIDTH OF MILLED RWY=36 FT ; DEPTH OF MILLED RWY 2-3 INCHES-OK
|
2023-01-09
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY=40 FT; TOTAL LENGTH OF MILLED RWY= 83 FT- CURB TO CURB ; TOTAL WIDTH OF MILLED RWY=40 FT ; DEPTH OF MILLED RWY 2-3 INCHES-OK
|
2023-01-09
|
No data
|
LESTER STREET, FROM STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY=40 FT; TOTAL LENGTH OF MILLED RWY= 36 FT- CURB TO CURB ; TOTAL WIDTH OF MILLED RWY=40 FT ; DEPTH OF MILLED RWY 2-3 INCHES-OK
|
2023-01-07
|
No data
|
WEST 17 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Majority of restoration is covered by M152020310A53.
|
2023-01-07
|
No data
|
TRENTON COURT, FROM STREET HANK PLACE TO STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2023-01-07
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS PAVED VIA BPP
|
2023-01-07
|
No data
|
MEMO STREET, FROM STREET SEGUINE AVENUE TO STREET TRENTON COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS PAVED VIA BPP
|
2023-01-07
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-01-07
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY AREA WAS PAVED VIA BPP
|
2023-01-07
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2023-01-07
|
No data
|
ST JOHN'S AVENUE, FROM STREET ALTAVISTA COURT TO STREET WAGNER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP completed at this location
|
2023-01-07
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w resurfaced
|
2023-01-07
|
No data
|
TILSON PLACE, FROM STREET BUTLER PLACE TO STREET KALTENMEIER LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed that runs from t-intersection
|
2023-01-07
|
No data
|
HOLLY AVENUE, FROM STREET ELEANOR LANE TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY PAVED VIA BPP
|
2023-01-07
|
No data
|
TILSON PLACE, FROM STREET KALTENMEIER LANE TO STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2023-01-07
|
No data
|
7 AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Street opening joints need to be resealed in the roadway. In front of 116.
|
2023-01-06
|
No data
|
ELMBANK STREET, FROM STREET WOODS OF ARDEN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY AREA PAVED VIA BPP
|
2023-01-06
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2023-01-06
|
No data
|
SEACREST AVENUE, FROM STREET HYLAN BOULEVARD TO STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS SINCE PAVED VIA BPP *** CORNER PROPERTY ***
|
2023-01-05
|
No data
|
SEAVER AVENUE, FROM STREET QUINCY AVENUE TO STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS PAVED VIA BPP
|
2023-01-05
|
No data
|
WOODS OF ARDEN ROAD, FROM STREET BATHGATE STREET TO STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2023-01-05
|
No data
|
ST JOHNS AVENUE, FROM STREET BAY STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP was done
|
2023-01-05
|
No data
|
IONA STREET, FROM STREET QUINCY AVENUE TO STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY PAVED VIA BPP
|
2023-01-03
|
No data
|
EAST 28 STREET, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DOT paved the segment
|
2022-12-29
|
No data
|
ANDREWS AVENUE, FROM STREET NATICK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE OF INTERSECTION OK
|
2022-12-29
|
No data
|
ELMBANK STREET, FROM STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Active permit. No work started. No new work done. Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Measured & collected in Prism 7/15/22. Excessive elements remain the same at this time of inspection.
|
2022-12-28
|
No data
|
WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspection Roadway has just been milled today.Roadway width 37’10”Roadway width milled 30’7”Milled down 3 inches.
|
2022-12-27
|
No data
|
MORTON STREET, FROM STREET CENTER STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS & DRIVEWAY APRON AT 45-OK
|
2022-12-23
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2022-12-20
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 41' x 22 portion of the roadway milled down 3"
|
2022-12-20
|
No data
|
ARDSLEY STREET, FROM STREET ANDREWS AVENUE TO STREET KENSICO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 104' x 41 portion of the roadway milled down 3"
|
2022-12-20
|
No data
|
NATICK STREET, FROM STREET ANDREWS AVENUE TO STREET CONNOR AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 233' x 22 portion of the roadway milled down 3"
|
2022-12-20
|
No data
|
ANDREWS AVENUE, FROM STREET NATICK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 22' x 20 portion of the roadway milled down 3"
|
2022-12-20
|
No data
|
ANDREWS AVENUE, FROM STREET ARDSLEY STREET TO STREET NATICK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 223' x 22 portion of the roadway milled down 3"
|
2022-12-20
|
No data
|
WILLOWBROOK ROAD, FROM STREET JAFFE STREET TO STREET LATHROP AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Container on roadway has proper permit, no action taken.
|
2022-12-19
|
No data
|
WIELAND AVENUE, FROM STREET FOSTER ROAD TO STREET WOODROW ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been paved in front.
|
2022-12-16
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-12-15
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
MULTIPLE S/WALK FLAGS
|
2022-12-12
|
No data
|
WILLOWBROOK ROAD, FROM STREET JAFFE STREET TO STREET LATHROP AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON ROADWAY - EXPIRES 12/12/22- AT BUILDING OPERATION
|
2022-12-10
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
COBBLESTONE CURB OK & ROADWAY RE-PAVED OK
|
2022-12-10
|
No data
|
CLIFFWOOD AVENUE, FROM STREET DEAD END TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
COBBLESTONE CURB OK & ROADWAY RE-PAVED OK
|
2022-12-08
|
No data
|
ROSE AVENUE, FROM STREET 3 STREET TO STREET 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site scoring sidewalk in kind with existing sidewalk.
|
2022-12-07
|
No data
|
SINCLAIR AVENUE, FROM STREET DEAD END TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk
|
2022-12-06
|
No data
|
ROSE AVENUE, FROM STREET 3 STREET TO STREET 4 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done active S042022322A63 on file.
|
2022-12-03
|
No data
|
FOXHOLM STREET, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK
|
2022-11-30
|
No data
|
21 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permit on file #B042022322A47. Work done by DDC - HWPR20K2
|
2022-11-30
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Appears concrete was removed & sealed with AC
|
2022-11-30
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NE3 corner newly constructed single ramp, non ADA compliant. Must correct landing running slope of (5.7%) not to exceed 2%. Measured and collected today on 10/7/2022. No TIF on file.
|
2022-11-30
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Left flare within the SE4 corner quadrant has been corrected. Unable to remeasure at this time due to rain. We’ll measure at a later date.
|
2022-11-30
|
No data
|
SEACREST AVENUE, FROM STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Southwest corner. Failed to correct landing running slope (4.2%) & landing cross slope (2.3%) not to exceed 2% per standard detail drawing H-1011-1 note #8 (Table 1) and H-1011-2 Case C1. Notified on 8/31/22 - CAR# 20226890255. Condition remains.
|
2022-11-29
|
No data
|
BYRNE AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints have been sealed
|
2022-11-25
|
No data
|
GENESEE AVENUE, FROM STREET STANLEY CIRCLE TO STREET STANLEY CIRCLE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS & DRIVEWAY APRON-OK
|
2022-11-24
|
No data
|
FLATBUSH AVENUE, FROM STREET AVENUE L TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed and in compliance
|
2022-11-22
|
No data
|
FLATBUSH AVENUE, FROM STREET AVENUE L TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb installed
|
2022-11-16
|
No data
|
TRAVIS AVENUE, FROM STREET KELLY BOULEVARD TO STREET EVANS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS OK
|
2022-11-14
|
No data
|
27 AVENUE, FROM STREET BATH AVENUE TO STREET HARWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk in compliance
|
2022-11-13
|
No data
|
RICHMOND AVENUE, FROM STREET SI RAPID TRANSIT TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS AT DUNKIN DONUTS -OK
|
2022-11-10
|
No data
|
STEINWAY AVENUE, FROM STREET SAXON AVENUE TO STREET TRAVIS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS AT REAR OF BUILDING OPERATION-OK
|
2022-11-09
|
No data
|
VICTORY BOULEVARD, FROM STREET LESTER STREET TO STREET SOUTH GANNON AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent has constructed a new pedestrian ramp in the southeast corner without the correct 410 pedestrian ramp permit on record. Permit # S042022250A19 used for I.D purposes only. (AKA 1842 Victoy Blvd)
|
2022-10-27
|
No data
|
CROMWELL AVENUE, FROM STREET HANCOCK STREET TO STREET HENRY PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-10-26
|
No data
|
BYRNE AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please remove caps and seal expansion joints.
|
2022-10-24
|
No data
|
RICHMOND VALLEY ROAD, FROM STREET MADSEN AVENUE TO STREET WEINER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled (233’5x31’) down 3in, crew onsite setting up to start paving. Sent office pics & measurements
|
2022-10-22
|
No data
|
RICHMOND AVENUE, FROM STREET SI RAPID TRANSIT TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
RWY RESTORED WITHOUT PERMIT NOV WAS WRITTEN DQ9
|
2022-10-22
|
No data
|
RICHMOND AVENUE, FROM STREET SI RAPID TRANSIT TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I OBSERVED RESPONDENT HAD INSTALLED PERMANENT (L) 29 FEET X (W) 2 FEET RESTORATION IN ROADWAY-WITHOUT NEW VALID DOT PERMIT AFTER RECEIVING CORRECTIVE ACTION REQUEST#20224511025 ON 9/18/22-A VIOLATION OF SECTION/RULE 34 RCNY 2-02(d)(6)OF HIGHWAY RULES
|
2022-10-21
|
No data
|
BYRNE AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 41 x 34 portion of the roadway milled down 3" for BPP
|
2022-10-21
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
60’ x 22’ AREA OF R/WAY WAS MILLED OUT, DOWN 3”. *** CHECKING FOR BPP MILLING DEPTH AS PER SIHIQA ***
|
2022-10-20
|
No data
|
ARDEN AVENUE, FROM STREET SHELDON AVENUE TO STREET SINCLAIR AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB AT NEW BUILDING-BPP WORK-OK
|
2022-10-19
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joint was properly sealed -ok will re-issue car for concrete overlay at curb in driveway
|
2022-10-19
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE REMOVE CONCRETE OVERLAY ON ROADWAY AT NEW CURB INSTALLED IN DRIVEWAY-(SAW CUT ROADWAY, SQUARE OFF CUTS) AND INSTALL WEARING COURSE, RESTORE ROADWAY IN-KIND ALONG DRIVEWAY/APRON CURB- AT 788 STAFFORD AVENUE between FOSTER ROAD and VERNON AVENUE
|
2022-10-18
|
No data
|
VIRGINIA AVENUE, FROM STREET TOMPKINS AVENUE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > CONTAINER ON SITE
|
2022-10-17
|
No data
|
KNESEL STREET, FROM STREET DEAD END TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 80 x 28 portion of the roadway milled down 3" for BPP
|
2022-10-16
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
TEMPORARY RESTORATION IN ROADWAY ALONG NEW DRIVEWAY CURB DOWN 2 INCHES & OVERDUE FOR FINAL- IN FRONT OF 120 WHITLOCK AVENUE between BEND and HELENA ROAD. PLEASE PERMANENTLY RESTORE ROADWAY.
|
2022-10-16
|
No data
|
HOME PLACE, FROM STREET DEAD END TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is ok
|
2022-10-16
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
WAIVER OF CURB ALIGNMENT & OF SIDEWALKS ON DRAWING IN NYC STREETS ON PERMIT# S012022103A30 ON BPP - GIVEN DOB
|
2022-10-13
|
No data
|
ARDEN AVENUE, FROM STREET SHELDON AVENUE TO STREET SINCLAIR AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
52'3"X32'6" of roadway milled (curb to curb), BPP acceptable.
|
2022-10-12
|
No data
|
CROMWELL AVENUE, FROM STREET HANCOCK STREET TO STREET HENRY PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK STARTED - BPP WORK
|
2022-10-12
|
No data
|
POMPEY AVENUE, FROM STREET LEVERETT AVENUE TO STREET STROUD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB AT CORNER BUILDING
|
2022-10-11
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp, non ADA compliant Must correct excessive left flare of 13.5% as per standard detail drawing H-1011-1 note #8 and H-1011-2 Case C1. M&C today on 10/11/22. CAR issued.
|
2022-10-08
|
No data
|
ROSE AVENUE, FROM STREET 3 STREET TO STREET 4 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work started.
|
2022-10-08
|
No data
|
VIRGINIA AVENUE, FROM STREET TOMPKINS AVENUE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > CONTAINER ON SITE
|
2022-10-07
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp. We will measure at a later date. No action taken.
|
2022-10-07
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed single ramp, non ADA compliant. Must correct landing running slope of 2.5% no to exceed 2%. Measured and collected today on 10/7/2022. No TIF on file CAR issued.
|
2022-10-05
|
No data
|
VIRGINIA AVENUE, FROM STREET TOMPKINS AVENUE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > 20 YD CONTAINER ON SITE
|
2022-10-05
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags are ok
|
2022-10-04
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is ok
|
2022-10-04
|
No data
|
BEACHVIEW AVENUE, FROM STREET DEAD END TO STREET IDLEASE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2022-10-04
|
No data
|
LESTER STREET, FROM STREET JOSEPHINE STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk installed in compliance
|
2022-10-04
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work was not done.
|
2022-10-01
|
No data
|
HOME PLACE, FROM STREET DEAD END TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2022-10-01
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-09-30
|
No data
|
ST JOHN'S AVENUE, FROM STREET ALTAVISTA COURT TO STREET WAGNER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 113' x 21' portion of the roadway milled down 3" for BPP
|
2022-09-30
|
No data
|
SCHUBERT STREET, FROM STREET DEAD END TO STREET ST JOHNS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 112' x 22' roadway milled down 3" for BPP
|
2022-09-28
|
No data
|
ROKEBY PLACE, FROM STREET BARD AVENUE TO STREET KISSEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2022-09-27
|
No data
|
VICTORY BOULEVARD, FROM STREET FAIRVIEW CEMETERY BOUNDARY TO STREET LESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed in compliance Shell G/S and Dunkin Donut.
|
2022-09-27
|
No data
|
LESTER STREET, FROM STREET JOSEPHINE STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed in compliance. Shell G/S.
|
2022-09-26
|
No data
|
WILLOWBROOK ROAD, FROM STREET CRAFTON AVENUE TO STREET FOREST HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installed in compliance.
|
2022-09-26
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is ok
|
2022-09-24
|
No data
|
RADCLIFF ROAD, FROM STREET BEND TO STREET BRIARCLIFF ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > 20 YD CONTAINER ON SITE
|
2022-09-20
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET MINERVA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2022-09-20
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2022-09-20
|
No data
|
BARLOW AVENUE, FROM STREET GREAVES AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS OK
|
2022-09-18
|
No data
|
RICHMOND AVENUE, FROM STREET SI RAPID TRANSIT TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS AT DUNKIN DONUTS -OK
|
2022-09-17
|
No data
|
MOBILE AVENUE, FROM STREET COVERLY STREET TO STREET DALTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON RWY AT 89 -OK
|
2022-09-17
|
No data
|
FIGUREA AVENUE, FROM STREET LOVELACE AVENUE TO STREET POMPEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS & NEW DRIVEWAY-OK
|
2022-09-16
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY= 30 FEET- TOTAL LENGTH OF MILLED ROADWAY 21 FEET X WIDTH OF MILLED ROADWAY 20 FEET X (D) 2-3 INCHES
|
2022-09-16
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY= 30 FEET- TOTAL LENGTH OF MILLED ROADWAY 52 FEET X WIDTH OF MILLED ROADWAY 20 FEET X (D) 2-3 INCHES
|
2022-09-16
|
No data
|
PLATTSBURG STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY= 30 FEET- TOTAL LENGTH OF MILLED ROADWAY 113 FEET X WIDTH OF MILLED ROADWAY 20 FEET X (D) 2-3 INCHES
|
2022-09-14
|
No data
|
ATLANTIC AVENUE, FROM STREET DEAD END TO STREET HENRY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO CONTAINER FOUND ON SITE
|
2022-09-14
|
No data
|
HYLAN BOULEVARD, FROM STREET BACHE AVENUE TO STREET BURBANK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w in front of Dunkin Donuts acceptable.
|
2022-09-13
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK HAS YET STARTED
|
2022-09-13
|
No data
|
MILES AVENUE, FROM STREET DEWEY AVENUE TO STREET KATAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER WAS REMOVED- DRIVEWAY INSTALLED ON SIDE OF 120 MILES AVENUE
|
2022-09-13
|
No data
|
CROMWELL AVENUE, FROM STREET PLATTSBURG STREET TO STREET RICHMOND ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK WAS YET STARTED AT LOCATION
|
2022-09-13
|
No data
|
PLATTSBURG STREET, FROM STREET CROMWELL AVENUE TO STREET GARRETSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK WAS YET TO START
|
2022-09-13
|
No data
|
3 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2022-09-09
|
No data
|
BANCROFT AVENUE, FROM STREET BEND TO STREET CLAWSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2022-09-09
|
No data
|
BURBANK AVENUE, FROM STREET CLAWSON STREET TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w on side of Dunkin Donuts acceptable.
|
2022-09-07
|
No data
|
MAYBERRY PROMENADE, FROM STREET BEND TO STREET STRAWBERRY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2022-09-07
|
No data
|
FOXHOLM STREET, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK AT NEW BUILDING/HOUSE- BPP WORK
|
2022-09-06
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, driveway apron & drop curb was replaced in kind:1-Expansion joint along the left side property line was never trimmed & sealed as the rest were done.2-Concrete over poured onto asphalt roadway.
|
2022-09-06
|
No data
|
MERRILL AVENUE, FROM STREET ARLENE STREET TO STREET FIRTH ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is ok
|
2022-09-05
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE SEAL EXPANSION JOINT BETWEEN SIDEWALK/DRIVEWAY FLAG & CURB- AT 120 WHITWELL AVENUE BETWEEN BEND & HELENA ROAD.
|
2022-09-03
|
No data
|
ELTINGVILLE BOULEVARD, FROM STREET CORYN COURT TO STREET WILSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK & DRIVEWAY -OK
|
2022-09-02
|
No data
|
SEACREST AVENUE, FROM STREET HYLAN BOULEVARD TO STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed.
|
2022-09-02
|
No data
|
TENNYSON DRIVE, FROM STREET OCEANIC AVENUE TO STREET SEACREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed.
|
2022-09-02
|
No data
|
CROWN AVENUE, FROM STREET ARDEN AVENUE TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE CURB TO CURB- BPP WORK
|
2022-09-01
|
No data
|
HOPE AVENUE, FROM STREET BELAIR LANE TO STREET HOME AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/walk flags
|
2022-09-01
|
No data
|
VIRGINIA AVENUE, FROM STREET TOMPKINS AVENUE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > 20 YD CONTAINER ON SITE
|
2022-08-31
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb install is ok
|
2022-08-31
|
No data
|
SEACREST AVENUE, FROM STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp, non ADA compliant. Must correct landing running slope, landing cross slope & remove plastic cover on DWS. Functional and accessible. Measured and collected today on 8/31/22. No TIF on file. CAR issued.
|
2022-08-30
|
No data
|
PUTNAM STREET, FROM STREET AMBOY ROAD TO STREET WHITE COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
As previous stated- area called in for BPP for today is privateNote: Wendy’s is closed & was done in connection to the resurfacing
|
2022-08-29
|
No data
|
VIRGINIA AVENUE, FROM STREET TOMPKINS AVENUE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER ON RWY AT 114-OK
|
2022-08-28
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
PORTION OF WORD "SCHOO" RESTORED- NYC DOT RRM RE-PAVED REST OF ROADWAY-OK
|
2022-08-27
|
No data
|
RICHARD AVENUE, FROM STREET FLOWER AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/walk flags
|
2022-08-25
|
No data
|
ZEBRA PLACE, FROM STREET ARTHUR KILL ROAD TO STREET VETERANS ROAD WEST
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS WERE RESEALED.
|
2022-08-22
|
No data
|
PUTNAM STREET, FROM STREET AMBOY ROAD TO STREET WHITE COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled out along private property of what was a dead end before Wendy’s was built
|
2022-08-21
|
No data
|
HOLLY AVENUE, FROM STREET ELEANOR LANE TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags are ok
|
2022-08-20
|
No data
|
37 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sw ok seal
|
2022-08-17
|
No data
|
HOLLY AVENUE, FROM STREET ELEANOR LANE TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed curb ok
|
2022-08-13
|
No data
|
BYRNE AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w installed
|
2022-08-11
|
No data
|
TENNYSON DRIVE, FROM STREET OCEANIC AVENUE TO STREET SEACREST AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk is in compliance.
|
2022-08-08
|
No data
|
SEACREST AVENUE, FROM STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection:Dimensions are 30’5” by 21’8”Milled down 3 inches
|
2022-08-08
|
No data
|
SEACREST AVENUE, FROM STREET HYLAN BOULEVARD TO STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection:Roadway width 32’Roadway width milled is 21’8’’Millled down 3 inches
|
2022-08-08
|
No data
|
EAST 9 STREET, FROM STREET AVENUE I TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind sealed and flush.
|
2022-08-08
|
No data
|
HOLLY AVENUE, FROM STREET ELEANOR LANE TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection:Roadway width 30’1’’Roadway has been milled curb to curbMilled down 3 and a half inches
|
2022-08-08
|
No data
|
TENNYSON DRIVE, FROM STREET OCEANIC AVENUE TO STREET SEACREST AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspection.Roadway width 30’5”Roadway has been milled curb to curb.Milled down 3 inches.
|
2022-08-03
|
No data
|
WOODS OF ARDEN ROAD, FROM STREET BATHGATE STREET TO STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection:Roadway width 52’5’’Roadway width milled 31’10”Milled down 3 inches
|
2022-08-03
|
No data
|
ELMBANK STREET, FROM STREET ARDEN AVENUE TO STREET KING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection:Roadway width 53’1”Roadway Width milled 31’8’’Milled down 3 inches
|
2022-08-03
|
No data
|
ELMBANK STREET, FROM STREET WOODS OF ARDEN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP Inspection:Roadway widths milled31’10’’x 31’8”Milled down 3 inches
|
2022-07-29
|
No data
|
WOODS OF ARDEN ROAD, FROM STREET BATHGATE STREET TO STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-07-23
|
No data
|
CITY BOULEVARD, FROM STREET BIRCH AVENUE TO STREET THAMES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW DRIVEWAY & SWK FLAGS -OK
|
2022-07-22
|
No data
|
21 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remains the same. Permittee failed to obtain a 410 permit and install red DWS on ramps in the SW1 corner. Ramps are functional and accessible.
|
2022-07-20
|
No data
|
MC CLEAN AVENUE, FROM STREET JEROME AVENUE TO STREET KENSINGTON AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
LANE MARKING WAS RESTORED-OK
|
2022-07-19
|
No data
|
EAST 9 STREET, FROM STREET AVENUE I TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kind sealed and flush.
|
2022-07-15
|
No data
|
ELMBANK STREET, FROM STREET KING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NW2 corner newly constructed tangent ramps, non ADA compliant (SW is elevated). Curb reveal 1/2” on ramp# 1, landing running, utility pole not isolated. Ramps functional, accessible. M&C today on 7/15/22. No action taken. Active permit.
|
2022-07-14
|
No data
|
CONEY ISLAND AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb installed
|
2022-07-14
|
No data
|
ELMBANK STREET, FROM STREET KING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NW2 corner newly constructed tangent ramps. Ramps are functional and accessible. We will measure at a later date.
|
2022-07-11
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE "SCH" OF WORD "SCHOOL" WHITE LANE MARKING OVER NEW RE-PAVE ROADWAY - AT CHESNUT AVENUE BETWEEN TOMPKINS AVENUE & ANDERSON AVENUE "AKA" 415 TOMPKINS AVENUE. (NOV# ISSUED 7/4/22-RE-ISSUE OF CORRECTIVE ACTION REQUEST.)
|
2022-07-11
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
RE-ISSUE CAR
|
2022-07-10
|
No data
|
MEMO STREET, FROM STREET SEGUINE AVENUE TO STREET TRENTON COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly installed sidewalk flags are ok
|
2022-07-09
|
No data
|
ZEBRA PLACE, FROM STREET ARTHUR KILL ROAD TO STREET VETERANS ROAD WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE/APPLY SEALER TO S/WALK EXPANSION JOINTS WHERE ITS HAS SINCE PEELED OFF. *** I/F/O SELF STORAGE FACILITY ***
|
2022-07-05
|
No data
|
ST JOHNS AVENUE, FROM STREET BAY STREET TO STREET WHITE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
76’X20’ of r/w milled. BPP acceptable.
|
2022-07-04
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20224510530-FAILED TO RESTORE "SCH" TO RESTORE WORD LANE "SCHOOL" LANE MARKING OVER NEW PERMANENT HALF PLUS 5 FEET RE-PAVED ROADWAY-A VIOLATION OF THE ABOVE SECTION/RULE OF
|
2022-07-01
|
No data
|
43 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
40x20 milled in compliance with bpp
|
2022-06-29
|
No data
|
TRENTON COURT, FROM STREET HANK PLACE TO STREET MEMO STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2022-06-29
|
No data
|
MEMO STREET, FROM STREET SEGUINE AVENUE TO STREET TRENTON COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2022-06-29
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed offset ramp in the SE4 corner quadrant is functional and accessible. Previously measured and collected, no date on file.
|
2022-06-29
|
No data
|
CLERMONT AVENUE, FROM STREET MANHATTAN STREET TO STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb was installed
|
2022-06-29
|
No data
|
WOODS OF ARDEN ROAD, FROM STREET BATHGATE STREET TO STREET ELMBANK STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site stips in compliance.
|
2022-06-27
|
No data
|
BEACON AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2022-06-25
|
No data
|
KENNETH PLACE, FROM STREET CORDELIA AVENUE TO STREET SHARROTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2022-06-25
|
No data
|
YETMAN AVENUE, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-06-25
|
No data
|
CORDELIA AVENUE, FROM STREET EVERETT PLACE TO STREET KENNETH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK PED RAMP
|
2022-06-23
|
No data
|
AMITY PLACE, FROM STREET WILCOX STREET TO STREET LUDWIG LANE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
CONTAINER WITH BIC #2888 IS STORED ON THE R/WAY WITH NO ACTIVE PERMIT ON RECORD.
|
2022-06-21
|
No data
|
POMPEY AVENUE, FROM STREET PETRUS AVENUE TO STREET ROCHELLE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CONTAINER ON SITE AT THIS TIME
|
2022-06-19
|
No data
|
NAUGHTON AVENUE, FROM STREET OLYMPIA BOULEVARD TO STREET PATTERSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags and driveway apron ok
|
2022-06-15
|
No data
|
RICHMOND AVENUE, FROM STREET SI RAPID TRANSIT TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Driveway apron replaced in kind, steel curb done under curb permit
|
2022-06-11
|
No data
|
TUTTLE STREET, FROM STREET DEAD END TO STREET DEVENS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2022-06-10
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-06-07
|
No data
|
MEMO STREET, FROM STREET SEGUINE AVENUE TO STREET TRENTON COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
111'X35'6" of r/w milled curb to curb- BPP acceptable.
|
2022-06-07
|
No data
|
TRENTON COURT, FROM STREET MEMO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
47'2"X26'8" of r/w miled. BPP acceptable.
|
2022-06-07
|
No data
|
TRENTON COURT, FROM STREET HANK PLACE TO STREET MEMO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
143'5"X20'5" of r/w milled. BPP acceptable.
|
2022-06-07
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
72’X37’8” of r/w milled (curb to curb). BPP acceptable.
|
2022-06-07
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
103'10"X24'6" of r/w milled. BPP acceptable.
|
2022-06-07
|
No data
|
VAN WYCK AVENUE, FROM STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
32'6"X25'6" of r/w milled. BPP acceptable.
|
2022-06-04
|
No data
|
NORTH RAILROAD AVENUE, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK OFF CORNER PROPERTY- BPP WORK
|
2022-06-04
|
No data
|
TRENTON COURT, FROM STREET HANK PLACE TO STREET MEMO STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MINI BOBCAT WITH “ADVANCED” MARKINGS ON IT IS STORED IN THIS R/WAY WITH NO PERMIT FOR THIS EQUIPMENT. NO ONE ON SITE.
|
2022-06-03
|
No data
|
MC CLEAN AVENUE, FROM STREET JEROME AVENUE TO STREET KENSINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE RESTORE WHITE LANE MARKING OVER NEW PERMANENT RE-PAVE AT Mc CLEAN AVENUE BETWEEN KENSINGTON AVENUE & JEROME AVENUE "AKA" 153 KENSINGTON AVENUE.
|
2022-06-01
|
No data
|
21 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. No red DWS mats installed. Will measure and collect once fully restored.
|
2022-05-31
|
No data
|
BRADFORD AVENUE, FROM STREET LENEVAR AVENUE TO STREET MINTURN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2022-05-31
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS OK AT NEW TOMPKINS SQUARE SHOPPING CENTER-
|
2022-05-31
|
No data
|
SYLVATON TERRACE, FROM STREET BAY STREET TO STREET WIMAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB ON SIDE OF SHOPPING CENTER
|
2022-05-28
|
No data
|
RICHARD AVENUE, FROM STREET DEAD END TO STREET FLOWER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
BPP OKAY
|
2022-05-28
|
No data
|
EDGEWATER STREET, FROM STREET LYNHURST AVENUE TO STREET SYLVATON TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB OK
|
2022-05-25
|
No data
|
TILSON PLACE, FROM STREET BUTLER PLACE TO STREET KALTENMEIER LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SWK FLAGS AT 3 NEW BUILDINGS -SEALED OK BPP WORK
|
2022-05-25
|
No data
|
TILSON PLACE, FROM STREET KALTENMEIER LANE TO STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SWK FLAGS SEALED OK AT 3 NEW BUILDINGS -OK BPP WORK
|
2022-05-24
|
No data
|
KALTENMEIER LANE, FROM STREET TILSON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
FROM WORK DONE AM ON 5/18/22-WAITING FOR OCMC APPROVE PERMIT- TOTAL WIDTH OF ROADWAY= 35 FEET - MILLED ROADWAY (L) 16 FEET X (W) 24 FEET X (D) 2-3 INCHES- INTERSECTION WAS RE-PAVED OK IN AFTERNOON 5/18/22-OK
|
2022-05-23
|
No data
|
SEAVER AVENUE, FROM STREET QUINCY AVENUE TO STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ARRIVE AT 906 AM- TOTAL WIDTH OF ROADWAY= 23 FEET - MILLED ROADWAY (L) 95 FEET X (W) 20 FEET X (D) 2-3 INCHES (1 OF 3 BLOCKS TO BE MILLED AROUND BUILDING OPERATION)
|
2022-05-23
|
No data
|
IONA STREET, FROM STREET QUINCY AVENUE TO STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP WORK- TOTAL WIDTH OF RWY= 20 FEET - MILLED RWY - (W) 20 FEET X (L) 38 FEET X (D) 2-3 INCHES
|
2022-05-23
|
No data
|
FR CAPODANNO BOULEVARD, FROM STREET IONA STREET TO STREET SEAVER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP WORK- TOTAL WIDTH OF ROADWAY BETWEEN MEDIAN= 34 FEET; MILLED ROADWAY (W) 34 FEET CURB TO MEDIAN X (L) 129 FEET X (D) 2-3 INCHES
|
2022-05-21
|
No data
|
CARTERET STREET, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CONTAINER ON SITE AT THIS TIME
|
2022-05-21
|
No data
|
GIEGERICH AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-05-21
|
No data
|
HUNT LANE, FROM STREET BUTTONWOOD ROAD TO STREET WOODHAVEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONTAINER WAS REMOVED -OK
|
2022-05-19
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2022-05-19
|
No data
|
ROSSVILLE AVENUE, FROM STREET CORRELL AVENUE TO STREET BARROW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-05-18
|
No data
|
TILSON PLACE, FROM STREET KALTENMEIER LANE TO STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK DONE WITH NP#S012022133B16
|
2022-05-18
|
No data
|
ST MARYS AVENUE, FROM STREET TILSON PLACE TO STREET VERMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY-23 FEET; MILLED ROADWAY CURB TO CURB - (L) 49 FEET X (W) 23 FEET X (D) 2 1/2 -3 INCHES
|
2022-05-18
|
No data
|
ST MARYS AVENUE, FROM STREET TILSON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY IN INTERSECTION-23 FEET; MILLED ROADWAY (L) 22 FEET X (W) 23 FEET X (D) 2 1/2 -3 INCHES
|
2022-05-18
|
No data
|
TILSON PLACE, FROM STREET BUTLER PLACE TO STREET KALTENMEIER LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY-35 FEET; MILLED ROADWAY (L) 5 FEET X (W) 24 FEET X (D) 2 1/2 -3 INCHES
|
2022-05-18
|
No data
|
CHESTNUT AVENUE, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAVE OK FOR NEW TOMPKINS PLAZA- BPP WORK
|
2022-05-18
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS AT SHOPPING CENTER
|
2022-05-18
|
No data
|
BUTLER PLACE, FROM STREET TILSON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
INSPECTOR BRUNO REQUESTED PERMIT BE TAKEN OUT BY NICK AT ADVANCED SITE CONTRACTORS- A LIBERTI ON SITE FOR MILLING -INTERSECTION OF ROADWAY. TOTAL WIDTH OF RWY
|
2022-05-18
|
No data
|
TILSON PLACE, FROM STREET KALTENMEIER LANE TO STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SWK INSTALLED AT BUILDING OPERATION BUT NOT SEALED - BPP WORK 3 NEW HOMES
|
2022-05-17
|
No data
|
SEAVER AVENUE, FROM STREET QUINCY AVENUE TO STREET FR CAPODANNO BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CALLED NICK - INSTALLING SWK FLAGS IN ROADWAY ENTRANCE TO SEAVER AVENUE NEXT TO BUILDING OPERATION -BPP
|
2022-05-17
|
No data
|
FR CAPODANNO BOULEVARD, FROM STREET SEAVER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CALLED NICK - INSTALLING SWK FLAGS IN ROADWAY ENTRANCE TO SEAVER AVENUE NEXT TO BUILDING OPERATION -BPP
|
2022-05-17
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-05-17
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET HEMLOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-05-15
|
No data
|
TARGEE STREET, FROM STREET ROME AVENUE TO STREET VENICE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS, CURB & DRIVEWAY & RE-PAVED AT NEW BUILDING- BPP WORK OK
|
2022-05-13
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK - WORK BUMP ERASED BUT NO SPEED BUMP ON STREET-OK
|
2022-05-13
|
No data
|
4 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw OK seal
|
2022-05-12
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-05-11
|
No data
|
AMBOY ROAD, FROM STREET AVIVA COURT TO STREET HOPPING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW CURB INSTALLED
|
2022-05-11
|
No data
|
TILSON PLACE, FROM STREET KALTENMEIER LANE TO STREET ST MARYS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WORK NOT DONE BUILDER INSTALLING SWK AND CURB NO PERMIT GAVE BUILDER 24 HOURS TO COME UP WITH DOT PERMITS-THEY ARE IN NYC STREETS TAKEN OUT UNDER ADVANCE SITE CONTRACTORS INC. IN SUBMITTED PHASE 4 PERMITS-OK
|
2022-05-07
|
No data
|
4 AVENUE, FROM STREET 36 STREET TO STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2022-05-05
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW 500 FEET SWK IN FRONT TOMPKINS PLAZA ON TWO SIDES SHOPPING CENTER -OK
|
2022-05-04
|
No data
|
WAYNE STREET, FROM STREET BROADWAY TO STREET CAMPBELL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
lane marking replaced
|
2022-04-30
|
No data
|
CLERMONT AVENUE, FROM STREET CONNECTICUT STREET TO STREET MASSACHUSETTS ST SOUTH
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw okay
|
2022-04-26
|
No data
|
KENSINGTON AVENUE, FROM STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled out (36’6x3' down 3in.) awaiting paving, sent measurements & pics to office. Note: crew painted out the 1/2 plus 5ft however boss came onsite & said McClean Av only needed 3ft wide milled due to no connections were made
|
2022-04-26
|
No data
|
MC CLEAN AVENUE, FROM STREET JEROME AVENUE TO STREET KENSINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled out (94'4x3' down 3in.) awaiting paving, sent measurements & pics to office. Note: crew painted out the 1/2 plus 5ft however boss came onsite & said McClean Av only needed 3ft wide milled due to no connections were made
|
2022-04-26
|
No data
|
KENSINGTON AVENUE, FROM STREET FOCH AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled out curb to curb (121’6x34’6 down 3in.) awaiting paving, sent measurements & pics to office
|
2022-04-25
|
No data
|
PERKIOMEN AVENUE, FROM STREET DEAD END TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb is ok
|
2022-04-21
|
No data
|
LIVINGSTON AVENUE, FROM STREET HOLDEN BOULEVARD TO STREET WESTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE -OK AT NEW BUILDING -BPP WORK
|
2022-04-18
|
No data
|
TILSON PLACE, FROM STREET BUTLER PLACE TO STREET KALTENMEIER LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP InspectionRoadway width- 34'3"Roadway width milled 23'10"Milled down 3 and a half inches.
|
2022-04-16
|
No data
|
RICHMOND TERRACE, FROM STREET STATEN IS CEMETERY BOUNDARY TO STREET TOMPKINS COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE-OK
|
2022-04-15
|
No data
|
RICHMOND TERRACE, FROM STREET CLINTON AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS OK AT NEW BUILDING -BPP WORK-OK
|
2022-04-14
|
No data
|
RICHARD AVENUE, FROM STREET DEAD END TO STREET FLOWER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Failed to reseal BBP
|
2022-04-13
|
No data
|
MILL ROAD, FROM STREET EBBITTS STREET TO STREET INA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled out (170'x29' down 3in) awaiting paving- site ok
|
2022-04-12
|
No data
|
44 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: PASS - Length of Milling: 46ft 6in Width of Milling: 20ft 4in Full Width of Roadway: 30ft 0in Depth: 4in
|
2022-04-11
|
No data
|
21 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. No DWS installed
|
2022-04-05
|
No data
|
RETFORD AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-04-03
|
No data
|
52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway flush and sealed
|
2022-04-02
|
No data
|
BOONE AVENUE, FROM STREET EAST 172 STREET TO STREET EAST 173 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No street paving work done at this time
|
2022-03-31
|
No data
|
PARK STREET, FROM STREET ANDREWS AVENUE TO STREET PINEWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
R/WAY WAS SINCE PAVED WITHOUT NOTIFICATION TO HIQA BOROUGH OFFICE AS STIPULATED.
|
2022-03-29
|
No data
|
MARGARET STREET, FROM STREET COLON AVENUE TO STREET HARDY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk has been replaced in front of address with driveway apron and drop curb replaced
|
2022-03-25
|
No data
|
4 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done in the southeast corner at the time of inspection. "FROM KERRY - PLEASE USE THIS PERMIT FOR WORK DONE 959 4th Avenue"
|
2022-03-23
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installation portion of block seems to be private not even paved
|
2022-03-23
|
No data
|
CLIFFWOOD AVENUE, FROM STREET DEAD END TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cobblestone curb is ok
|
2022-03-19
|
No data
|
WAYNE STREET, FROM STREET BROADWAY TO STREET CAMPBELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT 40-42 WAYNE STREET
|
2022-03-18
|
No data
|
CASTLETON AVENUE, FROM STREET BODINE STREET TO STREET DONGAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK
|
2022-03-18
|
No data
|
86 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replacement acceptable
|
2022-03-18
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET MINERVA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-03-18
|
No data
|
RETFORD AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2022-03-18
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-03-15
|
No data
|
WINHAM AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > CONTAINER ON SITE
|
2022-03-11
|
No data
|
FABIAN STREET, FROM STREET AMBOY ROAD TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Open container on location
|
2022-03-07
|
No data
|
PARK STREET, FROM STREET ANDREWS AVENUE TO STREET PINEWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP inspectionRoadway width 37'10"Roadway width milled 24'11''Roadway has been milled down 4 inches.
|
2022-03-07
|
No data
|
4 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly completed tangent ramps in the NE3 corner quad are accessible and functional but not Ada compliant. Measured and collected in Prism on 3/7/22.
|
2022-03-07
|
No data
|
FOREST ROAD, FROM STREET DALEMERE ROAD TO STREET DUTCHESS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP WORK- MILLED RWY (L) 85 FEET X (W) 33 FEET - CURB TO CURB X (D) 3 INCHES -OK
|
2022-03-07
|
No data
|
4 AVENUE, FROM STREET 37 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work done in the southeast corner.Deli at 959 is the northeast corner. GC did fully upgrade corner but will issue non permit for correct corner direction.
|
2022-03-07
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quad are accessible and functional but not Ada compliant. Measured and collected in Prism on 3/7/22.
|
2022-03-02
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2022-02-26
|
No data
|
ZEBRA PLACE, FROM STREET ARTHUR KILL ROAD TO STREET VETERANS ROAD WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
STEEL FACED CURB & APRON INSTALLED
|
2022-02-26
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2022-02-24
|
No data
|
MAYBERRY PROMENADE, FROM STREET BEND TO STREET STRAWBERRY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-02-23
|
No data
|
37 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew on site excavating on swk. No impaction to bike lane on 4 Ave.
|
2022-02-21
|
No data
|
RICHARD AVENUE, FROM STREET DEAD END TO STREET FLOWER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
re-seal builders pavement
|
2022-02-18
|
No data
|
TARGEE STREET, FROM STREET ROME AVENUE TO STREET VENICE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel faced curb installed
|
2022-02-18
|
No data
|
HOME PLACE, FROM STREET DEAD END TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2022-02-18
|
No data
|
RICHMOND TERRACE, FROM STREET STATEN IS CEMETERY BOUNDARY TO STREET TOMPKINS COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crew on site, 200’4” X 20’ of roadway milled. BPP ready for paving.
|
2022-02-17
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2022-02-15
|
No data
|
MAJOR AVENUE, FROM STREET LINWOOD AVENUE TO STREET SAND LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk was replaced in kind
|
2022-02-13
|
No data
|
WALDEN AVENUE, FROM STREET BEACON AVENUE TO STREET GELDNER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk flags have not yet been replaced
|
2022-02-12
|
No data
|
EVERETT AVENUE, FROM STREET FINLAY AVENUE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container placed at time of inspection
|
2022-02-09
|
No data
|
RICHMOND TERRACE, FROM STREET CLINTON AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 36' x 25' portion of the roadway milled down 3' for BPP
|
2022-02-09
|
No data
|
VAN BUREN STREET, FROM STREET CLINTON AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 93' x 30' portion of the roadway on VanBuren Street milled down 3" for paving. Richmond Terrace is not ready yet.
|
2022-02-03
|
No data
|
BUFFALO STREET, FROM STREET HOOPER AVENUE TO STREET O GORMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONTAINER NO LONGER ON SITE
|
2022-02-03
|
No data
|
BANCROFT AVENUE, FROM STREET BEND TO STREET CLAWSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2022-02-02
|
No data
|
WILLOWWOOD LANE, FROM STREET OCEANVIEW CEMETERY BOUNDARY TO STREET SANDALWOOD DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No OPEN CONSTRUCTION DEBRIS CONTAINER on the street.
|
2022-02-02
|
No data
|
EVERETT AVENUE, FROM STREET FINLAY AVENUE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
10 cubic yard container on location
|
2022-02-01
|
No data
|
RICHMOND ROAD, FROM STREET DONGAN HILLS AVENUE TO STREET SEAVER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Can not see curb, but from when having to inspect bpp it was ok
|
2022-01-27
|
No data
|
60 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags installed.
|
2022-01-27
|
No data
|
DARLINGTON AVENUE, FROM STREET MARCY AVENUE TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Small portion of curb replaced acceptable for now
|
2022-01-26
|
No data
|
WILLOWBROOK ROAD, FROM STREET CRAFTON AVENUE TO STREET FOREST HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK OK
|
2022-01-26
|
No data
|
EVERETT AVENUE, FROM STREET FINLAY AVENUE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
10yd container placed along the p/l, wood underneath for rw protection
|
2022-01-25
|
No data
|
RICHMOND ROAD, FROM STREET DONGAN HILLS AVENUE TO STREET SEAVER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Email for BPP wasn't clear i thought milling was to be done yesterday not today and that permittee would be paving today.
|
2022-01-24
|
No data
|
TRAVIS AVENUE, FROM STREET KELLY BOULEVARD TO STREET EVANS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK FLAGS OK
|
2022-01-19
|
No data
|
3 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-01-14
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2022-01-14
|
No data
|
81 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb acceptable
|
2022-01-13
|
No data
|
9 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2022-01-10
|
No data
|
RICHARD AVENUE, FROM STREET FLOWER AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2022-01-10
|
No data
|
MORTON STREET, FROM STREET CENTER STREET TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags, driveway apron, curb and drop curb are ok
|
2022-01-03
|
No data
|
KENNETH PLACE, FROM STREET CORDELIA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Please reach out to (646) 892-5820 or e-mail at dashbilling@dot.nyc.gov for questions on billing, thank you
|
2021-12-28
|
No data
|
ZEBRA PLACE, FROM STREET ARTHUR KILL ROAD TO STREET VETERANS ROAD WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2021-12-28
|
No data
|
STECHER STREET, FROM STREET AMBOY ROAD TO STREET BILLIOU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2021-12-27
|
No data
|
QUINTARD STREET, FROM STREET HURLBERT STREET TO STREET LEDYARD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been re-paved
|
2021-12-23
|
No data
|
GIEGERICH AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2021-12-23
|
No data
|
CLERMONT AVENUE, FROM STREET MANHATTAN STREET TO STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable.
|
2021-12-23
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2021-12-23
|
No data
|
TRAVIS AVENUE, FROM STREET KELLY BOULEVARD TO STREET EVANS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & shared driveway (308) has been restored in kind, 308 has 2 permits on file
|
2021-12-21
|
No data
|
BAY STREET, FROM STREET HICKS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been paved and white lines have been restored back fully.
|
2021-12-21
|
No data
|
BAY STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been paved, white lines have been restored back fully.
|
2021-12-21
|
No data
|
COLUMBIA STREET, FROM STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been paved, white lines fully restored back.
|
2021-12-21
|
No data
|
COLUMBIA STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been paved, white lines have been restored back fully.
|
2021-12-21
|
No data
|
BAY STREET, FROM STREET COLUMBIA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway has been paved, white line has been restored back fully.
|
2021-12-18
|
No data
|
AVENUE J, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W FLAGS
|
2021-12-16
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET MINERVA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2021-12-16
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2021-12-15
|
No data
|
YETMAN AVENUE, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable.
|
2021-12-11
|
No data
|
ENGLEWOOD AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET QUAIL LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-12-11
|
No data
|
CORDELIA AVENUE, FROM STREET EVERETT PLACE TO STREET KENNETH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-12-11
|
No data
|
KENNETH PLACE, FROM STREET CORDELIA AVENUE TO STREET SHARROTT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w & apron acceptable.
|
2021-12-10
|
No data
|
TENAFLY PLACE, FROM STREET ALBEE AVENUE TO STREET HODA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb acceptable.
|
2021-12-08
|
No data
|
KENNETH PLACE, FROM STREET CORDELIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NW2 corner newly constructed tangent ramps. Must trim and seal properly expansion joints as per H-1011 standard specs. Ramps are functional and accessible. Measured and collected on 10/12/2021. CAR issued.
|
2021-12-08
|
No data
|
81 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2021-12-06
|
No data
|
21 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installed in compliance for 2084 60th Street
|
2021-12-06
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Metal faced curb ok
|
2021-12-06
|
No data
|
60 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installed in compliance for 2084 60th Street.
|
2021-12-04
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-12-04
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-12-04
|
No data
|
CLIFFWOOD AVENUE, FROM STREET DEAD END TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-12-03
|
No data
|
RICHMOND AVENUE, FROM STREET SI RAPID TRANSIT TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-12-03
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK
|
2021-12-02
|
No data
|
DIRENZO COURT, FROM STREET DEAD END TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2021-12-01
|
No data
|
DI MARCO PLACE, FROM STREET DEAD END TO STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-12-01
|
No data
|
BEACON AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS SINCE INSTALLED
|
2021-12-01
|
No data
|
ENFIELD PLACE, FROM STREET DI MARCO PLACE TO STREET MORLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-11-30
|
No data
|
SINCLAIR AVENUE, FROM STREET DEAD END TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2021-11-29
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2021-11-29
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2021-11-26
|
No data
|
RETFORD AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2021-11-24
|
No data
|
ARTHUR KILL ROAD, FROM STREET WINANT PLACE TO STREET WINANT LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
68’x30’8 area milled in preparation to be paved, pictures sent to office
|
2021-11-24
|
No data
|
WENTWORTH AVENUE, FROM STREET DEAD END TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP INSPECTION: Width of roadway is 36'Width of roadway milled is 24'Milled down 3 inches.
|
2021-11-24
|
No data
|
TUTTLE STREET, FROM STREET DEAD END TO STREET DEVENS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK REAR OF HOUSE
|
2021-11-19
|
No data
|
HOME PLACE, FROM STREET DEAD END TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CONTAINER ON RWY
|
2021-11-17
|
No data
|
AMBOY ROAD, FROM STREET BLOOMINGDALE ROAD TO STREET SHARROTT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
TOTAL WIDTH OF ROADWAY IS 25 FEET- ROADWAY WAS RE-PAVED (L) 75 FEET X (W) 17 FEET X (D) ?; MIX UP WITH E-MAIL SENT BY PERMITTEE (WARNING WAS GIVEN NOT TO STARTED BEFORE WORK START TIME-HE STATED LANE MARKINGS WILL BE RESTORED WITHIN 2 HOURS.
|
2021-11-17
|
No data
|
CHESTNUT AVENUE, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SW1 corner newly constructed single ramp. Ramp is functional and accessible. Measured and collected on 10/2021. R/w grade, gutter slope and curb reveal measured today on 11/17/2021. No further action is needed.
|
2021-11-16
|
No data
|
MERRILL AVENUE, FROM STREET ARLENE STREET TO STREET FIRTH ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2021-11-15
|
No data
|
KENNETH PLACE, FROM STREET CORDELIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Must correct right flare 15.2% on ramp# 1 & left flare 15% on ramp# 2 which exceed 10%, also trim and seal properly expansion joints as per H-1011 standard specs. Functional and accessible. M&C on 10/12/21. CAR issued.
|
2021-11-13
|
No data
|
DIRENZO COURT, FROM STREET DEAD END TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2021-11-06
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2021-11-05
|
No data
|
21 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No 410 permit on file. No red DWS mats installed. Will measure and collect once fully restored.
|
2021-11-02
|
No data
|
CHESTNUT AVENUE, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON SITE
|
2021-11-02
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP IN FRONT OF PLAZA ON TOMPKINS AVENUE BETWEEN CHESTNUT AVENUE & SHAUGHNESSY LANE- TOTAL (L) 310 FT X (W) 28 FEET- MILLED ROADWAY (L) 310 FT X (W) 18 FT X (D) 3 INCHES - MILLED ROADWAY PASS
|
2021-11-02
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY 99% PAVED -TOTAL WIDTH OF ROADWAY 33 FT (AT LARGE END)-RE-PAVED SECTION CURB TO CURB (L) 100 FT X(W) 23 FT X (D) 3 IN BEFORE RE-PAVE; TOTAL RE-PAVE (L) 590 FT X (W) 33 FT X (D) 3 IN BEFORE & PORTION ADJACENT TO INTERSECTION WAITING FOR TOP.
|
2021-11-01
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP INSPECTION: ROADWAY MILLED 23' IN WIDTH ROADWAY WIDTH 34'6"MILLED DOWN 3 INCHES
|
2021-10-29
|
No data
|
WAIMER PLACE, FROM STREET AMBOY ROAD TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
permit check > 20 yd container on site
|
2021-10-28
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK INSTALLED & OPEN NOT SEAL AT NEW PLAZA-NP
|
2021-10-28
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SWK INSTALLED OK & OPEN NOT SEALED AT NEW PLAZA
|
2021-10-25
|
No data
|
MAINE AVENUE, FROM STREET BIDWELL AVENUE TO STREET NEAL DOW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK
|
2021-10-24
|
No data
|
EBBITTS STREET, FROM STREET MILL ROAD TO STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2021-10-24
|
No data
|
TITUS AVENUE, FROM STREET EBBITTS STREET TO STREET ISERNIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2021-10-23
|
No data
|
DIRENZO COURT, FROM STREET DEAD END TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2021-10-23
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-10-22
|
No data
|
DI MARCO PLACE, FROM STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance.
|
2021-10-20
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2021-10-20
|
No data
|
CHESTNUT AVENUE, FROM STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SE4 corner newly constructed offset ramp. Plastic cover on DWS, expansion joints not sealed properly. Must measure, R/w grade, gutter slope and curb reveal when Street is paved permanently. Functional and accessible. M&C on 10/20/21. Active permit.
|
2021-10-19
|
No data
|
CROWN AVENUE, FROM STREET ARDEN AVENUE TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS SINCE PAVED VIA BPP
|
2021-10-19
|
No data
|
SINCLAIR AVENUE, FROM STREET ARDEN AVENUE TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
R/WAY WAS SINCE PAVED VIA BPP
|
2021-10-19
|
No data
|
TOMPKINS AVENUE, FROM STREET CHESTNUT AVENUE TO STREET SHAUGHNESSY LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
MET WITH FORMAN AT WORKSITE MISSING SIGNS AT BOTH INTERSECTION- WARNING & EXPLANATION OF STIP 011 WAS GIVEN AT TOMPKINS PLAZA
|
2021-10-19
|
No data
|
SLOSSON AVENUE, FROM STREET LIGHTNER AVENUE TO STREET SCHMIDTS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved, permit is now out of guarantee
|
2021-10-06
|
No data
|
MAGUIRE AVENUE, FROM STREET MC BAINE AVENUE TO STREET MASON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2021-10-06
|
No data
|
ARTHUR KILL ROAD, FROM STREET BEND TO STREET ZEBRA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable.
|
2021-10-05
|
No data
|
HYLAN BOULEVARD, FROM STREET BUTLER BOULEVARD TO STREET RICHARD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
103'6" X 44' of r/w will be milled. Was told by foreman National Grid was supposed to show up this morning to fill two excavations plated at each end of BPP. Contractors left that area unmilled for now for national grid but will be milled once filled
|
2021-10-04
|
No data
|
WILLOWBROOK ROAD, FROM STREET CRAFTON AVENUE TO STREET FOREST HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced in kind/sealed. Note attached driveway apron has been patched however concrete is in poor condition & was patched prior- not gonna require full replacement
|
2021-10-04
|
No data
|
86 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: PASS - Length of Milling: 49ft 0in Width of Milling: 35ft 0in Full Width of Roadway: 59ft 4in Depth: 3in
|
2021-10-04
|
No data
|
52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The Job was rescheduled for 2:00pm
|
2021-10-03
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB HAS BEEN INSTALLED STREET HAS BEEN WIDENED. CURB IS CURRENTLY BLOCKED OF DUE TO PORTION OF ROADWAY BEING CONSTRUCTED.
|
2021-10-01
|
No data
|
WOEHRLE AVENUE, FROM STREET LORING AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2021-10-01
|
No data
|
86 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP paving work done at the time of inspection.
|
2021-10-01
|
No data
|
52 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent failed to notify the NYC DOT HIQA borough office within 4 Hours prior to paving. No notification was made for street paved as per 1/2+5' stip.
|
2021-10-01
|
No data
|
TILLMAN STREET, FROM STREET LA GUARDIA AVENUE TO STREET TODT HILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK
|
2021-09-28
|
No data
|
GENESEE AVENUE, FROM STREET STANLEY CIRCLE TO STREET STANLEY CIRCLE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-09-25
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2021-09-25
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET HEMLOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2021-09-25
|
No data
|
ROSSVILLE AVENUE, FROM STREET CORRELL AVENUE TO STREET BARROW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
i/f/o 812 one s/w flag
|
2021-09-24
|
No data
|
CANAL STREET, FROM STREET BAY STREET TO STREET SI RAPID TRANSIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP WAS INSTALLED
|
2021-09-24
|
No data
|
BAY STREET, FROM STREET CANAL STREET TO STREET THOMPSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS SINCE INSTALLED
|
2021-09-22
|
No data
|
TARGEE STREET, FROM STREET ROME AVENUE TO STREET VENICE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A 54' X 25' AREA OF R/WAY WAS MILLED OUT, DOWN 3". *** CHECKING FOR BPP MILLING DEPTH AS PER SIHIQA ***
|
2021-09-22
|
No data
|
HYLAN BOULEVARD, FROM STREET BUTLER BOULEVARD TO STREET RICHARD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work hasn’t been started at this time. Can’t see what was done behind green fence.
|
2021-09-21
|
No data
|
BENEDICT ROAD, FROM STREET REDMOND AVENUE TO STREET REDMOND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP APPLIED IN AREA
|
2021-09-21
|
No data
|
TARGEE STREET, FROM STREET ROME AVENUE TO STREET VENICE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-09-21
|
No data
|
BENEDICT ROAD, FROM STREET WILLOW POND ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP IN AREA
|
2021-09-19
|
No data
|
TITUS AVENUE, FROM STREET INA STREET TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failed to notify S.I HIQA office 4 hours prior to paving. NOV issued.
|
2021-09-17
|
No data
|
WOODVALE AVENUE, FROM STREET PALMIERI LANE TO STREET VAIL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway was paved 45'x19'10 done prior to 1pm as emailed BPP stated. Crew was gone except driver of flatbed driving away. Sent info to office
|
2021-09-17
|
No data
|
BARLOW AVENUE, FROM STREET GREAVES AVENUE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2021-09-15
|
No data
|
HOPE AVENUE, FROM STREET BELAIR LANE TO STREET HOME AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2021-09-14
|
No data
|
EBBITTS STREET, FROM STREET TITUS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway was milled on 9/9 along with the connecting streets for corner property (30'x22'2 down 3in), this permit was applied for with the other 2 permit's granted. OCMC held this up for unknown reasons.
|
2021-09-14
|
No data
|
COLUMBIA STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
CONES WERE SET-UP DUE TO MILLING & RE-PAVING OF 2 BLOCKS OF ROADWAY AT NEW AMAZON BUILDING 537 COLUMBIA STREET OR AKA 55 BAY STREET. ROADWAY OPEN & RESURFACED AT TIME OF INSPECTION. IN-COMPLIANCE.
|
2021-09-14
|
No data
|
COLUMBIA STREET, FROM STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESURFACED INTERSECTION OF RWY
|
2021-09-14
|
No data
|
COLUMBIA STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE WAS DONE-NICE
|
2021-09-10
|
No data
|
21 AVENUE, FROM STREET 60 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 permit on file. No red DWS mats installed. Will measure and collect once fully restored.
|
2021-09-08
|
No data
|
COLUMBIA STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street curb to curb 35ft mill 22ft by 207ft down 3in
|
2021-09-08
|
No data
|
CONEY ISLAND AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored in kins sealed and flush.
|
2021-09-08
|
No data
|
COLUMBIA STREET, FROM STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
mill 22ft by 40ft down 3in
|
2021-09-02
|
No data
|
CANAL STREET, FROM STREET BAY STREET TO STREET SI RAPID TRANSIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-09-01
|
No data
|
CONEY ISLAND AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway paved
|
2021-08-29
|
No data
|
47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Plus 5 BPP in Compliance
|
2021-08-29
|
No data
|
57 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Plus 5 BPP in Compliance
|
2021-08-28
|
No data
|
RETFORD AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-08-28
|
No data
|
IRON MINE DRIVE, FROM STREET COPPERLEAF TERRACE TO STREET WINDY HOLLOW WAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP
|
2021-08-19
|
No data
|
BAY STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
RE-PAVE OK AT NEW AMAZON BUILDING OFF NCL OFF COLUMBIA STREET
|
2021-08-19
|
No data
|
COLUMBIA STREET, FROM STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
HALF INTERSECTION WAS RE-PAVED OK
|
2021-08-19
|
No data
|
COLUMBIA STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PORTION OF ROADWAY - WAS PAVED WITHOUT A PERMIT- CONTRACTOR CLAIMS PERMIT WERE DENIED DUE TO COMPANY A HAD PERMIT BUT COMPANY B ADVANCE SITE WAS DOING WORK - AMAZON NEW BUILDING SUPERINDENTENT CHANGED PERMITTEE'S-
|
2021-08-18
|
No data
|
BAY STREET, FROM STREET COLUMBIA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w milled 34'x30depth milled2'' (cobble stone underneath wearing course)
|
2021-08-17
|
No data
|
BAY STREET, FROM STREET HICKS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w milled30'x26'x3''
|
2021-08-17
|
No data
|
HICKS STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full width- 30’Length milled-225’Width milled- 20’Depth milled- 3’’
|
2021-08-17
|
No data
|
BAY STREET, FROM STREET COLUMBIA STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed a 34'x33' of the roadway milled and down 2'' in a temporary state without a valid d.o.t permit (permit expired 8/7/2021). permit# used to I.D contractor
|
2021-08-17
|
No data
|
HICKS STREET, FROM STREET CREAMER STREET TO STREET LORRAINE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
(tricky intersection/ segment area)Length milled - 22’Width milled- 30’Depth milled-3’’
|
2021-08-17
|
No data
|
BAY STREET, FROM STREET COLUMBIA STREET TO STREET HICKS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
R/w width- 50’Width milled- 30’Length milled-461’Depth milled- 3’’
|
2021-08-17
|
No data
|
CREAMER STREET, FROM STREET HICKS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Length milled - 22’Width milled- 30’Depth milled-3’’
|
2021-08-16
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb installed
|
2021-08-11
|
No data
|
TILLMAN STREET, FROM STREET LA GUARDIA AVENUE TO STREET TODT HILL ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
85' X 22' AREA OF R/WAY WAS MILLED OUT, DOWN 3". *** CHECKING FOR BPP MILLING DEPTH AS PER SIHIQA ***
|
2021-08-11
|
No data
|
CREAMER STREET, FROM STREET HICKS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP work started in roadway.
|
2021-08-03
|
No data
|
WESTWOOD AVENUE, FROM STREET ELVIN STREET TO STREET MANOR ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP INSPECTION: WIDTH OF ROADWAY 42'3"ROADWAY WIDTH MILLED IS 42'3" (CURB TO CURB)ROADWAY MILLED DOWN 3 AND A HALF INCHES.
|
2021-08-03
|
No data
|
LIGHTHOUSE AVENUE, FROM STREET BEND TO STREET WINDSOR AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed a 45' x 31' portion of the roadway milled down 3" and is ready for paving
|
2021-07-27
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Non ADA compliant. Measured and collected in Prism on 7/27/21. Newer permit B042021085A12 on file
|
2021-07-26
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway is Paved.
|
2021-07-24
|
No data
|
WINTER AVENUE, FROM STREET BISMARK AVENUE TO STREET WESTERVELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2021-07-23
|
No data
|
COLUMBIA STREET, FROM STREET BAY STREET TO STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work has been started at this rime.
|
2021-07-23
|
No data
|
COLUMBIA STREET, FROM STREET CREAMER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work in the intersection has been started at this time.
|
2021-07-23
|
No data
|
PORTLAND PLACE, FROM STREET BRIGHTON AVENUE TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2021-07-23
|
No data
|
LIVINGSTON AVENUE, FROM STREET HOLDEN BOULEVARD TO STREET WESTWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
62’4x22’8 area milled acceptable, pictures sent to office
|
2021-07-23
|
No data
|
BAY STREET, FROM STREET HICKS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work in the intersection has been started at this time.
|
2021-07-23
|
No data
|
BAY STREET, FROM STREET COLUMBIA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work has been started at this time.
|
2021-07-17
|
No data
|
12 AVENUE, FROM STREET 52 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway completed and inspected on 6/17/2021
|
2021-07-13
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newly completed tangent ramps in the SE4 corner quadrant are functional and accessible. Unable to measure due to road closure and active street construction. Will measure and collect at a later date.
|
2021-07-08
|
No data
|
PROSPECT PLACE, FROM STREET CLASSON AVENUE TO STREET NYCTA SUBWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
The above respondent with 1/2+5in of the roadway repaved. This is a violation of StipID: 1/2+5' as the respondent fail to notify DOT within the minimum required time of 4 hours prior to paving.The respondent has been ID by active cited permit.
|
2021-07-07
|
No data
|
CLOVERDALE AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No open container on location
|
2021-07-02
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2021-07-02
|
No data
|
GIEGERICH AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2021-07-02
|
No data
|
LINDEN STREET, FROM STREET ST NICHOLAS AVENUE TO STREET WYCKOFF AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Whole: 29ft 2in Half plus 5: 21ft 8inWidth: 30ft 9in Down 3in
|
2021-06-26
|
No data
|
STOBE AVENUE, FROM STREET LACONIA AVENUE TO STREET MEADOW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-06-25
|
No data
|
BEACHVIEW AVENUE, FROM STREET DEAD END TO STREET IDLEASE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
21' X 17' AREA OF R/WAY IS MILLED OUT, DOWN 3". *** CHECKING FOR BPP MILLING DEPTH AS PER SIHIQA ***
|
2021-06-24
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 123 linden blvd
|
2021-06-20
|
No data
|
CONEY ISLAND AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Length of the milled roadway property line to property line:110’Width of the entire roadway curb to curb:70’Width of the milled roadway:40’
|
2021-06-19
|
No data
|
MILL ROAD, FROM STREET GUYON AVENUE TO STREET ISABELLA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-06-18
|
No data
|
BRAISTED AVENUE, FROM STREET DENKER PLACE TO STREET NEHRING AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container acceptable.
|
2021-06-17
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2021-06-17
|
No data
|
12 AVENUE, FROM STREET 52 STREET TO STREET 53 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Before milling the width of roadway is 43' 9” Milling length is 37’ 4” & Width milled is 27' 4” & Depth is 3". Foreman on site
|
2021-06-17
|
No data
|
52 STREET, FROM STREET 12 AVENUE TO STREET NEW UTRECHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP was inspected. Before milling the width of roadway is 31’ 6” Milling length is 118’ & Width milled is 22' 2” & Depth is 3". Foreman on site.
|
2021-06-17
|
No data
|
12 AVENUE, FROM STREET 52 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent has milled the intersection of 12 avenue & 52 street without a permit on file. Respondent ID by segment permit B012021165B38 expired 7/13/2021.
|
2021-06-16
|
No data
|
FOXHOLM STREET, FROM STREET ALTAMONT STREET TO STREET WALDEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled (52'4x34'4) down 3in. crew awaiting material to pave BPP. Sent pics and measurements to office.
|
2021-06-15
|
No data
|
3 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2021-06-03
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done
|
2021-05-27
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-05-25
|
No data
|
RICHMOND VALLEY ROAD, FROM STREET MADSEN AVENUE TO STREET WEINER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
335’x30’4 portion of 831’ area milled pictures sent to office
|
2021-05-25
|
No data
|
CHESTERTON AVENUE, FROM STREET GRAYSON STREET TO STREET PENDALE STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENTS FAILURE TO OBTAIN AN ACTIVE NYCDOT PERMIT FOR A CONTAINER PLACED ON R/WAY. AT THIS TIME, THE CONTAINER, WITH BIC #2888 ON IT, IS STORED ON THE R/WAY WITH NO ACTIVE PERMIT ON RECORD.
|
2021-05-25
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent failed to notify the NYC DOT HIQA borough office within 4 Hours prior to paving. No notification was made and street paved half plus 5 feet (1/2+5). As per stipulation 1/2 + 5 you must appreciate in person
|
2021-05-21
|
No data
|
HYLAN BOULEVARD, FROM STREET BATH AVENUE TO STREET COOPER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2021-05-20
|
No data
|
BRYANT AVENUE, FROM STREET CLAWSON STREET TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK D/WAY APRON
|
2021-05-14
|
No data
|
STECHER STREET, FROM STREET AMBOY ROAD TO STREET BILLIOU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2021-05-14
|
No data
|
MAYBERRY PROMENADE, FROM STREET DEAD END TO STREET BLUEBERRY LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
PERMIT CHECK > CONTAINER ON SITE
|
2021-05-10
|
No data
|
CONEY ISLAND AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #1941 CONEY ISLAND AVENUE in compliance
|
2021-05-08
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
THE PERMITTEE IS REQUIRED TO EMAIL THE NYC DOT HIQA BOROUGH OFFICE A MINIMUM OF 4 HOURS PRIOR TO PAVING.(BROOKLYN – Brooklynbpp@dot.nyc.gov). Time of inspection paving was completed and notification was not made.
|
2021-05-08
|
No data
|
CONEY ISLAND AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
THE PERMITTEE IS REQUIRED TO EMAIL THE NYC DOT HIQA BOROUGH OFFICE A MINIMUM OF 4 HOURS PRIOR TO PAVING. (BROOKLYN – Brooklynbpp@dot.nyc.gov) . At time of inspection notification was not made to the balance Hiqa office and roadway was paved.
|
2021-05-05
|
No data
|
BRIGHTON STREET, FROM STREET CLERMONT AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
container no longer on site permit expired
|
2021-05-04
|
No data
|
CROWN AVENUE, FROM STREET ARDEN AVENUE TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
84’x30’ was milled down 3” from curb to curb. . Emailed measurements and photos to StatenIslandbpp.
|
2021-05-02
|
No data
|
CONEY ISLAND AVENUE, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of building #1941 CONEY ISLAND AVENUE in compliance
|
2021-04-29
|
No data
|
CHESTNUT AVENUE, FROM STREET ANDERSON STREET TO STREET TOMPKINS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Curb installed but not sealed as of yet- permit is still active, check next inspection
|
2021-04-27
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SE4 corner plastic has been removed from DWS
|
2021-04-25
|
No data
|
DONGAN HILLS AVENUE, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-04-24
|
No data
|
MC BAINE AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permit expired container no longer on site
|
2021-04-23
|
No data
|
DALEMERE ROAD, FROM STREET DELAWARE STREET TO STREET ROCHELLE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled (102’6x34’4) down 3in. in process of being paved (advised crew to lay down AC prior to continuing the paving. Sent measurements/ pics and info to office.
|
2021-04-22
|
No data
|
ROKEBY PLACE, FROM STREET BARD AVENUE TO STREET KISSEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS AND CURB IS OK
|
2021-04-20
|
No data
|
CLIFFWOOD AVENUE, FROM STREET DEAD END TO STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failed to notify S.I HIQA office 4 hours prior to paving. NOV issued.
|
2021-04-20
|
No data
|
CLIFFWOOD AVENUE, FROM STREET WHITLOCK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failed to notify S.I HIQA office 4 hours prior to paving. NOV issued.
|
2021-04-17
|
No data
|
MANILA AVENUE, FROM STREET ISERNIA AVENUE TO STREET TYSENS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB
|
2021-04-14
|
No data
|
PERKIOMEN AVENUE, FROM STREET DEAD END TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-04-09
|
No data
|
SINCLAIR AVENUE, FROM STREET ARDEN AVENUE TO STREET JEFFERSON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
86’5x34’8 area milled in preparation to be paved. Pictures sent to office
|
2021-04-08
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Area filled in
|
2021-03-30
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS ARE OK
|
2021-03-30
|
No data
|
ILYSE COURT, FROM STREET DINA COURT TO STREET LYLE COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w & apron/dropcurb ok.
|
2021-03-29
|
No data
|
ADLAI CIRCLE, FROM STREET BEND TO STREET POMPEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Shared/split driveway, drop curb & Sidewalk ok.
|
2021-03-26
|
No data
|
DEMOPOLIS AVENUE, FROM STREET KATAN AVENUE TO STREET LAMOKA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-03-26
|
No data
|
DORVAL AVENUE, FROM STREET CROSSFIELD AVENUE TO STREET DRUMGOOLE ROAD WEST
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container
|
2021-03-25
|
No data
|
WHITLOCK AVENUE, FROM STREET BEND TO STREET HELENA ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Area milled and paved prior to arrival email sent
|
2021-03-25
|
No data
|
BRIGHTON STREET, FROM STREET CLERMONT AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container in parking lane acceptable
|
2021-03-23
|
No data
|
JAY STREET, FROM STREET DEAD END TO STREET JOHN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK OFF PARK
|
2021-03-22
|
No data
|
AVENUE P, FROM STREET CONEY ISLAND AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started within the SE4 corner quadrant, Barricades are in parking lane of quadrant. Active permit on file.
|
2021-03-20
|
No data
|
OTIS AVENUE, FROM STREET CLAWSON STREET TO STREET EDISON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2021-03-20
|
No data
|
BANCROFT AVENUE, FROM STREET BEND TO STREET CLAWSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags acceptable.
|
2021-03-17
|
No data
|
CASTLETON AVENUE, FROM STREET BODINE STREET TO STREET DONGAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
contractor in process of milling not completed yet
|
2021-03-13
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-03-13
|
No data
|
BENNETT AVENUE, FROM STREET BEND TO STREET HODA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-03-13
|
No data
|
BENNETT AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2021-03-11
|
No data
|
DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2021-03-06
|
No data
|
LEVERETT AVENUE, FROM STREET LOVELACE AVENUE TO STREET POMPEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2021-02-15
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE
|
2021-02-15
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK DONE
|
2021-02-09
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CONTAINER FOUND ON ROADWAY
|
2021-01-26
|
No data
|
CRESTON STREET, FROM STREET DEAD END TO STREET FINLAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb acceptable
|
2021-01-22
|
No data
|
BILLIOU STREET, FROM STREET ARBUTUS AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container in parking lane acceptable
|
2021-01-21
|
No data
|
9 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2021-01-14
|
No data
|
51 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed
|
2021-01-13
|
No data
|
42 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway measures 30 feet from curb to curb. Contractor has milled 20 feet of the roadway, adjacent to the property, with a depth of 3 inches. In compliance with BPP required measurements.
|
2021-01-12
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm s/w rest ok.
|
2021-01-11
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk was replaced. CAR was issued to fill in gaps to grade in sidewalk grass/sod area next to newly repaired/replaced sidewalk.
|
2021-01-08
|
No data
|
SHELDON AVENUE, FROM STREET DESERRE AVENUE TO STREET MARCY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container.
|
2021-01-07
|
No data
|
70 AVENUE, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2021-01-06
|
No data
|
EAST 14 STREET, FROM STREET AVENUE R TO STREET KINGS HIGHWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway resurfaced by BPP. AKA 1715 East 13th Street
|
2020-12-19
|
No data
|
STAFFORD AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/WALK FLAGS
|
2020-12-11
|
No data
|
54 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP done in compliance
|
2020-12-08
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk sealed
|
2020-12-08
|
No data
|
21 AVENUE, FROM STREET 60 STREET TO STREET 61 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk installed in compliance
|
2020-12-06
|
No data
|
204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restore completed with expansion joint seal in compliance.
|
2020-12-04
|
No data
|
WILSON AVENUE, FROM STREET BAYARD STREET TO STREET CHESEBROUGH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
84’10x22’7 milled in preparation to br paved
|
2020-12-03
|
No data
|
QUINTARD STREET, FROM STREET HURLBERT STREET TO STREET LEDYARD PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP INSPECTION:Width of roadway is 53’Roadway width that has been milled is 32’8” milled down 3 and a quarter inches.MILLED CORRECTLY.
|
2020-12-03
|
No data
|
PARKINSON AVENUE, FROM STREET KRAMER STREET TO STREET LEDYARD PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP INSPECTION: Width of roadway 25’6”Roadway width that has been milled is 24’2” milled down 3”
|
2020-11-28
|
No data
|
60 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk installed
|
2020-11-25
|
No data
|
HYLAN BOULEVARD, FROM STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2020-11-25
|
No data
|
YETMAN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2020-11-24
|
No data
|
GIEGERICH AVENUE, FROM STREET BEDELL AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2020-11-24
|
No data
|
DIRENZO COURT, FROM STREET DEAD END TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags & driveway apron acceptable.
|
2020-11-23
|
No data
|
VAN PELT AVENUE, FROM STREET DE RUYTER PLACE TO STREET NETHERLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2020-11-20
|
No data
|
MC CLEAN AVENUE, FROM STREET LINWOOD AVENUE TO STREET PIAVE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2020-11-19
|
No data
|
58 STREET, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP done in compliance, The Property width is 40’. The milled width is 43’. The roadway from curb to curb is 30’. The roadway milled off the curb is 20’, the required is ½ plus 5 feet. The milled depth 3.25” to 3.50”
|
2020-11-17
|
No data
|
WOEHRLE AVENUE, FROM STREET LORING AVENUE TO STREET WARING AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2020-11-16
|
No data
|
AVENUE J, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk flags in compliance
|
2020-11-09
|
No data
|
KISSEL AVENUE, FROM STREET DELAFIELD AVENUE TO STREET FOREST AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container on roadway valid permit on file
|
2020-11-05
|
No data
|
54 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway width from curb to curb 32 feet in front of the property. BPP width 22’3”. Property length 34’9”L. BPP length 35’. Roadway milled depth 3.5”
|
2020-11-02
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SE4 corner newly constructed offset 1 ramp. Plastic cover was left on the DWS, failed to remove the plastic cover upon completion. Condition remains the same. DA2 NOV issued.
|
2020-10-29
|
No data
|
AVENUE J, FROM STREET EAST 9 STREET TO STREET EAST 10 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence ok
|
2020-10-28
|
No data
|
STECHER STREET, FROM STREET AMBOY ROAD TO STREET BILLIOU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2020-10-15
|
No data
|
ROKEBY PLACE, FROM STREET BARD AVENUE TO STREET KISSEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w replaced
|
2020-10-14
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2020-10-10
|
No data
|
DIRENZO COURT, FROM STREET DEAD END TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2020-10-09
|
No data
|
RICHARDSON STREET, FROM STREET LORIMER STREET TO STREET UNION AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Length of the milled roadway property line to property line:28’Width of the entire roadway curb to curb:30’Width of the milled roadway:20’
|
2020-10-09
|
No data
|
FOREST ROAD, FROM STREET DALEMERE ROAD TO STREET DUTCHESS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival BPP was milled and paved – 65’6” X 22’6”
|
2020-10-09
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly constructed offset 1 ramp. Plastic cover on DWS. Ramp is functional and accessible. Previously measured and collected (Collector). Condition remains the same. No action taken.
|
2020-10-08
|
No data
|
FOREST ROAD, FROM STREET DALEMERE ROAD TO STREET DUTCHESS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sent to check BPP however no work has been done
|
2020-10-08
|
No data
|
MAINE AVENUE, FROM STREET BIDWELL AVENUE TO STREET NEAL DOW AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon my arrival a 39’ x 24’ portion of the roadway was paved for BPP and sealed.
|
2020-10-07
|
No data
|
CONNECTICUT STREET, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
140' X 38' (curb to curb) milled for address #87, 93, 99. BPP acceptable for paving.
|
2020-10-04
|
No data
|
HYLAN BOULEVARD, FROM STREET ALLISON AVENUE TO STREET PRINCETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2020-10-01
|
No data
|
EAST 16 STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb installed at 1602 Ave U.
|
2020-09-30
|
No data
|
BALTIC STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
rw paved
|
2020-09-29
|
No data
|
NORTH RAILROAD AVENUE, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS ARE OK JOINTS SEALED
|
2020-09-27
|
No data
|
DONGAN HILLS AVENUE, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2020-09-26
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced in front of 123 linden blvd
|
2020-09-25
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SE4 corner newly constructed offset 1 ramp. Must remove plastic cover from DWS.
|
2020-09-25
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SE4 newly constructed offset 1 ramp. DWS has now been replaced and measures 48” wide. Plastic cover on DWS still remains, will issue a CAR to remove.
|
2020-09-22
|
No data
|
AVENUE U, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset
|
2020-09-20
|
No data
|
EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W
|
2020-09-16
|
No data
|
ENGLEWOOD AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET QUAIL LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2020-09-16
|
No data
|
BEACON AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable
|
2020-09-16
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor has milled a 300’x33’ area of roadway to a depth of 3” in compliance, Roadway measures to be 56’ from curb to curb.
|
2020-09-15
|
No data
|
57 STREET, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway from curb to curb measures 30 feet. The contractor has milled 20 feet of the roadway, adjacent to the property, with a length of 22 feet, and a depth of 3 inches. In compliance with BPP required measurements
|
2020-09-15
|
No data
|
MAYBERRY PROMENADE, FROM STREET BEND TO STREET STRAWBERRY LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints have been sealed
|
2020-09-15
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No BPP paving work started at the time of inspection.
|
2020-09-13
|
No data
|
BRYANT AVENUE, FROM STREET CLAWSON STREET TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2020-09-02
|
No data
|
POMPEY AVENUE, FROM STREET LEVERETT AVENUE TO STREET STROUD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-09-01
|
No data
|
81 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2020-09-01
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SEALER WAS SINCE APPLIED
|
2020-08-31
|
No data
|
81 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2020-08-29
|
No data
|
ENFIELD PLACE, FROM STREET DI MARCO PLACE TO STREET MORLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-08-29
|
No data
|
DI MARCO PLACE, FROM STREET DEAD END TO STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-08-27
|
No data
|
METROPOLITAN AVENUE, FROM STREET 61 STREET TO STREET FRESH POND ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no work done
|
2020-08-26
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2020-08-25
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & Apron ok.
|
2020-08-25
|
No data
|
BAYVIEW AVENUE, FROM STREET EXCELSIOR AVENUE TO STREET FLORENCE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled (50’x21’) down 3in. awaiting paving. Sent photos and measurements to office
|
2020-08-25
|
No data
|
FINLAY AVENUE, FROM STREET BAYVIEW AVENUE TO STREET EVERETT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled (56’x25'6) down 3in. awaiting paving, sent photos and measurements to office
|
2020-08-20
|
No data
|
ZEBRA PLACE, FROM STREET ARTHUR KILL ROAD TO STREET VETERANS ROAD WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY PAVED VIA BPP
|
2020-08-20
|
No data
|
VETERANS ROAD WEST, FROM STREET ZEBRA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY PAVED VIA BPP
|
2020-08-20
|
No data
|
47 STREET, FROM STREET 14 AVENUE TO STREET 15 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP measurement :1455 47 Street : Curb to Curb 30ft0in – Portion of street milled : Width 21ft0in – Length 25ft0in - Depth 3 inches – Properly length 25ft0in
|
2020-08-20
|
No data
|
VETERANS ROAD WEST, FROM STREET WSE SB EXIT 3 TO STREET ZEBRA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP WAS APPLIED
|
2020-08-15
|
No data
|
ARBUTUS AVENUE, FROM STREET TROUT PLACE TO STREET YEOMALT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable
|
2020-08-13
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed on sidewalk
|
2020-08-12
|
No data
|
DI MARCO PLACE, FROM STREET DEAD END TO STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR pass. BPP sealed.
|
2020-08-12
|
No data
|
ENFIELD PLACE, FROM STREET DI MARCO PLACE TO STREET MORLEY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR pass. BPP sealed.
|
2020-08-09
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, ok ... walk ... ped ..
|
2020-08-06
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR had to be passed out because it was only said to remove all white plastic caps. New CAR was issued including language to also trim & seal expansion joints in the sidewalk to better fit the rule.
|
2020-08-06
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR had to be passed out because it was only said to remove all white plastic caps. New CAR was issued including language to also trim & seal expansion joints in the sidewalk to better fit the rule.
|
2020-08-06
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR pass. BPP sealed.
|
2020-08-05
|
No data
|
RADFORD STREET, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No refuse container on location at this time.
|
2020-08-05
|
No data
|
BANCROFT AVENUE, FROM STREET BEND TO STREET CLAWSON STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Roadway curb cutback made and restored in kind. Apron and Sidewalk ok
|
2020-08-04
|
No data
|
RADFORD STREET, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CONTAINER ON RWY
|
2020-08-04
|
No data
|
SWINNERTON STREET, FROM STREET AMBOY ROAD TO STREET PITTSVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container in parking lane. Area is in full compliance.
|
2020-08-04
|
No data
|
EAST 28 STREET, FROM STREET AVENUE D TO STREET NEWKIRK AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Full width of the roadway 30’0Cut size L32’0 W20’0Rw was paved upon arrival
|
2020-08-03
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new walk
|
2020-07-31
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NE3 corner newly constructed tangent ramps. Ramps functional & accessible. Street is elevated. Measured & collected on 5/3/19. No further action needed at this time.
|
2020-07-31
|
No data
|
DEMOPOLIS AVENUE, FROM STREET KATAN AVENUE TO STREET LAMOKA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2020-07-30
|
No data
|
PRESTON AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permit expired container no longer on site
|
2020-07-30
|
No data
|
TUTTLE STREET, FROM STREET DEAD END TO STREET DEVENS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb done in back of property. Street doesn't go through at this time.
|
2020-07-29
|
No data
|
VAN BRUNT STREET, FROM STREET BEARD STREET TO STREET VAN DYKE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RE-PAVE OK AT NEW BUILDING
|
2020-07-25
|
No data
|
CLERMONT AVENUE, FROM STREET MANHATTAN STREET TO STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2020-07-25
|
No data
|
HETT AVENUE, FROM STREET EBBITTS STREET TO STREET MARINE WAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
active ddc site
|
2020-07-25
|
No data
|
YETMAN AVENUE, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2020-07-25
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2020-07-24
|
No data
|
HYLAN BOULEVARD, FROM STREET ALLISON AVENUE TO STREET PRINCETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags
|
2020-07-24
|
No data
|
EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2020-07-22
|
No data
|
IRVING PLACE, FROM STREET HARDY STREET TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2020-07-22
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2020-07-21
|
No data
|
TYSENS LANE, FROM STREET HYLAN BOULEVARD TO STREET PRIMROSE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags
|
2020-07-18
|
No data
|
RAMONA AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container no longer on site permit expired
|
2020-07-16
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit #S042019102A07 exp:5/10/19 for NE3. Newly constructed tangent ramps. Some measurements exceed acceptable standards. Ramps functional & accessible. Street is elevated. No further action needed at this time.
|
2020-07-15
|
No data
|
NORTH 3 STREET, FROM STREET KENT AVENUE TO STREET WYTHE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Entire segment repaved
|
2020-07-15
|
No data
|
WEST 17 STREET, FROM STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No 410 ped ramp permit on file. Ramps were installed as apart of new B.O. Ramps in the SW1 corner quadrant are functional and accessible. Non Ada compliant. Measured in prism on 7/15/20
|
2020-07-15
|
No data
|
WEST 17 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent failed to call the NYC DOT HIQA borough office within 4 hours prior to work being done. A violation of stipulation 1/2+5” of above DOT permit used for I.D.
|
2020-07-15
|
No data
|
7 AVENUE, FROM STREET WEST 16 STREET TO STREET WEST 17 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent failed to call the NYC DOT HIQA borough office within 4 hours prior to work being done. A violation of stipulation 1/2+5” of above DOT permit used for I.D.
|
2020-07-13
|
No data
|
MADISON STREET, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ROADWAY RESURFACED
|
2020-07-13
|
No data
|
CRESTON STREET, FROM STREET DEAD END TO STREET FINLAY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway was milled (54'x28'2) down 3in, awaiting paving, sent measurements and photos to office
|
2020-07-07
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, new building ... bank ..
|
2020-07-06
|
No data
|
54 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP: PASS - Length: 30ft 7in Width: 21ft 10in Full Width of Roadway: 31ft 10in Depth: 3in
|
2020-07-06
|
No data
|
PENNSYLVANIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street fully paved by ... nycdot ...
|
2020-07-03
|
No data
|
SOUTH STREET, FROM STREET BROAD STREET TO STREET WHITEHALL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP work done , inspector was on site. BPP has been finalized, lane marking has been restored and in compliance I/F/O #10 (Governors Island ferry) refer #M012019204A53.
|
2020-07-02
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Reseal exposed street opening joints
|
2020-07-02
|
No data
|
TENAFLY PLACE, FROM STREET ALBEE AVENUE TO STREET HODA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable
|
2020-07-01
|
No data
|
MAYBERRY PROMENADE, FROM STREET BEND TO STREET STRAWBERRY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY PAVED VIA BPP
|
2020-07-01
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal was cracked along perimeter of builders pavement in roadway. Please reseal entire perimeter.
|
2020-06-30
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
White plastic caps must be removed from expansion joints. In front of 41.
|
2020-06-30
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paved .....
|
2020-06-30
|
No data
|
PENNSYLVANIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
street fully paved by nycdot ... summer of 2020..
|
2020-06-29
|
No data
|
DAVIS AVENUE, FROM STREET DELAFIELD AVENUE TO STREET FOREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway resurface
|
2020-06-27
|
No data
|
VERNON AVENUE, FROM STREET ALBOURNE AVENUE TO STREET AMBOY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP acceptable
|
2020-06-26
|
No data
|
ATLANTIC AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, street paved under DDC ... capital ..
|
2020-06-26
|
No data
|
ENFIELD PLACE, FROM STREET DI MARCO PLACE TO STREET MORLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal was cracked along the perimeter of builders pavement in the roadway. Please reseal along the edge.
|
2020-06-26
|
No data
|
DI MARCO PLACE, FROM STREET DEAD END TO STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal was cracked along the perimeter of builders pavement in the roadway. Please reseal along the edge.
|
2020-06-26
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Sidewalk expansion joints need to be sealedPlease remove plastic caps & seal expansion joints in between the sidewalk & curb in front of building #123 LINDEN BOULEVARD, in a timely fashion. CAR issued
|
2020-06-26
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed roadway has wear & tear. As per Google Map showing prior to work commenced
|
2020-06-24
|
No data
|
BRADLEY AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
AREA OF R/WAY WAS PAVED VIA BPP
|
2020-06-23
|
No data
|
WAYNE STREET, FROM STREET BROADWAY TO STREET CAMPBELL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w was resurfaced BPP
|
2020-06-20
|
No data
|
POMPEY AVENUE, FROM STREET LEVERETT AVENUE TO STREET STROUD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO CONTAINER ON SITE
|
2020-06-19
|
No data
|
YETMAN AVENUE, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
23’x20’ portion of rdwy milled, half plus 5 acceptable
|
2020-06-17
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEC newly constructed tangent ramps. Ramps functional and accessible. Previously measured and collected. No further action needed at this time.
|
2020-06-12
|
No data
|
GARIBALDI AVENUE, FROM STREET CEDAR GROVE AVENUE TO STREET ROMA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-06-09
|
No data
|
PORTLAND PLACE, FROM STREET BRIGHTON AVENUE TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w replaced
|
2020-06-05
|
No data
|
HOYT AVENUE, FROM STREET CASTLETON AVENUE TO STREET DELAFIELD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
flags replaced
|
2020-06-04
|
No data
|
TUTTLE STREET, FROM STREET DEAD END TO STREET DEVENS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New homes built at deadend lot no curb visible. Active permits on file
|
2020-06-03
|
No data
|
HOME PLACE, FROM STREET DEAD END TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Curb was installed however after research houses 47-57 were built on grass that extended from Zion Church property. Home Pl was a dead end at both sides. We dont have jurisdiction at these houses including the roadway built
|
2020-06-03
|
No data
|
CLERMONT AVENUE, FROM STREET MANHATTAN STREET TO STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
75' X 32'- curb to curb r/w milled. BPP acceptable.
|
2020-06-03
|
No data
|
HOME PLACE, FROM STREET DEAD END TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed under active permit
|
2020-06-02
|
No data
|
MERRILL AVENUE, FROM STREET ARLENE STREET TO STREET FIRTH ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Mezzacappa has newer permit on file for curb as well as the aka 314 Arlene St side of corner property. Therefore using that permit for concrete over-pour removal
|
2020-06-01
|
No data
|
RAMAPO AVENUE, FROM STREET MARCY AVENUE TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container.
|
2020-05-23
|
No data
|
CASTLETON AVENUE, FROM STREET BARD AVENUE TO STREET HOYT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 flag replaced on s/w
|
2020-05-21
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SEC newly installed offset 1 ramp, this ramp feeds 2 ramps. Must replace with the correct size 5’ DWS as per the H-1011 specs. The installed DWS only measures 36”. If you any questions please email HIQApedramp@dot.nyc.gov.
|
2020-05-21
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SEC newly installed offset 1 ramp, this ramp feeds 2 ramps. Must replace with the correct size 5’ DWS as per the H-1011 specs. The installed DWS only measures 36”. If you any questions please email HIQApedramp@dot.nyc.gov.
|
2020-05-16
|
No data
|
GARIBALDI AVENUE, FROM STREET CEDAR GROVE AVENUE TO STREET ROMA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-05-16
|
No data
|
AMBOY ROAD, FROM STREET ACACIA AVENUE TO STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
old curb no work done
|
2020-05-13
|
No data
|
BENNETT AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
BPP seal ok CAR is not necessary at this time . To be re-evaluated at next inspection
|
2020-05-13
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
bpp seal ok rw adjacent to area poor
|
2020-05-10
|
No data
|
ILYSE COURT, FROM STREET DINA COURT TO STREET LYLE COURT
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/C APPLIED
|
2020-05-08
|
No data
|
MC CLEAN AVENUE, FROM STREET LINWOOD AVENUE TO STREET PIAVE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Corrections made.
|
2020-05-08
|
No data
|
NORTH RAILROAD AVENUE, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Safety cones removed.
|
2020-04-18
|
No data
|
OTIS AVENUE, FROM STREET CLAWSON STREET TO STREET EDISON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2020-04-18
|
No data
|
NEW DORP LANE, FROM STREET RICHMOND ROAD TO STREET 2 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & apron.
|
2020-04-16
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw acceptable
|
2020-04-15
|
No data
|
ZEBRA PLACE, FROM STREET ARTHUR KILL ROAD TO STREET VETERANS ROAD WEST
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2020-04-03
|
No data
|
TUTTLE STREET, FROM STREET DEAD END TO STREET DEVENS STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
nothing found
|
2020-04-02
|
No data
|
MANILA AVENUE, FROM STREET ISERNIA AVENUE TO STREET TYSENS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk
|
2020-03-28
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET MINERVA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-03-28
|
No data
|
YETMAN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-03-21
|
No data
|
GIEGERICH AVENUE, FROM STREET BEDELL AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2020-03-21
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-03-17
|
No data
|
METROPOLITAN AVENUE, FROM STREET 61 STREET TO STREET FRESH POND ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
several sidewalk flags restored in kind
|
2020-03-11
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2020-03-11
|
No data
|
HYLAN BOULEVARD, FROM STREET BENTON AVENUE TO STREET COOPER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags acceptable.
|
2020-03-10
|
No data
|
STECHER STREET, FROM STREET AMBOY ROAD TO STREET BILLIOU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2020-03-10
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2020-03-06
|
No data
|
BENNETT AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal was cracked along the perimeter of restoration (builders pavement plan). CAR issued.
|
2020-03-06
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Seal was cracked along the perimeter of restoration (builders pavement plan). CAR issued.
|
2020-03-06
|
No data
|
LACONIA AVENUE, FROM STREET BENTON AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags ok.
|
2020-02-28
|
No data
|
HYLAN BOULEVARD, FROM STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2020-02-26
|
No data
|
GIEGERICH AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2020-02-25
|
No data
|
SENECA AVENUE, FROM STREET NIAGARA STREET TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w replaced and joints sealed
|
2020-02-25
|
No data
|
VICTORY BOULEVARD, FROM STREET CLOVE ROAD TO STREET SENECA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w replaced joints sealed
|
2020-02-19
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS.
|
2020-02-12
|
No data
|
WINTER AVENUE, FROM STREET BISMARK AVENUE TO STREET WESTERVELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w and apron replaced
|
2020-02-12
|
No data
|
12 AVENUE, FROM STREET 70 STREET TO STREET 71 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Commercial refuse container placed on the roadway.
|
2020-02-08
|
No data
|
CANAL STREET, FROM STREET BAY STREET TO STREET SI RAPID TRANSIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok.
|
2020-02-07
|
No data
|
VICTORY BOULEVARD, FROM STREET SILVER LAKE CEMETERY BOUNDARY TO STREET SILVER LAKE PARK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags replaced
|
2020-02-03
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2020-02-03
|
No data
|
MC ARTHUR AVENUE, FROM STREET BEND TO STREET FORRESTAL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DRIVEWAY APRON OK
|
2020-02-01
|
No data
|
DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reveal installed in front of property #98 in compliance
|
2020-01-29
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEC newly completed tangent ramps found to be non ADA compliant, however ramps are functional and accessible. Previously measured and collected. No action taken at this time of the inspection.
|
2020-01-29
|
No data
|
WAYNE STREET, FROM STREET BROADWAY TO STREET CAMPBELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
51' x 34' portion of the roadway was paved for BPP
|
2020-01-28
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly installed offset 1 ramp, this ramp feeds 2 other ramps. DWS should be 60”X24”. The installed DWS only measures 36”. Ramp functional and accessible. Previously measured. Condition remains the same.
|
2020-01-25
|
No data
|
STOBE AVENUE, FROM STREET LACONIA AVENUE TO STREET MEADOW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W
|
2020-01-24
|
No data
|
ILYSE COURT, FROM STREET DINA COURT TO STREET LYLE COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w apron and drop curb was replaced. CAR issued to correct concrete over spillage from roadway i/f/o newly repaired drop curb/curb and restore area with asphalt.
|
2020-01-24
|
No data
|
22 STREET, FROM STREET 6 AVENUE TO STREET 7 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
street 30ft by 50ft down 3in
|
2020-01-22
|
No data
|
ROCKAWAY STREET, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2020-01-21
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET MINERVA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2020-01-21
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb.
|
2020-01-21
|
No data
|
HOME PLACE, FROM STREET DEAD END TO STREET WILLOWBROOK ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2020-01-16
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple s/w flags ok
|
2020-01-14
|
No data
|
LYNDALE AVENUE, FROM STREET KING STREET TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container in parking lane acceptable
|
2020-01-12
|
No data
|
BEACON AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS AND DRIVEWAY APRON ARE OK
|
2020-01-09
|
No data
|
MOUNTAINVIEW AVENUE, FROM STREET PURDY AVENUE TO STREET VICTORY BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the contractor on site paving an 83' x 30' area that was milled for BPP
|
2020-01-09
|
No data
|
KENMORE STREET, FROM STREET BEND TO STREET WOODROW ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container in parking lane acceptable
|
2020-01-07
|
No data
|
MILL ROAD, FROM STREET GUYON AVENUE TO STREET ISABELLA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew had already started paving roadway when arrived at location.Width of roadway is 38’10”Width that has been milled down 3 inches is 38’10”.Entire width of roadway has been milled out.
|
2019-12-24
|
No data
|
RAMONA AVENUE, FROM STREET LENEVAR AVENUE TO STREET MINTURN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and double driveway apron replaced in kind ok
|
2019-12-24
|
No data
|
ROKEBY PLACE, FROM STREET BARD AVENUE TO STREET KISSEL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w and curb replaced
|
2019-12-21
|
No data
|
HETT AVENUE, FROM STREET EBBITTS STREET TO STREET MARINE WAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-12-18
|
No data
|
NORTH RAILROAD AVENUE, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
70'x22' portion of the roadway was milled down 3" awaiting to be paved. Emailed photos to Staff Inspector.
|
2019-12-18
|
No data
|
VERNON AVENUE, FROM STREET ALBOURNE AVENUE TO STREET AMBOY ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway was paved upon arrival. Called office and sent measurements 96'x 22'6 & photos
|
2019-12-17
|
No data
|
RYE AVENUE, FROM STREET POMPEY AVENUE TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
permit expired container not on site
|
2019-12-17
|
No data
|
ADLAI CIRCLE, FROM STREET BEND TO STREET POMPEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Shared/split driveway, drop curb & Sidewalk replaced in kind/sealed
|
2019-12-16
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2019-12-13
|
No data
|
BRYANT AVENUE, FROM STREET CLAWSON STREET TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-12-11
|
No data
|
BUTLER BOULEVARD, FROM STREET FAITH COURT TO STREET FLOWER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
161’ x 30’ area of r/way is currently paved via BPP. Did not witness milling depth.
|
2019-12-05
|
No data
|
VAN PELT AVENUE, FROM STREET DE RUYTER PLACE TO STREET NETHERLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2019-12-04
|
No data
|
BANCROFT AVENUE, FROM STREET BEND TO STREET CLAWSON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & apron replaced. CAR was issued to remove concrete over spillage from the roadway (i/f/o apron/dropcurb) and restore area with asphalt.
|
2019-12-02
|
No data
|
EDGEWATER STREET, FROM STREET LYNHURST AVENUE TO STREET SYLVATON TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb ok
|
2019-12-02
|
No data
|
SYLVATON TERRACE, FROM STREET BAY STREET TO STREET WIMAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel face curb ok
|
2019-12-01
|
No data
|
BAY 31 STREET, FROM STREET BATH AVENUE TO STREET CROPSEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Construction container placed on the roadway, street protection under container provided.
|
2019-11-27
|
No data
|
DICKIE AVENUE, FROM STREET COLLEGE AVENUE TO STREET NORTH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active construction taking place at this time on curb and s/w
|
2019-11-26
|
No data
|
NORTH RAILROAD AVENUE, FROM STREET BURGHER AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REMOVE MULTIPLE CONES FROM THE R/WAY.
|
2019-11-24
|
No data
|
DONGAN HILLS AVENUE, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2019-11-24
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB IS OK
|
2019-11-22
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DUPLICATE PERMIT: Newer permit #S042019102A07 exp:5/10/19 has been obtained for the NEC. Newly constructed tangent ramps non ADA compliant, however ramps functional & accessible. Some measurements exceed acceptable standards. C&M, no action.
|
2019-11-22
|
No data
|
MC CLEAN AVENUE, FROM STREET LINWOOD AVENUE TO STREET PIAVE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sporadic sidewalk flags and patch of curb newly repaired. CAR issued to fill in gaps to grade with sod eliminating potential tripping condition along newly repaired sidewalk flags and curb patches.
|
2019-11-16
|
No data
|
PERKIOMEN AVENUE, FROM STREET DEAD END TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb acceptable.
|
2019-11-14
|
No data
|
LEVERETT AVENUE, FROM STREET LOVELACE AVENUE TO STREET POMPEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-11-12
|
No data
|
MAYBERRY PROMENADE, FROM STREET BEND TO STREET STRAWBERRY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REMOVE CAPS & APPLY SEALER FOR EXPANSION JOINTS OF S/WALK FLAGS.
|
2019-11-09
|
No data
|
BENNETT AVENUE, FROM STREET BEND TO STREET HODA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2019-11-07
|
No data
|
GIEGERICH AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2019-10-30
|
No data
|
CORRELL AVENUE, FROM STREET BOMBAY STREET TO STREET NORTH EDO COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Various Sidewalk flags replaced in kind
|
2019-10-26
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2019-10-24
|
No data
|
HYLAN BOULEVARD, FROM STREET ALLISON AVENUE TO STREET PRINCETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-10-19
|
No data
|
EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WORK NOT YET COMPLETE. *** NEW ACTIVE PERMIT ON FILE. ***
|
2019-10-11
|
No data
|
77 STREET, FROM STREET 10 AVENUE TO STREET FT HAMILTON PARKWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONSTRUCTION DEBRIS CONTAINER STORED ON THE STREET
|
2019-10-10
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw acceptable
|
2019-10-08
|
No data
|
OTIS AVENUE, FROM STREET CLAWSON STREET TO STREET EDISON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-10-08
|
No data
|
MAYBERRY PROMENADE, FROM STREET BEND TO STREET STRAWBERRY LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2019-10-05
|
No data
|
HYLAN BOULEVARD, FROM STREET ALLISON AVENUE TO STREET PRINCETON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/walk flags
|
2019-10-04
|
No data
|
NEW DORP LANE, FROM STREET RICHMOND ROAD TO STREET 2 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS.
|
2019-10-04
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb within active DDC site
|
2019-10-03
|
No data
|
DEMOPOLIS AVENUE, FROM STREET KATAN AVENUE TO STREET LAMOKA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2019-10-02
|
No data
|
WILLARD AVENUE, FROM STREET WATCHOGUE ROAD TO STREET WATERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb was replaced
|
2019-10-02
|
No data
|
DI MARCO PLACE, FROM STREET DEAD END TO STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-10-02
|
No data
|
FILLMORE STREET, FROM STREET FRANKLIN AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw acceptable
|
2019-10-02
|
No data
|
ENFIELD PLACE, FROM STREET DI MARCO PLACE TO STREET MORLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-09-28
|
No data
|
PROSPECT PARK SOUTHWEST, FROM STREET EAST DRIVE TO STREET GREENWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installation is in compliance.
|
2019-09-27
|
No data
|
CASTLETON AVENUE, FROM STREET BARD AVENUE TO STREET HOYT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sw. acceptable
|
2019-09-25
|
No data
|
WEST 34 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to comply with the terms of their DOT permit stip 1/2+5 ft by paving roadway without contacting the NYC DOT HIQA Manhattan borough office 4hrs in advance.
|
2019-09-20
|
No data
|
HYLAN BOULEVARD, FROM STREET BATH AVENUE TO STREET COOPER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-09-19
|
No data
|
COOPER AVENUE, FROM STREET BENTON AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. NEAR HYLAN X/WALK
|
2019-09-19
|
No data
|
REID AVENUE, FROM STREET HYLAN BOULEVARD TO STREET JEROME ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per d.o.t Engineering contractors are not responsible for replacing school crossing markers
|
2019-09-05
|
No data
|
OTIS AVENUE, FROM STREET CLAWSON STREET TO STREET EDISON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-09-05
|
No data
|
REVERE STREET, FROM STREET DEAD END TO STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk acceptable
|
2019-09-05
|
No data
|
ATLANTIC AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
ROADWAY HAVE BEEN REPAVED AND OPEN AT THIS TIME.
|
2019-08-26
|
No data
|
RICHARD AVENUE, FROM STREET DEAD END TO STREET FLOWER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
11:40 i had arrived at location permittee has already started to lay new wearing course. Inspection of BPP width of roadway is 40'1". Permittee has milled out a width of 27'7" down 3 inches.
|
2019-08-22
|
No data
|
MANILA AVENUE, FROM STREET ISERNIA AVENUE TO STREET TYSENS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-08-21
|
No data
|
ATLANTIC AVENUE, FROM STREET NEW JERSEY AVENUE TO STREET PENNSYLVANIA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
paving done as required (126 x 38' ) Passed
|
2019-08-21
|
No data
|
PENNSYLVANIA AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
paving done as required (165' x 35' ) Passed
|
2019-08-21
|
No data
|
NEW JERSEY AVENUE, FROM STREET ATLANTIC AVENUE TO STREET LIBERTY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
permit does not have half plus 5 stip, roadway milled and paved at this time
|
2019-08-14
|
No data
|
FOSTER AVENUE, FROM STREET EAST 7 STREET TO STREET EAST 8 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container on the roadway
|
2019-08-06
|
No data
|
BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple sidewalk flags installed I/F/O 150.
|
2019-08-06
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk has been sealed
|
2019-07-26
|
No data
|
TYSENS LANE, FROM STREET HYLAN BOULEVARD TO STREET PRIMROSE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/walk flags
|
2019-07-19
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NE3 corner newly installed tangent ramps non ADA compliant, however ramps are functional and accessible. Some measurements exceed acceptable standards. Collected and Measured on 5/3/2019. No action taken at this time.
|
2019-07-18
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SE4 corner newly installed offset 1 ramp, this ramp feeds 2 other ramps. Please replace with the correct size 5’ DWS as per the H-1011 specs. The installed DWS only measures 36”. Thank you.
|
2019-07-17
|
No data
|
WAVECREST STREET, FROM STREET CEDAR GROVE AVENUE TO STREET DUSTAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-07-12
|
No data
|
REID AVENUE, FROM STREET HYLAN BOULEVARD TO STREET JEROME ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAS FAILED TO RESTORE LANE MARKINGS IN KIND. AT THIS TIME, THE PROPER LANE MARKINGS TO NOTIFY PEDESTRIANS OF "SCHOOL X-ING" WAS NOT RESTORED. CAR #20193340592 WAS ISSUED ON 5-23-19.
|
2019-07-12
|
No data
|
DI MARCO PLACE, FROM STREET DEAD END TO STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
105' x 35' AREA OF R/WAY IS MILLED OUT, DOWN 3". *** CHECKING FOR MILLING DEPTH VIA SIHIQA ***
|
2019-07-10
|
No data
|
PROVIDENCE STREET, FROM STREET OLD TOWN ROAD TO STREET URBANA STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
8’ X 28’ AREA OF R/WAY WAS FULLY PAVED VIA BPP. *** I was not able to check for milling depth, as the area was paved upon my arrival. ***
|
2019-07-08
|
No data
|
59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk installed; sealed and flush
|
2019-07-06
|
No data
|
DI MARCO PLACE, FROM STREET DEAD END TO STREET ENFIELD PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no new milling or paving has taken place at this time
|
2019-07-06
|
No data
|
ENFIELD PLACE, FROM STREET DI MARCO PLACE TO STREET MORLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no new milling or paving has taken place at this time
|
2019-07-05
|
No data
|
LINDEN BOULEVARD, FROM STREET BEDFORD AVENUE TO STREET ROGERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb in compliance
|
2019-07-05
|
No data
|
WILLOW POND ROAD, FROM STREET BENEDICT ROAD TO STREET BUTTONWOOD ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Complaint #311-00056833 The roadway is to grade. At this time all potholes adjacent to newly paved road are to grade , no action taken.
|
2019-06-30
|
No data
|
81 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk
|
2019-06-22
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable
|
2019-06-20
|
No data
|
STECHER STREET, FROM STREET AMBOY ROAD TO STREET BILLIOU STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-06-18
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-06-15
|
No data
|
LIBERTY STREET, FROM STREET BROADWAY TO STREET LIBERTY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk in compliance.
|
2019-06-13
|
No data
|
EBBITTS STREET, FROM STREET ALLISON AVENUE TO STREET MILL ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Multiple sidewalk flags ok.
|
2019-06-13
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-06-13
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REMOVE PLASTIC CAPS & APPLY SEALER TO EXPANSION JOINTS. I/F/O #420
|
2019-06-13
|
No data
|
RAMONA AVENUE, FROM STREET LENEVAR AVENUE TO STREET MINTURN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2019-06-12
|
No data
|
81 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk close
|
2019-06-11
|
No data
|
WINDSOR PLACE, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container in front of building number 55, in compliance.
|
2019-05-30
|
No data
|
TENAFLY PLACE, FROM STREET ALBEE AVENUE TO STREET HODA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-05-23
|
No data
|
EAST SCRANTON AVENUE, FROM STREET ABINGDON AVENUE TO STREET ARMSTRONG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-05-23
|
No data
|
REID AVENUE, FROM STREET HYLAN BOULEVARD TO STREET JEROME ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2019-05-23
|
No data
|
MASON BOULEVARD, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2019-05-17
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SE4 newly installed single 1 ramp. 410 permit type has been obtained and ped ramp has been restored. DWS measurements of 36” x 24” acceptable as per Kerry.
|
2019-05-14
|
No data
|
PORTLAND PLACE, FROM STREET BRIGHTON AVENUE TO STREET STANLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and apron ok.
|
2019-05-11
|
No data
|
DELAFIELD AVENUE, FROM STREET HART BOULEVARD TO STREET WALBROOKE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
area in front of driveway to grade
|
2019-05-10
|
No data
|
YETMAN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb was installed.
|
2019-05-10
|
No data
|
ROCKAWAY STREET, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-05-10
|
No data
|
HYLAN BOULEVARD, FROM STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb was installed.
|
2019-05-09
|
No data
|
CASTLETON AVENUE, FROM STREET BARD AVENUE TO STREET HOYT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 SIDEWALK FLAGS AND TRUNCATED DOME AS BEEN REPLACED
|
2019-05-08
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NE3 newly installed tangent ramps. Full corner quad has been restored and traffic signal pole has been properly isolated.
|
2019-05-08
|
No data
|
9 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2019-05-08
|
No data
|
HOYT AVENUE, FROM STREET CASTLETON AVENUE TO STREET DELAFIELD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
2 SIDEWALK FLAGS ARE OK JOINTS SEALED
|
2019-05-03
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NE3 Corner newly completed tangent ramps found to be non ADA compliant, however ramps are functional and accessible. Measured on 5/3/2019.
|
2019-05-03
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Duplicate permit. Newer permit on file S042019102A07. NE3 Corner newly completed tangent ramps found to be non ADA compliant, however ramps are functional and accessible. Measured on 5/3/2019.
|
2019-05-01
|
No data
|
GOODWIN AVENUE, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2019-04-27
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-04-27
|
No data
|
HYLAN BOULEVARD, FROM STREET CULOTTA LANE TO STREET PAGE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/walk flags.
|
2019-04-27
|
No data
|
TENAFLY PLACE, FROM STREET ALBEE AVENUE TO STREET HODA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb acceptable.
|
2019-04-18
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb acceptable.
|
2019-04-18
|
No data
|
GIEGERICH AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-04-18
|
No data
|
MORRISON AVENUE, FROM STREET BEMENT AVENUE TO STREET NORTH BURGHER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK FLAGS OK JOINTS SEALED
|
2019-04-17
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET MINERVA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED
|
2019-04-16
|
No data
|
LEE AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SEALER WAS APPLIED TO EXPANSION JOINTS.
|
2019-04-16
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SE4 old existing single 1 ramp, non ADA compliant. DWS incorrect color must be safety red. Ramp is functional and accessible. Previously measured, updated collector today 4/16/19.
|
2019-04-11
|
No data
|
CORRELL AVENUE, FROM STREET BOMBAY STREET TO STREET NORTH EDO COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. *** ENTERING FINDINGS OFF-SITE AS NO MIFI SIGNAL AT THIS LOCATION ***
|
2019-04-10
|
No data
|
HEWITT AVENUE, FROM STREET MICHAEL LOOP TO STREET MILFORD DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/w - ok
|
2019-04-05
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
See email response to Terry Florio dated 4/5/19. Permit # is automatically generated under Non-Permit.
|
2019-04-05
|
No data
|
DELAFIELD AVENUE, FROM STREET HART BOULEVARD TO STREET WALBROOKE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NOV issued for failure to restore roadway inkind after being notified via CAR to remove excess concrete from curb
|
2019-03-30
|
No data
|
JAY STREET, FROM STREET DEAD END TO STREET JOHN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW CURB OK
|
2019-03-29
|
No data
|
CANAL STREET, FROM STREET BAY STREET TO STREET SI RAPID TRANSIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb repaired
|
2019-03-21
|
No data
|
DEWEY AVENUE, FROM STREET GREAVES AVENUE TO STREET TUDOR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk ok
|
2019-03-20
|
No data
|
ASHLAND AVENUE EAST, FROM STREET ELLSWORTH AVENUE TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-03-16
|
No data
|
WINTER AVENUE, FROM STREET BISMARK AVENUE TO STREET WESTERVELT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w & apron acceptable.
|
2019-03-16
|
No data
|
FIELDWAY AVENUE, FROM STREET DURANT AVENUE TO STREET MAYBURY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No container on location at this time.
|
2019-03-15
|
No data
|
BAY STREET, FROM STREET CANAL STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly installed off set one ramp in the SE4 corner quad, pleas obtain a new 410 permit and restore corner quad as per H-1011 specs ID by advanced site contractors inc. permit # S042019018A15. Ramp in non ADA compliant however ramps are functional
|
2019-03-14
|
No data
|
WILBUR STREET, FROM STREET HOLTON AVENUE TO STREET VAN WYCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-03-14
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-03-12
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb was installed
|
2019-03-10
|
No data
|
MC DERMOTT AVENUE, FROM STREET DEAD END TO STREET HURLBERT STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Commercial refuse container stored on the street without DOT permit.
|
2019-03-09
|
No data
|
SHARROTTS ROAD, FROM STREET DARNELL LANE TO STREET ROBIN COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-03-01
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-02-28
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Old existing tangent ramp in the NE3 corner quad, is non ADA compliant due to gray DWS however ramps are functional and accessible. Measured and collected.
|
2019-02-28
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-02-27
|
No data
|
EAST 16 STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2019-02-27
|
No data
|
DELAFIELD AVENUE, FROM STREET HART BOULEVARD TO STREET WALBROOKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR issued to have excess concrete removed from in front of drive
|
2019-02-22
|
No data
|
YETMAN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-02-22
|
No data
|
AVENUE U, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2019-02-22
|
No data
|
HYLAN BOULEVARD, FROM STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2019-02-21
|
No data
|
LACONIA AVENUE, FROM STREET BENTON AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Looks like one new s/w flag was replaced.
|
2019-02-21
|
No data
|
SHILOH STREET, FROM STREET MERRYMOUNT STREET TO STREET RADFORD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w acceptable.
|
2019-02-21
|
No data
|
CORRELL AVENUE, FROM STREET BOMBAY STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2019-02-17
|
No data
|
HYLAN BOULEVARD, FROM STREET DUMONT AVENUE TO STREET REID AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Curb installed. Bus lane portion of r/w was closed off with orange safety barrels. Non-compliant of stip 078. NOV was issued.
|
2019-02-14
|
No data
|
COALE AVENUE, FROM STREET SOUTH GREENLEAF AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in roadway opp 31
|
2019-02-12
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Old existing tangent ramp in the NE3 corner quad has incorrect DWS color, ramp is non ADA complaint due to several elements exceeds acceptable measurements, ramps are functional and accessible.
|
2019-02-12
|
No data
|
LORRAINE AVENUE, FROM STREET ANNADALE ROAD TO STREET ENDVIEW STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
10yd container placed along parking lane, wood underneath for street protection
|
2019-02-12
|
No data
|
HYLAN BOULEVARD, FROM STREET REID AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active permit, not a valid corner location,a non permit CAR was created (SNP2019043A03) to obtain a new 410 permit for correct corner location and restore corner quad as per H-1011 specs.
|
2019-02-10
|
No data
|
CLAWSON STREET, FROM STREET COLFAX AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk was ok.
|
2019-02-01
|
No data
|
METROPOLITAN AVENUE, FROM STREET 61 STREET TO STREET FRESH POND ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
not started
|
2019-02-01
|
No data
|
EAST 16 STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2019-01-31
|
No data
|
DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new curb
|
2019-01-31
|
No data
|
LEE AVENUE, FROM STREET AMBOY ROAD TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS FOR S/WALK FLAGS ARE VOID OF SEALER. REMOVE CAPS & APPLY SEALER TO EXPANSION JOINTS.
|
2019-01-30
|
No data
|
51 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s\w ok seal
|
2019-01-30
|
No data
|
CASTLETON AVENUE, FROM STREET BARD AVENUE TO STREET HOYT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk installed
|
2019-01-24
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2019-01-23
|
No data
|
FILLMORE STREET, FROM STREET FRANKLIN AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk installed
|
2019-01-23
|
No data
|
REVERE STREET, FROM STREET DEAD END TO STREET METROPOLITAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk acceptable.
|
2019-01-17
|
No data
|
STOBE AVENUE, FROM STREET LACONIA AVENUE TO STREET MEADOW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk was ok.
|
2019-01-16
|
No data
|
POTTER AVENUE, FROM STREET ROYAL OAK ROAD TO STREET SLOSSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
20 yard refuse container along parking lane
|
2019-01-12
|
No data
|
GIEGERICH AVENUE, FROM STREET BEDELL AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-01-10
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2019-01-02
|
No data
|
223 STREET, FROM STREET 103 AVENUE TO STREET HEMPSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2018-12-31
|
No data
|
DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new swk ok
|
2018-12-26
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
opp of s/w installed.
|
2018-12-24
|
No data
|
DE GRAW STREET, FROM STREET COLUMBIA STREET TO STREET VAN BRUNT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok seal
|
2018-12-15
|
No data
|
STOBE AVENUE, FROM STREET LACONIA AVENUE TO STREET MEADOW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON.
|
2018-12-15
|
No data
|
NEW DORP LANE, FROM STREET RICHMOND ROAD TO STREET 2 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2018-12-04
|
No data
|
RICHMOND ROAD, FROM STREET BLACKHORSE COURT TO STREET SANTO COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
bpp
|
2018-12-03
|
No data
|
49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm cut in parking lane
|
2018-11-27
|
No data
|
HYLAN BOULEVARD, FROM STREET BATH AVENUE TO STREET COOPER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CONCRETE OVERSPILL REPAIRED
|
2018-11-21
|
No data
|
HYLAN BOULEVARD, FROM STREET BENTON AVENUE TO STREET COOPER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB WAS INSTALLED
|
2018-11-20
|
No data
|
80 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container is placed in roadway
|
2018-11-19
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb -ok
|
2018-11-13
|
No data
|
GIEGERICH AVENUE, FROM STREET BEND TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb -ok
|
2018-11-12
|
No data
|
PAGE AVENUE, FROM STREET CHEEVERS LANE TO STREET EASTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb - ok
|
2018-11-05
|
No data
|
86 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container is placed in roadway
|
2018-11-02
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2018-10-30
|
No data
|
WAVECREST STREET, FROM STREET CEDAR GROVE AVENUE TO STREET DUSTAN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2018-10-28
|
No data
|
COOPER AVENUE, FROM STREET BENTON AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags ok.
|
2018-10-28
|
No data
|
BENNETT AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permit check, container p/l. Active.
|
2018-10-26
|
No data
|
ALBEE AVENUE, FROM STREET BENNETT AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb - ok
|
2018-10-26
|
No data
|
BENNETT AVENUE, FROM STREET ALBEE AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb-ok
|
2018-10-26
|
No data
|
BENNETT AVENUE, FROM STREET BEND TO STREET HODA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb - ok
|
2018-10-24
|
No data
|
MASON BOULEVARD, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2018-10-23
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Work was done prior to 2018 new policy and no action is necessary. Ped ramp is accessible, functional and in compliance with the old policy.
|
2018-10-19
|
No data
|
MANILA AVENUE, FROM STREET ISERNIA AVENUE TO STREET TYSENS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2018-10-19
|
No data
|
RAMONA AVENUE, FROM STREET LENEVAR AVENUE TO STREET MINTURN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk acceptable
|
2018-10-14
|
No data
|
HYLAN BOULEVARD, FROM STREET BATH AVENUE TO STREET COOPER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & apron to Island Mitsubishi was ok.
|
2018-10-11
|
No data
|
OTIS AVENUE, FROM STREET CLAWSON STREET TO STREET EDISON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2018-10-03
|
No data
|
CORRELL AVENUE, FROM STREET BOMBAY STREET TO STREET NORTH EDO COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed.
|
2018-09-25
|
No data
|
JAY STREET, FROM STREET DEAD END TO STREET JOHN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW SWK INSTALLED
|
2018-09-16
|
No data
|
HEWITT AVENUE, FROM STREET MICHAEL LOOP TO STREET MILFORD DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w & apron ok.
|
2018-09-09
|
No data
|
ASHLAND AVENUE EAST, FROM STREET ELLSWORTH AVENUE TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb -ok
|
2018-09-08
|
No data
|
DONGAN HILLS AVENUE, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SEALER WAS APPLIED.
|
2018-09-08
|
No data
|
CRAIG AVENUE, FROM STREET AMBOY ROAD TO STREET SUMMIT ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container in r/w with street protection
|
2018-09-04
|
No data
|
MARCY AVENUE, FROM STREET WOODROW ROAD TO STREET VENUS PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
spoke with owner (joe) explained the situation regarding the paving at this location.Contractor did curb to curb with two different materials (two batch tickets)at the same time.No seems made down the center of roadway.resealed width of road at xwalk
|
2018-09-02
|
No data
|
WILLOWBROOK ROAD, FROM STREET AUBURN AVENUE TO STREET DENTON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit check, container p/l. Active.
|
2018-08-29
|
No data
|
GARIBALDI AVENUE, FROM STREET CEDAR GROVE AVENUE TO STREET ROMA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2018-08-28
|
No data
|
MC ARTHUR AVENUE, FROM STREET BEND TO STREET FORRESTAL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Apron Drop curb replaced in kind/sealed
|
2018-08-27
|
No data
|
HETT AVENUE, FROM STREET EBBITTS STREET TO STREET MARINE WAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2018-08-25
|
No data
|
MARCY AVENUE, FROM STREET WOODROW ROAD TO STREET VENUS PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EDGES OF BPP REMAIN UNSEALED. CAR #20183340349 WAS ISSUED ON 6-28-18.
|
2018-08-20
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB
|
2018-08-20
|
No data
|
WILBUR STREET, FROM STREET HOLTON AVENUE TO STREET VAN WYCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2018-08-17
|
No data
|
FILLMORE STREET, FROM STREET FRANKLIN AVENUE TO STREET LAFAYETTE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cp: "A fenced/barricaded sidewalk/curb repair at active BO. site."
|
2018-08-15
|
No data
|
EAST 7 STREET, FROM STREET AVENUE I TO STREET AVENUE J
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Previous active permit exist.
|
2018-08-13
|
No data
|
ROCKAWAY STREET, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2018-08-08
|
No data
|
EAST SCRANTON AVENUE, FROM STREET ABINGDON AVENUE TO STREET ARMSTRONG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2018-08-05
|
No data
|
GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2018-08-01
|
No data
|
WILBUR STREET, FROM STREET HOLTON AVENUE TO STREET VAN WYCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2018-07-27
|
No data
|
RIVINGTON AVENUE, FROM STREET FREEDOM AVENUE TO STREET GARY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repair acceptable
|
2018-07-24
|
No data
|
DONGAN HILLS AVENUE, FROM STREET DEAD END TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS ON SIDEWALK NEED TO BE SEALED IN FRONT OF 323/325 DONGAN HILLS AVENUE
|
2018-07-23
|
No data
|
COALE AVENUE, FROM STREET SOUTH GREENLEAF AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2018-07-20
|
No data
|
OAKDALE STREET, FROM STREET CLOVERDALE AVENUE TO STREET ELMWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
permit check > container on site.
|
2018-07-19
|
No data
|
RICHMOND AVENUE, FROM STREET PARK ROAD TO STREET SHIRLEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no such address
|
2018-07-18
|
No data
|
FOSTER ROAD, FROM STREET SINCLAIR AVENUE TO STREET STAFFORD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Perm cut slightly cracked- Address home was demo'd now 2 houses with Sinclair addresses was built. Check next Inspection for possible BPP. (Permit was taken out in 2017 but no work was done)
|
2018-07-08
|
No data
|
59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installation of Curb in Compliance
|
2018-07-06
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2018-07-05
|
No data
|
OAKDALE STREET, FROM STREET ARMSTRONG AVENUE TO STREET ROBINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2018-06-28
|
No data
|
MARCY AVENUE, FROM STREET WOODROW ROAD TO STREET VENUS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Roadway was paved 1/2 plus 5ft, only found sealer along edge at crosswalk, segment outer edge was never sealed. Kindly seal all joints including cracked sealer at crosswalk.
|
2018-06-24
|
No data
|
VAN PELT AVENUE, FROM STREET DE RUYTER PLACE TO STREET NETHERLAND AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Drop curb ok
|
2018-06-24
|
No data
|
VAN PELT AVENUE, FROM STREET DE RUYTER PLACE TO STREET WALKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done.
|
2018-06-19
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CLOSING OUT CAR AS i CAN NOT ISSUE ANYTHING
|
2018-06-14
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2018-06-13
|
No data
|
WILLARD AVENUE, FROM STREET WATCHOGUE ROAD TO STREET WATERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2018-06-08
|
No data
|
AVERILL PLACE, FROM STREET ARTHUR KILL ROAD TO STREET NASSAU PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP- Half plus 5ft
|
2018-06-08
|
No data
|
NICHOLS AVENUE, FROM STREET ETNA STREET TO STREET JAMAICA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CHECKING ...CONTAINER ON ST
|
2018-06-08
|
No data
|
NASSAU PLACE, FROM STREET ARTHUR KILL ROAD TO STREET AVERILL PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP- half plus 5ft
|
2018-06-08
|
No data
|
AVERILL PLACE, FROM STREET NASSAU PLACE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Portion of the roadway (half plus 5ft) was replaced for the Builders Pavement Plan. Respondent was identified by the BPP work done on both crossstreets S012017346A42 & S012017346A41. No permit on file
|
2018-06-02
|
No data
|
59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK INSTALLED, EXPANSION JOINTS SEALED
|
2018-06-02
|
No data
|
GIEGERICH AVENUE, FROM STREET BEDELL AVENUE TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok, sw joints on cheevers ln not sealed this is a private st
|
2018-05-26
|
No data
|
70 AVENUE, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags restored expansion joints sealed
|
2018-05-26
|
No data
|
MYRTLE AVENUE, FROM STREET FOREST AVENUE TO STREET ONDERDONK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags restored expansion joints sealed
|
2018-05-26
|
No data
|
ONDERDONK AVENUE, FROM STREET 70 AVENUE TO STREET MYRTLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags restored expansion joints sealed
|
2018-05-20
|
No data
|
NORTH GANNON AVENUE, FROM STREET GOWER STREET TO STREET MOUNTAINVIEW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
no s/w work done.
|
2018-05-14
|
No data
|
BALTIC STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SWK & RWY RESURFACED AT 483-489
|
2018-05-11
|
No data
|
AVENUE U, FROM STREET EAST 16 STREET TO STREET EAST 17 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2018-04-19
|
No data
|
GARIBALDI AVENUE, FROM STREET CEDAR GROVE AVENUE TO STREET ROMA AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS WERE TRIMMED & SEALED.
|
2018-04-13
|
No data
|
MASON BOULEVARD, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. EXPANSION JOINTS & SEALER APPLIED.
|
2018-04-09
|
No data
|
MASON BOULEVARD, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw ok
|
2018-04-07
|
No data
|
NORWOOD AVENUE, FROM STREET BAY STREET TO STREET ERRINGTON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cp: "Ctr."
|
2018-04-03
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints were trimmed & sealed.
|
2018-04-02
|
No data
|
DEWEY AVENUE, FROM STREET GREAVES AVENUE TO STREET TUDOR STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Correction made.
|
2018-03-30
|
No data
|
NORWOOD AVENUE, FROM STREET BAY STREET TO STREET ERRINGTON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cp: "Ctr."
|
2018-03-24
|
No data
|
NORWOOD AVENUE, FROM STREET BAY STREET TO STREET ERRINGTON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cp: "Ctr." Snow on the ground.
|
2018-03-22
|
No data
|
OLD AMBOY ROAD, FROM STREET AMBOY ROAD TO STREET ARMSTRONG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bpp in r/w was sealed.
|
2018-03-21
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bpp in the intersection was sealed however additional permit wasn't obtained. CAR was re-issued (#20183160270). Inspection was done upon CAR clean up project.
|
2018-03-21
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Additional permit must be obtained for Builders pavement plan in the intersection for 4275 Old Amboy Rd. In conjunction with BPP# RP14-124, permit #'sS012017205A74, & S012017206A19.
|
2018-03-21
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD TO STREET SI RAPID TRANSIT
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Bpp in the r/w was sealed along the perimeter.
|
2018-03-17
|
No data
|
BROADWAY, FROM STREET CORTLANDT STREET TO STREET LIBERTY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two sidewalk flags replace IFO entrance to 150 Broadway (aka 148-158 Broadway). Acceptable. No defects at this time.
|
2018-03-15
|
No data
|
NARROWS AVENUE, FROM STREET BAY RIDGE PARKWAY TO STREET 76 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SIDEWALK EXCAVATED AWAITING CONCRETE
|
2018-03-15
|
No data
|
NARROWS AVENUE, FROM STREET 76 STREET TO STREET 77 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SIDEWALK EXCAVATED
|
2018-03-11
|
No data
|
LIBERTY STREET, FROM STREET BROADWAY TO STREET LIBERTY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
5 s/w flags replaced acceptable
|
2018-03-10
|
No data
|
GOODWIN AVENUE, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2018-03-01
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2018-02-28
|
No data
|
51 STREET, FROM STREET 8 AVENUE TO STREET 9 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New curb ok, expansion joints sealed
|
2018-02-24
|
No data
|
EAST 16 STREET, FROM STREET AVENUE U TO STREET AVENUE V
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb (concrete), found to be in compliance
|
2018-02-15
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
- No refuse container on location at this time.
|
2018-02-13
|
No data
|
CORRELL AVENUE, FROM STREET BOMBAY STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2018-02-13
|
No data
|
SHARROTTS ROAD, FROM STREET DARNELL LANE TO STREET ROBIN COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2018-02-10
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please replace the pedestrian ramp quadrant as per standard specification H-1011
|
2018-02-03
|
No data
|
SHILOH STREET, FROM STREET MERRYMOUNT STREET TO STREET RADFORD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w sealed
|
2018-02-03
|
No data
|
CUBA AVENUE, FROM STREET CELTIC PLACE TO STREET NEW DORP LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
- No refuse container on location at this time.
|
2018-01-24
|
No data
|
YETMAN AVENUE, FROM STREET HYLAN BOULEVARD TO STREET PITTSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2018-01-24
|
No data
|
HYLAN BOULEVARD, FROM STREET YETMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
WORK WAS DONE IN SEGMENT. PERMITS ON FILE.
|
2018-01-23
|
No data
|
HYLAN BOULEVARD, FROM STREET CULOTTA LANE TO STREET PAGE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2017-12-29
|
No data
|
HEMPSTEAD AVENUE, FROM STREET 222 STREET TO STREET 223 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flags restored, expansion joints sealed
|
2017-12-28
|
No data
|
GREEN VALLEY ROAD, FROM STREET BEND TO STREET MANCHESTER DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2017-12-10
|
No data
|
GARIBALDI AVENUE, FROM STREET CEDAR GROVE AVENUE TO STREET ROMA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2017-12-09
|
No data
|
PRALL AVENUE, FROM STREET BILLIOU STREET TO STREET DEISIUS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Sidewalk expansion joints need to be trimmed and sealed
|
2017-12-09
|
No data
|
BILLIOU STREET, FROM STREET ANDROVETTE AVENUE TO STREET PRALL AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed that the respondent failed to obtain a street opening permit authorizing the respondent to perform sidewalk construction. This work was being completed for 68 Prall Avenue
|
2017-12-09
|
No data
|
WILBUR STREET, FROM STREET VAN WYCK AVENUE TO STREET WALCH PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2017-12-05
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK, APRON AND DROP CURB REPLACED SIDE OF #51 I/F/O PRIVATE DRIVE - FIRE LANE
|
2017-11-30
|
No data
|
LOIS PLACE, FROM STREET HENDERSON AVENUE TO STREET PROSPECT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cp: Ctr.
|
2017-11-23
|
No data
|
NORTH GANNON AVENUE, FROM STREET GOWER STREET TO STREET MOUNTAINVIEW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2017-11-23
|
No data
|
ST JOHN AVENUE, FROM STREET WATCHOGUE ROAD TO STREET WATERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2017-11-23
|
No data
|
FOREST AVENUE, FROM STREET CRYSTAL AVENUE TO STREET MARIANNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2017-11-09
|
No data
|
COALE AVENUE, FROM STREET SOUTH GREENLEAF AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
excess concrete sealed
|
2017-11-06
|
No data
|
DURANT AVENUE, FROM STREET FIELDWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
r/w paved
|
2017-11-05
|
No data
|
GARIBALDI AVENUE, FROM STREET CEDAR GROVE AVENUE TO STREET ROMA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb.
|
2017-11-01
|
No data
|
HETT AVENUE, FROM STREET EBBITTS STREET TO STREET MARINE WAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb.
|
2017-10-26
|
No data
|
OLD AMBOY ROAD, FROM STREET AMBOY ROAD TO STREET ARMSTRONG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Builders pavement in roadway failed to be sealed. C.A.R. was issued.
|
2017-10-26
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
C.A.R issued for Builders pavement in roadway to be sealed along the edges. - Additional Permit is required for the intersection.
|
2017-10-26
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD TO STREET SI RAPID TRANSIT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Builders pavement in roadway faliled to be sealed. C.A.R. was issued.
|
2017-10-25
|
No data
|
DEWEY AVENUE, FROM STREET GREAVES AVENUE TO STREET TUDOR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, 2 aprons, and dropcurb at right side of property repaired/replaced. C.A.R issued to have concrete overlay removed i/f/o curb/dropcurb.
|
2017-10-22
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok..
|
2017-10-08
|
No data
|
59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2017-10-07
|
No data
|
LAREDO AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO SIDEWALK WORK OBSERVED I/FO# 50 LAREDO AVE
|
2017-10-07
|
No data
|
OTIS AVENUE, FROM STREET CLAWSON STREET TO STREET EDISON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb sealed
|
2017-09-30
|
No data
|
COALE AVENUE, FROM STREET SOUTH GREENLEAF AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
remove excess concrete from roadway and restore in kind with asphalt
|
2017-09-29
|
No data
|
HEWITT AVENUE, FROM STREET MICHAEL LOOP TO STREET MILFORD DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. CAPS FOR EXPANSION JOINTS NEED TO BE REMOVED & SEALER TO BE APPLIED. *** PERMIT IS CURRENTLY ACTIVE ***
|
2017-09-29
|
No data
|
DELAFIELD AVENUE, FROM STREET HART BOULEVARD TO STREET WALBROOKE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w - ok
|
2017-09-29
|
No data
|
58 STREET, FROM STREET 56 DRIVE TO STREET 56 TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored, expansion joints sealed.
|
2017-09-29
|
No data
|
HEWITT AVENUE, FROM STREET MICHAEL LOOP TO STREET MILFORD DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAG & D/WAY APRON
|
2017-09-27
|
No data
|
IRVING PLACE, FROM STREET HARDY STREET TO STREET VANDERBILT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Replaced/repaired curb/sidewalk at new property.
|
2017-09-17
|
No data
|
WILLARD AVENUE, FROM STREET WATCHOGUE ROAD TO STREET WATERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2017-09-17
|
No data
|
9 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok.
|
2017-09-16
|
No data
|
GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new swk...BPP
|
2017-09-03
|
No data
|
223 STREET, FROM STREET 103 AVENUE TO STREET HEMPSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2017-09-02
|
No data
|
CLAWSON STREET, FROM STREET COLFAX AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
Complaint: New Sidewalk was installed & is curing for # 29 Clawson St at the corner of Colfax Av. Roadway and Sidewalk is now open. Street is narrow and needed to close it for short time while pouring concrete.No cause for complaint at this time.
|
2017-08-28
|
No data
|
HILBURN AVENUE, FROM STREET HANNIBAL STREET TO STREET RYE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
several sidewalk flags restored to grade
|
2017-08-21
|
No data
|
RIVINGTON AVENUE, FROM STREET FREEDOM AVENUE TO STREET GARY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A sw repair was on Freedom Ave side of corner property.
|
2017-08-06
|
No data
|
GOODWIN AVENUE, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2017-08-03
|
No data
|
LENEVAR AVENUE, FROM STREET WIELAND AVENUE TO STREET WOODROW ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Permit check, container p/l. Active.
|
2017-07-31
|
No data
|
GARIBALDI AVENUE, FROM STREET CEDAR GROVE AVENUE TO STREET ROMA AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
10yd Container on the street without wood under wheels to protect the roadway.
|
2017-07-26
|
No data
|
OLD AMBOY ROAD, FROM STREET AMBOY ROAD TO STREET ARMSTRONG AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled out (202âx19â6 down 3in) sent info to office.
|
2017-07-26
|
No data
|
ARMSTRONG AVENUE, FROM STREET OLD AMBOY ROAD TO STREET SI RAPID TRANSIT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway has been milled (145â6x23â3 down 3in). Plumbers Trench was milled out (19âx11â6 down 3in)Spoke with crew onsite advised them to obtain intersection permit for record purposes (20âx19â down 3in). Will check tom
|
2017-07-08
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2017-06-13
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb - ok
|
2017-06-09
|
No data
|
BEACH ROAD, FROM STREET OAKDALE STREET TO STREET OLD AMBOY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/walk flags
|
2017-06-09
|
No data
|
WILBUR STREET, FROM STREET HOLTON AVENUE TO STREET VAN WYCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb - k
|
2017-05-20
|
No data
|
WILLOWBROOK ROAD, FROM STREET NEPTUNE PLACE TO STREET NORTH GANNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2017-05-13
|
No data
|
ST JOHN AVENUE, FROM STREET WATCHOGUE ROAD TO STREET WATERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w ok
|
2017-05-11
|
No data
|
EAST SCRANTON AVENUE, FROM STREET ABINGDON AVENUE TO STREET ARMSTRONG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRONS. EXPANSION JOINTS & SEALER APPLIED.
|
2017-05-07
|
No data
|
FOREST AVENUE, FROM STREET CRYSTAL AVENUE TO STREET MARIANNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb.
|
2017-05-07
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk.
|
2017-05-02
|
No data
|
ASHLAND AVENUE EAST, FROM STREET ELLSWORTH AVENUE TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w - ok
|
2017-04-26
|
No data
|
OAKDALE STREET, FROM STREET ARMSTRONG AVENUE TO STREET ROBINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb-ok
|
2017-04-12
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2017-04-09
|
No data
|
GOWER STREET, FROM STREET ALEXANDRA PLACE TO STREET PENN STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Gaps filled in to grade.
|
2017-04-07
|
No data
|
ELM STREET, FROM STREET HENDERSON AVENUE TO STREET RICHMOND TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
6 sidewalk flags have been replaced
|
2017-03-28
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Installed/repaired curb.
|
2017-03-25
|
No data
|
59 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W repaired.
|
2017-03-08
|
No data
|
WILLARD AVENUE, FROM STREET WATCHOGUE ROAD TO STREET WATERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repaired curb.
|
2017-03-07
|
No data
|
82 ROAD, FROM STREET 252 STREET TO STREET LITTLE NECK PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags restored expansion joints sealed
|
2017-02-27
|
No data
|
GOWER STREET, FROM STREET ALEXANDRA PLACE TO STREET PENN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk was replaced. C.A.R was issued to fill in gaps btwn grass area and s/w.
|
2017-02-26
|
No data
|
NORTH GANNON AVENUE, FROM STREET GOWER STREET TO STREET MOUNTAINVIEW AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk ok.
|
2017-02-06
|
No data
|
BROOKFIELD AVENUE, FROM STREET KATAN AVENUE TO STREET LAMOKA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed.
|
2017-01-26
|
No data
|
58 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CREW ON SITE
|
2017-01-26
|
No data
|
OCEAN AVENUE, FROM STREET CEDAR AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb
|
2017-01-20
|
No data
|
WHITE PLAINS ROAD, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk is good. Inspected / In Compliance
|
2017-01-11
|
No data
|
ASHLAND AVENUE EAST, FROM STREET ELLSWORTH AVENUE TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2017-01-11
|
No data
|
WINTER AVENUE, FROM STREET BISMARK AVENUE TO STREET JERSEY STREET
|
No data
|
Street Construction Inspections: Complaint
|
Department of Transportation
|
permit check, comtainer p/l. Active.
|
2017-01-06
|
No data
|
ROCKAWAY STREET, FROM STREET BILLOP AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cp: A fenced/barricaded repaired curb at active B.O. site.
|
2016-12-30
|
No data
|
79 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w restored
|
2016-12-29
|
No data
|
JUMEL STREET, FROM STREET GIFFORDS LANE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2016-12-28
|
No data
|
GREEN VALLEY ROAD, FROM STREET BEND TO STREET MANCHESTER DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAG & D/WAY APRON
|
2016-12-25
|
No data
|
HILBURN AVENUE, FROM STREET HANNIBAL STREET TO STREET RYE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
d/w restore in kind
|
2016-12-24
|
No data
|
WHITE PLAINS ROAD, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway milled and paved, lane markings restored
|
2016-12-23
|
No data
|
204 STREET, FROM STREET 46 ROAD TO STREET 47 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new curb installed
|
2016-12-20
|
No data
|
WHITE PLAINS ROAD, FROM STREET ALLERTON AVENUE TO STREET MACE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Parking lane been milled, i spoke to foreman LUIS in regards to paving of the roadway and confirmation number
|
2016-12-20
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2016-12-15
|
No data
|
WILBUR STREET, FROM STREET HOLTON AVENUE TO STREET VAN WYCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2016-12-15
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2016-12-14
|
No data
|
49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset
|
2016-12-14
|
No data
|
OSWALD PLACE, FROM STREET ELIZABETH PLACE TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2016-12-08
|
No data
|
EAST 56 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
tape was removed from sidewalk area
|
2016-11-29
|
No data
|
LENEVAR AVENUE, FROM STREET WIELAND AVENUE TO STREET WOODROW ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2016-11-28
|
No data
|
GOODWIN AVENUE, FROM STREET JEWETT AVENUE TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Repaired curb.
|
2016-11-28
|
No data
|
EAST 56 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
seal was applied evenly, as requested
|
2016-11-22
|
No data
|
EAST 56 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
seal applied on expansion joints
|
2016-11-21
|
No data
|
EAST 56 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
As per policy, limit NOVâs issued for this defect. Permittee placed on hold.
|
2016-11-14
|
No data
|
EAST 56 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Nov issued for the above respondent failure to seal their expansion joints at the curb & around sidewalk flags. respondent was previously notified to correct this condition by via(CAR #20166040433) on 9/28/16.
|
2016-11-02
|
No data
|
ST JOHN AVENUE, FROM STREET WATCHOGUE ROAD TO STREET WATERS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A repaired s/w.
|
2016-11-01
|
No data
|
WILBUR STREET, FROM STREET HOLTON AVENUE TO STREET VAN WYCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2016-10-28
|
No data
|
TWOMBLY AVENUE, FROM STREET JUSTIN AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Respondent Sealed the Roadway but then Painted the Concrete Overlay to make it look like they did a cutback and restored in kind Sent photos to Dispatch
|
2016-10-26
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed - ok
|
2016-10-26
|
No data
|
TWOMBLY AVENUE, FROM STREET JUSTIN AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
concrete overlay remains on the roadway / NOV issued / Placed on hold
|
2016-10-24
|
No data
|
FOREST AVENUE, FROM STREET CRYSTAL AVENUE TO STREET MARIANNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb - ok
|
2016-10-21
|
No data
|
TWOMBLY AVENUE, FROM STREET JUSTIN AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR# 20163340490 issued 8/26/16 for Concrete Overlay from Apron onto Asphalt Roadway. At this time condition remains. Failed to comply.
|
2016-10-20
|
No data
|
9 STREET, FROM STREET NEW DORP LANE TO STREET ROSE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
44'x20' portion of the roadway was milled 2 to 2 1/2". Took photos to send to S.I. Base as requested.
|
2016-10-20
|
No data
|
WOODROW ROAD, FROM STREET LENEVAR AVENUE TO STREET LATHAM PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON
|
2016-10-20
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS.
|
2016-10-04
|
No data
|
SUMMIT ROAD, FROM STREET BRYAN STREET TO STREET CONNECTICUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2016-09-29
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2016-09-28
|
No data
|
EAST 56 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No expansion joints sealed at the curb and around sidewalk flags.
|
2016-09-15
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and Driveway ok
|
2016-09-14
|
No data
|
OAKDALE STREET, FROM STREET ARMSTRONG AVENUE TO STREET ROBINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok.
|
2016-09-13
|
No data
|
HEMPSTEAD AVENUE, FROM STREET 222 STREET TO STREET 223 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored and expansion joints sealed
|
2016-09-12
|
No data
|
223 STREET, FROM STREET 103 AVENUE TO STREET HEMPSTEAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk and curb installed
|
2016-09-01
|
No data
|
82 ROAD, FROM STREET 252 STREET TO STREET LITTLE NECK PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags restored in kind
|
2016-08-29
|
No data
|
BUTLER STREET, FROM STREET BOND STREET TO STREET NEVINS STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repair ok joint sealed
|
2016-08-26
|
No data
|
TWOMBLY AVENUE, FROM STREET JUSTIN AVENUE TO STREET SPRATT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, 2 Driveway Aprons and curbs replaced in kind/sealed, Roadway has concrete spillage along right apron and roadway cutback is missing sealer along left Apron. please restore in kind and seal
|
2016-08-25
|
No data
|
MC ARTHUR AVENUE, FROM STREET BEND TO STREET FORRESTAL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE.
|
2016-08-24
|
No data
|
ELM STREET, FROM STREET HENDERSON AVENUE TO STREET RICHMOND TERRACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A repaired sidewalk.
|
2016-08-24
|
No data
|
VINELAND AVENUE, FROM STREET ARDEN AVENUE TO STREET CARLTON BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON. EXPANSION JOINTS & SEALER APPLIED.
|
2016-08-18
|
No data
|
OCEAN AVENUE, FROM STREET CEDAR AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w - ok
|
2016-08-18
|
No data
|
WINCHESTER AVENUE, FROM STREET HYLAN BOULEVARD TO STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and Apron ok
|
2016-08-07
|
No data
|
EAST 12 STREET, FROM STREET BEVERLY ROAD TO STREET SLOCUM PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
new s.w.
|
2016-07-30
|
No data
|
EAST 12 STREET, FROM STREET GUIDER AVENUE TO STREET NEPTUNE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave str BPP
|
2016-07-30
|
No data
|
GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave str BPP
|
2016-07-29
|
No data
|
OAKDALE STREET, FROM STREET RICHMOND AVENUE TO STREET RIDGECREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and apron ok
|
2016-07-28
|
No data
|
BRYSON AVENUE, FROM STREET CASWELL AVENUE TO STREET WATCHOGUE ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Cp: Ctr.
|
2016-07-25
|
No data
|
5 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s\w ok joints seal
|
2016-07-05
|
No data
|
OCEAN AVENUE, FROM STREET CEDAR AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB INSTALLED.
|
2016-06-29
|
No data
|
87 STREET, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2016-06-29
|
No data
|
88 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2016-06-25
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2016-06-25
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. FROM #54 TO #124
|
2016-06-24
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET HEMLOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2016-06-24
|
No data
|
ROSSVILLE AVENUE, FROM STREET CORRELL AVENUE TO STREET BARROW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2016-06-23
|
No data
|
ASHLAND AVENUE EAST, FROM STREET ELLSWORTH AVENUE TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2016-06-23
|
No data
|
CONSTANT AVENUE, FROM STREET MILLER STREET TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A repaired s/w, curb.
|
2016-06-22
|
No data
|
ALYSIA COURT, FROM STREET BLOOMINGDALE ROAD TO STREET MARVIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS & D/WAY APRON.
|
2016-06-21
|
No data
|
ALVERSON AVENUE, FROM STREET ALVERSON LOOP TO STREET WEST CASTOR PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENTS FAILURE TO MAINTAIN AN ACTIVE PERMIT FOR THE PLACEMENT OF A COMMERCIAL REFUSE CONTAINER THAT IS PLACED ON THE R/WAY. CONTAINER ID BY BIC #2888 MARKED ON CONTAINER. PREVIOUS PERMIT EXPIRED ON 6-18-16.
|
2016-06-18
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET HEMLOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok, Gervil St side of property
|
2016-06-15
|
No data
|
WILLOWBROOK ROAD, FROM STREET NEPTUNE PLACE TO STREET NORTH GANNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2016-06-14
|
No data
|
PITNEY AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET GAYNOR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS
|
2016-06-11
|
No data
|
TURF ROAD, FROM STREET NOME AVENUE TO STREET STEPNEY STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
rw has been restored adj to curb
|
2016-06-05
|
No data
|
HYLAN BOULEVARD, FROM STREET NELSON AVENUE TO STREET WIMAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk.
|
2016-06-04
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
EXPANSION JOINTS & SEALER APPLIED
|
2016-05-29
|
No data
|
79 STREET, FROM STREET 31 AVENUE TO STREET 32 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored to grade. Expansion joints sealed.
|
2016-05-27
|
No data
|
SOUTH RAILROAD STREET, FROM STREET BUFFINGTON AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, Apron and Drop curb installed- joints sealer
|
2016-05-24
|
No data
|
HILBURN AVENUE, FROM STREET HANNIBAL STREET TO STREET RYE PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk flags restored in kind, expansion joints sealed
|
2016-05-24
|
No data
|
BROOKFIELD AVENUE, FROM STREET KATAN AVENUE TO STREET LAMOKA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk okay.
|
2016-05-22
|
No data
|
HOOKER PLACE, FROM STREET PORT RICHMOND AVENUE TO STREET LA FORGE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2016-05-22
|
No data
|
82 ROAD, FROM STREET 252 STREET TO STREET LITTLE NECK PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
repaired sidewalk with sealed expansion joints.
|
2016-05-20
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS.
|
2016-05-20
|
No data
|
OSWALD PLACE, FROM STREET ELIZABETH PLACE TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2016-05-20
|
No data
|
WILBUR STREET, FROM STREET HOLTON AVENUE TO STREET VAN WYCK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE
|
2016-05-17
|
No data
|
GUIDER AVENUE, FROM STREET EAST 11 STREET TO STREET EAST 12 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2016-05-17
|
No data
|
EAST 12 STREET, FROM STREET GUIDER AVENUE TO STREET NEPTUNE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2016-05-14
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition reported has been corrected rw has been restored.
|
2016-05-08
|
No data
|
49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Installation of Curb in good condition.
|
2016-05-04
|
No data
|
JUMEL STREET, FROM STREET GIFFORDS LANE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb.
|
2016-05-04
|
No data
|
ALYSIA COURT, FROM STREET BLOOMINGDALE ROAD TO STREET MARVIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2016-05-03
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb -ok
|
2016-05-01
|
No data
|
49 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ATPO I observed the respondent failed to comply with terms & conditions of DOT permits. Violation of OCMC12. Full sidewalk closure allowed. However,after working hours minimum of 5 ft sidewalk must maintained for pedestrians. No 5ft sidewalk provided
|
2016-04-26
|
No data
|
UNIVERSITY AVENUE, FROM STREET SEDGWICK AVENUE TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2016-04-21
|
No data
|
ASHLAND AVENUE EAST, FROM STREET ELLSWORTH AVENUE TO STREET WOODHULL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB WAS DONE.
|
2016-04-20
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A curb installation/repair at Bank.
|
2016-04-19
|
No data
|
MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
CONTAINER IN R.W
|
2016-04-14
|
No data
|
4 AVENUE, FROM STREET 3 STREET TO STREET 5 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work
|
2016-04-11
|
No data
|
MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container on street .......
|
2016-04-08
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Check repairs made as per DBC for Hold release.Permittee has Sawcut Apron to install Expansion Joint and then Sealed it. Adjacent property appears to have been done around the same time but has a different style, therefore not responsible
|
2016-04-07
|
No data
|
TURF ROAD, FROM STREET NOME AVENUE TO STREET STEPNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please restore roadway with asphalt and remove concrete at curbline at 12 Turf Road.
|
2016-04-07
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I OBSERVED THE ABOVE RESPONDENTS FAILURE TO "FULLY" RESTORE ASPHALT R/WAY IN KIND, DUE TO CONCRETE SPILL OUT IN R/WAY, RUNNING ACROSS D/WAY APRON & CURB . CAR #20153161006 WAS ISSUED ON 12-13-15.
|
2016-04-05
|
No data
|
WEST 165 STREET, FROM STREET SUMMIT AVENUE TO STREET UNIVERSITY AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
all joints sealed
|
2016-04-02
|
No data
|
VAN WYCK AVENUE, FROM STREET MARSCHER PLACE TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE APPLY SEALER & EXPANSION JOINTS ALONG CURB NEAR D/WAY APRON AND SEPARATING S/WALK FROM D/WAY APRON. BROKEN OUT ASPHALT RUNNING ADJACENT TO CURB LINE DUE TO INSTALL OF CURB, NEEDS TO BE RESTORED IN KIND. *** AKA 54 WILBUR ST ***
|
2016-03-31
|
No data
|
RICE AVENUE, FROM STREET ROYAL OAK ROAD TO STREET SLOSSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Driveway repair.
|
2016-03-30
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS.
|
2016-03-26
|
No data
|
SUMMIT ROAD, FROM STREET BRYAN STREET TO STREET CONNECTICUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2016-03-20
|
No data
|
MONROE STREET, FROM STREET PATCHEN AVENUE TO STREET RALPH AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container in r.w
|
2016-03-20
|
No data
|
46 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair OK
|
2016-03-19
|
No data
|
ALTER AVENUE, FROM STREET HYLAN BOULEVARD TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
driveway apron done
|
2016-03-18
|
No data
|
ROANOKE STREET, FROM STREET BEND TO STREET SOREN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk ok
|
2016-03-16
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Failure to provide a 5ft clear pedestrian walkway in roadway. Sidewalk is closed off with caution tape (no signs posted to use other side) and parking lane is open but not safely barricaded off to protect pedestrians from traffic.
|
2016-03-15
|
No data
|
STOBE AVENUE, FROM STREET LACONIA AVENUE TO STREET MASON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & apron okay.
|
2016-03-14
|
No data
|
COURT STREET, FROM STREET GARNET STREET TO STREET WEST 9 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work not started
|
2016-03-12
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. FROM #54 TO #124
|
2016-03-03
|
No data
|
OAKDALE STREET, FROM STREET ARMSTRONG AVENUE TO STREET ROBINSON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced in kind/sealed and Roadway cutback paved/sealed
|
2016-02-16
|
No data
|
FOREST AVENUE, FROM STREET CRYSTAL AVENUE TO STREET MARIANNE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
ok
|
2016-02-08
|
No data
|
FOREST AVENUE, FROM STREET CRYSTAL AVENUE TO STREET MARIANNE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Curb area excavated for repair at the old chase bank.
|
2016-02-06
|
No data
|
MARIANNE STREET, FROM STREET FOREST AVENUE TO STREET GALLOWAY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to adhere to stipulation OCMC12 in the terms & conditions of the DOT permit..Respondent had the sidewalk fully closed to pedestrians when stip OCMC12 states after working hours minimum
|
2016-02-06
|
No data
|
FOREST AVENUE, FROM STREET CRYSTAL AVENUE TO STREET MARIANNE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk excavated..5 foot clear for pedestrians
|
2016-01-29
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/WALK FLAGS. EXPANSION JOINTS & SEALER APPLIED.
|
2016-01-28
|
No data
|
TURF ROAD, FROM STREET NOME AVENUE TO STREET STEPNEY STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk apron installed
|
2016-01-22
|
No data
|
SOUTH RAILROAD STREET, FROM STREET BUFFINGTON AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk ok
|
2016-01-20
|
No data
|
HENRY STREET, FROM STREET CRANBERRY STREET TO STREET MIDDAGH STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk repair work not started at this time.
|
2016-01-20
|
No data
|
LUCILLE AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DEP WORK VIA PERMIT #S012015356A46 IN AREA. COULD NOT PROPERLY INSPECT.
|
2016-01-05
|
No data
|
WEST 165 STREET, FROM STREET SUMMIT AVENUE TO STREET UNIVERSITY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Expansion joints need to be installed at the curb in a few location - Sidewalk expansion joints need to be sealed
|
2015-12-22
|
No data
|
ROSSVILLE AVENUE, FROM STREET CORRELL AVENUE TO STREET BARROW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk okay.
|
2015-12-21
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET HEMLOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk.
|
2015-12-16
|
No data
|
CORRELL AVENUE, FROM STREET GERVIL STREET TO STREET HEMLOCK STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new sidewalk i/f/o this address however, Contractor may have replaced 4 s/w flags on side of corner property on Gervil St.
|
2015-12-14
|
No data
|
WOODROW ROAD, FROM STREET LENEVAR AVENUE TO STREET LATHAM PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, apron, and drop curb okay.
|
2015-12-13
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sealed over score line in apron was made which is unacceptable. Remove seal, install expansion joints dividing the apron from curb and then seal i/f/o # 192 and adjacent property. Remove concrete over pour in the roadway and replace with asphalt.
|
2015-12-13
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sealed over score line in apron was made which is unacceptable. Remove seal, install expansion joints dividing the apron from curb and then seal i/f/o # 192 and adjacent property. Remove concrete over pour in the roadway and replace with asphalt.
|
2015-12-12
|
No data
|
87 STREET, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2015-12-05
|
No data
|
RAMONA AVENUE, FROM STREET DELMAR AVENUE TO STREET NIPPON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W AND APRON REPLACED EXPANSION JOINT TRIMMED AND SEALED
|
2015-12-01
|
No data
|
CONSTANT AVENUE, FROM STREET MILLER STREET TO STREET WESTCOTT BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
A/T/P/O THE ABOVE NAMED RESPONDENT REPLACED/ RESTORED/ REPAIRED 36'10" OF CURB W/O A DOT S01 PERMIT ON FILE/ IN DASH FOR SUCH RESTORATION.
|
2015-11-28
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb..
|
2015-11-27
|
No data
|
WILLOWBROOK ROAD, FROM STREET NEPTUNE PLACE TO STREET NORTH GANNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb and apron ok
|
2015-11-24
|
No data
|
70 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2015-11-22
|
No data
|
HYLAN BOULEVARD, FROM STREET PEARE PLACE TO STREET RYAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, apron, & drop curb.
|
2015-11-16
|
No data
|
82 ROAD, FROM STREET 252 STREET TO STREET LITTLE NECK PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W RESTORED
|
2015-11-10
|
No data
|
FORRESTAL AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk apron and drop curb okay.
|
2015-10-31
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Monolithic Driveway Aprons for house #192 and adjacent house. No expansion joints/sealer installed and curb replaced in kind has over-pour on Asphalt Roadway entire length. Install Joints and remove concrete on roadway and replace with Asphalt.
|
2015-10-31
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Monolithic Driveway Aprons for house #192 and adjacent house. No expansion joints/sealer installed and curb replaced in kind has over-pour on Asphalt Roadway entire length. Install Joints and remove concrete on roadway and replace with Asphalt.
|
2015-10-31
|
No data
|
PRESTON AVENUE, FROM STREET AMBOY ROAD TO STREET OGDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2015-10-25
|
No data
|
OSWALD PLACE, FROM STREET ELIZABETH PLACE TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb okay.
|
2015-10-24
|
No data
|
88 STREET, FROM STREET COLONIAL ROAD TO STREET RIDGE BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2015-10-19
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sealed.
|
2015-10-09
|
No data
|
FORRESTAL AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2015-10-09
|
No data
|
CORBIN AVENUE, FROM STREET BARLOW AVENUE TO STREET JUMEL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and Driveway Double Apron restored in kind/sealed
|
2015-10-03
|
No data
|
MIDLAND AVENUE, FROM STREET LISBON PLACE TO STREET NORTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed
|
2015-09-30
|
No data
|
WINCHESTER AVENUE, FROM STREET HYLAN BOULEVARD TO STREET TENNYSON DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and Driveway apron restored in kind/sealed
|
2015-09-30
|
No data
|
4 AVENUE, FROM STREET BALTIC STREET TO STREET WARREN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No container on street
|
2015-09-27
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2015-09-27
|
No data
|
BUTLER AVENUE, FROM STREET BENTLEY LANE TO STREET CRAIG AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No expansion joint dividing apron from curb. Please make adequate repair.
|
2015-09-26
|
No data
|
OCEAN AVENUE, FROM STREET CEDAR AVENUE TO STREET MC CLEAN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w to grade
|
2015-09-23
|
No data
|
FIELDWAY AVENUE, FROM STREET DURANT AVENUE TO STREET MAYBURY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and Curb replaced in kind/sealed
|
2015-09-20
|
No data
|
RICE AVENUE, FROM STREET ROYAL OAK ROAD TO STREET SLOSSON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
A/T/P/O I observed the above respondent failed to adhere to stipulation OCMC12 in the terms & conditions of the DOT permit..Respondent had the full width of the sidewalk closed when stip OCMC12 states after working hours a minimum of 5 feet of
|
2015-09-19
|
No data
|
SPRATT AVENUE, FROM STREET DURANT AVENUE TO STREET THOLLEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, Apron and Drop curb restored in kind/Sealed
|
2015-09-13
|
No data
|
ALYSIA COURT, FROM STREET BLOOMINGDALE ROAD TO STREET MARVIN ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W & Apron. okay
|
2015-09-04
|
No data
|
STOBE AVENUE, FROM STREET LACONIA AVENUE TO STREET MASON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w and apron to grade
|
2015-09-01
|
No data
|
COLLEGE AVENUE, FROM STREET ALABAMA PLACE TO STREET CAROLINA PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Checked for active permit at a milling site.
|
2015-09-01
|
No data
|
CARLTON BOULEVARD, FROM STREET BEND TO STREET DETROIT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk, Driveway apron and drop curb restored in kind/ Sealed
|
2015-09-01
|
No data
|
ALABAMA PLACE, FROM STREET COLLEGE AVENUE TO STREET MAINE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Checked permit for active milling site.
|
2015-08-17
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk I/F/O 158 is free of defects. No work has been done at AKA 581 portion of sidewalk.
|
2015-08-17
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please remove plastic and seal joint I/F/O 126 Gervil Street.
|
2015-07-28
|
No data
|
HOOKER PLACE, FROM STREET PORT RICHMOND AVENUE TO STREET LA FORGE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
porton of sw has been fixed, near dw
|
2015-07-20
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and Driveway replaced/ Sealed corner property for 346 Oakdale St. Homeowner came out asking why I was there.
|
2015-07-20
|
No data
|
OAKDALE STREET, FROM STREET RICHMOND AVENUE TO STREET RIDGECREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and Apron Sealed, area replaced is closest to Driveway, rest of the corner property has original sidewalk
|
2015-07-15
|
No data
|
SUMMIT ROAD, FROM STREET BRYAN STREET TO STREET CONNECTICUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints in s/w, apron, & drop curb had been sealed.
|
2015-07-11
|
No data
|
SUMMIT ROAD, FROM STREET BRYAN STREET TO STREET CONNECTICUT STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the above Respondent with a failure to seal expansion joints as per subsection; CAR# 20150220119-01 notifying Permittee to seal expansion joints. Permittee has protector plastic covers over joints at this time.
|
2015-07-10
|
No data
|
LUCILLE AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb ok
|
2015-06-26
|
No data
|
UNIVERSITY AVENUE, FROM STREET SEDGWICK AVENUE TO STREET WEST 165 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2015-06-26
|
No data
|
WEST 165 STREET, FROM STREET SUMMIT AVENUE TO STREET UNIVERSITY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w repaired
|
2015-06-25
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET BROAD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-06-11
|
No data
|
BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to seal expansion joints as per subsection - Failure to seal expansion joints on sidewalk - Notified prior by car #20151670005 dated 1/3/2015
|
2015-06-08
|
No data
|
WOODROW ROAD, FROM STREET LENEVAR AVENUE TO STREET LATHAM PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew onsite excavated Sidewalk and setting up framing for new Sidewalk/ Apron installation. Signs posted to instruct Pedestrian traffic to opposite side of segment
|
2015-05-30
|
No data
|
SUMMIT ROAD, FROM STREET BRYAN STREET TO STREET CONNECTICUT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Sidewalk expansion joints need to be sealed
|
2015-05-24
|
No data
|
JUMEL STREET, FROM STREET GIFFORDS LANE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk & Curb.
|
2015-05-23
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2015-05-13
|
No data
|
ALTER AVENUE, FROM STREET HYLAN BOULEVARD TO STREET LACONIA AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk and apron ok
|
2015-05-09
|
No data
|
82 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2015-05-09
|
No data
|
NARROWS AVENUE, FROM STREET 87 STREET TO STREET 88 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair is in compliance
|
2015-05-09
|
No data
|
87 STREET, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2015-05-09
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CURB
|
2015-05-09
|
No data
|
88 STREET, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk repair
|
2015-04-27
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Apron replaced at unknown house #, adjacent to #3993 Richmond Ave
|
2015-04-11
|
No data
|
77 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installation is in compliance.
|
2015-03-29
|
No data
|
73 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk ok
|
2015-03-28
|
No data
|
MACON STREET, FROM STREET MARCY AVENUE TO STREET VERONA PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new swk ok
|
2015-03-28
|
No data
|
WILLOWBROOK ROAD, FROM STREET NEPTUNE PLACE TO STREET NORTH GANNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2015-03-28
|
No data
|
FORRESTAL AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W AND 2 APRON REPLACED EXPANSION JOINTS SEALED.
|
2015-03-11
|
No data
|
88 STREET, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s\w pass joints seal
|
2015-02-28
|
No data
|
DEWEY AVENUE, FROM STREET GIFFORDS LANE TO STREET NORTH RHETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2015-01-28
|
No data
|
PENN AVENUE, FROM STREET CLAWSON STREET TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk ok
|
2015-01-20
|
No data
|
WEST 219 STREET, FROM STREET 9 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags replaced pass
|
2015-01-15
|
No data
|
REDGRAVE AVENUE, FROM STREET SOUTH RAILROAD AVENUE TO STREET O GORMAN AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Debris removed from area
|
2015-01-03
|
No data
|
BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk joints not seal
|
2015-01-01
|
No data
|
AMBOY ROAD, FROM STREET BEND TO STREET RICHMOND VALLEY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
swk
|
2014-12-13
|
No data
|
SEGUINE AVENUE, FROM STREET MELVILLE STREET TO STREET HANK PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-12-12
|
No data
|
SHORE PARKWAY, FROM STREET 24 AVENUE TO STREET BELT PARKWAY EB EN BAY PKWY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active sw
|
2014-11-29
|
No data
|
GREENPORT STREET, FROM STREET ALDERWOOD PLACE TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new s/w construction/ repair
|
2014-11-27
|
No data
|
LUCILLE AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed and Cutback restored at the corner of Bloomingdale Rd, corner lot
|
2014-11-23
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET BROAD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-11-20
|
No data
|
RAMONA AVENUE, FROM STREET DELMAR AVENUE TO STREET NIPPON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk and Driveway apron replaced in kind/ Sealed
|
2014-11-14
|
No data
|
REDGRAVE AVENUE, FROM STREET SOUTH RAILROAD AVENUE TO STREET O GORMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Milling debris and leftover asphalt top left in the roadway at intersection of S. Railroad Ave. & Redgrave Ave. Day before when work was being done i spoke & warned a worker that materials and debris cannot be dumped or left behind. CAR issued.
|
2014-11-13
|
No data
|
MAIDEN LANE, FROM STREET GOLD STREET TO STREET PEARL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
siodewalk repair
|
2014-11-13
|
No data
|
REDGRAVE AVENUE, FROM STREET SOUTH RAILROAD AVENUE TO STREET O GORMAN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
permit check, crew on site, milling half the rwy, valid permit.
|
2014-11-13
|
No data
|
MAIDEN LANE, FROM STREET GOLD STREET TO STREET PEARL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
valid permit still needs joints sealed
|
2014-11-03
|
No data
|
PAIDGE AVENUE, FROM STREET DEAD END TO STREET PROVOST STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
sealed..
|
2014-11-03
|
No data
|
MAIDEN LANE, FROM STREET GOLD STREET TO STREET PEARL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repair
|
2014-10-28
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-10-26
|
No data
|
OSWALD PLACE, FROM STREET ELIZABETH PLACE TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2014-10-26
|
No data
|
STEVENSON PLACE, FROM STREET SHARROTT AVENUE TO STREET SOUTH GOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb ok
|
2014-10-25
|
No data
|
BALTIC STREET, FROM STREET 4 AVENUE TO STREET QUISENBURY DRIVE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk repair work not started
|
2014-10-25
|
No data
|
SOUTH RAILROAD STREET, FROM STREET BUFFINGTON AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Wood removed from site
|
2014-10-18
|
No data
|
ROANOKE STREET, FROM STREET BEND TO STREET SOREN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w replaced
|
2014-10-10
|
No data
|
82 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk repair by 3 Avenue is in compliance.
|
2014-10-08
|
No data
|
MIDLAND AVENUE, FROM STREET LISBON PLACE TO STREET NORTH RAILROAD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed, corner.
|
2014-10-04
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk ok
|
2014-09-25
|
No data
|
GOWER STREET, FROM STREET HOLDEN BOULEVARD TO STREET WESTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk ok
|
2014-09-21
|
No data
|
SOUTH RAILROAD STREET, FROM STREET BUFFINGTON AVENUE TO STREET DOWNES AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLEASE REMOVE 2 WOODEN STAKES IN GRASS AREA ADJACENT TO S/W FLAG. S/W WAS REPLACED JOINTS SEALED - JOB IS COMPLETED. POSSIBLE TRIP HAZARD THANK YOU.
|
2014-09-20
|
No data
|
DEWEY AVENUE, FROM STREET GREAVES AVENUE TO STREET TUDOR STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-09-17
|
No data
|
WILLOWBROOK ROAD, FROM STREET NEPTUNE PLACE TO STREET NORTH GANNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installled
|
2014-09-14
|
No data
|
DURANT AVENUE, FROM STREET FIELDWAY AVENUE TO STREET KEEGANS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W AND APRON REPLACED EXPANSION JOINTS SEALED
|
2014-09-13
|
No data
|
EAST 2 STREET, FROM STREET BEND TO STREET BILLINGS PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave str BPP
|
2014-09-10
|
No data
|
PAIDGE AVENUE, FROM STREET DEAD END TO STREET PROVOST STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Remove plastic and seal all expansion joints please comply with DOT standard Specifications for sidewalk work
|
2014-09-07
|
No data
|
77 STREET, FROM STREET 11 AVENUE TO STREET 12 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repair
|
2014-09-06
|
No data
|
PINE TERRACE, FROM STREET AMBOY ROAD TO STREET ANNADALE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok, NOTE: POOR CONNECTION IN SECTOR
|
2014-09-06
|
No data
|
PRESTON AVENUE, FROM STREET AMBOY ROAD TO STREET OGDEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-09-05
|
No data
|
JEFFERSON BOULEVARD, FROM STREET NORTH RAILROAD STREET TO STREET NORTH RAILROAD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel Faced Curb and Drop Curb ok
|
2014-09-04
|
No data
|
AVENUE K, FROM STREET EAST 17 STREET TO STREET EAST 18 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container
|
2014-08-31
|
No data
|
TARGEE STREET, FROM STREET DE KALB STREET TO STREET PIERCE STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Container was on the r/w at f/o sidewalk operation site w/o a DOT permit.
|
2014-08-23
|
No data
|
AMBOY ROAD, FROM STREET CLARKE AVENUE TO STREET MONTREAL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2014-08-22
|
No data
|
NARROWS AVENUE, FROM STREET 87 STREET TO STREET 88 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installation is in compliance.
|
2014-08-19
|
No data
|
73 STREET, FROM STREET 21 AVENUE TO STREET BAY PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repair
|
2014-08-14
|
No data
|
87 STREET, FROM STREET NARROWS AVENUE TO STREET SHORE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installation is in compliance.
|
2014-08-13
|
No data
|
DEWEY AVENUE, FROM STREET GIFFORDS LANE TO STREET NORTH RHETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb.
|
2014-08-10
|
No data
|
CORBIN AVENUE, FROM STREET BARLOW AVENUE TO STREET JUMEL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk okay, (expansion joints not fully sealed btwn curb and apron at this time, check post-audit). Materials stored neatly along parking lane.
|
2014-07-19
|
No data
|
FORRESTAL AVENUE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and 2 Aprons replaced in kind
|
2014-07-17
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2014-07-17
|
No data
|
Staten Island, STATEN ISLAND, NY, 10309
|
No Violation Issued
|
Inspectorate of the Department of Consumer and Workers' Rights Protection
|
Department of Consumer and Worker Protection
|
No data
|
2014-07-16
|
No data
|
COLON AVENUE, FROM STREET ARTHUR KILL ROAD TO STREET GURLEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2014-07-12
|
No data
|
EAST 3 STREET, FROM STREET AVENUE T TO STREET AVENUE U
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pave BPP curb to curb
|
2014-07-11
|
No data
|
Staten Island, STATEN ISLAND, NY, 10309
|
No Violation Issued
|
Inspectorate of the Department of Consumer and Workers' Rights Protection
|
Department of Consumer and Worker Protection
|
No data
|
2014-07-02
|
No data
|
Manhattan, STATEN ISLAND, NY, 10309
|
No Violation Issued
|
Inspectorate of the Department of Consumer and Workers' Rights Protection
|
Department of Consumer and Worker Protection
|
No data
|
2014-06-12
|
No data
|
HAROLD AVENUE, FROM STREET EYLANDT STREET TO STREET TALLMAN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw ok
|
2014-06-12
|
No data
|
EYLANDT STREET, FROM STREET ARDEN AVENUE TO STREET HAROLD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active sw
|
2014-06-07
|
No data
|
KATAN AVENUE, FROM STREET EXETER STREET TO STREET SHAFTER AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active sw
|
2014-05-25
|
No data
|
AMBOY ROAD, FROM STREET BEND TO STREET RICHMOND VALLEY ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-05-14
|
No data
|
NEVADA AVENUE, FROM STREET BEND TO STREET SLOANE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Perm to grade, re- sealed, cc,
|
2014-05-01
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2014-04-28
|
No data
|
EAST 8 STREET, FROM STREET AVENUE N TO STREET AVENUE O
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-04-21
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET BROAD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2014-04-12
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-04-12
|
No data
|
ROCKVILLE AVENUE, FROM STREET BEND TO STREET MULBERRY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-04-06
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2014-04-06
|
No data
|
OSWALD PLACE, FROM STREET ELIZABETH PLACE TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2014-04-06
|
No data
|
FURMAN STREET, FROM STREET ANNADALE ROAD TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw ok
|
2014-03-26
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb is complete
|
2014-03-25
|
No data
|
NEVADA AVENUE, FROM STREET BEND TO STREET SLOANE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Cracked seal. Please reseal perimeter of builders pavement in roadway.
|
2014-03-22
|
No data
|
CORRELL AVENUE, FROM STREET HEMLOCK STREET TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installed within last 6month under different permit
|
2014-03-22
|
No data
|
CORRELL AVENUE, FROM STREET BOMBAY STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flag replaced
|
2014-03-21
|
No data
|
SHIRLEY AVENUE, FROM STREET BARCLAY AVENUE TO STREET HOLDRIDGE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2014-03-20
|
No data
|
ROSSVILLE AVENUE, FROM STREET CORRELL AVENUE TO STREET BARROW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced IFO #830-834 Rossville Av sign
|
2014-03-15
|
No data
|
WILSON TERRACE, FROM STREET BEND TO STREET MADIGAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk ok
|
2014-03-05
|
No data
|
JOHN STREET, FROM STREET BRIDGE STREET TO STREET JAY STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
container on rwy
|
2014-01-22
|
No data
|
BEDFORD AVENUE, FROM STREET AVENUE R TO STREET AVENUE S
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw close
|
2014-01-19
|
No data
|
64 STREET, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new swk ok
|
2014-01-18
|
No data
|
13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new swk flags ok
|
2014-01-17
|
No data
|
9 AVENUE, FROM STREET WEST 219 STREET TO STREET WEST 220 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No defect.
|
2014-01-15
|
No data
|
GOWER STREET, FROM STREET HOLDEN BOULEVARD TO STREET WESTWOOD AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2014-01-15
|
No data
|
SEGUINE AVENUE, FROM STREET MELVILLE STREET TO STREET HANK PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2014-01-15
|
No data
|
HALE STREET, FROM STREET AMBOY ROAD TO STREET LENHART STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2014-01-07
|
No data
|
SEGUINE AVENUE, FROM STREET AMBOY ROAD TO STREET WATERBURY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb
|
2013-12-25
|
No data
|
EAST 3 STREET, FROM STREET AVENUE T TO STREET AVENUE U
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
paved curb to curb
|
2013-12-21
|
No data
|
OSWALD PLACE, FROM STREET ELIZABETH PLACE TO STREET SEGUINE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit
|
2013-12-16
|
No data
|
63 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2013-12-12
|
No data
|
SEGUINE PLACE, FROM STREET AMBOY ROAD TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb and Driveway drop curb installed
|
2013-12-04
|
No data
|
AVENUE W, FROM STREET MC DONALD AVENUE TO STREET STRYKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb okay.
|
2013-11-20
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET WATER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk repaired
|
2013-11-17
|
No data
|
RYE AVENUE, FROM STREET PETRUS AVENUE TO STREET POMPEY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W REPLACED EXPANSION JOINTS SEALED.
|
2013-11-01
|
No data
|
AMBOY ROAD, FROM STREET CLARKE AVENUE TO STREET MONTREAL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Various sidewalk flags replaced for bank
|
2013-10-12
|
No data
|
SANILAC STREET, FROM STREET GREELEY AVENUE TO STREET LINCOLN AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit no existing conditions at this time of inspection
|
2013-10-09
|
No data
|
CORRELL AVENUE, FROM STREET HEMLOCK STREET TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit no existing conditions at this ime
|
2013-10-09
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active s/w job
|
2013-10-07
|
No data
|
CORRELL AVENUE, FROM STREET HEMLOCK STREET TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active Sidewalk Op - crew onsite excavating approx 75ft of concrete. Signs posted on both sides of area instructing pedestrians to use opp sidewalk. Pouring new concrete Tomorrow 10-8-13
|
2013-10-02
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2013-09-28
|
No data
|
AMBOY ROAD, FROM STREET CLARKE AVENUE TO STREET MONTREAL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed @ SI Bank
|
2013-09-25
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit
|
2013-09-24
|
No data
|
HYATT STREET, FROM STREET CENTRAL AVENUE TO STREET STUYVESANT PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
replacing s/w
|
2013-09-22
|
No data
|
EAST 3 STREET, FROM STREET AVENUE T TO STREET AVENUE U
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway resurfaced curb to curb.
|
2013-09-14
|
No data
|
VETERANS ROAD EAST, FROM STREET BEND TO STREET BLOOMINGDALE ROAD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work found
|
2013-09-11
|
No data
|
DEWEY AVENUE, FROM STREET GREAVES AVENUE TO STREET TUDOR STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit
|
2013-09-07
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET BROAD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb reset
|
2013-09-05
|
No data
|
ATLANTIC AVENUE, FROM STREET 134 STREET TO STREET VAN WYCK EXPRESSWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk Repair in Progress. Work Zone in Compliance Signs Posted.
|
2013-08-31
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
active permit. inspection was based on a sidewalk dismissal all conditions that were reported on 8/2/2013 still remain. dismissal fails this is the 2nd inspection
|
2013-08-25
|
No data
|
DEWEY AVENUE, FROM STREET GIFFORDS LANE TO STREET NORTH RHETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-08-24
|
No data
|
PENN AVENUE, FROM STREET CLAWSON STREET TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active Sidewalk Permit
|
2013-08-23
|
No data
|
RICHMOND AVENUE, FROM STREET OAKDALE STREET TO STREET SYCAMORE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Contractor on location repairing the sidewalk. Spoke to job supervisor Donald to provide additional signage to warn the pedestrians.
|
2013-08-23
|
No data
|
OAKDALE STREET, FROM STREET RICHMOND AVENUE TO STREET RIDGECREST AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Container not on site during time of inspection.
|
2013-08-19
|
No data
|
GREEN VALLEY ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w
|
2013-08-18
|
No data
|
GOWER STREET, FROM STREET HOLDEN BOULEVARD TO STREET WESTWOOD AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active Sidewalk Permit
|
2013-08-18
|
No data
|
OLYMPIA BOULEVARD, FROM STREET KENSINGTON AVENUE TO STREET PEARSALL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-08-17
|
No data
|
WILSON TERRACE, FROM STREET BEND TO STREET MADIGAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-08-16
|
No data
|
ROCKVILLE AVENUE, FROM STREET BEND TO STREET MULBERRY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced
|
2013-08-10
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk replaced
|
2013-08-08
|
No data
|
74 STREET, FROM STREET 4 AVENUE TO STREET 5 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w in compliance
|
2013-08-02
|
No data
|
JEFFERSON BOULEVARD, FROM STREET NORTH RAILROAD STREET TO STREET NORTH RAILROAD STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
steel face curb installed
|
2013-07-24
|
No data
|
LUCILLE AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Corner City owned lot @ Lucielle St/ Bloomingdale Rd/ Veterans Rd East- New Sidewalk installed along with Truncated domes@ corner
|
2013-07-13
|
No data
|
HALE STREET, FROM STREET AMBOY ROAD TO STREET LENHART STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Active Sidewalk Permit
|
2013-07-10
|
No data
|
JEFFERSON BOULEVARD, FROM STREET NORTH RAILROAD STREET TO STREET BURCHARD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2013-06-22
|
No data
|
LUCILLE AVENUE, FROM STREET BLOOMINGDALE ROAD TO STREET WINANT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb installed
|
2013-06-12
|
No data
|
ROSSVILLE AVENUE, FROM STREET GRAFE STREET TO STREET LARCH COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Corner quads replaced
|
2013-06-12
|
No data
|
SEGUINE PLACE, FROM STREET AMBOY ROAD TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk/ apron
|
2013-05-25
|
No data
|
SEGUINE AVENUE, FROM STREET MELVILLE STREET TO STREET HANK PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw active permit
|
2013-05-25
|
No data
|
STEVENSON PLACE, FROM STREET SHARROTT AVENUE TO STREET SOUTH GOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-05-16
|
No data
|
CORRELL AVENUE, FROM STREET BOMBAY STREET TO STREET MAGUIRE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w flag okay.
|
2013-05-07
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion sealed, wood removed.
|
2013-05-01
|
No data
|
OLYMPIA BOULEVARD, FROM STREET KENSINGTON AVENUE TO STREET PEARSALL STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
3 sidewalk flags replaced
|
2013-05-01
|
No data
|
PEARSALL STREET, FROM STREET AGNES PLACE TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk
|
2013-04-28
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb cut is complete
|
2013-04-27
|
No data
|
KLONDIKE AVENUE, FROM STREET LEWISTON STREET TO STREET SHALE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-04-26
|
No data
|
BRIGHTON STREET, FROM STREET CLERMONT AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W
|
2013-04-18
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk restored
|
2013-04-16
|
No data
|
SEGUINE AVENUE, FROM STREET AMBOY ROAD TO STREET WATERBURY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb was reset
|
2013-04-03
|
No data
|
FINGERBOARD ROAD, FROM STREET BRIARCLIFF ROAD TO STREET STEUBEN STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and driveway apron replaced
|
2013-03-31
|
No data
|
AVENUE W, FROM STREET MC DONALD AVENUE TO STREET STRYKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb reset
|
2013-03-24
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET WATER STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
at time of this inspection the expansion joints are installed
|
2013-03-23
|
No data
|
PINE TERRACE, FROM STREET AMBOY ROAD TO STREET ANNADALE ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2013-03-09
|
No data
|
CLAY PIT ROAD, FROM STREET GLADWIN STREET TO STREET RED CEDAR LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2013-02-16
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Seal all expansion joints & remove wood from tree pit.
|
2013-02-14
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET WATER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints must be installed between driveway Curb and Sidewalk.
|
2013-02-12
|
No data
|
NEW DORP LANE, FROM STREET NEW DORP PLAZA TO STREET 8 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
no new sidewalk info this address
|
2013-01-29
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Barricades removed, truncated dome installed in ped. ramp.
|
2013-01-26
|
No data
|
ROCKVILLE AVENUE, FROM STREET BEND TO STREET MULBERRY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK REPLACED
|
2013-01-24
|
No data
|
NEW DORP LANE, FROM STREET NEW DORP PLAZA TO STREET 8 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
restore full flags on s/w
|
2013-01-18
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET WATER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK
|
2013-01-15
|
No data
|
DEWEY AVENUE, FROM STREET GIFFORDS LANE TO STREET NORTH RHETT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK REPLACED
|
2013-01-14
|
No data
|
GREENLEAF AVENUE, FROM STREET ARTHUR COURT TO STREET FOREST AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2013-01-14
|
No data
|
SHIRLEY AVENUE, FROM STREET BARCLAY AVENUE TO STREET HOLDRIDGE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
area done ok
|
2012-12-28
|
No data
|
EAGAN AVENUE, FROM STREET SNEDEN AVENUE TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and apron installed
|
2012-12-28
|
No data
|
FURMAN STREET, FROM STREET ANNADALE ROAD TO STREET DEAD END
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installed
|
2012-12-25
|
No data
|
WILSON TERRACE, FROM STREET BEND TO STREET MADIGAN PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sw
|
2012-12-17
|
No data
|
SHIRLEY AVENUE, FROM STREET BARCLAY AVENUE TO STREET HOLDRIDGE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
New sidewalk installed as per violation
|
2012-11-22
|
No data
|
GREEN VALLEY ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk replaced
|
2012-11-13
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw repaired
|
2012-11-10
|
No data
|
JEFFERSON BOULEVARD, FROM STREET NORTH RAILROAD STREET TO STREET NORTH RAILROAD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb reset
|
2012-10-22
|
No data
|
PEARSALL STREET, FROM STREET AGNES PLACE TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w pass.
|
2012-10-22
|
No data
|
JEFFERSON BOULEVARD, FROM STREET NORTH RAILROAD STREET TO STREET BURCHARD COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk installed
|
2012-10-20
|
No data
|
JEFFERSON BOULEVARD, FROM STREET NORTH RAILROAD STREET TO STREET NORTH RAILROAD STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
replace swk flag stip 019 violation M-F 7-6
|
2012-10-01
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Install truncated dome in the pedestrian ramp area. Remove all barricades off s/w.
|
2012-09-29
|
No data
|
HYLAN BOULEVARD, FROM STREET BEND TO STREET DAWSON PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no work seen
|
2012-09-29
|
No data
|
SHIRLEY AVENUE, FROM STREET BARCLAY AVENUE TO STREET HOLDRIDGE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk OK
|
2012-09-20
|
No data
|
WOODROW ROAD, FROM STREET BELFIELD AVENUE TO STREET EVERTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced
|
2012-09-18
|
No data
|
ROSSVILLE AVENUE, FROM STREET GRAFE STREET TO STREET LARCH COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk still in good condition joints sealed
|
2012-09-18
|
No data
|
BRIGHTON STREET, FROM STREET CLERMONT AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
perm and sealed
|
2012-09-18
|
No data
|
ROSSVILLE AVENUE, FROM STREET CORRELL AVENUE TO STREET BARROW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk in private loop
|
2012-09-06
|
No data
|
KLONDIKE AVENUE, FROM STREET LEWISTON STREET TO STREET SHALE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No data
|
2012-08-26
|
No data
|
PEARSALL STREET, FROM STREET AGNES PLACE TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
S/W
|
2012-08-25
|
No data
|
72 STREET, FROM STREET COLONIAL ROAD TO STREET NARROWS AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w (new)
|
2012-08-24
|
No data
|
KLONDIKE AVENUE, FROM STREET LEWISTON STREET TO STREET SHALE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please trim and seal expansion joint on sidwalk
|
2012-08-22
|
No data
|
GERVIL STREET, FROM STREET CORRELL AVENUE TO STREET LOCUST COURT
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w pass.
|
2012-08-22
|
No data
|
CORRELL AVENUE, FROM STREET HEMLOCK STREET TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w pass
|
2012-08-19
|
No data
|
CARDIFF STREET, FROM STREET CASTOR PLACE TO STREET COVENTRY LOOP
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SIDEWALK INSTALLED
|
2012-08-16
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET BROAD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
curb
|
2012-08-11
|
No data
|
AMBOY ROAD, FROM STREET CLARKE AVENUE TO STREET MONTREAL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-08-11
|
No data
|
AMBOY ROAD, FROM STREET CLARKE AVENUE TO STREET MONTREAL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w not re-paved permit expired
|
2012-08-09
|
No data
|
63 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s.w completed . However s/w violation might not be dismissed due to contractor not restoring the whole flag.
|
2012-07-31
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET WATER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2012-07-30
|
No data
|
CANAL STREET, FROM STREET BEND TO STREET WATER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2012-07-27
|
No data
|
STEVENSON PLACE, FROM STREET SHARROTT AVENUE TO STREET SOUTH GOFF AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
s/w is o/k sealed and completed
|
2012-07-07
|
No data
|
STEVENSON PLACE, FROM STREET SHARROTT AVENUE TO STREET SOUTH GOFF AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Work not actually in front of 30. Work done in front of 19.
|
2012-07-07
|
No data
|
STEVENSON PLACE, FROM STREET SHARROTT AVENUE TO STREET SOUTH GOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please obtain permit for the correct property address. Work on sidewalk, curb and pavement in roadway done for house number 19
|
2012-06-17
|
No data
|
WALCH PLACE, FROM STREET MELVILLE STREET TO STREET WILBUR STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
a/t/p/o I observed the above respondent stored materials and equipment such as pallets of decorative brick and lift on the roadway without a valid permit on file without a valid permit on file with the nycdot
|
2012-06-09
|
No data
|
EAST 8 STREET, FROM STREET AVENUE N TO STREET AVENUE O
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-05-24
|
No data
|
AMBOY ROAD, FROM STREET CLARKE AVENUE TO STREET MONTREAL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Curb repair work not started.
|
2012-05-22
|
No data
|
AMBOY ROAD, FROM STREET CLARKE AVENUE TO STREET MONTREAL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk work not started.
|
2012-05-19
|
No data
|
AVENUE W, FROM STREET MC DONALD AVENUE TO STREET STRYKER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-05-16
|
No data
|
STEVENSON PLACE, FROM STREET SHARROTT AVENUE TO STREET SOUTH GOFF AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please seal edges of paved area
|
2012-05-02
|
No data
|
STEVENSON PLACE, FROM STREET SHARROTT AVENUE TO STREET SOUTH GOFF AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Work not done
|
2012-04-26
|
No data
|
SEGUINE PLACE, FROM STREET AMBOY ROAD TO STREET MOSELY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb done in driveway apron
|
2012-03-20
|
No data
|
63 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2012-03-13
|
No data
|
13 AVENUE, FROM STREET 39 STREET TO STREET 40 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-12-20
|
No data
|
HELENA ROAD, FROM STREET BEND TO STREET TODT HILL ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Pass.
|
2011-11-16
|
No data
|
ROSSVILLE AVENUE, FROM STREET CORRELL AVENUE TO STREET BARROW PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
two flags on sidewalk done. (very difficult to see addresses)
|
2011-11-15
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-10-22
|
No data
|
AVENUE K, FROM STREET EAST 7 STREET TO STREET OCEAN PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-10-14
|
No data
|
GREEN VALLEY ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-08-31
|
No data
|
RYE AVENUE, FROM STREET PETRUS AVENUE TO STREET POMPEY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-08-31
|
No data
|
MOFFETT STREET, FROM STREET PETRUS AVENUE TO STREET SERRELL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-08-27
|
No data
|
13 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-08-05
|
No data
|
GREEN VALLEY ROAD, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw
|
2011-07-23
|
No data
|
ROCKVILLE AVENUE, FROM STREET BEND TO STREET MULBERRY AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
SIDEWALK REPLACED
|
2011-06-06
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints/sealer installed
|
2011-06-06
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2011-04-09
|
No data
|
49 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-04-09
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
No data
|
2011-04-09
|
No data
|
13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw active permit
|
2011-03-28
|
No data
|
49 STREET, FROM STREET 13 AVENUE TO STREET 14 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2011-03-28
|
No data
|
13 AVENUE, FROM STREET 48 STREET TO STREET 49 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-12-21
|
No data
|
FINGERBOARD ROAD, FROM STREET BRIARCLIFF ROAD TO STREET STEUBEN STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
expansion joints not jet placed in sidewalk.
|
2010-12-11
|
No data
|
PEARSALL STREET, FROM STREET AGNES PLACE TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2010-12-11
|
No data
|
OLYMPIA BOULEVARD, FROM STREET KENSINGTON AVENUE TO STREET PEARSALL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2010-11-16
|
No data
|
21 STREET, FROM STREET HOYT AVENUE TO STREET HOYT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|
2010-11-14
|
No data
|
PEARSALL STREET, FROM STREET AGNES PLACE TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2010-11-14
|
No data
|
OLYMPIA BOULEVARD, FROM STREET KENSINGTON AVENUE TO STREET PEARSALL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2010-11-13
|
No data
|
PEARSALL STREET, FROM STREET AGNES PLACE TO STREET OLYMPIA BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2010-11-13
|
No data
|
OLYMPIA BOULEVARD, FROM STREET KENSINGTON AVENUE TO STREET PEARSALL STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk
|
2010-11-09
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NO EXP. JOINTS AND NO SEALER APLY BOTH
|
2010-11-09
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NO EXP. JOINTS AND NO SEALER APLY BOTH
|
2010-09-24
|
No data
|
FIELDWAY AVENUE, FROM STREET DURANT AVENUE TO STREET MAYBURY AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w replaced expansion joints sealed.
|
2010-09-22
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Protest reviewed and denied. Most of the existing curb is flush with the new sidewalk flags installed adjacant to curb. Install expansion joints and seal.
|
2010-09-08
|
No data
|
ROSSVILLE AVENUE, FROM STREET GRAFE STREET TO STREET LARCH COURT
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk excavation
|
2010-09-08
|
No data
|
GRAFE STREET, FROM STREET BEND TO STREET ROSSVILLE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk excavation
|
2010-08-30
|
No data
|
PACIFIC AVENUE, FROM STREET BEACH ROAD TO STREET KING STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw
|
2010-08-16
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no expansion joints against the curb on 4 Avenue side
|
2010-08-16
|
No data
|
4 AVENUE, FROM STREET 73 STREET TO STREET 74 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2010-07-06
|
No data
|
MILES AVENUE, FROM STREET ELKHART STREET TO STREET FAIRFIELD STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
rw
|
2010-07-06
|
No data
|
ELKHART STREET, FROM STREET GIFFORDS LANE TO STREET MILES AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
replace pedestrain crosswalk lane markings
|
2010-06-30
|
No data
|
KLONDIKE AVENUE, FROM STREET LEWISTON STREET TO STREET SHALE STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk work completed
|
2010-06-29
|
No data
|
BRIGHTON STREET, FROM STREET CLERMONT AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/ repaired expansion joints sealed.
|
2010-06-03
|
No data
|
MARISA CIRCLE, FROM STREET BEND TO STREET BEND
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w replaced expansion joints sealed.
|
2010-06-02
|
No data
|
BRIGHTON STREET, FROM STREET CLERMONT AVENUE TO STREET HYLAN BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
S/W REPLACED EXPANSION JOINTS SEALED.
|
2010-03-14
|
No data
|
CARDIFF STREET, FROM STREET CASTOR PLACE TO STREET COVENTRY LOOP
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
work done
|
2009-12-11
|
No data
|
CARDIFF STREET, FROM STREET CASTOR PLACE TO STREET COVENTRY LOOP
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
11-529-024-507
|
2009-10-21
|
No data
|
EVERTON AVENUE, FROM STREET EVERTON PLACE TO STREET WOODROW ROAD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w replaced expansion joints sealed.
|
2009-10-20
|
No data
|
WOODROW ROAD, FROM STREET BELFIELD AVENUE TO STREET EVERTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
s/w replaced expansion joints sealed.
|
2009-09-15
|
No data
|
SERRELL AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-12-21
|
No data
|
SERRELL AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No data
|
2008-10-16
|
No data
|
RAMONA AVENUE, FROM STREET FOSTER ROAD TO STREET VERNON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk done
|
2008-08-11
|
No data
|
NORTH RAILROAD STREET, FROM STREET BELFIELD AVENUE TO STREET CARLTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sw
|
2008-08-10
|
No data
|
NORTH RAILROAD STREET, FROM STREET BELFIELD AVENUE TO STREET CARLTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk done
|
2008-08-06
|
No data
|
NORTH RAILROAD STREET, FROM STREET BELFIELD AVENUE TO STREET CARLTON BOULEVARD
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk done
|
2008-07-03
|
No data
|
SERRELL AVENUE, FROM STREET RICHMOND AVENUE TO STREET WAINWRIGHT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No data
|