Name: | FOREVER CONSTRUCTION, CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 30 May 2008 (17 years ago) |
Entity Number: | 3678437 |
ZIP code: | 11435 |
County: | Queens |
Place of Formation: | New York |
Address: | 139-23 86TH RD, 2ND FLR, BRIARWOOD, NY, United States, 11435 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 139-23 86TH RD, 2ND FLR, BRIARWOOD, NY, United States, 11435 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
080530000637 | 2008-05-30 | CERTIFICATE OF INCORPORATION | 2008-05-30 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345882815 | 0215000 | 2022-04-07 | 1511 E. 9TH ST, BROOKLYN, NY, 11230 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1543683 |
Safety | Yes |
Inspection Type | Planned |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2021-07-23 |
Emphasis | L: LOCALTARG, P: LOCALTARG |
Case Closed | 2024-07-16 |
Related Activity
Type | Inspection |
Activity Nr | 1543688 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260102 A01 |
Issuance Date | 2021-12-28 |
Abatement Due Date | 2022-01-06 |
Current Penalty | 2926.0 |
Initial Penalty | 2926.0 |
Final Order | 2022-01-25 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.102(a)(1): Employees did not use eye and face protection equipment when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents: a) Foyer to the house: On or about July 23, 2021: An employee used a hammer to demo concrete at the entrance, but did not wear eye protection for flying particles. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260404 B01 I |
Issuance Date | 2021-12-28 |
Abatement Due Date | 2022-01-06 |
Current Penalty | 2926.0 |
Initial Penalty | 2926.0 |
Final Order | 2022-01-25 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. a) Foyer to the house: On or about July 23, 2021: An employee used a hammer to demo concrete at the entrance, which was plugged in by extension cord. The extension cord was not protected by GFI. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260404 F06 |
Issuance Date | 2021-12-28 |
Abatement Due Date | 2022-01-06 |
Current Penalty | 2926.0 |
Initial Penalty | 2926.0 |
Final Order | 2022-01-25 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) Foyer to the house: On or about July 23, 2021: An employee used a hammer to demo concrete at the entrance, which was plugged in by an extension cord. The extension cord was plugged into an outlet that was not grounded. |
Date of last update: 28 Mar 2025
Sources: New York Secretary of State