Name: | KNG BUILDERS INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 22 Jul 2008 (17 years ago) |
Entity Number: | 3699292 |
ZIP code: | 11211 |
County: | Kings |
Place of Formation: | New York |
Address: | 199 LEE AVENUE, SUITE 276, BROOKLYN, NY, United States, 11211 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
C/O THE CORPORATION | DOS Process Agent | 199 LEE AVENUE, SUITE 276, BROOKLYN, NY, United States, 11211 |
Number | Date | End date | Type | Address |
---|---|---|---|---|
B012022271A63 | 2022-09-28 | 2022-10-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012022271A64 | 2022-09-28 | 2022-10-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B012022271A62 | 2022-09-28 | 2022-10-22 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELLERY STREET, BROOKLYN, FROM STREET THROOP AVENUE |
B012022229A89 | 2022-08-17 | 2022-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012022229A90 | 2022-08-17 | 2022-09-14 | RESET, REPAIR OR REPLACE CURB | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B012022229A91 | 2022-08-17 | 2022-09-14 | PAVE STREET-W/ ENGINEERING & INSP FEE | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022229B10 | 2022-08-17 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022229B09 | 2022-08-17 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B042022229A95 | 2022-08-17 | 2022-09-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B042022229A94 | 2022-08-17 | 2022-09-14 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012022229A88 | 2022-08-17 | 2022-09-14 | RESET, REPAIR OR REPLACE CURB | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022223A56 | 2022-08-11 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022223A55 | 2022-08-11 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220A33 | 2022-08-08 | 2022-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220B61 | 2022-08-08 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220B60 | 2022-08-08 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220B59 | 2022-08-08 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220B58 | 2022-08-08 | 2022-10-26 | TEMP. CONST. SIGNS/MARKINGS | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220B57 | 2022-08-08 | 2022-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220B56 | 2022-08-08 | 2022-10-26 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220B55 | 2022-08-08 | 2022-10-26 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220B54 | 2022-08-08 | 2022-10-26 | CROSSING SIDEWALK | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220A32 | 2022-08-08 | 2022-10-26 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220B53 | 2022-08-08 | 2022-10-26 | PLACE MATERIAL ON STREET | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022220A47 | 2022-08-08 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220A46 | 2022-08-08 | 2022-10-26 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220A45 | 2022-08-08 | 2022-10-26 | OCCUPANCY OF ROADWAY AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220A44 | 2022-08-08 | 2022-10-26 | CROSSING SIDEWALK | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220A43 | 2022-08-08 | 2022-10-26 | PLACE MATERIAL ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220A42 | 2022-08-08 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220A41 | 2022-08-08 | 2022-10-26 | TEMP. CONST. SIGNS/MARKINGS | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220A40 | 2022-08-08 | 2022-10-26 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220A39 | 2022-08-08 | 2022-10-26 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220A38 | 2022-08-08 | 2022-10-26 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220A37 | 2022-08-08 | 2022-10-26 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220A36 | 2022-08-08 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022220A35 | 2022-08-08 | 2022-10-26 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022220A34 | 2022-08-08 | 2022-10-26 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012022192A83 | 2022-07-11 | 2022-08-05 | INSTALL FENCE | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B002022186A00 | 2022-07-05 | No data | MISCELLANEOUS - MINOR SALES | No data |
B022022181A53 | 2022-06-30 | 2022-08-07 | TEMP. CONST. SIGNS/MARKINGS | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022178C23 | 2022-06-27 | 2022-08-07 | CROSSING SIDEWALK | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022178C24 | 2022-06-27 | 2022-08-07 | OCCUPANCY OF ROADWAY AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022178C25 | 2022-06-27 | 2022-08-07 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022178C26 | 2022-06-27 | 2022-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022178C27 | 2022-06-27 | 2022-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022178C22 | 2022-06-27 | 2022-08-07 | PLACE MATERIAL ON STREET | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B012022164A44 | 2022-06-13 | 2022-07-02 | INSTALL FENCE | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022164A43 | 2022-06-13 | 2022-08-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022164A44 | 2022-06-13 | 2022-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022153B60 | 2022-06-02 | 2022-07-01 | TEMP. CONST. SIGNS/MARKINGS | GLENWOOD ROAD, BROOKLYN, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE |
B022022143C39 | 2022-05-23 | 2022-08-07 | OCCUPANCY OF ROADWAY AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C35 | 2022-05-23 | 2022-08-07 | TEMP. CONST. SIGNS/MARKINGS | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C36 | 2022-05-23 | 2022-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022143C37 | 2022-05-23 | 2022-08-07 | PLACE MATERIAL ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C38 | 2022-05-23 | 2022-08-07 | CROSSING SIDEWALK | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C34 | 2022-05-23 | 2022-08-07 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022143C40 | 2022-05-23 | 2022-08-07 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C41 | 2022-05-23 | 2022-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C26 | 2022-05-23 | 2022-08-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022143C27 | 2022-05-23 | 2022-08-07 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C28 | 2022-05-23 | 2022-08-07 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022143C29 | 2022-05-23 | 2022-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022143C30 | 2022-05-23 | 2022-08-07 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022143C31 | 2022-05-23 | 2022-08-07 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022143C32 | 2022-05-23 | 2022-08-07 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022143C33 | 2022-05-23 | 2022-08-07 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088A98 | 2022-03-29 | 2022-05-24 | TEMP. CONST. SIGNS/MARKINGS | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088A99 | 2022-03-29 | 2022-05-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088B00 | 2022-03-29 | 2022-05-24 | PLACE MATERIAL ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088B01 | 2022-03-29 | 2022-05-24 | CROSSING SIDEWALK | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088B02 | 2022-03-29 | 2022-05-24 | OCCUPANCY OF ROADWAY AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088B03 | 2022-03-29 | 2022-05-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088D79 | 2022-03-29 | 2022-05-24 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088D80 | 2022-03-29 | 2022-05-24 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088A88 | 2022-03-29 | 2022-05-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088A89 | 2022-03-29 | 2022-05-24 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088A91 | 2022-03-29 | 2022-05-24 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088A93 | 2022-03-29 | 2022-05-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088A94 | 2022-03-29 | 2022-05-24 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022022088A95 | 2022-03-29 | 2022-05-24 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088A96 | 2022-03-29 | 2022-05-24 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022022088A97 | 2022-03-29 | 2022-05-24 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B53 | 2021-12-27 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B43 | 2021-12-27 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B44 | 2021-12-27 | 2022-03-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021361B45 | 2021-12-27 | 2022-03-31 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B46 | 2021-12-27 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B47 | 2021-12-27 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021361B48 | 2021-12-27 | 2022-03-31 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B49 | 2021-12-27 | 2022-03-31 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B50 | 2021-12-27 | 2022-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B51 | 2021-12-27 | 2022-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021361B52 | 2021-12-27 | 2022-03-31 | TEMP. CONST. SIGNS/MARKINGS | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021361B54 | 2021-12-27 | 2022-03-31 | PLACE MATERIAL ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021361B55 | 2021-12-27 | 2022-03-31 | CROSSING SIDEWALK | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021361B56 | 2021-12-27 | 2022-03-31 | OCCUPANCY OF ROADWAY AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021361B57 | 2021-12-27 | 2022-03-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021361B58 | 2021-12-27 | 2022-03-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
Q042021327A11 | 2021-11-23 | 2021-12-22 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
B022021312A73 | 2021-11-08 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021309A86 | 2021-11-05 | 2021-12-31 | CROSSING SIDEWALK | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A85 | 2021-11-05 | 2021-12-31 | PLACE MATERIAL ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A84 | 2021-11-05 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A83 | 2021-11-05 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A91 | 2021-11-05 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A90 | 2021-11-05 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A41 | 2021-11-05 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A40 | 2021-11-05 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021309A88 | 2021-11-05 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A89 | 2021-11-05 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B022021309A87 | 2021-11-05 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
Q022021308A90 | 2021-11-04 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
B022021308C01 | 2021-11-04 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021308C00 | 2021-11-04 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021308B99 | 2021-11-04 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021308B98 | 2021-11-04 | 2021-12-31 | CROSSING SIDEWALK | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021308B97 | 2021-11-04 | 2021-12-31 | PLACE MATERIAL ON STREET | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021308B96 | 2021-11-04 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021308B95 | 2021-11-04 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B022021308C02 | 2021-11-04 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
Q022021308A82 | 2021-11-04 | 2021-12-31 | TEMPORARY PEDESTRIAN WALK | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A80 | 2021-11-04 | 2021-12-31 | PLACE MATERIAL ON STREET | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A81 | 2021-11-04 | 2021-12-31 | CROSSING SIDEWALK | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A83 | 2021-11-04 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A84 | 2021-11-04 | 2021-12-31 | OCCUPANCY OF ROADWAY AS STIPULATED | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A85 | 2021-11-04 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A86 | 2021-11-04 | 2021-12-31 | PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A87 | 2021-11-04 | 2021-12-31 | OCCUPANCY OF SIDEWALK AS STIPULATED | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A88 | 2021-11-04 | 2021-12-31 | TEMP. CONST. SIGNS/MARKINGS | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q022021308A89 | 2021-11-04 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET |
Q022021308B03 | 2021-11-04 | 2021-12-31 | PLACE EQUIPMENT OTHER THAN CRANE OR SHOV | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET HART STREET |
Q042021159A36 | 2021-06-08 | 2021-07-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | DE KALB AVENUE, QUEENS, FROM STREET WOODWARD AVENUE |
Q042021159A37 | 2021-06-08 | 2021-07-07 | PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR | DE KALB AVENUE, QUEENS, FROM STREET WOODWARD AVENUE |
Q042021126A35 | 2021-05-06 | 2021-06-04 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | WOODWARD AVENUE, QUEENS, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET |
Q042021126A36 | 2021-05-06 | 2021-06-05 | CONSTRUCT NEW SIDEWALK BLG. PAVEMENT | DE KALB AVENUE, QUEENS, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE |
B012021078B05 | 2021-03-19 | 2021-06-29 | OPEN SIDEWALK TO INSTALL FOUNDATION | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012021077B80 | 2021-03-18 | 2021-06-29 | OPEN SIDEWALK TO INSTALL FOUNDATION | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B012020359B17 | 2020-12-24 | 2021-03-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B012020359B16 | 2020-12-24 | 2021-03-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012020332A21 | 2020-11-27 | 2020-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B012020332A20 | 2020-11-27 | 2020-12-31 | OPEN SIDEWALK TO INSTALL FOUNDATION | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012020261C11 | 2020-09-17 | 2020-10-16 | INSTALL FENCE | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B012020261C10 | 2020-09-17 | 2020-10-16 | INSTALL FENCE | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012020260F35 | 2020-09-16 | 2020-12-01 | OPEN SIDEWALK TO INSTALL FOUNDATION | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
B012020259D22 | 2020-09-15 | 2020-12-09 | OPEN SIDEWALK TO INSTALL FOUNDATION | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012020157B09 | 2020-06-05 | 2020-07-04 | INSTALL FENCE | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
B012020157B08 | 2020-06-05 | 2020-07-04 | INSTALL FENCE | ELLERY STREET, BROOKLYN, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE |
Q012019231B23 | 2019-08-19 | 2019-09-14 | INSTALL FENCE - PROTECTED | DE KALB AVENUE, QUEENS, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE |
B012019227A32 | 2019-08-15 | 2019-09-13 | INSTALL FENCE | THROOP AVENUE, BROOKLYN, FROM STREET ELLERY STREET TO STREET PARK AVENUE |
Start date | End date | Type | Value |
---|---|---|---|
2023-06-09 | 2024-03-28 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-14 | 2023-06-09 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-07-01 | 2022-07-14 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-06-17 | 2022-07-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2022-02-08 | 2022-06-17 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-10-01 | 2022-02-08 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-09-21 | 2021-10-01 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2021-07-13 | 2021-09-21 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2008-07-22 | 2021-07-13 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
080722000684 | 2008-07-22 | CERTIFICATE OF INCORPORATION | 2008-07-22 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2024-03-01 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No fence at this time |
2024-02-27 | No data | DE KALB AVENUE, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner was found not to be ADA compliant. Previously measured & collected in Prism on 7/7/21. |
2023-04-12 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No curb installed |
2023-02-01 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Street was paved |
2023-01-19 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed |
2023-01-19 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed |
2023-01-18 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed |
2023-01-18 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Fence installed |
2023-01-11 | No data | ELLERY STREET, FROM STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP is in compliance |
2023-01-11 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP was in compliance |
2023-01-02 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESUFACED BY BPP B012022271A63. |
2023-01-02 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | RESURFACED BY BPP FOR PROPERTY #180 THROOP AV. B012022271A64 |
2022-11-18 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB RESET IFO PROPERTY #180. |
2022-10-18 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Construction materials no longer on street. Conventional bike lane is clear. |
2022-10-02 | No data | GLENWOOD ROAD, FROM STREET EAST 34 STREET TO STREET NEW YORK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk in compliance |
2022-09-29 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 33FT, W MILLED 23FT, L MILLED 123FT, D3in. |
2022-09-29 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | W OF RDWY 48FT, W MILLED 28FT, L MILLED 120FT, D3in. |
2022-09-29 | No data | ELLERY STREET, FROM STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | INTERSECTION L48, W36. MILLED L27, MILLED W24. |
2022-09-28 | No data | DE KALB AVENUE, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Completed tangent ramps in the SE4 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 7/7/21. |
2022-09-21 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CUT RESET ON THE SIDE OF PROPERTY #180 THROOP AV. |
2022-08-30 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Construction fence in compliance. |
2022-08-22 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Work not started. |
2022-06-14 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Occupancy of sidewalk by green plywood fence is compliant. |
2022-04-22 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Upon arrival respondent KNG BUILDERS INC has sealed the expansion joints in between the sidewalk at both ends of the property lines in front of property #314 WOODWARD AVENUE in compliance |
2022-04-21 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence meets DOT standards |
2022-04-21 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk currently open |
2022-04-13 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Concrete curb and new sidewalk complete. |
2022-04-13 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | BPP complete ifo #314, conventional bike lane restored. |
2022-04-02 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Upon arrival respondent KNG BUILDERS INC failed to obtain a valid DOT permit on file for the storage of the several jersey barriers/equipment stored in the roadway adjacent to the new building operation. Nov issued |
2022-04-01 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permittee occupying swk currently. Conventional bike lane is clear. |
2022-03-09 | No data | DE KALB AVENUE, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Ramps are functional and accessible. Previously measured & collected in Prism on 7/7/21. |
2022-01-25 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | - Sidewalk expansion joints need to be sealedplease seal expansion joints in between the sidewalk at both ends of the property lines in front of property #314 WOODWARD AVENUE, in a timely fashion. CAR issued |
2021-12-10 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | BPP completed and acceptable. • Curb to Curb width – 30’• Milled area – 20’• Depth of milled area – 3’’ |
2021-12-03 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No concrete pump on location at this time |
2021-10-29 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk with wooden fence |
2021-10-29 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of sidewalk with wooden fence |
2021-09-20 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Green construction fence on SWK WCL of Throop Avenue. |
2021-09-17 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | In compliance - container stored in the parking lane. |
2021-08-13 | No data | DE KALB AVENUE, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Condition repaired. Permittee obtained 410 permit # Q042021159A36 for the newly completed tangent ramps in the SE4 corner. Ramps are functional and accessible. |
2021-07-30 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers in parking lane IFO 314. Conventional bike lane clear. |
2021-07-28 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New SW flags installed, in compliance |
2021-07-09 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Construction container placed on street in the parking lane at this time of inspection. |
2021-07-09 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | No bobcat on site at this time of inspection. |
2021-07-07 | No data | DE KALB AVENUE, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Active permit. Newly completed tangent ramps in the SE4 corner found not to be ADA compliant. Ramps are functional and accessible. Measured & collected in Prism on 7/7/21. |
2021-06-10 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | location passQ012021158D54• Curb to Curb width-30’• Milled area-20’x109’• Depth of milled area- 3”• ½ +5’ milled (yes/no) – y• Waiver (yes/no)-n |
2021-06-10 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | • Curb to Curb width-30’• Milled area-20’x56’• Depth of milled area- 3”• ½ +5’ milled (yes/no) – y• Waiver (yes/no)-npass |
2021-06-10 | No data | DE KALB AVENUE, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | bpp passQ012021159B77• Curb to Curb width-30’• Milled area-20x24’• Depth of milled area-3” • ½ +5’ milled (yes/no) – y• Waiver (yes/no)-n |
2021-06-07 | No data | DE KALB AVENUE, FROM STREET WOODWARD AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No 410 permit on file. Newly completed tangent ramps in the SE corner found to be functional and accessible. Plastic on DWS, permanent pavement key needed and expansion joints around street light post needed and seal expansion joints on corner. |
2021-06-04 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-06-04 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No BPP roadway pavement work observed at this time of inspection. |
2021-06-01 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Container in parking lane for new building 1894-1896 DEKALB AVENUE, QUEENS A/K/A 18-94,18-96 DEKALB AVENUE with crew on site working on new sidewalk and curb. |
2021-06-01 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers in roadway for corner property at Dekalb Ave, not blocking bike lane. |
2021-05-22 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Place material behind the fence i/f/o 314 Woodward Avenue |
2021-05-20 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway is occupied with jersey barriers with reflective tape attached on the street i/f/o 314 Woodward Avenue |
2021-05-15 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Bobcat behind the fence AKA 314 Woodward Avenue |
2021-05-15 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway is occupied with jersey barriers with reflective tape attached i/f/o 314 Woodward Avenue |
2021-05-06 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Maintain fence on the sidewalk i/f/o 314 Woodward Avenue |
2021-05-06 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Spoke to foreman. Signs in right place for the bike lane. But they have outdated signs. Informed of proper signage. They said they would get proper signs. |
2021-05-05 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Place open construction debris container on the street i/f/o 314 Woodward Avenue |
2021-05-03 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No material observed on the street i/f/i 18-86 Dekalb Avenue |
2021-05-03 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Material place behind the fence AKA 18-96 Dekalb Avenue |
2021-04-23 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon arrival respondent KNG BUILDERS INC. failed to comply with terms & conditions of stipulation #BIKE02, create a temporary bike-way around the work-zone delineated by cones or similar vertical traffic devices. Nov issued no bike gear on site!!! |
2021-02-21 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No washout box on site |
2021-02-21 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk open |
2021-02-19 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is open. |
2021-02-10 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Permit is in compliance |
2021-02-07 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | jersey barriers on r/w |
2021-02-06 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE ON SITE. |
2021-02-06 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO CONTAINER ON SITE. |
2021-01-12 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIGNS POSTED. |
2021-01-06 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #1295 GREENE AVENUE in compliance |
2021-01-06 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb reveal installed in front of property #18 STANHOPE STREET in compliance |
2020-12-09 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE ON SITE. |
2020-11-10 | No data | ELLERY STREET, FROM STREET DELMONICO PLACE TO STREET THROOP AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | JERSEY BARRIERS ON SITE. |
2020-09-26 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed |
2020-08-12 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Materials Visible Placed On Street At Time Of Inspection |
2020-08-12 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No Materials Visible On Site At Time Of Inspection |
2020-08-12 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Occupied At Time Of Inspection |
2020-08-11 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | No Materials Visible Placed On Street At Time Of Inspection |
2020-07-31 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Complaint | Department of Transportation | Complaint Not Verified: No blocked construction, No tractor trailer, no crew on site at Building operations site. Pedestrian walkway in placeand clear for pedestrian traffic. |
2020-07-16 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no work done |
2020-07-09 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | jersey barriers acceptable |
2020-07-08 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | occupancy of r.w acceptable |
2020-07-08 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material on street acceptable |
2020-07-02 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | concrete pump not on site |
2020-07-02 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | permit expired new permit on file |
2020-07-02 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | material acceptable |
2020-07-02 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new permit on file |
2020-06-18 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | material acceptable |
2020-06-16 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material acceptable |
2020-06-03 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container stored in c/l. |
2020-05-27 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk Occupied At Time Of Inspection |
2020-03-19 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | jersey barriers |
2020-03-19 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | no container on roadway |
2020-02-28 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | reset curb |
2020-02-12 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb |
2020-02-10 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence stored |
2020-02-07 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | wooden fence on sidewalk |
2020-02-07 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | roadway is occupy also 5' clear walkway |
2020-02-06 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | plastic barriers stored on street |
2020-02-06 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | sidewalk in compliance |
2020-01-10 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | verified roadway is occupy when delivery |
2020-01-10 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | sign posted |
2019-12-21 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCCUPANCY OF ROADWAY-CONSTRUCTION BARRIERS ON THE ROADWAY FOR WALKWAY |
2019-12-15 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | temp signs posted |
2019-12-15 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence s/w |
2019-12-11 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Parking lane ok. |
2019-11-29 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | No container on roadway, bike lane clear |
2019-11-09 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Roadway occupied(barriers), bike lane clear |
2019-11-09 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp /signs posted |
2019-10-30 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed in front of 123-127 boreum street |
2019-10-15 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Temp construction signs posted, no crew on site, bike lane clear |
2019-10-13 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk installed |
2019-10-13 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | no x s/w |
2019-10-13 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | temp /signs posted |
2019-10-12 | No data | WOODWARD AVENUE, FROM STREET DE KALB AVENUE TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers on roadway encroaching/blocking bike lane |
2019-09-30 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk replaced in front of 123-127 Boreum street |
2019-09-08 | No data | DE KALB AVENUE, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material not visible |
2019-03-20 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in compliance |
2018-11-18 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIGNS POSTED |
2018-09-11 | No data | 59 STREET, FROM STREET 19 AVENUE TO STREET 20 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No material placed on street at this time |
2018-08-29 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONSTRUCTION DEBRIS CONTAINER ON ROADWAY |
2018-08-15 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB OK |
2018-05-27 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb in good condition |
2018-04-25 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2018-03-07 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Curb work not yet started. |
2018-02-22 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2018-01-30 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb |
2018-01-17 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb ok. |
2018-01-09 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | In compliance. |
2017-12-09 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on r/w |
2017-10-21 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is in compliance |
2017-10-13 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NPA sign posted. |
2017-10-07 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb. |
2017-10-02 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Failed to adhere to OCMC stipulation ID 047. Respondent occupied 9' width of roadway adjacent to the curb-line as opposed to the allowed 8'. SITE UNATTENDED. Permit B022017229B29 used to ID. |
2017-09-28 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Jersey barriers placed in the roadway |
2017-09-26 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb. |
2017-09-20 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb in compliance. |
2017-09-15 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb. |
2017-09-11 | No data | CEDAR STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Respondent failed to adhere to OCMC stipulation ID 047. Respondent occupied 10' width of roadway adjacent to the curb-line, as opposed to the allowed 8'. SITE UNATTENDED. |
2017-07-17 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NEW CURB INSTALLED AND IN COMPLIANCE |
2017-06-24 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | New curb. Joint sealed. |
2017-05-13 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO container on location at this time. |
2017-03-16 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material placed on st |
2017-03-11 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed |
2017-02-18 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SIDEWALK GOOD |
2017-02-18 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SIDEWALK GOOD. |
2017-01-23 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb is ok |
2017-01-11 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material placed on st |
2017-01-09 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material on st |
2016-12-16 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB IN COMPLIANCE |
2016-12-16 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CHECKING ....CONTAINER ON ST |
2016-11-28 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON ST ...CHECKING |
2016-10-21 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material placed on site |
2016-10-03 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | JERSEY BARRIERS IN THE PARKING AT TIME OF INSPECTION |
2016-09-12 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | checking container on st |
2016-08-24 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON THE ST |
2016-08-24 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb installed |
2016-08-08 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | temp const signs posted under valid permits on file |
2016-08-08 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no material on st |
2016-07-18 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2016-07-08 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | checking .....container on st |
2016-06-30 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Curb was repaired at time of inspection. |
2016-06-20 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W IN COMPLIANCE |
2016-05-14 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new curb ok |
2016-05-09 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on the st |
2016-04-18 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W IN COMPLIANCE |
2016-04-15 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CROSSING S/W |
2016-04-14 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT HAVING CONSTRUCTION MATERIAL (CINDER BLOCKS) ON THE STREET IN THE PARKING LANE STORED HIGHER THAN 5 FT , MATERIAL IS STORED GREATER THAN 7 FT ON THE ROADWAY,ABOVE PERMIT USED FOR I.D PURPOSES |
2016-03-29 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE MAINTAINED AT TIME OF INSPECTION |
2016-03-29 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | NO WORK GOING ON AT THIS TIME FOR BLOCKED CONSTRUCTION , |
2016-03-21 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | TEMP CONST SIGNS POSTED ON FENCE |
2016-03-08 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | container on st at time of inspection /no debris or material on the st at time of of inspection area i/f/o building opp is clean |
2016-03-02 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence |
2016-03-02 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence |
2016-02-26 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCC OF S/W |
2016-02-08 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk |
2016-02-05 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO MATERIAL ON ST AT TIME OF INSPECTION |
2016-02-04 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk completed. |
2016-01-29 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | PLACE MATERIAL ON ST |
2016-01-10 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | CURB REPAIRED. |
2015-12-30 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Roadway being occupied at time of inspection. |
2015-12-30 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO C/S AT TIME OF INSPECTION |
2015-12-01 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 5 FEET CLEAR SIDEWALK. |
2015-11-27 | No data | GREENE AVENUE, FROM STREET MYRTLE AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | occ s/w |
2015-11-04 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO MATERIAL FOUND |
2015-11-02 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | new sidewalk good. |
2015-10-06 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk is not being occupied at time of inspection. |
2015-09-30 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new sidewalk. |
2015-09-30 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | sidewalk in compliance. |
2015-09-30 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | curb.. |
2015-09-21 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | new swk |
2015-09-21 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No new work started i/f/o of property 1145 at time of inspection. |
2015-09-19 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Sidewalk occupied with plywood fence. |
2015-09-16 | No data | STANHOPE STREET, FROM STREET BUSHWICK AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE MAINTAINED ON SIDEWALK. |
2015-09-05 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | New sidewalk installed. |
2015-09-03 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE MAINTAINED |
2015-08-25 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | D01 Atpo I observed the above respondent and respondent's sub-contractor(Casa Contracting) was installing new sidewalk(not repairing sidewalk and installing curb) with the incorrect permit type. Use of street/street opening with invalid permit type(c |
2015-08-24 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | D01 Atpo I observed the above respontent and respondent's sub-contractor(Casa Concrete) had a crew excavate the old curb out of street for 100 feet, down 1 foot in roadway-without a valid dot permit to do so.Use of street/street opening-no perm |
2015-08-05 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container in r/w. |
2015-06-18 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | EXPANSION JOINTS SEALED |
2015-06-12 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Respondent placed on hold. Still need to seal joints. CAR pass as per policy. |
2015-06-09 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | A/T/P/O I OBSERVED THE ABOVE RESPONDENT FAIL TO SEAL ALL THE EXPANSION JOINTS ON THE SIDEWALK AS PER SUB SECTION |
2015-05-17 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 2 container on rw with permit for 1 |
2015-05-17 | No data | PARK AVENUE, FROM STREET CUMBERLAND STREET TO STREET NORTH OXFORD STREET | No data | Street Construction Inspections: Active | Department of Transportation | new swk ok |
2015-04-30 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | lull |
2015-04-21 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | 0201 - PLACE MATERIAL ON STREET /no material on street |
2015-03-31 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | OCC OF S/W DUE TO FENCE |
2015-03-20 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCC OF S/W DUE TO FENCE |
2015-03-11 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | S/W EXPANSION JOINTS MISSING SEALER |
2015-03-09 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence.. |
2015-03-06 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO CONTAINER ON ST |
2015-03-05 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE MAINTAINED |
2015-03-05 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | occ of s/w due to fence |
2015-02-27 | No data | WILSON AVENUE, FROM STREET DE KALB AVENUE TO STREET HART STREET | No data | Street Construction Inspections: Active | Department of Transportation | container |
2015-02-19 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO OCC OF S/W AT THIS TIME FENCE DOWN |
2015-02-16 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence.. |
2015-02-06 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCC OF S/W DUE TO FENCE |
2015-02-05 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO FENCE UP AT SITE AT TIME OF INSPECTION |
2015-01-29 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | occ of s/w due to fence |
2015-01-28 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | cross swk |
2015-01-26 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no fence up at time of inspection |
2015-01-24 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | C/S.. |
2015-01-21 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container in r/w... |
2015-01-06 | No data | STANHOPE STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence maintained |
2014-12-30 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | OCC OF S/W DUE TO FENCE |
2014-12-29 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO FENCE ,FENCE IS DOWN |
2014-12-24 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on st |
2014-12-20 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | Container in r/w |
2014-12-19 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Fence on s/w. 5' clear maintained |
2014-12-05 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass ...crane on r/w.. |
2014-11-24 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | fence .....bo, located on n/w/c ... |
2014-11-24 | No data | GREENE AVENUE, FROM STREET MARCY AVENUE TO STREET NOSTRAND AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pass, crane on street ...for new building n/s of street ... |
2014-11-10 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON THE STREET |
2014-11-04 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on rwy |
2014-11-04 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | D09 construction material (red bricks placed/stored on street without a valid dot permit to do so . |
2014-10-29 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | BRICKS IN R/W NO PERMIT. |
2014-10-09 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON THE STREET |
2014-10-07 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON THE STREET |
2014-09-23 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO CONTAINER ON THE STREET |
2014-09-21 | No data | EVERGREEN AVENUE, FROM STREET STANHOPE STREET TO STREET STOCKHOLM STREET | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON THE STREET |
2014-09-08 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | SCAFFOLDING OCCUPY SIDEWALK |
2014-09-07 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | D30 bricks placed/ stored on street without dot permit to do so. |
2014-08-15 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | D30 placed / stored material on street at unattended site without separate dot permit |
2014-08-06 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crane |
2014-07-22 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO Concrete Pump |
2014-07-09 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | material in r/w.. |
2014-06-30 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | PERM SIDEWALK SEALED |
2014-06-24 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO CEMENT MIXER |
2014-06-08 | No data | 52 STREET, FROM STREET 15 AVENUE TO STREET 16 AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | swk ok |
2014-06-04 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO EQ CRANE PUMP A/T/O INSP |
2014-06-04 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | NO TEMP NO PARK POSTED |
2014-05-24 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2014-05-17 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2014-02-26 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence.. |
2014-02-25 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2014-02-21 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crossing sidewalk with concrete truck no flag person violation of stipulation 012 of permit.Violation D30 |
2014-02-21 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | signs |
2014-02-13 | No data | GREENE AVENUE, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway not occupied at this time by anything ok only snow. |
2014-02-05 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | roadway is clear |
2014-02-03 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no concrete pump on site.. |
2014-01-14 | No data | CUMBERLAND STREET, FROM STREET FLUSHING AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | FENCE MAINTAINED MIN 5 FT CLEAR S/W. |
2013-11-21 | No data | 58 STREET, FROM STREET 20 AVENUE TO STREET 21 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER PARKING LANE |
2013-11-14 | No data | THROOP AVENUE, FROM STREET ELLERY STREET TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | fence. |
2013-10-30 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | maintain fence |
2013-08-07 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Commercial refuse container stored on the street w/o a permit |
2013-08-04 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | occupancy of s/w |
2013-06-21 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2013-06-20 | No data | SOUTH 3 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | s/w |
2013-06-14 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | eq |
2013-06-13 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crossing s/w |
2013-06-03 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2013-06-02 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | joints sealed |
2013-05-21 | No data | SOUTH 3 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | REPAIR SDWK |
2013-05-16 | No data | SENECA AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | crane not stored on r/w at time of inspection |
2013-05-09 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | mat |
2013-04-04 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joint on sidewalk not sealed. |
2013-03-12 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container on roadway |
2013-03-06 | No data | SENECA AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | s/w open to pedestrians |
2013-01-17 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Sidewalk flags defected by graffiti require repair/replacement. Installed expansion joints must be sealed in accordance with DOT specifications. |
2013-01-05 | No data | SENECA AVENUE, FROM STREET BLEECKER STREET TO STREET GREENE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-12-30 | No data | GATES AVENUE, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | Equipment on the street without a valid DOT permit. |
2012-12-30 | No data | GATES AVENUE, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container okay. |
2012-12-04 | No data | BOERUM STREET, FROM STREET GRAHAM AVENUE TO STREET MANHATTAN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-11-02 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-10-19 | No data | GATES AVENUE, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No container at site. |
2012-09-04 | No data | MENAHAN STREET, FROM STREET ONDERDONK AVENUE TO STREET WOODWARD AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | no container placed on r/w at time of inspection. |
2012-08-22 | No data | MENAHAN STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Repair sidewalk ok. Perm sidewalk installed. |
2012-08-12 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | signs |
2012-08-12 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | Expansion joints installed and sealed. |
2012-08-01 | No data | HART STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No container at site. |
2012-07-08 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-06-20 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-05-25 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No material at site. |
2012-05-02 | No data | TROUTMAN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-04-26 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | SEAL ALL EXPANSION JOINTS & INSTALL EXPANSION JOINTS @ CURB LINE. |
2012-04-07 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2012-04-02 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-03-28 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | p/l |
2012-03-05 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Flagman posted. |
2012-02-29 | No data | 58 STREET, FROM STREET 19 AVENUE TO STREET DAHL COURT | No data | Street Construction Inspections: CAR Re-Inspect | Department of Transportation | No data |
2012-02-20 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Temp construction signs ok. |
2012-02-15 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2012-01-22 | No data | MADISON STREET, FROM STREET CYPRESS AVENUE TO STREET SENECA AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-12-31 | No data | GRATTAN STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-12-28 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | NO EQUIPMENT |
2011-12-09 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-12-06 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-12-04 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-11-02 | No data | FRANKLIN AVENUE, FROM STREET MYRTLE AVENUE TO STREET PARK AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-10-29 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-10-29 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-10-02 | No data | GRATTAN STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container |
2011-09-27 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container |
2011-09-27 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container |
2011-09-21 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container |
2011-09-21 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container |
2011-09-16 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container |
2011-09-16 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container |
2011-09-16 | No data | GRATTAN STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Container |
2011-08-30 | No data | 58 STREET, FROM STREET 19 AVENUE TO STREET DAHL COURT | No data | Street Construction Inspections: Post-Audit | Department of Transportation | expansion joints not sealed |
2011-08-29 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No data |
2011-08-18 | No data | 19 AVENUE, FROM STREET 58 STREET TO STREET 59 STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2011-08-14 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Container on street exp 7-27-11 |
2011-08-03 | No data | GRATTAN STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-08-03 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-07-29 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-07-27 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-07-26 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-07-24 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-07-19 | No data | GRATTAN STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-07-14 | No data | SOUTH 3 STREET, FROM STREET BEDFORD AVENUE TO STREET BERRY STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | curb |
2011-07-05 | No data | LINDEN STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-06-28 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-06-24 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-06-24 | No data | 19 AVENUE, FROM STREET 58 STREET TO STREET 59 STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-06-12 | No data | GRATTAN STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET PORTER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-06-04 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-05-23 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-05-07 | No data | HIMROD STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET MYRTLE AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-04-29 | No data | 58 STREET, FROM STREET 19 AVENUE TO STREET DAHL COURT | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-03-01 | No data | HOWARD AVENUE, FROM STREET MAC DOUGAL STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-02-23 | No data | HOWARD AVENUE, FROM STREET MAC DOUGAL STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2011-01-31 | No data | HOWARD AVENUE, FROM STREET MAC DOUGAL STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | no container |
2011-01-28 | No data | HOWARD AVENUE, FROM STREET MAC DOUGAL STREET TO STREET SUMPTER STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-04-11 | No data | MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-04-03 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2010-04-03 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | Pass No Container on street |
2010-02-28 | No data | MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-02-27 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Valid no container on street |
2010-02-27 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Valid No Container on street |
2010-02-21 | No data | MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Pass Container |
2010-02-20 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-02-20 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-02-06 | No data | MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-02-05 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-02-05 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-31 | No data | MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-28 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-28 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | Pass Container |
2010-01-25 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Valid container |
2010-01-25 | No data | MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-25 | No data | WYCKOFF AVENUE, FROM STREET GREENE AVENUE TO STREET HARMAN STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2010-01-19 | No data | MELROSE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-11-14 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-10-10 | No data | GROVE STREET, FROM STREET IRVING AVENUE TO STREET WYCKOFF AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-10-10 | No data | HIMROD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-10-10 | No data | STANHOPE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-10-10 | No data | BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-08-15 | No data | WILSON AVENUE, FROM STREET GEORGE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2009-08-04 | No data | STANHOPE STREET, FROM STREET KNICKERBOCKER AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Complaint | Department of Transportation | No data |
2009-08-03 | No data | WILSON AVENUE, FROM STREET GEORGE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-06-11 | No data | HIMROD STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-06-09 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-05-29 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No data |
2009-03-06 | No data | WILSON AVENUE, FROM STREET GEORGE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-03-05 | No data | JEFFERSON STREET, FROM STREET CENTRAL AVENUE TO STREET WILSON AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-02-05 | No data | HIMROD STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2009-01-23 | No data | MARION STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Pick-Up | Department of Transportation | No data |
2009-01-02 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Post-Audit | Department of Transportation | No data |
2008-12-23 | No data | COOPER STREET, FROM STREET IRVING AVENUE TO STREET KNICKERBOCKER AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-12-20 | No data | 55 STREET, FROM STREET 18 AVENUE TO STREET 19 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-12-18 | No data | MARION STREET, FROM STREET HOPKINSON AVENUE TO STREET ROCKAWAY AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Valid place container |
2008-12-11 | No data | WILSON AVENUE, FROM STREET GEORGE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
2008-11-18 | No data | WILSON AVENUE, FROM STREET GEORGE STREET TO STREET MELROSE STREET | No data | Street Construction Inspections: Active | Department of Transportation | No data |
C/O THE CORPORATION
05 ALOHA INC. 10 ELMONT RD CORP. 100% MR LIN INC 1040A JOSELSON CORP. 1042 II REALTY INC. SHREE MAAN LLC 1088 LIBERTY AVE. ASSOC. INC. 110 HORACE GAS INC 110 ST REALTY INC. 111 RD REALTY INC.199 LEE AVENUE, SUITE 276, BROOKLYN, NY, United States, 11211
GROVE RESIDENCE LLCDate of last update: 17 Jan 2025
Sources: New York Secretary of State
© 2025 bizyork.com, Part of Big Data Integrated