Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2012-06-29
|
Emphasis |
L: FALL, N: CTARGET
|
Case Closed |
2017-12-18
|
Related Activity
Type |
Inspection |
Activity Nr |
507218 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 E01 |
Issuance Date |
2012-12-20 |
Abatement Due Date |
2012-12-27 |
Current Penalty |
1500.0 |
Initial Penalty |
2000.0 |
Final Order |
2013-01-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, stucture, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access: a) Worksite, north side of building- Employees climbed the frames and crossbracing of a fabricated frame scaffold to access the 12' and 18' levels; on or about 06/29/12. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 G01 |
Issuance Date |
2012-12-20 |
Abatement Due Date |
2012-12-27 |
Current Penalty |
2100.0 |
Initial Penalty |
2800.0 |
Final Order |
2013-01-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Related Event Code (REC) |
Imminent Danger |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) Worksite- north side of building- Employee was working at the 18' level of a scaffold that had no guardrails; on or about 06/29/12. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19260451 B01 |
Issuance Date |
2012-12-20 |
Abatement Due Date |
2012-12-27 |
Current Penalty |
2100.0 |
Initial Penalty |
2800.0 |
Final Order |
2013-01-16 |
Nr Instances |
1 |
Nr Exposed |
2 |
Related Event Code (REC) |
Imminent Danger |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) Worksite, north side of building- Employee was working on the third level of a fabricated frame scaffold at the 18' level. The scaffold had only four planks installed. Two planks were missing, leaving an opening 18" wide; on or about 06/29/12. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19. |
|
|