Search icon

HMC CONSTRUCTION LLC

Company Details

Name: HMC CONSTRUCTION LLC
Jurisdiction: New York
Legal type: DOMESTIC LIMITED LIABILITY COMPANY
Status: Active
Date of registration: 02 Mar 2010 (15 years ago)
Entity Number: 3918880
ZIP code: 10461
County: Bronx
Place of Formation: New York
Address: 1250 WATERS PLACE, PH1, BRONX, NY, United States, 10461

DOS Process Agent

Name Role Address
C/O SIMONE DEVELOPMENT COMPANIES DOS Process Agent 1250 WATERS PLACE, PH1, BRONX, NY, United States, 10461

History

Start date End date Type Value
2011-06-07 2024-10-02 Address 1250 WATERS PLACE, PH1, BRONX, NY, 10461, USA (Type of address: Service of Process)
2010-03-02 2011-06-07 Address 1000 MAIN STREET, NEW ROCHELLE, NY, 10801, USA (Type of address: Service of Process)

Filings

Filing Number Date Filed Type Effective Date
241002003358 2024-10-02 BIENNIAL STATEMENT 2024-10-02
220829002643 2022-08-29 BIENNIAL STATEMENT 2022-03-01
180314006174 2018-03-14 BIENNIAL STATEMENT 2018-03-01
161123006120 2016-11-23 BIENNIAL STATEMENT 2016-03-01
140514002222 2014-05-14 BIENNIAL STATEMENT 2014-03-01
120606002883 2012-06-06 BIENNIAL STATEMENT 2012-03-01
110607000682 2011-06-07 CERTIFICATE OF CHANGE 2011-06-07
100604000096 2010-06-04 CERTIFICATE OF PUBLICATION 2010-06-04
100302000912 2010-03-02 ARTICLES OF ORGANIZATION 2010-03-02

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
340646835 0216000 2015-05-19 353 ZEREGA AVE., BRONX, NY, 10473
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2015-05-20
Case Closed 2015-12-09

Related Activity

Type Inspection
Activity Nr 1071411
Safety Yes
Type Inspection
Activity Nr 1076604
Safety Yes
Type Referral
Activity Nr 985747
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Other
Standard Cited 19260752 A01
Issuance Date 2015-10-13
Abatement Due Date 2015-11-06
Current Penalty 2500.0
Initial Penalty 2800.0
Final Order 2015-11-20
Nr Instances 1
Nr Exposed 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.752(a)(1): Before authorizing the commencement of the steel erection, the controlling contractor did not ensure the steel erector was provided notification that the concrete in the footings, piers and walls and the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection: Location: 535 Zegra Ave. On or about: 05/19/15 a) Employees were engaged in steel erection activities. The steel erector was not provided with the written notification that the concrete in the footings has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection.
Citation ID 01002
Citaton Type Other
Standard Cited 19260752 A02
Issuance Date 2015-10-13
Abatement Due Date 2015-11-06
Current Penalty 2500.0
Initial Penalty 2800.0
Final Order 2015-11-20
Nr Instances 1
Nr Exposed 4
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.752(a)(2): Before authorizing the commencement of the steel erection, the controlling contractor did not ensure that the steel erector was provided notification of any modifications to the anchor bolts. Location: 535 Zerega Ave. On or about: 5/19/15 a) Numerous anchor rods were field modified without the approval of the structural engineer. Anchor rods were not imbedded in to the concrete foundation to the depth specified in the engineering blueprints. Written notification was not provided to the steel erector of field modifications prior to steel erection.