Inspection Type |
Prog Related
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2013-06-26
|
Emphasis |
L: LOCALTARG, P: LOCALTARG
|
Case Closed |
2013-08-15
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260404 B01 II |
Issuance Date |
2013-07-18 |
Current Penalty |
840.0 |
Initial Penalty |
1200.0 |
Final Order |
2013-08-06 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection: a) On or about 6/26/13, at the theater area of the site, Buffalo, NY. Employees, drew power from a wall receptacle through a flexible cord, did not have ground fault circuit interrupters for protection. No Abatement Certification Required |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260404 F06 |
Issuance Date |
2013-07-18 |
Current Penalty |
840.0 |
Initial Penalty |
1200.0 |
Final Order |
2013-08-06 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) On or about 6/26/13, at the theater area of the site, Buffalo, NY. The flexible cord, that supplied power to the tools, lacked the ground prong. No Abatement Certification Required |
|
|