Name: | M & V LABOR RESOURCES, INC. |
Jurisdiction: | New York |
Legal type: | FOREIGN BUSINESS CORPORATION |
Status: | Inactive |
Date of registration: | 07 Apr 2010 (15 years ago) |
Date of dissolution: | 29 Jun 2016 |
Branch of: | M & V LABOR RESOURCES, INC., Florida (Company Number P08000032923) |
Entity Number: | 3934224 |
ZIP code: | 32811 |
County: | Monroe |
Place of Formation: | Florida |
Address: | 4630 S KIRKMAN ROAD / #148, ORLANDO, FL, United States, 32811 |
Name | Role | Address |
---|---|---|
JESUS MENDEZ | Chief Executive Officer | 4630 S KIRKMAN ROAD / #148, ORLANDO, FL, United States, 32811 |
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 4630 S KIRKMAN ROAD / #148, ORLANDO, FL, United States, 32811 |
Start date | End date | Type | Value |
---|---|---|---|
2010-04-07 | 2012-05-22 | Address | 7725 S.E. 60TH DRIVE, OKEECHOBEE, FL, 34974, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
DP-2180058 | 2016-06-29 | ANNULMENT OF AUTHORITY | 2016-06-29 |
120522002427 | 2012-05-22 | BIENNIAL STATEMENT | 2012-04-01 |
100407000956 | 2010-04-07 | APPLICATION OF AUTHORITY | 2010-04-07 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
335461984 | 0215800 | 2012-07-27 | GEORGE A. FOWLER HIGH SCHOOL 227 MAGNOLIA STREET, SYRACUSE, NY, 13204 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 470230 |
Safety | Yes |
Health | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19261101 F02 I |
Issuance Date | 2012-10-19 |
Current Penalty | 3600.0 |
Initial Penalty | 4500.0 |
Contest Date | 2012-11-05 |
Final Order | 2013-07-01 |
Nr Instances | 3 |
Nr Exposed | 14 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1101(f)(2)(i): The employer failed to ensure that the exposure assessment was conducted in time to comply with requirements which are triggered by the exposure data or the lack of a negative exposure assessment: a) Fowler High School, on or about 6/28/12: Samples of asbestos exposure monitoring taken between 6/28/12 through 7/2/12 were not submitted for analysis until 11 days later, on 7/13/12. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19261101 F03 I |
Issuance Date | 2012-10-19 |
Abatement Due Date | 2012-10-22 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2012-11-05 |
Final Order | 2013-07-01 |
Nr Instances | 4 |
Nr Exposed | 15 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1101(f)(3)(i): The employer failed to conduct daily monitoring that was representative of the exposure of each employee assigned to work in regulated areas and performing Class I or II work: a) Fowler High School, on or about 7/9/12: Daily monitoring was not performed on 7/9/12 for employees removing and bagging asbestos out on the main floor. b) Fowler High School, on or about 7/10/12: Daily monitoring was not performed on 7/10/12 for employees removing asbestos in the main floor bathroom and bagging out asbestos on the main floor. c) Fowler High School, on aor about 7/11/12: Daily monitoring was not performed on 7/11/12 for employees removing and bagging out asbestos in the main floor bathroom. d) Fowler High School, on or about 7/12/12: Daily monitoring was not performed on 7/12/12 for employees removing asbestos on main floor and re-cleaning upper levels. |
Citation ID | 01001C |
Citaton Type | Serious |
Standard Cited | 19261101 O03 I D |
Issuance Date | 2012-10-19 |
Abatement Due Date | 2012-10-22 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2012-11-05 |
Final Order | 2013-07-01 |
Nr Instances | 4 |
Nr Exposed | 15 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1101(o)(3)(i)(D): The competent person did not supervise all employee exposure monitoring required by 29 CFR 1926.1101(o) and ensure that it is conducted as required by 29 CFR 1926.1101(f): a) Fowler High School, on or about 7/2/12: The competent person did not submit for analysis, in a timely manner, air samples taken between 6/28/12 and 7/2/12. Eleven days elapsed before they were sent to the lab for analysis. b) Fowler High School, on or about 7/9/12: The competent person did not perform daily air monitoring on 7/9/12 for employees removing and bagging out asbestos on the main floor. c) Fowler High School, on or about 7/10/12: The competent person did not perform daily air monitoring on 7/10/12 for employees removing asbestos in the main floor bathroom and bagging out asbestos on the main floor. d) Fowler High School, on aor about 7/11/12: The competent person did not perform daily air monitoring on 7/11/12 for employees removing and bagging out asbestos in the main floor bathroom. e) Fowler High School, on or about 7/12/12: The competent person did not perform daily air monitoring on 7/12/12 for employees removing asbestos on the main floor and when recleaning upper levels. f) Fowler High School, on or about 7/28/12: The competent person did not notify affected employees of air monitoring results received on 7/16/12 until 11 days later on 7/28/12. |
Citation ID | 02001A |
Citaton Type | Other |
Standard Cited | 19100134 C01 I |
Issuance Date | 2012-10-19 |
Abatement Due Date | 2012-11-18 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2012-11-05 |
Final Order | 2013-07-01 |
Nr Instances | 1 |
Nr Exposed | 15 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1910.134(c)(1)(i): The written program did not contain procedures for selecting respirators for use in the workplace: a) Fowler High School, On or about 7/27/12: the written respiratory protection program for asbestos abatement workers did not contain site specific information including, but not limited to, the required availability of powered air purifying respirators (PAPRs) for employees who choose to use them. Abatement certification must be submitted for this item. |
Citation ID | 02001B |
Citaton Type | Other |
Standard Cited | 19261101 H03 II |
Issuance Date | 2012-10-19 |
Abatement Due Date | 2012-11-18 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2012-11-05 |
Final Order | 2013-07-01 |
Nr Instances | 1 |
Nr Exposed | 15 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1101(h)(3)(ii): The employer did not provide an employee with tight-fitting, powered air-purifying respirator (PAPR) instead of a negative pressure respirator selected in accordance with 29 CFR 1926.1101(h)(3)(i)(A) when the employee chose to use a PAPR and it provides adequate protection to the employee: a) Fowler High School, on or about 8/15/12: Powered air purifying respirators were not available for employees to request nor were employees informed on their right to request them. Abatement certification must be provided for this item. |
Citation ID | 02002 |
Citaton Type | Other |
Standard Cited | 19261101 F05 |
Issuance Date | 2012-10-19 |
Abatement Due Date | 2012-10-22 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2012-11-05 |
Final Order | 2013-07-01 |
Nr Instances | 1 |
Nr Exposed | 15 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1101(f)(5): The employer did not notify, as soon as possible nor within 5 working days of receipt of results, each affected employee of any monitoring performed under this section: a) George Fowler High School, on or about 7/16/12: Sample results for 6/28/12 through 7/13/12 received by M & V Labor Resources on 7/16/12 were not provided for employees until 8/15/12, 30 days later. |
Inspection Type | Complaint |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2012-09-24 |
Emphasis | L: GUTREH |
Case Closed | 2018-03-22 |
Related Activity
Type | Complaint |
Activity Nr | 470230 |
Safety | Yes |
Health | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260021 B02 |
Issuance Date | 2012-09-25 |
Abatement Due Date | 2012-10-25 |
Current Penalty | 0.0 |
Initial Penalty | 6300.0 |
Contest Date | 2012-10-24 |
Final Order | 2013-07-01 |
Nr Instances | 6 |
Nr Exposed | 6 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a) East side of building, on or about 7-25-12: Six employees were performing demolition work without the training necessary for employees to recognize and avoid the hazards associated their work. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260850 A |
Issuance Date | 2012-09-25 |
Current Penalty | 4725.0 |
Initial Penalty | 0.0 |
Contest Date | 2012-10-24 |
Final Order | 2013-07-01 |
Nr Instances | 1 |
Nr Exposed | 6 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations: a) East side of building, on or about 7-25-12: Six employees were performing demolition work in a structurally compromised area of a building without an engineering survey by a competent person. |
Citation ID | 01001C |
Citaton Type | Serious |
Standard Cited | 19260850 B |
Issuance Date | 2012-09-25 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2012-10-24 |
Final Order | 2013-07-01 |
Nr Instances | 1 |
Nr Exposed | 6 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.850(b): The walls or floors were not shored or braced where employee(s) were required to work within a damaged structure to be demolished: a) East side of building, on or about 7-25-12: Six employees were performing demolition work in a structurally compromised area of a building without shoring or bracing the weakened portion of the structure. |
Date of last update: 27 Mar 2025
Sources: New York Secretary of State