Name: | EAST COAST WALL COATINGS. INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 11 Aug 2011 (14 years ago) |
Entity Number: | 4129814 |
ZIP code: | 11563 |
County: | Nassau |
Place of Formation: | New York |
Address: | 273 MERRICK ROAD, LYNBROOK, NY, United States, 11563 |
Principal Address: | 245 FRANKLIN AVE, FRANKLIN SQUARE, NY, United States, 11010 |
Shares Details
Shares issued 90
Share Par Value 0.01
Type PAR VALUE
Name | Role | Address |
---|---|---|
MARIA RIGGI | Chief Executive Officer | 352 FRANKLIN AVE, FRANKLIN SQUARE, NY, United States, 11010 |
Name | Role | Address |
---|---|---|
UNITED STATES CORPORATION AGENTS, INC. | Agent | 7014 13TH AVENUE, SUITE 202, BROOKLYN, NY, 11228 |
Name | Role | Address |
---|---|---|
EAST COAST WALL COATINGS INC | DOS Process Agent | 273 MERRICK ROAD, LYNBROOK, NY, United States, 11563 |
Start date | End date | Type | Value |
---|---|---|---|
2024-05-29 | 2024-05-29 | Address | 352 FRANKLIN AVE, FRANKLIN SQUARE, NY, 11010, USA (Type of address: Chief Executive Officer) |
2022-11-28 | 2024-05-29 | Shares | Share type: PAR VALUE, Number of shares: 90, Par value: 0.01 |
2021-05-04 | 2024-05-29 | Address | 245 FRANKLIN AVE, FRANKLIN SQUARE, NY, 11010, USA (Type of address: Service of Process) |
2013-09-12 | 2024-05-29 | Address | 352 FRANKLIN AVE, FRANKLIN SQUARE, NY, 11010, USA (Type of address: Chief Executive Officer) |
2011-08-11 | 2022-11-28 | Shares | Share type: PAR VALUE, Number of shares: 90, Par value: 0.01 |
2011-08-11 | 2024-05-29 | Address | 7014 13TH AVENUE, SUITE 202, BROOKLYN, NY, 11228, USA (Type of address: Registered Agent) |
2011-08-11 | 2021-05-04 | Address | 7014 13TH AVENUE, SUITE 202, BROOKLYN, NY, 11228, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
240529000833 | 2024-05-29 | BIENNIAL STATEMENT | 2024-05-29 |
210504060415 | 2021-05-04 | BIENNIAL STATEMENT | 2019-08-01 |
130912006016 | 2013-09-12 | BIENNIAL STATEMENT | 2013-08-01 |
110811001098 | 2011-08-11 | CERTIFICATE OF INCORPORATION | 2011-08-11 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345301964 | 0214700 | 2021-05-11 | 11 MAPLE AVE, BAY SHORE, NY, 11706 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1530148 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1530177 |
Safety | Yes |
Inspection Type | Prog Related |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2018-02-14 |
Emphasis | P: LOCALTARG, L: LOCALTARG, N: CTARGET |
Case Closed | 2019-04-09 |
Related Activity
Type | Inspection |
Activity Nr | 1294970 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260451 B01 |
Issuance Date | 2018-03-22 |
Abatement Due Date | 2018-04-11 |
Current Penalty | 1664.0 |
Initial Penalty | 2772.0 |
Final Order | 2018-04-09 |
Nr Instances | 2 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Worksite, north side of building - The employee was exposed to falling approximately 14 feet to the ground below. The scaffold had three planks installed; on or about 2/14/18. b) Worksite, west side of building - The employee was exposed to falling approximately 16 feet to the ground below. The scaffold had two planks installed; on or about 2/14/18. Note: Because the abatement of this violation is already documented in the case file, the employer need not submit certification of documentation of abatement for this violation as normally required by CFR 1903.19 |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260451 E01 |
Issuance Date | 2018-03-22 |
Abatement Due Date | 2018-04-11 |
Current Penalty | 1664.0 |
Initial Penalty | 2772.0 |
Final Order | 2018-04-09 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Cross braces were used as a means of access. a) Worksite, north side of building - The employees were accessing the second level of the fabricated frame scaffold by climbing on the end frames and cross bracing, exposing themselves to falls of approximately 14 feet to the ground below; on or about 2/14/18. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification of documentation of abatement for this violation as normally required by CFR 1903.19 |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260451 G04 XV |
Issuance Date | 2018-03-22 |
Abatement Due Date | 2018-04-11 |
Current Penalty | 1664.0 |
Initial Penalty | 2772.0 |
Final Order | 2018-04-09 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(g)(4)(xv): Crossbracing used in place of both a toprail and midrail was unacceptable. When the crossing point of two braces is between 38 inches (0.97 m) and 48 inches (1.3 m) above the work platform, this may be concentered as a toprail only. A midrail is required. a) Worksite, north side of building - The employees were observed working from the second tier of a fabricated frame scaffold, with only a crossbrace used in lieu of a toprail. A midrail was missing, exposing themselves to a fall of approximately 14 feet to the ground below on or about 2/14/18. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification of documentation of abatement for this violation as normally required by 29 CFR 1903.19. |
Inspection Type | Unprog Rel |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2013-07-26 |
Emphasis | L: FALL |
Case Closed | 2019-08-02 |
Related Activity
Type | Inspection |
Activity Nr | 923576 |
Safety | Yes |
Type | Inspection |
Activity Nr | 923703 |
Health | Yes |
Type | Inspection |
Activity Nr | 923387 |
Safety | Yes |
Type | Inspection |
Activity Nr | 923488 |
Safety | Yes |
Type | Inspection |
Activity Nr | 923667 |
Safety | Yes |
Type | Inspection |
Activity Nr | 923430 |
Safety | Yes |
Type | Inspection |
Activity Nr | 923458 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260403 B01 |
Issuance Date | 2013-12-06 |
Current Penalty | 960.0 |
Initial Penalty | 1600.0 |
Contest Date | 2014-01-10 |
Final Order | 2014-07-02 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.403(b)(1): Employer did not ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees: On or about 7/25/13 Location: 90 Business Park Ave, Armonk, NY 10504 a) The outer insulation on the DeWalt drill mixer was damaged and wrapped with black electrical tape. |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
4321527704 | 2020-05-01 | 0235 | PPP | 245 Franklin Avenue, Franklin Square, NY, 11010 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5277018402 | 2021-02-08 | 0235 | PPS | 245 Franklin Ave, Franklin Square, NY, 11010-1446 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Date of last update: 26 Mar 2025
Sources: New York Secretary of State