Search icon

FINE LINE CONSTRUCTION INC.

Company Details

Name: FINE LINE CONSTRUCTION INC.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 22 Aug 2011 (14 years ago)
Entity Number: 4133176
ZIP code: 11787
County: Suffolk
Place of Formation: New York
Address: 39 BROOKSITE DRIVE, SMITHTOWN, NY, United States, 11787

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
LOUIS FORRISI DOS Process Agent 39 BROOKSITE DRIVE, SMITHTOWN, NY, United States, 11787

Filings

Filing Number Date Filed Type Effective Date
110822000242 2011-08-22 CERTIFICATE OF INCORPORATION 2011-08-22

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
339255838 0214700 2013-08-07 2459 HORACE CT., BELLMORE, NY, 11710
Inspection Type Planned
Scope Partial
Safety/Health Safety
Close Conference 2013-08-07
Emphasis L: FALL, L: SANDY, P: FALL
Case Closed 2015-11-10

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260100 A
Issuance Date 2013-09-03
Abatement Due Date 2013-09-09
Current Penalty 840.0
Initial Penalty 1200.0
Final Order 2013-10-21
Nr Instances 1
Nr Exposed 4
Gravity 1
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a) Worksite, 2459 Horace Ct. Bellmore NY - Employees were not wearing protective helmets and were exposed to being struck by overhead materials and tools while walking below overhead siding work; on or about 08/7/13. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 F06
Issuance Date 2013-09-03
Abatement Due Date 2013-09-09
Current Penalty 1960.0
Initial Penalty 2800.0
Final Order 2013-10-21
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6).Note: Specify distances as indicated in table in paragraph (f)(6) of this section. a) Worksite, 2459 Horace Ct. Bellmore NY - Employees were installing siding on a residential home while walking and working on a pump jack scaffold. The employee was working less than 2ft away from an energized 220V power line; on or about 08/07/13. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2013-09-03
Abatement Due Date 2013-09-09
Current Penalty 1400.0
Initial Penalty 2000.0
Final Order 2013-10-21
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) Worksite, 2459 Horace Ct. Bellmore NY - Employees were exposed to falling while working from the platform of a pump jack scaffold, approximately 12ft above the ground below; on or about 08/07/13. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2013-09-03
Abatement Due Date 2013-09-13
Current Penalty 1120.0
Initial Penalty 1600.0
Final Order 2013-10-21
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) Worksite, 2459 Horace Ct. Bellmore NY - Employees were installing siding on s residential home while working from the platform of a pump jack scaffold. The employees were not trained to recognize the hazards associated with the scaffold; on or about 08/07/13. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.

Date of last update: 26 Mar 2025

Sources: New York Secretary of State