Search icon

MARTIRANO CONSTRUCTION MANAGEMENT LLC

Company Details

Name: MARTIRANO CONSTRUCTION MANAGEMENT LLC
Jurisdiction: New York
Legal type: DOMESTIC LIMITED LIABILITY COMPANY
Status: Active
Date of registration: 31 Oct 2011 (13 years ago)
Entity Number: 4159949
ZIP code: 10710
County: Westchester
Place of Formation: New York
Address: 10 VIA TRENTA COURT, YONKERS, NY, United States, 10710

DOS Process Agent

Name Role Address
ANTHONY MARTIRANO DOS Process Agent 10 VIA TRENTA COURT, YONKERS, NY, United States, 10710

History

Start date End date Type Value
2011-10-31 2013-10-30 Address 475 BRONX RIVER RD, STE 4C, YONKERS, NY, 10704, USA (Type of address: Service of Process)

Filings

Filing Number Date Filed Type Effective Date
131030006097 2013-10-30 BIENNIAL STATEMENT 2013-10-01
120523000273 2012-05-23 CERTIFICATE OF PUBLICATION 2012-05-23
111031000629 2011-10-31 ARTICLES OF ORGANIZATION 2011-10-31

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
340771799 0216000 2015-07-10 125 SPENCER PLACE, MAMARONECK, NY, 10543
Inspection Type Referral
Scope Complete
Safety/Health Safety
Close Conference 2015-07-10
Emphasis L: FALL
Case Closed 2019-07-31

Related Activity

Type Inspection
Activity Nr 1077197
Safety Yes
Type Referral
Activity Nr 1000630
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2015-07-23
Current Penalty 1680.0
Initial Penalty 2800.0
Final Order 2015-08-15
Nr Instances 2
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about 7/10/2015, Spencer Place a) Employees work from a tubular welded frame scaffold that was not fully planked.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2015-07-23
Current Penalty 1200.0
Initial Penalty 2000.0
Final Order 2015-08-15
Nr Instances 1
Nr Exposed 2
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, sturcure, personnel hoist, or similar surface was not used: On or about 7/10/2015, Spencer Place a) The employees gained access to and from the scaffold platform by climbing on the frame.
Citation ID 01003A
Citaton Type Serious
Standard Cited 19260451 G01
Issuance Date 2015-07-23
Current Penalty 1680.0
Initial Penalty 2800.0
Final Order 2015-08-15
Nr Instances 2
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level: On or about 7/10/2015, Spencer Place a) The employees worked from the tubular welded frame scaffold without guardrails. The scaffold was approximately 13' high.
Citation ID 01003B
Citaton Type Serious
Standard Cited 19260451 G01 V
Issuance Date 2015-07-23
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2015-08-15
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(v): Each employee on a walkway located within a scaffold was not protected by a guardrail system (with a minimum 200 pound toprail capacity) installed within 9.5 inches (24.1 cm) of and along at least one side of the walkway: On or about 7/10/2015, Spencer pplace a) Employees used the 10' long walkway between the scaffolds which was not guarded.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2015-07-23
Current Penalty 1200.0
Initial Penalty 2000.0
Final Order 2015-08-15
Nr Instances 3
Nr Exposed 3
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: On or about 7/10/2015, Spencer Place a) The employees were not provided training as required by the standard.

Date of last update: 26 Mar 2025

Sources: New York Secretary of State