2024-12-11
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Conditions previously reported. No ped ramp work started in the SE corner quadrant.
|
2024-12-10
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractor has removed DWS and replaced area with concrete to upgrade SW corner quadrant from dual ramps to a single ramp. After measuring , corner has been found to be non ADA compliant. Previously measured and collected in Prism on 3/10/23.
|
2024-02-27
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon inspection I found the respondent with a plywood fence extending outward 8' providing a 6'9" clear walk on sidewalk without a DOT permit. Construction signs permit # Q022023192B38 expired on 9/6/2023 and used for identification.
|
2024-02-26
|
No data
|
EAST 178 STREET, FROM STREET DALY AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PLACE MATERIAL ON STREET was removed
|
2024-02-06
|
No data
|
EAST 178 STREET, FROM STREET DALY AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIR SIDEWALK
|
2023-12-28
|
No data
|
ROOSEVELT AVENUE, FROM STREET 39 AVENUE TO STREET 67 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVE STREET-PERM ROADWAY
|
2023-12-14
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent maintaining placement of 2 Temporary Construction Regulation signs posted to scaffolding on sidewalk in front of 32-24 Steinway Street without a valid DOT permit on file to do so.
|
2023-12-09
|
No data
|
ROOSEVELT AVENUE, FROM STREET 67 STREET TO STREET 68 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
PAVE STREET-PERM ROADWAY
|
2023-10-04
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition has been corrected within the SW1 corner quadrant.
|
2023-08-10
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Material stored behind fence
|
2023-07-28
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
This is not on our permit application and contract, owner only hire us to finish the ADA ramp at his property corner.
|
2023-07-15
|
No data
|
DALY AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joints sealed and flags restored i.f.o. 1912
|
2023-07-15
|
No data
|
EAST 178 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Full sidewalk flags restored, expansion joint sealed
|
2023-07-15
|
No data
|
DALY AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint sealed between sidewalk flags and curb
|
2023-07-14
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk in compliance
|
2023-07-08
|
No data
|
EAST 178 STREET, FROM STREET DALY AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joint sealed at multiple locations
|
2023-06-29
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Passing permit to re issue a new C.A.R without roadway counter slope as per Kerry.
|
2023-06-29
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractor has removed DWS and replaced area with concrete to upgrade SW corner quadrant from dual ramps to a single ramp. After measuring , corner has been found to be non ADA compliant. Previously measured and collected in Prism on 3/10/23.
|
2023-06-28
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please pass out CAR and re-issue to not include roadway counter. All other items can be included, thank you
|
2023-06-11
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Debris no longer on location at this time.
|
2023-06-08
|
No data
|
DALY AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET ELSMERE PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
In front of #1980, there’s concrete patchwork on sidewalk. The sidewalk flag needs to be made to two full flags. Also, expansion joints are needed between sidewalk flags and curb.
|
2023-06-08
|
No data
|
DALY AVENUE, FROM STREET EAST 178 STREET TO STREET EAST 179 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Please install expansion joints between sidewalk flags and curb in front of #2012. Also, properly seal expansion joints.
|
2023-06-08
|
No data
|
EAST 178 STREET, FROM STREET BRYANT AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There’s concrete patchwork in several areas on the sidewalk. Please restore patchwork to full concrete sidewalk flags in front of #976 and #974.
|
2023-06-05
|
No data
|
VYSE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk flags installed. Expansion joints are sealed.
|
2023-06-05
|
No data
|
EAST 178 STREET, FROM STREET DALY AVENUE TO STREET VYSE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
There are no expansion joints between sidewalk flags and curb in front of #941 and #947. There’s also patchwork in front of 941, surrounding mailbox. Please install expansion joints and properly seal them. Please restore patched area near tree.
|
2023-06-05
|
No data
|
VYSE AVENUE, FROM STREET EAST 178 STREET TO STREET EAST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several new sidewalk flags installed on both sides of sidewalk.
|
2023-05-26
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crossing sidewalk not observed
|
2023-05-12
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
roadway, landing running, and landing cross are all part of the pedestrian ramp and must be made compliant per the approved BPP drawings as well as ADA and H-1011 standard detail drawing requirements. Email HIQApedramp@dot.nyc.gov for any questions
|
2023-05-01
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Contractor has removed DWS and replaced area with concrete to upgrade SW corner quadrant from dual ramps to a single ramp. After measuring for record purposes, existing corner has been found to be non ADA compliant. M&C in Prism on 3/10/23.
|
2023-04-07
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
IFO 240, please remove access debris left behind after building work.
|
2023-04-03
|
No data
|
49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB-PERM
|
2023-03-29
|
No data
|
64 AVENUE, FROM STREET 229 STREET TO STREET 230 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
builder pave incompliance
|
2023-03-14
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
okay
|
2023-03-10
|
No data
|
250 STREET, FROM STREET THORNHILL AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian ramp work observed within the SE4 corner quadrant. Old existing ramp is accessible and non compliant. We’ll reinspect at later date when work is completed.
|
2023-03-07
|
No data
|
VYSE AVENUE, FROM STREET CROSS BRONX EXPRESSWAY TO STREET EAST TREMONT AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO MATERIAL ON STREET
|
2023-03-07
|
No data
|
49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
no expansion joint installed between curb and sidewalk flag at drivewayin front of 198-37 49 avenue no expansion joint installed between curb and sidewalk flag at driveway
|
2023-02-06
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Parking Anytine sign posted at location informed foreman of violation, he complied & removed sign from post. In compliance
|
2023-01-31
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the above respondent with a temp construction sign posted at job location without a vlid dot permit on file. Permit is being used to id M022023005A45.
|
2023-01-31
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No boom stored
|
2022-12-31
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway clear
|
2022-12-22
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Roadway in compliance
|
2022-12-13
|
No data
|
WEST 123 STREET, FROM STREET 7 AVENUE TO STREET 8 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No material on street
|
2022-10-15
|
No data
|
49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
in front of 198-37 49 avenue no expansion joint installed between curb and sidewalk flag at driveway
|
2022-10-12
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk in compliance
|
2022-09-02
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
B.P.P. restoration width remains at 12' with roadway width measuring 43'. Permittee has failed to restore within the 1/2+5' requirements. New C.A.R. to be issued.
|
2022-09-02
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
B.P.P. restoration width measuring 12' with roadway width measuring 43'. Restore B.P.P. to the 1/2 width of the roadway + 5' requirement.
|
2022-08-17
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
expansion joint placed and sealed in driveway curb
|
2022-06-22
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Permittee found crossing sidewalk with expired permit. Spoke with foreman on site. Respondent will resume work once proper permits are attained.
|
2022-05-06
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Upon arrival respondent METROCITY CONSTRUCTION INC HAD RE-PAVED 53 FEET X 11 FEET WIDTH OF ROADWAY. HAD FAILED TO REPAVE MINIMUM 13 FEET WIDTH OF ROADWAY-A VIOLATION OF SECTION/RULE 34 RCNY2-09 (H)(2) OF HIGHWAY RULES. Nov issued
|
2022-04-20
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints need to be installed between sidewalk flags & curb in front of 246-12 60th Avenue.
|
2022-04-20
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
C.A.R. re-inspection passed as action will be taken on permittee's installation of curb permit Q012020225A06 for failure to install expansion joints between sidewalk flags & curb in front of 246-12 60th Avenue.
|
2022-04-09
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
METROCITY CONSTRUCTION INC failed to comply with terms & conditions of stipulation #015, maintain minimum 8’ clear sidewalk passage to all ongoing pedestrians. Nov issued GC & site safety not on site told crew to bring flag personnel to assist now !
|
2022-04-09
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Upon arrival respondent METROCITY CONSTRUCTION INC failed to obtain a DOT permit on file for the storage of the excavator/equipment stored in the roadway adjacent to the active building operation. Nov issued
|
2022-03-31
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
construction signs in compliance
|
2021-12-15
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
- Sidewalk expansion joints need to be sealed along property line; also Expansion joints need to be installed along driveway curb.
|
2021-11-21
|
No data
|
46 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Concrete curb reveal installed in front of building #48-15 46 STREET in compliance
|
2021-11-09
|
No data
|
49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Driveway curb repaired, in front of 198-27.
|
2021-11-05
|
No data
|
HOLLY PLACE, FROM STREET GRACE ROAD TO STREET OAKLEY PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
SEALER WAS SINCE APPLIED TO EDGES OF BPP
|
2021-10-20
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk flags restored, joints sealed
|
2021-08-26
|
No data
|
HOLLY PLACE, FROM STREET GRACE ROAD TO STREET OAKLEY PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
All defects remain, NOV issued or cracked sealer.
|
2021-06-20
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent failed to comply with DOT standard specifications 2-09 (H)(2). The roadway shall be paved at a minimum from the curb line to 5 ft. beyond the center of the legal roadway width in front and on the sides of the property of the applicant.
|
2021-05-22
|
No data
|
49 AVENUE, FROM STREET FRANCIS LEWIS BOULEVARD TO STREET WEEKS LANE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk under construction active permit
|
2021-05-19
|
No data
|
HOLLY PLACE, FROM STREET GRACE ROAD TO STREET OAKLEY PLACE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Nothing was repaired. NOV issued for cracked seal.
|
2021-05-01
|
No data
|
97 PLACE, FROM STREET 55 AVENUE TO STREET 57 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
r/w not occupiec
|
2021-04-13
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent failed to restore BPP of 1/2 + 5 on the roadway in front of 48-05. The respondent failed to comply with all applicable sections of highway rules.
|
2021-04-06
|
No data
|
HOLLYWOOD AVENUE, FROM STREET DOUGLAS ROAD TO STREET EAST DRIVE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Sidewalk restored expansion joints sealed at 351 Hollywood Ave
|
2021-04-02
|
No data
|
97 PLACE, FROM STREET 55 AVENUE TO STREET 57 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crossing sidewalk acceptable
|
2021-03-18
|
No data
|
HOLLY PLACE, FROM STREET GRACE ROAD TO STREET OAKLEY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb installed
|
2021-03-11
|
No data
|
97 PLACE, FROM STREET 55 AVENUE TO STREET 57 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
crossing s.w acceptable
|
2021-02-04
|
No data
|
97 PLACE, FROM STREET 55 AVENUE TO STREET 57 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
fence stored
|
2021-01-31
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new s/w in compliance
|
2021-01-22
|
No data
|
STEINWAY STREET, FROM STREET 34 AVENUE TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no x s/w
|
2020-12-16
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Respondent failed to proper restore 1/2 +5 in the roadway. Restoration is a skin patch with asphalt breaking up in a localized area. Entire restoration need to be re-dig.
|
2020-12-15
|
No data
|
182 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several sidewalk flags restore in compliance.
|
2020-11-09
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent failed to comply with the terms and conditions of DOT Permit regarding 1/2+5 of BPP roadway paving. Roadway is 43' wide and BPP is only 11'.
|
2020-09-29
|
No data
|
46 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
pass, flags ....localized areas......east side of street ...
|
2020-09-25
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints recessed and sealed. Plastic caps removed
|
2020-09-21
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Condition remains. Contractor only poured sealant over joint without recesses. Parts of sealant already peeling off. Photos sent to base.
|
2020-09-17
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR IS CLOSED. PERMITTEE PLACED ON HOLD UNTIL CONDITION IS REPAIRED AS PER DOT SPECIFICATIONS.
|
2020-09-17
|
No data
|
HOLLYWOOD AVENUE, FROM STREET DOUGLAS ROAD TO STREET EAST DRIVE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to correct newly restored sidewalk defect after (CAR #20205340095) notification was made on 6/1/2020. At time of re-inspection no expansion joints was install or sealed
|
2020-09-14
|
No data
|
64 AVENUE, FROM STREET 229 STREET TO STREET 230 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb replaced, joint sealed.
|
2020-09-10
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
BPP was corrected 1/2 + 5' roadway was resurfaced lane marking restored
|
2020-09-02
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
A/T/P/O I observed the respondent failed to correct sidewalk condition after CAR #20205340078) notification was made on 5/17/2020. At time of re-inspection the expansion joints was no sealed.
|
2020-09-01
|
No data
|
64 AVENUE, FROM STREET 229 STREET TO STREET 230 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP 50'5"L x 30' x 3"
|
2020-08-03
|
No data
|
WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CONDITION NOT CORRECTED NOV BEING ISSUED UNDER POST AUDIT
|
2020-08-03
|
No data
|
WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS STILL NOT INSTALLED BETWEEN CURB AND SIDE WALK
|
2020-06-05
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not started
|
2020-06-01
|
No data
|
HOLLYWOOD AVENUE, FROM STREET DOUGLAS ROAD TO STREET EAST DRIVE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints not installed in s/w at 20' intervalsfound at 351
|
2020-05-17
|
No data
|
60 AVENUE, FROM STREET 246 PLACE TO STREET MARATHON PARKWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
246-08 expansion joints installed not sealed
|
2020-05-01
|
No data
|
WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
EXPANSION JOINTS NOT INSTALLED /SEALED AFTER INSTALLATION OF SW FLAGS IFO PROPERTY #910
|
2020-05-01
|
No data
|
WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition has not been repaired, expansion joints not installed/sealed on sidewalk after installation of new flags CAR to be issued
|
2020-03-15
|
No data
|
182 STREET, FROM STREET 69 AVENUE TO STREET 73 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Several sidewalk flags restore in compliance with expansion joint seal.
|
2020-03-07
|
No data
|
WILLOUGHBY AVENUE, FROM STREET BROADWAY TO STREET BUSHWICK AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joint not installed
|
2020-02-07
|
No data
|
48 AVENUE, FROM STREET 42 STREET TO STREET 43 STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No crossing sidewalk work at this time.
|
2019-12-20
|
No data
|
QUEENS BOULEVARD, FROM STREET 39 PLACE TO STREET 40 STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed the respondent with construction equipment - pump delivering concrete on site during DOT Holiday Construction Embargo running 11/15/19 to 1/02/20 - no DOT permit or permission granted by OCMC.DOB permit # 421624255-01-NB to ID contractor.
|
2019-11-21
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
I observed above respondent install "NO PARKING ANYTIME - temporary construction regulation" signs on construction site without active DOT permit.Above DOT permit expired on 4/8/19 and DOB permit #421390836-01-NB were used to identify the contractor.
|
2019-11-21
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Signs still posted - no active DOT permit found - non permit NOV issued.
|
2019-09-03
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Sidewalk Crossing Being Done On Site At Time Of Inspection
|
2019-07-23
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Respondent failed to comply with DOT standard specifications 2-09 (H)(2). The roadway shall be paved at a minimum from the curb line to 5 ft. beyond the center of the legal roadway width in front and on the sides of the property of the applicant.
|
2019-06-01
|
No data
|
188 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Builders pavement needs to be made 1/2+5
|
2019-05-06
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No Sidewalk Crossing Being Done On Site At Time Of Inspection
|
2019-04-16
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no forklift at time of inspection, valid permit on file
|
2019-03-06
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk occupied as stipulated
|
2019-02-12
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
partially closing of sidewalk with a wooden fence without a permit. Upon inspection at site found fence extending 20' x 4' 8" off property line, 3' off property line is DOT jurisdiction.
|
2019-02-11
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no x s/w
|
2019-01-23
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
i observed the above respondent to maintain fence on the sidewalk on a construction site without a DOT building operation permit to do so.Permit # Q022019010B29 and a DOB permit # 421390836-01-NB were used to identify the contractor.
|
2019-01-23
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp. signs posted.
|
2019-01-22
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp signs posted
|
2018-12-25
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp. signs posted.
|
2018-12-16
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp /signs posted
|
2018-12-12
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0221 - TEMP. CONST. SIGNS/MARKINGS/temp const sign posted front of property
|
2018-12-09
|
No data
|
46 STREET, FROM STREET 48 AVENUE TO STREET 50 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Two sidewalk flags restore in compliance with expansion joint seal.
|
2018-12-07
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
0221 - TEMP. CONST. SIGNS/MARKINGS /temp const.signs/markings posted in front of work site
|
2018-11-01
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp signs posted
|
2018-10-23
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temp Construction Signs/Markings Posted On Site At Time Of Inspection
|
2018-10-17
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
no s.w crossing at time of inspection, valid permit on file
|
2018-09-15
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
temp signs posted at time of inspection, valid permit on file
|
2018-09-08
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Sidewalk occupancy in compliance
|
2018-08-29
|
No data
|
41 ROAD, FROM STREET COLLEGE POINT BOULEVARD TO STREET FRAME PLACE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
sidewalk is occupied with fence i/f/o 132-21 41 Road
|
2018-08-25
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO MATERIAL ON STREET
|
2018-08-15
|
No data
|
43 STREET, FROM STREET 25 AVENUE TO STREET 28 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Temporary construction sign posted on wooden fence
|