Name: | SSC HIGH RISE CONSTRUCTION INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 16 Nov 2011 (13 years ago) |
Entity Number: | 4166464 |
ZIP code: | 10965 |
County: | Rockland |
Place of Formation: | New York |
Address: | 36 RIDGE ST., PEARL RIVER, NY, United States, 10965 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
TIMOTHY MAHONEY | DOS Process Agent | 36 RIDGE ST., PEARL RIVER, NY, United States, 10965 |
Start date | End date | Type | Value |
---|---|---|---|
2011-11-16 | 2014-07-01 | Address | 36 S. MAIN ST., PEARL RIVER, NY, 10965, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
140701000030 | 2014-07-01 | CERTIFICATE OF CHANGE | 2014-07-01 |
111116000820 | 2011-11-16 | CERTIFICATE OF INCORPORATION | 2011-11-16 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342660347 | 0215000 | 2017-09-21 | 161 MAIDEN LANE, NEW YORK, NY, 10038 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Accident |
Activity Nr | 1270219 |
Type | Accident |
Activity Nr | 1272588 |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260021 B02 |
Issuance Date | 2018-03-20 |
Abatement Due Date | 2018-03-26 |
Current Penalty | 10476.9 |
Initial Penalty | 11641.0 |
Contest Date | 2018-04-12 |
Final Order | 2019-02-04 |
Nr Instances | 1 |
Nr Exposed | 7 |
Related Event Code (REC) | Accident |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe condition(s) and the regulation(s) applicable to his work environment to control or eliminate any hazard(s) or other exposure to illness or injury. 161 Maiden Lane, New York, NY On or about Sept. 21, 2017 a) The employer did not train the employees that were on a formwork climbing system that no one could be on the platform when the crane started to hoist the platform. The formwork climbing system manufacturer has specific instructions that the employees were not instructed on. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19261431 A |
Issuance Date | 2018-03-20 |
Abatement Due Date | 2018-03-26 |
Current Penalty | 10476.9 |
Initial Penalty | 11641.0 |
Contest Date | 2018-04-12 |
Final Order | 2019-02-19 |
Nr Instances | 1 |
Nr Exposed | 7 |
Related Event Code (REC) | Accident |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1431(a): The use of equipment to hoist employees was not prohibited. 161 Maiden Lane, New York, NY On or about Sept. 21, 2017 a) Employees were on a formwork climbing system while it was being lifted by a crane from one set of shoes to another set that was higher up the face of the building and offset by approximately 2 feet. |
Inspection Type | Referral |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2015-02-13 |
Case Closed | 2016-09-02 |
Related Activity
Type | Referral |
Activity Nr | 960689 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1039169 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19261053 B16 |
Issuance Date | 2015-05-21 |
Abatement Due Date | 2015-06-01 |
Current Penalty | 1900.0 |
Initial Penalty | 2800.0 |
Final Order | 2015-06-16 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(16): Portable ladder(s) with structural defects, such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components, were not either immediately a) Shaft Ladder Cellar to First floor: On or about February 13, 2015 The job made wood ladder had a split rail when employees were egressing / accessing the cellar. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19261053 A11 |
Issuance Date | 2015-05-21 |
Abatement Due Date | 2015-06-01 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2015-06-16 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Referral |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(a)(11): Ladder components were not surfaced so as to prevent injury to employees from punctures or lacerations, and to prevent snagging of clothing: a) Shaft Ladder Cellar to First floor: On or about February 13, 2015 The job made ladder had a split rail was a potential source of splinters when employees were egressing / accessing the cellar. |
Date of last update: 26 Mar 2025
Sources: New York Secretary of State