Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19101001 J05 I |
Issuance Date |
2014-11-07 |
Current Penalty |
1000.0 |
Initial Penalty |
2000.0 |
Final Order |
2014-12-02 |
Nr Instances |
1 |
Nr Exposed |
7 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1001(j)(5)(i): The employer did not affix signs or labels so that employees would be notified of what materials contain ACM and/or PACM to materials that were previously identified to be ACM and/or PACM a) 185 Lang Avenue, Buffalo, NY - On or about 10/03/2014, labels were not affixed to any ACM/PCAM in the building including 9"x9" floor tiles which contained between 6% and 8% Chrysotile asbestos. NO ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19101001 J07 IV |
Issuance Date |
2014-11-07 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Final Order |
2014-12-02 |
Nr Instances |
1 |
Nr Exposed |
7 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1001(j)(7)(iv): The employer did not provide, at no cost to employees who perform housekeeping operations in an area which contains presumed asbestos-containing material (PACM) and/or other asbestos-containing material (ACM), an asbestos awareness training course: (Note: "Other ACM"� is asphalt flooring and vinyl flooring material installed no later than 1980 and other installed materials that the employer would have identified as asbestos-containing if the employer had exercised due diligence.) a) 185 Lang Avenue - On or about 10/03/2014, the employer did not institute a training program to employees who perform housekeeping in areas where floor tiles containing between 6% and 8% asbestos are located. NO ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19101001 K01 |
Issuance Date |
2014-11-07 |
Abatement Due Date |
2015-05-28 |
Current Penalty |
1000.0 |
Initial Penalty |
2000.0 |
Final Order |
2014-12-02 |
Nr Instances |
1 |
Nr Exposed |
7 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1001(k)(1): All surfaces were not maintained as free as practicable of ACM waste and debris and accompanying dust: a) 185 Lang Avenue, Buffalo, NY - On or about 10/03/2014, all surfaces in the building were not maintained as free as practicable of ACM waste and debris. Deteriorated floor tiles (9" x 9") located in the building contained 6% and 8% asbestos. ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01004A |
Citaton Type |
Serious |
Standard Cited |
19101025 D02 |
Issuance Date |
2014-11-07 |
Abatement Due Date |
2015-05-28 |
Current Penalty |
1000.0 |
Initial Penalty |
2000.0 |
Final Order |
2014-12-02 |
Nr Instances |
1 |
Nr Exposed |
5 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1025(d)(2): An initial determination was not made to determine if any employee may be exposed to lead at or above the action level: a) 185 Lang Avenue, Buffalo, NY 14215 - On or about 10/03/2014, samples of paint chips from the building contained approximately 0.0292% lead. The employer did not determine if employees may be exposed to lead at or above the action level for lead. ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01004B |
Citaton Type |
Serious |
Standard Cited |
19101025 H01 |
Issuance Date |
2014-11-07 |
Abatement Due Date |
2015-05-28 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Final Order |
2014-12-02 |
Nr Instances |
1 |
Nr Exposed |
7 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1025(h)(1): All surfaces were not maintained as free as practicable of accumulations of lead: a) 185 Lang Avenue, Buffalo, NY 14215 - On or about 10/03/2014, paint chips in the building contained 0.0292% lead. All surfaces were not maintained as free as practicable of accumulations of lead. ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01006A |
Citaton Type |
Other |
Standard Cited |
19101025 L01 I |
Issuance Date |
2014-11-07 |
Abatement Due Date |
2015-05-28 |
Current Penalty |
0.0 |
Initial Penalty |
2000.0 |
Final Order |
2014-12-02 |
Nr Instances |
1 |
Nr Exposed |
7 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1025(l)(1)(i): Employee(s) working in an area where there is potential exposure to airborne lead at any level were not informed of the content of Appendices A and B of 29 CFR 1910.1025: a) 185 Lang Avenue, Buffalo, NY 14215 - On or about 10/03/2014, paint chips contained 0.0292% lead. Employees working in an area where there is potential airborne lead at any level were not informed of the content of Appendices A and B of the lead regulation. ABATEMENT CERTIFICATION REQUIRED |
|
Citation ID |
01006B |
Citaton Type |
Other |
Standard Cited |
19101025 L02 I |
Issuance Date |
2014-11-07 |
Abatement Due Date |
2015-05-28 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2014-12-02 |
Nr Instances |
1 |
Nr Exposed |
7 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1025(l)(2)(i): A copy of 29 CFR 1910.1025 and its appendices was not made readily available to all employees who had a potential exposure to airborne lead at any level: a) 185 Lang Avenue, Buffalo, NY 14215 - On or about 10/03/2014, paint chips contained 0.0292% lead. A copy of 29 CFR 1910.1025 and its appendices were not made readily available to all employees who had a potential exposure to airborne lead at any level ABATEMENT CERTIFICATION REQUIRED |
|