B022025093B49
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025093B46
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025093B45
|
2025-04-03
|
2025-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025093B44
|
2025-04-03
|
2025-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025093B43
|
2025-04-03
|
2025-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025093B42
|
2025-04-03
|
2025-05-23
|
CROSSING SIDEWALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025093B41
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B40
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B39
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B38
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B37
|
2025-04-03
|
2025-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B36
|
2025-04-03
|
2025-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B35
|
2025-04-03
|
2025-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B34
|
2025-04-03
|
2025-05-23
|
CROSSING SIDEWALK
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022025093B48
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025093B47
|
2025-04-03
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022025092D60
|
2025-04-02
|
2025-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022025092D59
|
2025-04-02
|
2025-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022025092D58
|
2025-04-02
|
2025-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022025092D57
|
2025-04-02
|
2025-05-23
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022025092D63
|
2025-04-02
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022025092D62
|
2025-04-02
|
2025-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022025092D61
|
2025-04-02
|
2025-04-08
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022025030A25
|
2025-01-30
|
2025-04-12
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022025030A24
|
2025-01-30
|
2025-04-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022025030A23
|
2025-01-30
|
2025-04-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022025030A22
|
2025-01-30
|
2025-04-12
|
CROSSING SIDEWALK
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022025030A26
|
2025-01-30
|
2025-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022025030A21
|
2025-01-30
|
2025-04-12
|
PLACE MATERIAL ON STREET
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024366F70
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
M022024366E47
|
2024-12-31
|
2025-03-30
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024366E46
|
2024-12-31
|
2025-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024366E45
|
2024-12-31
|
2025-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024366E44
|
2024-12-31
|
2025-03-30
|
PLACE MATERIAL ON STREET
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022024366F79
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024366F78
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024366F77
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024366F76
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024366F75
|
2024-12-31
|
2025-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024366F73
|
2024-12-31
|
2025-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024366F72
|
2024-12-31
|
2025-03-31
|
CROSSING SIDEWALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024366F71
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024366F69
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024366F68
|
2024-12-31
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024366F67
|
2024-12-31
|
2025-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024366F66
|
2024-12-31
|
2025-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024366F65
|
2024-12-31
|
2025-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024366F64
|
2024-12-31
|
2025-03-31
|
CROSSING SIDEWALK
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024366F74
|
2024-12-31
|
2025-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B012024366D50
|
2024-12-31
|
2025-03-31
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B012024366D49
|
2024-12-31
|
2025-03-31
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024365J85
|
2024-12-30
|
2025-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J84
|
2024-12-30
|
2025-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365D28
|
2024-12-30
|
2025-01-25
|
PLACE MATERIAL ON STREET
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024365D29
|
2024-12-30
|
2025-01-25
|
CROSSING SIDEWALK
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024365D30
|
2024-12-30
|
2025-01-25
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024365D31
|
2024-12-30
|
2025-01-25
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024365D32
|
2024-12-30
|
2025-01-25
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024365D33
|
2024-12-30
|
2025-01-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024365J80
|
2024-12-30
|
2025-03-31
|
PLACE MATERIAL ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J81
|
2024-12-30
|
2025-03-31
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J82
|
2024-12-30
|
2025-03-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J83
|
2024-12-30
|
2025-03-31
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J98
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J97
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J96
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J95
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J94
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J93
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J92
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J91
|
2024-12-30
|
2025-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J90
|
2024-12-30
|
2025-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J89
|
2024-12-30
|
2025-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J88
|
2024-12-30
|
2025-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024365J87
|
2024-12-30
|
2025-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024365J86
|
2024-12-30
|
2025-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024320B92
|
2024-11-15
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B91
|
2024-11-15
|
2024-12-31
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B99
|
2024-11-15
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B98
|
2024-11-15
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B97
|
2024-11-15
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B96
|
2024-11-15
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B95
|
2024-11-15
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B94
|
2024-11-15
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024320B93
|
2024-11-15
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024319B84
|
2024-11-14
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B92
|
2024-11-14
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B93
|
2024-11-14
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B85
|
2024-11-14
|
2024-12-31
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B86
|
2024-11-14
|
2024-12-31
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B87
|
2024-11-14
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B88
|
2024-11-14
|
2024-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B89
|
2024-11-14
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B90
|
2024-11-14
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024319B91
|
2024-11-14
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
M022024313D84
|
2024-11-08
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024313D85
|
2024-11-08
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B012024313A86
|
2024-11-08
|
2024-12-07
|
INSTALL FENCE - PROTECTED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T
|
B012024313A82
|
2024-11-08
|
2024-12-07
|
INSTALL FENCE
|
AVENUE T, BROOKLYN, FROM STREET LAKE STREET TO STREET MC DONALD AVENUE
|
M022024313D87
|
2024-11-08
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022024313B17
|
2024-11-08
|
2024-12-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T
|
B022024313B12
|
2024-11-08
|
2024-12-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE T, BROOKLYN, FROM STREET LAKE STREET TO STREET MC DONALD AVENUE
|
B022024313B09
|
2024-11-08
|
2024-12-30
|
TEMPORARY PEDESTRIAN WALK
|
AVENUE T, BROOKLYN, FROM STREET LAKE STREET TO STREET MC DONALD AVENUE
|
B022024313B10
|
2024-11-08
|
2024-12-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE T, BROOKLYN, FROM STREET LAKE STREET TO STREET MC DONALD AVENUE
|
B022024313B11
|
2024-11-08
|
2024-12-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
AVENUE T, BROOKLYN, FROM STREET LAKE STREET TO STREET MC DONALD AVENUE
|
B022024313B13
|
2024-11-08
|
2024-12-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE T, BROOKLYN, FROM STREET LAKE STREET TO STREET MC DONALD AVENUE
|
B022024313B14
|
2024-11-08
|
2024-12-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T
|
B022024313B15
|
2024-11-08
|
2024-12-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T
|
B022024313B16
|
2024-11-08
|
2024-12-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET AVENUE T
|
M022024313D86
|
2024-11-08
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022024306A80
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A85
|
2024-11-01
|
2024-12-31
|
CROSSING SIDEWALK
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024306A84
|
2024-11-01
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024306A82
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A81
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A79
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A78
|
2024-11-01
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A77
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A76
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A75
|
2024-11-01
|
2024-12-31
|
CROSSING SIDEWALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024306A74
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A73
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A72
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A71
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A70
|
2024-11-01
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A69
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A68
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A67
|
2024-11-01
|
2024-12-31
|
CROSSING SIDEWALK
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B012024306A70
|
2024-11-01
|
2024-12-31
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B012024306A69
|
2024-11-01
|
2024-12-31
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024306A95
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024306A94
|
2024-11-01
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024306A93
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024306A92
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024306A91
|
2024-11-01
|
2024-12-31
|
CROSSING SIDEWALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024306A90
|
2024-11-01
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024306A89
|
2024-11-01
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024306A88
|
2024-11-01
|
2024-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024306A87
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024306A86
|
2024-11-01
|
2024-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
M002024305A38
|
2024-10-31
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B022024240B45
|
2024-08-27
|
2024-09-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B44
|
2024-08-27
|
2024-09-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B43
|
2024-08-27
|
2024-09-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B42
|
2024-08-27
|
2024-09-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B41
|
2024-08-27
|
2024-09-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B40
|
2024-08-27
|
2024-09-25
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B39
|
2024-08-27
|
2024-09-25
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B38
|
2024-08-27
|
2024-09-25
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024240B37
|
2024-08-27
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024240B36
|
2024-08-27
|
2024-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024240B35
|
2024-08-27
|
2024-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024240B34
|
2024-08-27
|
2024-10-27
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024240B46
|
2024-08-27
|
2024-09-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
M022024239C21
|
2024-08-26
|
2024-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024239C20
|
2024-08-26
|
2024-09-24
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024239C19
|
2024-08-26
|
2024-09-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024239C22
|
2024-08-26
|
2024-09-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024239C18
|
2024-08-26
|
2024-09-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022024236B63
|
2024-08-23
|
2024-10-27
|
PLACE MATERIAL ON STREET
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024236B68
|
2024-08-23
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024236B67
|
2024-08-23
|
2024-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024236B66
|
2024-08-23
|
2024-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024236B65
|
2024-08-23
|
2024-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024236B64
|
2024-08-23
|
2024-10-27
|
CROSSING SIDEWALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024236B62
|
2024-08-23
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024236B60
|
2024-08-23
|
2024-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024236B59
|
2024-08-23
|
2024-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024236B58
|
2024-08-23
|
2024-10-27
|
CROSSING SIDEWALK
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024236B57
|
2024-08-23
|
2024-10-27
|
PLACE MATERIAL ON STREET
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024236B61
|
2024-08-23
|
2024-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024232A53
|
2024-08-19
|
2024-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A52
|
2024-08-19
|
2024-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A51
|
2024-08-19
|
2024-10-27
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A50
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A49
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A48
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A47
|
2024-08-19
|
2024-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A46
|
2024-08-19
|
2024-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A45
|
2024-08-19
|
2024-10-27
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A44
|
2024-08-19
|
2024-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A43
|
2024-08-19
|
2024-10-27
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A42
|
2024-08-19
|
2024-10-27
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A41
|
2024-08-19
|
2024-10-27
|
PLACE MATERIAL ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024232A59
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A58
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A57
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A56
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A55
|
2024-08-19
|
2024-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024232A54
|
2024-08-19
|
2024-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024205B95
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B94
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B80
|
2024-07-23
|
2024-10-13
|
CROSSING SIDEWALK
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024205B81
|
2024-07-23
|
2024-10-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024205B82
|
2024-07-23
|
2024-10-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B012024205C24
|
2024-07-23
|
2024-10-13
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B012024205C25
|
2024-07-23
|
2024-08-14
|
INSTALL FENCE
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B012024205C26
|
2024-07-23
|
2024-10-13
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B012024205C27
|
2024-07-23
|
2024-08-14
|
INSTALL FENCE
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B83
|
2024-07-23
|
2024-10-13
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024205B84
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024205B85
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024205B86
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024205B87
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024205B88
|
2024-07-23
|
2024-10-13
|
CROSSING SIDEWALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B89
|
2024-07-23
|
2024-10-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B90
|
2024-07-23
|
2024-10-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B91
|
2024-07-23
|
2024-10-13
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B92
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024205B93
|
2024-07-23
|
2024-10-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024144B65
|
2024-05-23
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B64
|
2024-05-23
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B63
|
2024-05-23
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B62
|
2024-05-23
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B61
|
2024-05-23
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B60
|
2024-05-23
|
2024-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B59
|
2024-05-23
|
2024-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B58
|
2024-05-23
|
2024-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024144B57
|
2024-05-23
|
2024-08-21
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024143C77
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C76
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C75
|
2024-05-22
|
2024-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C74
|
2024-05-22
|
2024-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C22
|
2024-05-22
|
2024-08-18
|
PLACE MATERIAL ON STREET
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024143C70
|
2024-05-22
|
2024-08-21
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C26
|
2024-05-22
|
2024-08-18
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024143C25
|
2024-05-22
|
2024-08-18
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024143C24
|
2024-05-22
|
2024-08-18
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024143C23
|
2024-05-22
|
2024-08-18
|
CROSSING SIDEWALK
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024143C27
|
2024-05-22
|
2024-08-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024143C28
|
2024-05-22
|
2024-08-18
|
PLACE MATERIAL ON STREET
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024143C29
|
2024-05-22
|
2024-08-18
|
CROSSING SIDEWALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024143C30
|
2024-05-22
|
2024-08-18
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024143C31
|
2024-05-22
|
2024-08-18
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B012024143B92
|
2024-05-22
|
2024-06-20
|
INSTALL FENCE
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024143C32
|
2024-05-22
|
2024-08-18
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024143C33
|
2024-05-22
|
2024-08-18
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022024143C69
|
2024-05-22
|
2024-08-21
|
PLACE MATERIAL ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C71
|
2024-05-22
|
2024-08-21
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C72
|
2024-05-22
|
2024-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
M022024143B13
|
2024-05-22
|
2024-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024143B14
|
2024-05-22
|
2024-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024143B15
|
2024-05-22
|
2024-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024143B16
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024143B17
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022024143C73
|
2024-05-22
|
2024-08-21
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024143C87
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C86
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C85
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C84
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C83
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C82
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C81
|
2024-05-22
|
2024-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C80
|
2024-05-22
|
2024-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C79
|
2024-05-22
|
2024-08-21
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024143C78
|
2024-05-22
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024142B58
|
2024-05-21
|
2024-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024142B57
|
2024-05-21
|
2024-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024142B56
|
2024-05-21
|
2024-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024142B55
|
2024-05-21
|
2024-08-21
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024102B18
|
2024-04-11
|
2024-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B17
|
2024-04-11
|
2024-05-23
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B16
|
2024-04-11
|
2024-05-23
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B24
|
2024-04-11
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B15
|
2024-04-11
|
2024-05-23
|
PLACE MATERIAL ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B012024102A96
|
2024-04-11
|
2024-05-23
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B23
|
2024-04-11
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B22
|
2024-04-11
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B21
|
2024-04-11
|
2024-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B20
|
2024-04-11
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024102B19
|
2024-04-11
|
2024-05-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024101B46
|
2024-04-10
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B012024101C17
|
2024-04-10
|
2024-05-23
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B43
|
2024-04-10
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B42
|
2024-04-10
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B41
|
2024-04-10
|
2024-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B40
|
2024-04-10
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B39
|
2024-04-10
|
2024-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B38
|
2024-04-10
|
2024-05-23
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B37
|
2024-04-10
|
2024-05-23
|
CROSSING SIDEWALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B36
|
2024-04-10
|
2024-05-23
|
PLACE MATERIAL ON STREET
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B47
|
2024-04-10
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B45
|
2024-04-10
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024101B44
|
2024-04-10
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024092F63
|
2024-04-01
|
2024-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024092F64
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024092F65
|
2024-04-01
|
2024-05-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024092F66
|
2024-04-01
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
M022024092B99
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024092B98
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022024092F72
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024092F68
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024092F71
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024092F69
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024092F70
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
M022024092B97
|
2024-04-01
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024092B96
|
2024-04-01
|
2024-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024092B95
|
2024-04-01
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022024092B94
|
2024-04-01
|
2024-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022024092F67
|
2024-04-01
|
2024-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024092F73
|
2024-04-01
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022024092F61
|
2024-04-01
|
2024-05-23
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024092F62
|
2024-04-01
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024078A63
|
2024-03-18
|
2024-04-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A86
|
2024-03-18
|
2024-04-12
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A85
|
2024-03-18
|
2024-04-12
|
PLACE MATERIAL ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A84
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A83
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A82
|
2024-03-18
|
2024-04-12
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A81
|
2024-03-18
|
2024-04-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A80
|
2024-03-18
|
2024-04-12
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A79
|
2024-03-18
|
2024-04-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A78
|
2024-03-18
|
2024-04-12
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024078A70
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A69
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A68
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A67
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A66
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A65
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A64
|
2024-03-18
|
2024-04-12
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A62
|
2024-03-18
|
2024-04-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A61
|
2024-03-18
|
2024-04-12
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A60
|
2024-03-18
|
2024-04-12
|
CROSSING SIDEWALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A59
|
2024-03-18
|
2024-04-12
|
PLACE MATERIAL ON STREET
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A58
|
2024-03-18
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024078A57
|
2024-03-18
|
2024-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024078A56
|
2024-03-18
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024078A55
|
2024-03-18
|
2024-05-23
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B012024078A97
|
2024-03-18
|
2024-04-12
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B012024078A89
|
2024-03-18
|
2024-04-12
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022024078A87
|
2024-03-18
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022024075D23
|
2024-03-15
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024075D22
|
2024-03-15
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024075D21
|
2024-03-15
|
2024-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B012024075C02
|
2024-03-15
|
2024-04-16
|
INSTALL FENCE
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B012024075C01
|
2024-03-15
|
2024-04-16
|
INSTALL FENCE
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024075D24
|
2024-03-15
|
2024-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET QUENTIN ROAD TO STREET WOODSIDE AVENUE
|
B022024026C55
|
2024-01-26
|
2024-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024026C53
|
2024-01-26
|
2024-04-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022024026C54
|
2024-01-26
|
2024-04-12
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023356E43
|
2023-12-22
|
2024-03-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023356E44
|
2023-12-22
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023356E45
|
2023-12-22
|
2024-03-30
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023356C31
|
2023-12-22
|
2024-01-21
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
M022023356E08
|
2023-12-22
|
2024-03-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023356C30
|
2023-12-22
|
2024-01-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B012023356C73
|
2023-12-22
|
2024-03-30
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023356E46
|
2023-12-22
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023356E47
|
2023-12-22
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
M022023356E09
|
2023-12-22
|
2024-03-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023356E10
|
2023-12-22
|
2024-03-28
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023356E11
|
2023-12-22
|
2024-03-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023356E12
|
2023-12-22
|
2024-03-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023356C32
|
2023-12-22
|
2024-01-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
M022023356E13
|
2023-12-22
|
2024-03-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023356E42
|
2023-12-22
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023356E41
|
2023-12-22
|
2024-03-30
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023353D05
|
2023-12-19
|
2024-03-30
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B012023353C52
|
2023-12-19
|
2024-03-30
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D00
|
2023-12-19
|
2024-03-30
|
PLACE MATERIAL ON STREET
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D01
|
2023-12-19
|
2024-03-30
|
CROSSING SIDEWALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D02
|
2023-12-19
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D03
|
2023-12-19
|
2024-03-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D04
|
2023-12-19
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D06
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D07
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D08
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D09
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D10
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D11
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023353D12
|
2023-12-19
|
2024-03-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D13
|
2023-12-19
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D14
|
2023-12-19
|
2024-03-30
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D15
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D16
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D17
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D18
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D19
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D20
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023353D21
|
2023-12-19
|
2024-03-30
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023353D22
|
2023-12-19
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023353D23
|
2023-12-19
|
2024-03-30
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023353D24
|
2023-12-19
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023353D25
|
2023-12-19
|
2024-02-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023307C16
|
2023-11-03
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023307C15
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023307C14
|
2023-11-03
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023307C13
|
2023-11-03
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023307C12
|
2023-11-03
|
2023-12-31
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023307C17
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023307C18
|
2023-11-03
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B012023307B98
|
2023-11-03
|
2023-12-31
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023304C55
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C56
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C47
|
2023-10-31
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B012023304B65
|
2023-10-31
|
2023-12-31
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C58
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C57
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C48
|
2023-10-31
|
2023-12-31
|
CROSSING SIDEWALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C49
|
2023-10-31
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C50
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C51
|
2023-10-31
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C52
|
2023-10-31
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C53
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023304C54
|
2023-10-31
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
M022023300E65
|
2023-10-27
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023300B18
|
2023-10-27
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023300B19
|
2023-10-27
|
2023-12-31
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023300B20
|
2023-10-27
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023300B21
|
2023-10-27
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023300B22
|
2023-10-27
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023300B23
|
2023-10-27
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023300B24
|
2023-10-27
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023300B25
|
2023-10-27
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023300B26
|
2023-10-27
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023300B27
|
2023-10-27
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
M022023300E67
|
2023-10-27
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023300E66
|
2023-10-27
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023300E64
|
2023-10-27
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023300E63
|
2023-10-27
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023300E62
|
2023-10-27
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023299B07
|
2023-10-26
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B08
|
2023-10-26
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B06
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023299B15
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B14
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B13
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B10
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B11
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B02
|
2023-10-26
|
2023-12-31
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023299B04
|
2023-10-26
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023299B12
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023299B03
|
2023-10-26
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
M002023299A49
|
2023-10-26
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B022023299B05
|
2023-10-26
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023299B09
|
2023-10-26
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023297C18
|
2023-10-24
|
2023-10-27
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
M022023251B41
|
2023-09-08
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023234B57
|
2023-08-22
|
2023-10-27
|
CROSSING SIDEWALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B59
|
2023-08-22
|
2023-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B60
|
2023-08-22
|
2023-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B012023234C76
|
2023-08-22
|
2023-09-16
|
INSTALL FENCE
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B012023234C75
|
2023-08-22
|
2023-09-16
|
INSTALL FENCE
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B012023234C74
|
2023-08-22
|
2023-10-27
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B012023234C73
|
2023-08-22
|
2023-10-27
|
OPEN SIDEWALK TO INSTALL FOUNDATION
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B73
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B72
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B71
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B70
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B69
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B68
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B67
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B66
|
2023-08-22
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B65
|
2023-08-22
|
2023-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B64
|
2023-08-22
|
2023-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B63
|
2023-08-22
|
2023-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B62
|
2023-08-22
|
2023-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B61
|
2023-08-22
|
2023-10-27
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B55
|
2023-08-22
|
2023-10-27
|
PLACE MATERIAL ON STREET
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023234B56
|
2023-08-22
|
2023-10-27
|
CROSSING SIDEWALK
|
FULTON STREET, BROOKLYN, FROM STREET GRAND AVENUE TO STREET PUTNAM AVENUE
|
B022023234B58
|
2023-08-22
|
2023-10-27
|
TEMPORARY PEDESTRIAN WALK
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023233D17
|
2023-08-21
|
2023-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D25
|
2023-08-21
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023233D24
|
2023-08-21
|
2023-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023233D23
|
2023-08-21
|
2023-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023233D22
|
2023-08-21
|
2023-10-27
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023233D21
|
2023-08-21
|
2023-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D20
|
2023-08-21
|
2023-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D19
|
2023-08-21
|
2023-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D26
|
2023-08-21
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023233D18
|
2023-08-21
|
2023-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D13
|
2023-08-21
|
2023-10-24
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D14
|
2023-08-21
|
2023-10-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D15
|
2023-08-21
|
2023-10-24
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023233D16
|
2023-08-21
|
2023-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023230B34
|
2023-08-18
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023230B76
|
2023-08-18
|
2023-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023230B75
|
2023-08-18
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023230B74
|
2023-08-18
|
2023-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023230B73
|
2023-08-18
|
2023-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023230B72
|
2023-08-18
|
2023-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023230B71
|
2023-08-18
|
2023-10-27
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023230B70
|
2023-08-18
|
2023-10-27
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023230B69
|
2023-08-18
|
2023-10-27
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023230B33
|
2023-08-18
|
2023-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
M022023230B38
|
2023-08-18
|
2023-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023230B40
|
2023-08-18
|
2023-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023230B39
|
2023-08-18
|
2023-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023230B42
|
2023-08-18
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023230B41
|
2023-08-18
|
2023-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023193A46
|
2023-07-12
|
2023-10-07
|
PLACE MATERIAL ON STREET
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023193A47
|
2023-07-12
|
2023-10-07
|
PLACE MATERIAL ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023180A49
|
2023-06-29
|
2023-09-19
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023180A48
|
2023-06-29
|
2023-09-19
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023180A50
|
2023-06-29
|
2023-09-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023180A47
|
2023-06-29
|
2023-09-19
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023180A45
|
2023-06-29
|
2023-09-19
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023180A46
|
2023-06-29
|
2023-09-19
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
M022023166A95
|
2023-06-15
|
2023-09-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023158E72
|
2023-06-07
|
2023-08-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E70
|
2023-06-07
|
2023-08-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E69
|
2023-06-07
|
2023-08-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E77
|
2023-06-07
|
2023-08-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E78
|
2023-06-07
|
2023-06-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PUTNAM AVENUE, BROOKLYN, FROM STREET BEND TO STREET GRAND AVENUE
|
B022023158E79
|
2023-06-07
|
2023-06-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PUTNAM AVENUE, BROOKLYN, FROM STREET BEND TO STREET GRAND AVENUE
|
B022023158E80
|
2023-06-07
|
2023-06-14
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023158E81
|
2023-06-07
|
2023-06-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023158E76
|
2023-06-07
|
2023-08-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E75
|
2023-06-07
|
2023-08-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E74
|
2023-06-07
|
2023-08-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E73
|
2023-06-07
|
2023-08-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023158E71
|
2023-06-07
|
2023-08-28
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
M022023144C68
|
2023-05-24
|
2023-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023144C77
|
2023-05-24
|
2023-08-15
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023144C66
|
2023-05-24
|
2023-08-15
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023144C65
|
2023-05-24
|
2023-08-15
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023144C67
|
2023-05-24
|
2023-08-15
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022023130A32
|
2023-05-10
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023130A33
|
2023-05-10
|
2023-07-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023130A31
|
2023-05-10
|
2023-08-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023130A28
|
2023-05-10
|
2023-08-01
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023130A29
|
2023-05-10
|
2023-08-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023130A30
|
2023-05-10
|
2023-08-01
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023123A41
|
2023-05-03
|
2023-07-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023123A43
|
2023-05-03
|
2023-07-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023123A40
|
2023-05-03
|
2023-07-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023123A39
|
2023-05-03
|
2023-07-29
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023123A38
|
2023-05-03
|
2023-07-29
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023123A37
|
2023-05-03
|
2023-07-29
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023123A42
|
2023-05-03
|
2023-07-29
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012023121C00
|
2023-05-01
|
2023-05-30
|
INSTALL FENCE
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023121C24
|
2023-05-01
|
2023-07-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022023121C23
|
2023-05-01
|
2023-07-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022023121C22
|
2023-05-01
|
2023-07-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023121C21
|
2023-05-01
|
2023-07-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023115A26
|
2023-04-25
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PUTNAM AVENUE, BROOKLYN, FROM STREET BEND TO STREET GRAND AVENUE
|
B012023115B41
|
2023-04-25
|
2023-05-23
|
INSTALL FENCE
|
PUTNAM AVENUE, BROOKLYN, FROM STREET BEND TO STREET GRAND AVENUE
|
B022023115A25
|
2023-04-25
|
2023-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PUTNAM AVENUE, BROOKLYN, FROM STREET BEND TO STREET GRAND AVENUE
|
B022023090A91
|
2023-03-31
|
2023-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B012023090B03
|
2023-03-31
|
2023-04-25
|
INSTALL FENCE
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023090A92
|
2023-03-31
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CAMBRIDGE PLACE, BROOKLYN, FROM STREET FULTON STREET TO STREET GATES AVENUE
|
B022023086B02
|
2023-03-27
|
2023-05-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086A96
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A95
|
2023-03-27
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A94
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A93
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A92
|
2023-03-27
|
2023-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A91
|
2023-03-27
|
2023-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A90
|
2023-03-27
|
2023-05-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A89
|
2023-03-27
|
2023-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086A88
|
2023-03-27
|
2023-05-23
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022023086B10
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086B09
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086B08
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086B07
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086B05
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086B06
|
2023-03-27
|
2023-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086B04
|
2023-03-27
|
2023-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023086B03
|
2023-03-27
|
2023-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022023065C39
|
2023-03-06
|
2023-04-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023065C38
|
2023-03-06
|
2023-04-12
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023065C37
|
2023-03-06
|
2023-04-12
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023065C36
|
2023-03-06
|
2023-04-12
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023065C25
|
2023-03-06
|
2023-04-12
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023065C32
|
2023-03-06
|
2023-04-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022023065C31
|
2023-03-06
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023065C30
|
2023-03-06
|
2023-04-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022023065C29
|
2023-03-06
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023065C28
|
2023-03-06
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023065C27
|
2023-03-06
|
2023-04-12
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023065C33
|
2023-03-06
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022023065C26
|
2023-03-06
|
2023-04-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023065C40
|
2023-03-06
|
2023-04-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023065C41
|
2023-03-06
|
2023-04-12
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023065C42
|
2023-03-06
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022023065C43
|
2023-03-06
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012023065C70
|
2023-03-06
|
2023-04-12
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
M022023034B77
|
2023-02-03
|
2023-05-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023034B78
|
2023-02-03
|
2023-05-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023034B81
|
2023-02-03
|
2023-05-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023034B80
|
2023-02-03
|
2023-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022023034B79
|
2023-02-03
|
2023-05-11
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022362G10
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G11
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G12
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G20
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G21
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G22
|
2022-12-28
|
2023-03-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G16
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G14
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G13
|
2022-12-28
|
2023-03-31
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G08
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G09
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G07
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G19
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G18
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G17
|
2022-12-28
|
2023-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G15
|
2022-12-28
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022362G03
|
2022-12-28
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G04
|
2022-12-28
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G05
|
2022-12-28
|
2023-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022362G06
|
2022-12-28
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022346A21
|
2022-12-12
|
2023-03-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022346A18
|
2022-12-12
|
2023-03-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022346A17
|
2022-12-12
|
2023-03-09
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022346A20
|
2022-12-12
|
2023-03-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022346A19
|
2022-12-12
|
2023-03-09
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022341C46
|
2022-12-07
|
2023-03-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022341C45
|
2022-12-07
|
2023-03-06
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022341C44
|
2022-12-07
|
2023-03-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022341C43
|
2022-12-07
|
2023-03-06
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022341C42
|
2022-12-07
|
2023-03-06
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022341C41
|
2022-12-07
|
2023-03-06
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022341C40
|
2022-12-07
|
2023-03-06
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012022341E41
|
2022-12-07
|
2023-03-06
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
M022022341C00
|
2022-12-07
|
2023-02-10
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022341C47
|
2022-12-07
|
2023-03-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022340C01
|
2022-12-06
|
2023-03-05
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022022340C00
|
2022-12-06
|
2023-03-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022022340B99
|
2022-12-06
|
2023-03-05
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022022340C02
|
2022-12-06
|
2023-03-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022022314C22
|
2022-11-10
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022022314C21
|
2022-11-10
|
2022-12-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE S TO STREET COLIN PLACE
|
B022022313B44
|
2022-11-09
|
2022-12-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
M022022313C27
|
2022-11-09
|
2023-02-10
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022313C28
|
2022-11-09
|
2023-02-10
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022313C29
|
2022-11-09
|
2023-02-10
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022313C30
|
2022-11-09
|
2023-02-10
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022313B45
|
2022-11-09
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
AVENUE S, BROOKLYN, FROM STREET EAST 1 STREET TO STREET MC DONALD AVENUE
|
B022022311D22
|
2022-11-07
|
2022-12-03
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022311D21
|
2022-11-07
|
2022-12-03
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012022311C54
|
2022-11-07
|
2022-12-03
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022311D24
|
2022-11-07
|
2022-12-03
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022311D25
|
2022-11-07
|
2022-12-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022311D26
|
2022-11-07
|
2022-12-03
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022311D27
|
2022-11-07
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022311D28
|
2022-11-07
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022311D23
|
2022-11-07
|
2022-12-03
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
M022022304D76
|
2022-10-31
|
2022-11-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022304D72
|
2022-10-31
|
2022-11-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022304D73
|
2022-10-31
|
2022-11-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022304D74
|
2022-10-31
|
2022-11-12
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022304D75
|
2022-10-31
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022300B15
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
M002022300A55
|
2022-10-27
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B022022300B07
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B08
|
2022-10-27
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B09
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B10
|
2022-10-27
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B11
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B12
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B13
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B14
|
2022-10-27
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022300B06
|
2022-10-27
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022299D32
|
2022-10-26
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B002022299A15
|
2022-10-26
|
No data
|
MISCELLANEOUS - EMBARGO WAIVER REQUEST
|
No data
|
B022022299D37
|
2022-10-26
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022299D36
|
2022-10-26
|
2022-12-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022299D35
|
2022-10-26
|
2022-12-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022299D34
|
2022-10-26
|
2022-12-03
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022299D33
|
2022-10-26
|
2022-12-03
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022299D31
|
2022-10-26
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D30
|
2022-10-26
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D29
|
2022-10-26
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D28
|
2022-10-26
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D27
|
2022-10-26
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D26
|
2022-10-26
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D25
|
2022-10-26
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D24
|
2022-10-26
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022299D23
|
2022-10-26
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022272C71
|
2022-09-29
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022272C70
|
2022-09-29
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022272C69
|
2022-09-29
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022231A43
|
2022-08-19
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022231A44
|
2022-08-19
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012022231A38
|
2022-08-19
|
2022-10-27
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022231A42
|
2022-08-19
|
2022-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022231A40
|
2022-08-19
|
2022-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022231A39
|
2022-08-19
|
2022-10-27
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022231A38
|
2022-08-19
|
2022-10-27
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022231A37
|
2022-08-19
|
2022-10-27
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
M022022231A25
|
2022-08-19
|
2022-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022231A26
|
2022-08-19
|
2022-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022231A41
|
2022-08-19
|
2022-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
M022022231A27
|
2022-08-19
|
2022-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022231A28
|
2022-08-19
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022231A29
|
2022-08-19
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022230A31
|
2022-08-18
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A30
|
2022-08-18
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A29
|
2022-08-18
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A28
|
2022-08-18
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A27
|
2022-08-18
|
2022-10-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A26
|
2022-08-18
|
2022-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A25
|
2022-08-18
|
2022-10-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A24
|
2022-08-18
|
2022-10-27
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A23
|
2022-08-18
|
2022-10-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022230A22
|
2022-08-18
|
2022-10-27
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022200B38
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200D36
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200D35
|
2022-07-19
|
2022-10-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200D34
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022200D33
|
2022-07-19
|
2022-10-22
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022200B44
|
2022-07-19
|
2022-08-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200B43
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200B42
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200B41
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200B40
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200B37
|
2022-07-19
|
2022-10-22
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200B36
|
2022-07-19
|
2022-08-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200B35
|
2022-07-19
|
2022-10-22
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022200A90
|
2022-07-19
|
2022-10-16
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022200A89
|
2022-07-19
|
2022-08-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022200A88
|
2022-07-19
|
2022-10-27
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022200A87
|
2022-07-19
|
2022-08-11
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022200A86
|
2022-07-19
|
2022-10-22
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022200B39
|
2022-07-19
|
2022-10-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022158B87
|
2022-06-07
|
2022-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012022158B24
|
2022-06-07
|
2022-08-21
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022158B91
|
2022-06-07
|
2022-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022158B90
|
2022-06-07
|
2022-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022158B89
|
2022-06-07
|
2022-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022158B88
|
2022-06-07
|
2022-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022158B86
|
2022-06-07
|
2022-08-21
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022158B85
|
2022-06-07
|
2022-08-21
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022158B84
|
2022-06-07
|
2022-08-21
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022150A41
|
2022-05-30
|
2022-08-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A40
|
2022-05-30
|
2022-08-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A39
|
2022-05-30
|
2022-08-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A38
|
2022-05-30
|
2022-08-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A37
|
2022-05-30
|
2022-08-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A36
|
2022-05-30
|
2022-08-23
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A32
|
2022-05-30
|
2022-08-23
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A35
|
2022-05-30
|
2022-08-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A34
|
2022-05-30
|
2022-08-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022150A33
|
2022-05-30
|
2022-08-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
M022022144C79
|
2022-05-24
|
2022-08-21
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022144C81
|
2022-05-24
|
2022-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022144C77
|
2022-05-24
|
2022-08-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022144C78
|
2022-05-24
|
2022-08-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022144C80
|
2022-05-24
|
2022-08-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022136A72
|
2022-05-16
|
2022-07-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022136A71
|
2022-05-16
|
2022-07-24
|
TEMPORARY PEDESTRIAN WALK
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022136A70
|
2022-05-16
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022129A32
|
2022-05-09
|
2022-08-02
|
TEMP. CONST. SIGNS/MARKINGS
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022118C19
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C20
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C18
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C17
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C16
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C15
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C14
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C13
|
2022-04-28
|
2022-07-24
|
TEMP. CONST. SIGNS/MARKINGS
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C10
|
2022-04-28
|
2022-07-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C09
|
2022-04-28
|
2022-07-24
|
PLACE CONSTRUCTION OFFICE TRAILER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C08
|
2022-04-28
|
2022-07-24
|
CROSSING SIDEWALK
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C07
|
2022-04-28
|
2022-07-24
|
PLACE MATERIAL ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C06
|
2022-04-28
|
2022-07-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022118C05
|
2022-04-28
|
2022-07-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022118C12
|
2022-04-28
|
2022-07-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022118C11
|
2022-04-28
|
2022-07-24
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022022103B82
|
2022-04-13
|
2022-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B81
|
2022-04-13
|
2022-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B80
|
2022-04-13
|
2022-05-23
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B79
|
2022-04-13
|
2022-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B87
|
2022-04-13
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B88
|
2022-04-13
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B86
|
2022-04-13
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B78
|
2022-04-13
|
2022-05-23
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B85
|
2022-04-13
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B84
|
2022-04-13
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022022103B83
|
2022-04-13
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
M022022095D37
|
2022-04-05
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022095D33
|
2022-04-05
|
2022-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M012022095D74
|
2022-04-05
|
2022-04-27
|
INSTALL FENCE - PROTECTED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022095D34
|
2022-04-05
|
2022-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022095D35
|
2022-04-05
|
2022-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022095D36
|
2022-04-05
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B022022084C89
|
2022-03-25
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022084C88
|
2022-03-25
|
2022-05-23
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022084C87
|
2022-03-25
|
2022-05-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022084C86
|
2022-03-25
|
2022-05-23
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022084C85
|
2022-03-25
|
2022-05-23
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022084C84
|
2022-03-25
|
2022-05-23
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022084C83
|
2022-03-25
|
2022-05-23
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012022084D24
|
2022-03-25
|
2022-05-23
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022084C90
|
2022-03-25
|
2022-05-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022047C20
|
2022-02-16
|
2022-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
UTICA AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET UNION STREET
|
B022022047C19
|
2022-02-16
|
2022-04-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
UTICA AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET UNION STREET
|
B022022032B00
|
2022-02-01
|
2022-04-27
|
TEMP. CONST. SIGNS/MARKINGS
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022022032B02
|
2022-02-01
|
2022-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022022032B01
|
2022-02-01
|
2022-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET
|
M012022027A25
|
2022-01-27
|
2022-02-18
|
INSTALL FENCE - PROTECTED
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
M022022027A07
|
2022-01-27
|
2022-04-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
WEST BROADWAY, MANHATTAN, FROM STREET PRINCE STREET TO STREET SPRING STREET
|
B012022003C62
|
2022-01-03
|
2022-03-29
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D81
|
2022-01-03
|
2022-03-29
|
TEMPORARY PEDESTRIAN WALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D80
|
2022-01-03
|
2022-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D78
|
2022-01-03
|
2022-03-29
|
TEMP. CONST. SIGNS/MARKINGS
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D77
|
2022-01-03
|
2022-03-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D76
|
2022-01-03
|
2022-03-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D75
|
2022-01-03
|
2022-03-29
|
CROSSING SIDEWALK
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D74
|
2022-01-03
|
2022-03-29
|
PLACE MATERIAL ON STREET
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022022003D79
|
2022-01-03
|
2022-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B012022003C63
|
2022-01-03
|
2022-02-01
|
INSTALL FENCE - PROTECTED
|
EAST NEW YORK AVENUE, BROOKLYN, FROM STREET SCHENECTADY AVENUE TO STREET UTICA AVENUE
|
B022021364E30
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E29
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E28
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E27
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E26
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E25
|
2021-12-30
|
2022-04-02
|
TEMP. CONST. SIGNS/MARKINGS
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E24
|
2021-12-30
|
2022-04-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E23
|
2021-12-30
|
2022-04-02
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E22
|
2021-12-30
|
2022-04-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E21
|
2021-12-30
|
2022-04-02
|
CROSSING SIDEWALK
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E20
|
2021-12-30
|
2022-04-02
|
PLACE MATERIAL ON STREET
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E32
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E33
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E34
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E35
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E36
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B012021364G96
|
2021-12-30
|
2022-04-02
|
OPEN PROTECTED SIDEWALK FOR FOUNDATION
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B012021364G97
|
2021-12-30
|
2022-02-01
|
INSTALL FENCE - PROTECTED
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021364E31
|
2021-12-30
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
VANDERBILT AVENUE, BROOKLYN, FROM STREET PROSPECT PLACE TO STREET ST MARKS AVENUE
|
B022021299B32
|
2021-10-26
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022021299B31
|
2021-10-26
|
2021-12-31
|
CROSSING SIDEWALK
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022021299B30
|
2021-10-26
|
2021-12-31
|
PLACE MATERIAL ON STREET
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022021299B27
|
2021-10-26
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
UTICA AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE
|
B022021299B26
|
2021-10-26
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
UTICA AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE
|
B022021299B25
|
2021-10-26
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022021299B24
|
2021-10-26
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B022021299B23
|
2021-10-26
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022021299B22
|
2021-10-26
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022021299C35
|
2021-10-26
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
UTICA AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET UNION STREET
|
B022021299C34
|
2021-10-26
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
UTICA AVENUE, BROOKLYN, FROM STREET EASTERN PARKWAY TO STREET UNION STREET
|
B022021299B38
|
2021-10-26
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022021299B37
|
2021-10-26
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022021299B36
|
2021-10-26
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET
|
B022021299B35
|
2021-10-26
|
2021-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022021299B34
|
2021-10-26
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
HURON STREET, BROOKLYN, FROM STREET MANHATTAN AVENUE TO STREET MC GUINNESS BOULEVARD
|
B022021299B33
|
2021-10-26
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
MANHATTAN AVENUE, BROOKLYN, FROM STREET GREEN STREET TO STREET HURON STREET
|
B012021280A80
|
2021-10-07
|
2021-10-27
|
INSTALL FENCE
|
UTICA AVENUE, BROOKLYN, FROM STREET CHURCH AVENUE TO STREET SNYDER AVENUE
|
B012020258E58
|
2020-09-14
|
2020-10-11
|
INSTALL FENCE
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B012020258E59
|
2020-09-14
|
2020-10-11
|
INSTALL FENCE
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B012020226B94
|
2020-08-13
|
2020-09-11
|
INSTALL FENCE
|
MC DONALD AVENUE, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B012020226B95
|
2020-08-13
|
2020-09-11
|
INSTALL FENCE
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 2 STREET TO STREET MC DONALD AVENUE
|
B012020223A96
|
2020-08-10
|
2020-09-10
|
RESET, REPAIR OR REPLACE CURB
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET
|
B042020223A14
|
2020-08-10
|
2020-09-10
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
EAST 4 STREET, BROOKLYN, FROM STREET QUENTIN ROAD
|
B042020223A15
|
2020-08-10
|
2020-09-10
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
EAST 4 STREET, BROOKLYN, FROM STREET QUENTIN ROAD
|
B042020223A13
|
2020-08-10
|
2020-09-10
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
EAST 4 STREET, BROOKLYN, FROM STREET QUENTIN ROAD
|
B042020223A12
|
2020-08-10
|
2020-09-10
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
B042020223A11
|
2020-08-10
|
2020-09-10
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET
|
B012020223A97
|
2020-08-10
|
2020-09-10
|
RESET, REPAIR OR REPLACE CURB
|
EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
B042020195A44
|
2020-07-13
|
2020-08-11
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
EAST 4 STREET, BROOKLYN, FROM STREET QUENTIN ROAD
|
B042020195A42
|
2020-07-13
|
2020-08-11
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET
|
B012020195F12
|
2020-07-13
|
2020-08-11
|
RESET, REPAIR OR REPLACE CURB
|
QUENTIN ROAD, BROOKLYN, FROM STREET EAST 4 STREET TO STREET EAST 5 STREET
|
B012020195F13
|
2020-07-13
|
2020-08-11
|
RESET, REPAIR OR REPLACE CURB
|
EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|
B042020195A46
|
2020-07-13
|
2020-08-11
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
EAST 4 STREET, BROOKLYN, FROM STREET QUENTIN ROAD
|
B042020195A45
|
2020-07-13
|
2020-08-11
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
EAST 4 STREET, BROOKLYN, FROM STREET QUENTIN ROAD
|
B042020195A43
|
2020-07-13
|
2020-08-11
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 4 STREET, BROOKLYN, FROM STREET KINGS HIGHWAY TO STREET QUENTIN ROAD
|