Name: | BK AT LAKE GROVE CONSTRUCTION LLC |
Jurisdiction: | New York |
Legal type: | DOMESTIC LIMITED LIABILITY COMPANY |
Status: | Active |
Date of registration: | 03 Dec 2013 (11 years ago) |
Entity Number: | 4494939 |
ZIP code: | 11530 |
County: | Nassau |
Place of Formation: | New York |
Address: | 67 CLINTON ROAD, GARDEN CITY, NY, United States, 11530 |
Name | Role | Address |
---|---|---|
THE LLC | DOS Process Agent | 67 CLINTON ROAD, GARDEN CITY, NY, United States, 11530 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
140129000298 | 2014-01-29 | CERTIFICATE OF PUBLICATION | 2014-01-29 |
131203000279 | 2013-12-03 | ARTICLES OF ORGANIZATION | 2013-12-03 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
339862914 | 0214700 | 2014-07-23 | 2995 MIDDLE COUNTRY RD., LAKE GROVE, NY, 11755 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 986308 |
Safety | Yes |
Type | Inspection |
Activity Nr | 986298 |
Safety | Yes |
Type | Inspection |
Activity Nr | 986333 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260100 A |
Issuance Date | 2014-09-19 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Final Order | 2014-10-16 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a) Worksite, 2995 Middle Country Rd. Lake Grove NY - Employees were working in and around an excavation approximately 5ft below the ground. The employees were not wearing protective helmets and were exposed to being struck by overhead materials and tools; on or about 7/23/14. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260501 B13 |
Issuance Date | 2014-09-19 |
Abatement Due Date | 2014-09-25 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Final Order | 2014-10-16 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems, nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502. a) Worksite, 2995 Middle Country Rd. Lake Grove NY - Employees were walking and working directly on the edge of the second floor of a residential complex approximately 11 feet above the concrete floor below; on or about 7/23/14. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260651 J02 |
Issuance Date | 2014-09-19 |
Current Penalty | 2000.0 |
Initial Penalty | 2000.0 |
Final Order | 2014-10-16 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(j)(2): Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. a) Worksite, 2995 Middle Country Rd. Lake Grove NY - The spoil pile and other material were placed on the edge of the excavation; on or about 7/23/14. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19. |
Date of last update: 26 Mar 2025
Sources: New York Secretary of State