Name: | GCK CONSTRUCTION CORP. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Inactive |
Date of registration: | 06 Feb 2014 (11 years ago) |
Date of dissolution: | 20 Jul 2016 |
Entity Number: | 4525245 |
ZIP code: | 10704 |
County: | Westchester |
Place of Formation: | New York |
Address: | 53 HYATT AVE., YONKERS, NY, United States, 10704 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 53 HYATT AVE., YONKERS, NY, United States, 10704 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
160720000283 | 2016-07-20 | CERTIFICATE OF DISSOLUTION | 2016-07-20 |
140206010098 | 2014-02-06 | CERTIFICATE OF INCORPORATION | 2014-02-06 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
341218402 | 0215000 | 2015-08-04 | 210 BOWERY ST, NEW YORK, NY, 10012 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1082467 |
Safety | Yes |
Type | Referral |
Activity Nr | 1007549 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1121870 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260651 K01 |
Issuance Date | 2016-02-04 |
Abatement Due Date | 2016-02-11 |
Current Penalty | 0.0 |
Initial Penalty | 2000.0 |
Contest Date | 2016-02-24 |
Final Order | 2016-08-08 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems. Location: 210 Bowery Street basement On or about: August 4th 2015 a) A daily inspection of an elevator shaft excavation, which employees were working in and was between 8 and 9 feet deep, was not conducted by a competent person prior to the start of work. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260651 K02 |
Issuance Date | 2016-02-04 |
Abatement Due Date | 2016-02-11 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Contest Date | 2016-02-24 |
Final Order | 2016-08-08 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(k)(2): Where the competent person found evidence of a situation that could result in possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employee(s) was/were not removed from the hazardous area until the necessary precautions have been taken to ensure their safety. Location: 210 Bowery Street basement On or about: August 4th 2015 a) The competent person did not remove employees that were working on or in the elevator shaft/excavation. One employee was performing chipping operations in the elevator shaft excavation that was between 8 and 9 feet deep while the other employee was funneling dirt behind wood brace. The elevator shaft did not have adequate protective system and no means were installed to underpin or support an adjacent wall. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260652 A01 |
Issuance Date | 2016-02-04 |
Abatement Due Date | 2016-02-11 |
Current Penalty | 0.0 |
Initial Penalty | 2000.0 |
Contest Date | 2016-02-24 |
Final Order | 2016-08-08 |
Nr Instances | 1 |
Nr Exposed | 3 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system. Location: 210 Bowery Street basement On or about: August 4th 2015 a) Employees that were working in an elevator shaft excavation that was between 8 and 9 feet deep were not protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) and (c) of this section. |
Citation ID | 02001 |
Citaton Type | Willful |
Standard Cited | 19260651 I01 |
Issuance Date | 2016-02-04 |
Abatement Due Date | 2016-02-11 |
Current Penalty | 0.0 |
Initial Penalty | 28000.0 |
Contest Date | 2016-02-24 |
Final Order | 2016-08-08 |
Nr Instances | 1 |
Nr Exposed | 3 |
Related Event Code (REC) | Referral |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.651(i)(1): Where the stability of adjoining buildings, walls, or other structures was endangered by excavation operations, support systems such as shoring, bracing or underpinning was not provided to ensure the stability of such structures for the protection of employees. Location: 210 Bowery Street basement On or about: August 4th 2015 a) Employees worked in an 8 to 9 foot deep elevator shaft excavation which did not have underpinning or other means installed to ensure stability of an adjacent wall as identified by an engineering firm. |