Name: | QRS CONSTRUCTION INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Inactive |
Date of registration: | 07 Mar 2014 (11 years ago) |
Date of dissolution: | 14 Sep 2015 |
Entity Number: | 4540709 |
ZIP code: | 11530 |
County: | Nassau |
Place of Formation: | New York |
Address: | 1225 FRANKLIN AVENUE SUITE 325, GARDEN CITY, NY, United States, 11530 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
THE CORPORATION | DOS Process Agent | 1225 FRANKLIN AVENUE SUITE 325, GARDEN CITY, NY, United States, 11530 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
150914000626 | 2015-09-14 | CERTIFICATE OF DISSOLUTION | 2015-09-14 |
140307000571 | 2014-03-07 | CERTIFICATE OF INCORPORATION | 2014-03-07 |
Date | Inspection Object | Address | Grade | Type | Institution | Desctiption |
---|---|---|---|---|---|---|
2015-12-17 | No data | WEST 12 STREET, FROM STREET 5 AVENUE TO STREET 6 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, no ongoing crossing sidewalk activities found. site unattended. |
2015-12-13 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | Upon inspection, work unattended. No ongoing crossing sidewalk activities found. |
2015-10-22 | No data | 2 AVENUE, FROM STREET EAST 7 STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | container acceptable |
2015-10-22 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container stored on the rdwy is acceptable |
2015-10-16 | No data | 2 AVENUE, FROM STREET EAST 7 STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | container acceptable with dob permits posted in front of location |
2015-10-09 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pl material on the street |
2015-10-06 | No data | 2 AVENUE, FROM STREET EAST 7 STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | container acceptable |
2015-09-30 | No data | EAST 9 STREET, FROM STREET 1 AVENUE TO STREET 2 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | container acceptable |
2015-09-25 | No data | EAST 12 STREET, FROM STREET 2 AVENUE TO STREET 3 AVENUE | No data | Street Construction Inspections: Active | Department of Transportation | pl cont on the street |
2015-09-21 | No data | 2 AVENUE, FROM STREET EAST 7 STREET TO STREET ST MARKS PLACE | No data | Street Construction Inspections: Active | Department of Transportation | CONTAINER ON SITE ACCEPTABLE |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
341569713 | 0215000 | 2016-06-22 | 266 THIRD AVENUE, NEW YORK, NY, 10010 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Complaint |
Activity Nr | 1105025 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260300 B01 |
Issuance Date | 2016-10-12 |
Abatement Due Date | 2016-10-24 |
Current Penalty | 3576.0 |
Initial Penalty | 4276.0 |
Final Order | 2016-10-27 |
Nr Instances | 1 |
Nr Exposed | 7 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use. Site: 266 Third Avenue New York, NY On or about 6/22/16 a) The Dewalt grinder used by the employees was missing the blade guard. The grinder was being use to grind down metal plates. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260404 B01 I |
Issuance Date | 2016-10-12 |
Abatement Due Date | 2016-10-24 |
Current Penalty | 2114.0 |
Initial Penalty | 2850.0 |
Final Order | 2016-10-27 |
Nr Instances | 1 |
Nr Exposed | 7 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. Site: 266 Third Avenue New York NY On or about 6/22/16 a) The employer did not provide the employees with a GFCI assure grounding conductor program. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260501 B03 |
Issuance Date | 2016-10-12 |
Current Penalty | 4000.0 |
Initial Penalty | 4988.0 |
Final Order | 2016-10-27 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(3): Each employee in a hoist area was not protected from falling 6 feet (1.8m) or more to lower levels by guardrail systems or personal fall arrest systems: Site: 266 Third Avenue New York NY On or about 6/22/16 a) Employees hoisting materials from the structure of the fourth level of the building were exposed from falling from over 40 feet high. The employees were not using any of fall protection. |
Inspection Type | Complaint |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2016-04-06 |
Emphasis | L: FALL |
Case Closed | 2016-10-18 |
Related Activity
Type | Complaint |
Activity Nr | 1082188 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260300 B01 |
Issuance Date | 2016-09-12 |
Abatement Due Date | 2016-09-22 |
Current Penalty | 1500.0 |
Initial Penalty | 2138.0 |
Final Order | 2016-10-13 |
Nr Instances | 1 |
Nr Exposed | 5 |
Related Event Code (REC) | Complaint |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.300(b)(1): Power operated tool(s), designed to accommodate guards, were not equipped with such guards when in use. Site: 266 Third Avenue, New York, NY On or about 4/6/16 a) The Dewalt grinder used by the employees was missing the blade guard. The grinder was being use to cut rebar. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260405 G02 III |
Issuance Date | 2016-09-12 |
Abatement Due Date | 2016-09-22 |
Current Penalty | 1500.0 |
Initial Penalty | 2138.0 |
Final Order | 2016-10-13 |
Nr Instances | 1 |
Nr Exposed | 5 |
Related Event Code (REC) | Complaint |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(g)(2)(iii): Flexible cords were not used in continuous lengths without splice or tap. Site: 266 Third Avenue, New York NY On or about 4/6/16 a) An orange and black extension cord use to power a DeWalt grinder was spliced into an outlet cord and was not properly insulated. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260405 J01 II |
Issuance Date | 2016-09-12 |
Abatement Due Date | 2016-09-22 |
Current Penalty | 1500.0 |
Initial Penalty | 2138.0 |
Final Order | 2016-10-13 |
Nr Instances | 1 |
Nr Exposed | 5 |
Related Event Code (REC) | Complaint |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(j)(1)(ii): Fixtures, lampholders, rosettes, or receptacles were not securely supported. Site: 266 Third Avenue, New York, NY On or about 4/6/16 a)Receptacle use to connect power tools was not properly mounted or secured, It was supported by the electrical wires. |
Citation ID | 01004 |
Citaton Type | Serious |
Standard Cited | 19260451 E01 |
Issuance Date | 2016-09-12 |
Abatement Due Date | 2016-09-22 |
Current Penalty | 1500.0 |
Initial Penalty | 2138.0 |
Final Order | 2016-10-13 |
Nr Instances | 1 |
Nr Exposed | 5 |
Related Event Code (REC) | Complaint |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. Site: 266 Third Avenue, New York NY On or about 4/6/16 a) Employees worked from a tubular welded frame scaffold which did not have means of safe access. Workers climbed the frames and cross braces as a means of access. |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
3536918800 | 2021-04-15 | 0235 | PPP | 25 Great Neck Rd Ste 4, Great Neck, NY, 11021-3322 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Date of last update: 25 Mar 2025
Sources: New York Secretary of State