B022023289A28
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A27
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A26
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A25
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A24
|
2023-10-16
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A18
|
2023-10-16
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A19
|
2023-10-16
|
2023-12-31
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A20
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A21
|
2023-10-16
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A22
|
2023-10-16
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023289A23
|
2023-10-16
|
2023-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023283A05
|
2023-10-10
|
2023-10-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B152023275A12
|
2023-10-02
|
2023-12-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
Q042023270A09
|
2023-09-27
|
2023-10-26
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
Q012023270B78
|
2023-09-27
|
2023-10-26
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
Q012023270B77
|
2023-09-27
|
2023-10-26
|
RESET, REPAIR OR REPLACE CURB
|
255 STREET, QUEENS, FROM STREET 38 AVENUE TO STREET 39 AVENUE
|
B152023193A04
|
2023-07-12
|
2023-10-21
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A52
|
2023-07-10
|
2023-10-21
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A47
|
2023-07-10
|
2023-10-21
|
PLACE MATERIAL ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A48
|
2023-07-10
|
2023-10-21
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A49
|
2023-07-10
|
2023-10-21
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A50
|
2023-07-10
|
2023-10-21
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A56
|
2023-07-10
|
2023-10-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A55
|
2023-07-10
|
2023-10-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A54
|
2023-07-10
|
2023-10-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A53
|
2023-07-10
|
2023-10-21
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023191A51
|
2023-07-10
|
2023-10-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
Q042023135A17
|
2023-05-15
|
2023-06-13
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
GASKELL ROAD, QUEENS, FROM STREET 251 STREET TO STREET BEND
|
Q012023135B83
|
2023-05-15
|
2023-06-13
|
PAVE STREET-W/ ENGINEERING & INSP FEE
|
GASKELL ROAD, QUEENS, FROM STREET 251 STREET TO STREET BEND
|
Q012023135B82
|
2023-05-15
|
2023-06-13
|
RESET, REPAIR OR REPLACE CURB
|
GASKELL ROAD, QUEENS, FROM STREET 251 STREET TO STREET BEND
|
M022023123A87
|
2023-05-03
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
M022023123A85
|
2023-05-03
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
M022023123A84
|
2023-05-03
|
2023-06-26
|
CROSSING SIDEWALK
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
M022023123A86
|
2023-05-03
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
B022023118A23
|
2023-04-28
|
2023-07-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A26
|
2023-04-28
|
2023-07-26
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A25
|
2023-04-28
|
2023-07-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A24
|
2023-04-28
|
2023-07-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A22
|
2023-04-28
|
2023-07-26
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118B71
|
2023-04-28
|
2023-07-26
|
PLACE MATERIAL ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A30
|
2023-04-28
|
2023-07-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A29
|
2023-04-28
|
2023-07-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A28
|
2023-04-28
|
2023-07-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023118A27
|
2023-04-28
|
2023-07-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
M022023115D63
|
2023-04-25
|
2023-04-27
|
CROSSING SIDEWALK
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
M022023115D64
|
2023-04-25
|
2023-04-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
M022023115D65
|
2023-04-25
|
2023-04-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
M022023115D66
|
2023-04-25
|
2023-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, MANHATTAN, FROM STREET 1 AVENUE TO STREET QN MDTWN TUNNEL APPROACH
|
B022023089E53
|
2023-03-30
|
2023-04-27
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E54
|
2023-03-30
|
2023-04-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E55
|
2023-03-30
|
2023-04-27
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E56
|
2023-03-30
|
2023-04-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E57
|
2023-03-30
|
2023-04-27
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E58
|
2023-03-30
|
2023-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E59
|
2023-03-30
|
2023-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E60
|
2023-03-30
|
2023-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023089E61
|
2023-03-30
|
2023-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023083C00
|
2023-03-24
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023083C01
|
2023-03-24
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022023083C02
|
2023-03-24
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B152023075A16
|
2023-03-16
|
2023-06-25
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A31
|
2022-12-17
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A30
|
2022-12-17
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A29
|
2022-12-17
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A28
|
2022-12-17
|
2023-03-31
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A32
|
2022-12-17
|
2023-03-31
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A33
|
2022-12-17
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A34
|
2022-12-17
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A35
|
2022-12-17
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022351A36
|
2022-12-17
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A07
|
2022-10-22
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A08
|
2022-10-22
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A06
|
2022-10-22
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A05
|
2022-10-22
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A04
|
2022-10-22
|
2022-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A03
|
2022-10-22
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A02
|
2022-10-22
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A01
|
2022-10-22
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022295A00
|
2022-10-22
|
2022-12-31
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B152022292A02
|
2022-10-19
|
2022-11-30
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022277M88
|
2022-10-04
|
2022-10-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022269B22
|
2022-09-26
|
2022-10-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022269B21
|
2022-09-26
|
2022-10-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022269B20
|
2022-09-26
|
2022-10-28
|
PLACE CRANE OR SHOVEL ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B152022256A03
|
2022-09-13
|
2022-10-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022242B75
|
2022-08-30
|
2022-09-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022242B74
|
2022-08-30
|
2022-09-30
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022242B73
|
2022-08-30
|
2022-09-30
|
PLACE CRANE OR SHOVEL ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B152022241A01
|
2022-08-29
|
2022-10-07
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022210C77
|
2022-07-29
|
2022-08-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022210C76
|
2022-07-29
|
2022-08-31
|
PLACE CRANE OR SHOVEL ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022210C78
|
2022-07-29
|
2022-08-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022199A35
|
2022-07-18
|
2022-10-10
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B152022196A26
|
2022-07-15
|
2022-08-31
|
DOT USE ONLY-FULL ROADWAY CLOSURE APPL'S
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A57
|
2022-07-14
|
2022-10-24
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A56
|
2022-07-14
|
2022-10-24
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A55
|
2022-07-14
|
2022-10-24
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A54
|
2022-07-14
|
2022-10-24
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A59
|
2022-07-14
|
2022-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A60
|
2022-07-14
|
2022-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A58
|
2022-07-14
|
2022-10-24
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022195A61
|
2022-07-14
|
2022-10-24
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C47
|
2022-05-03
|
2022-07-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C51
|
2022-05-03
|
2022-07-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C50
|
2022-05-03
|
2022-07-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C49
|
2022-05-03
|
2022-07-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C48
|
2022-05-03
|
2022-07-26
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C46
|
2022-05-03
|
2022-07-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C45
|
2022-05-03
|
2022-07-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022123C44
|
2022-05-03
|
2022-07-26
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B012022066B23
|
2022-03-07
|
2022-03-23
|
INSTALL FENCE - PROTECTED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A50
|
2022-03-07
|
2022-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A49
|
2022-03-07
|
2022-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A48
|
2022-03-07
|
2022-04-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A47
|
2022-03-07
|
2022-04-27
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A46
|
2022-03-07
|
2022-04-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A45
|
2022-03-07
|
2022-04-27
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A44
|
2022-03-07
|
2022-04-27
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022022066A43
|
2022-03-07
|
2022-04-27
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C96
|
2021-11-12
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C98
|
2021-11-12
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C94
|
2021-11-12
|
2021-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C95
|
2021-11-12
|
2021-12-31
|
TEMP. CONST. SIGNS/MARKINGS
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C97
|
2021-11-12
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C93
|
2021-11-12
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C91
|
2021-11-12
|
2021-12-31
|
CROSSING SIDEWALK
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B022021316C92
|
2021-11-12
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B042021166A21
|
2021-06-15
|
2021-07-09
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B042021125A16
|
2021-05-05
|
2021-06-03
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
PRESIDENT STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|
B042021125A15
|
2021-05-05
|
2021-06-03
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
UNION STREET, BROOKLYN, FROM STREET 3 AVENUE TO STREET 4 AVENUE
|