Name: | BMC BUILDER CORP |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 06 Aug 2015 (10 years ago) |
Entity Number: | 4800835 |
ZIP code: | 11367 |
County: | Queens |
Place of Formation: | New York |
Address: | 141-02 78TH ROAD, SUITE 1L, FLUSHING, NY, United States, 11367 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
WALTER D. FLORENTIN | DOS Process Agent | 141-02 78TH ROAD, SUITE 1L, FLUSHING, NY, United States, 11367 |
Start date | End date | Type | Value |
---|---|---|---|
2022-09-24 | 2024-02-12 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2015-08-06 | 2022-09-24 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
150806010193 | 2015-08-06 | CERTIFICATE OF INCORPORATION | 2015-08-06 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
343592457 | 0215000 | 2018-11-09 | 125 WEST 25TH STREET, NEW YORK, NY, 10001 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1312791 |
Safety | Yes |
Inspection Type | Complaint |
Scope | Complete |
Safety/Health | Safety |
Close Conference | 2018-05-01 |
Case Closed | 2023-01-19 |
Related Activity
Type | Complaint |
Activity Nr | 1333363 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1313124 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260404 B01 I |
Issuance Date | 2018-08-06 |
Abatement Due Date | 2018-08-14 |
Current Penalty | 6467.0 |
Initial Penalty | 6467.0 |
Final Order | 2018-08-30 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. a) 3rd floor next to 7th Ave side of bldg.: On or about May 1, 2018: The painter was using the airless sprayer which was plugged in by extension cord but the extension cord was not plugged into a GFI protected outlet. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260404 F06 |
Issuance Date | 2018-08-06 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2018-08-30 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) 3rd floor next to 7th Ave side of bldg.: On or about May 1, 2018: The painter was using the airless sprayer which was plugged in by extension cord but the extension cord was missing the ground pin. |
Docket Number | Nature of Suit | Filing Date | Disposition | |||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1804134 | Fair Labor Standards Act | 2018-05-08 | want of prosecution | |||||||||||||||||||||||||||||||||||||||||||||||
|
Name | SOLIS |
Role | Plaintiff |
Name | BMC BUILDER CORP |
Role | Defendant |
Circuit | Second Circuit |
Origin | original proceeding |
Jurisdiction | federal question |
Jury Demand | Neither plaintiff nor defendant demands jury |
Demanded Amount | 200000 |
Termination Class Action | Missing |
Procedural Progress | pretrial conference held |
Nature Of Judgment | no monetary award |
Judgement | missing |
Arbitration On Termination | Missing |
Office | 1 |
Filing Date | 2019-05-01 |
Termination Date | 2021-03-15 |
Date Issue Joined | 2020-02-07 |
Section | 0201 |
Sub Section | FL |
Status | Terminated |
Parties
Name | ENCARNACION |
Role | Plaintiff |
Name | BMC BUILDER CORP |
Role | Defendant |
Circuit | Second Circuit |
Origin | original proceeding |
Jurisdiction | federal question |
Jury Demand | Plaintiff demands jury |
Demanded Amount | 0 |
Termination Class Action | Missing |
Procedural Progress | pretrial conference held |
Nature Of Judgment | no monetary award |
Judgement | missing |
Arbitration On Termination | Missing |
Office | 1 |
Filing Date | 2018-05-08 |
Termination Date | 2021-03-16 |
Date Issue Joined | 2018-08-15 |
Section | 0201 |
Sub Section | DO |
Status | Terminated |
Parties
Name | SOLIS, |
Role | Plaintiff |
Name | BMC BUILDER CORP |
Role | Defendant |
Date of last update: 25 Mar 2025
Sources: New York Secretary of State