Search icon

C.B. CARPENTRY CORP.

Company Details

Name: C.B. CARPENTRY CORP.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 16 Nov 2015 (9 years ago)
Entity Number: 4850228
ZIP code: 11368
County: Suffolk
Place of Formation: New York
Address: 40-09 104TH STREET, 2ND FLOOR, CORONA, NY, United States, 11368

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
C/O CHRISTIAN MORALES DOS Process Agent 40-09 104TH STREET, 2ND FLOOR, CORONA, NY, United States, 11368

History

Start date End date Type Value
2022-06-18 2023-07-11 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2015-11-16 2022-06-18 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0

Filings

Filing Number Date Filed Type Effective Date
151116010179 2015-11-16 CERTIFICATE OF INCORPORATION 2015-11-16

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
344582143 0214700 2020-01-24 57 GLENMORE AVE, MONTAUK, NY, 11954
Inspection Type Fat/Cat
Scope Complete
Safety/Health Safety
Close Conference 2020-01-24
Emphasis L: FALL
Case Closed 2023-12-19

Related Activity

Type Accident
Activity Nr 1537524
Type Inspection
Activity Nr 1458271
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260451 B01
Issuance Date 2020-07-20
Current Penalty 1124.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights. a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were performing cedar shake siding installation work from a 4-tier fabricated frame scaffold approximately 20-feet above the ground that was not fully planked, on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01002
Citaton Type Serious
Standard Cited 19260451 B05 II
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilivered end. a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were performing cedar shake siding installation work from a fabricated frame scaffold platform approximately 20-feet above the ground with a plank extended approximately 9-feet beyond the support; on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01003
Citaton Type Serious
Standard Cited 19260451 C02
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were performing cedar shake siding work on a 4-tier fabricated frame scaffold approximately 20-feet above the ground and the two outer scaffold frame legs did not have base plates and mud sills or any other adequate firm foundation to support the scaffold; on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01004
Citaton Type Serious
Standard Cited 19260451 C03
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement: a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were performing cedar shake siding installation work from a 4-tier fabricated frame scaffold approximately 20-feet above the ground. Adjustable building jack post columns were placed along the support braces of the outer upright frame scaffold to prevent lifting and displacement; on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01005
Citaton Type Serious
Standard Cited 19260451 E01
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were accessing a 4-tier fabricated frame scaffold approximately 20-feet above the ground by climbing on the end frames and cross bracing; on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification of documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01006
Citaton Type Serious
Standard Cited 19260451 F07
Issuance Date 2020-07-20
Abatement Due Date 2020-07-30
Current Penalty 3000.0
Initial Penalty 13494.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Accident
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person. a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees performing cedar shake siding work from a 4-teir fabricated frame scaffold and a ladder jack scaffold were exposed to falls between approximately 20-feet to 27-feet. The fabricated frame scaffold was erected by untrained and inexperienced employees without the supervision and direction of a competent person; on of about 01/24/2020. Note: In addition to abatement certification the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01007
Citaton Type Serious
Standard Cited 19260451 F13
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(f)(13): Debris was allowed to accumulate on scaffold platforms: a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were working on a metal platform of a ladder jack scaffold that was not clear of boxes of cedar shingles, on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01008
Citaton Type Serious
Standard Cited 19260451 G01 I
Issuance Date 2020-07-20
Current Penalty 3000.0
Initial Penalty 13494.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Accident
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system: a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees performing cedar shake siding installation work from a ladder jack scaffold were exposed to falls of approximately 27-feet into a concrete basement stairwell in that they did not have a personal fall arrest system, on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01009
Citaton Type Serious
Standard Cited 19260451 G01 VII
Issuance Date 2020-07-20
Current Penalty 3000.0
Initial Penalty 13494.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were performing cedar shake siding installation while working from a 4-tier fabricated frame scaffold approximately 20-feet above the ground and did not have a guardrail system installed along all open sides and ends of the scaffold; on or about 01/24/2020. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01010
Citaton Type Serious
Standard Cited 19260452 C02
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(c)(2): Frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would secure vertical members together laterally, and the cross braces were not of such length as would automatically square. a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees performing cedar shake siding installation work from a 4-tier fabricated frame scaffold approximately 20-feet above the ground which did not have crossbracing on the third and fourth tier of the fabricated frame scaffold to prevent the scaffolding from swaying and becoming displaced; on of about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification of documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01011
Citaton Type Serious
Standard Cited 19260452 K04
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.452(k)(4): Ladders used to support ladder jacks were not placed, fastened, or equipped with devices to prevent slipping: a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees were performing cedar shake siding installation work from a ladder jack scaffold approximately 27-feet above a concrete basement stairwell and the ladder used to support the ladder jack scaffold was not fastened or equipped with devices to prevent slipping; on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.
Citation ID 01012
Citaton Type Serious
Standard Cited 19260454 A
Issuance Date 2020-07-20
Abatement Due Date 2020-07-30
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Accident
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees who were authorized to work from scaffolds had not received training by a person qualified in the subject matter to recognize the hazards associated with ladder jack scaffolds and fabricated frame scaffolds and to understand the procedures to control or minimize those hazards; on or about 01/24/2020. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01013
Citaton Type Serious
Standard Cited 19260454 B
Issuance Date 2020-07-20
Abatement Due Date 2020-07-30
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Related Event Code (REC) Accident
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question. a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees erecting a 4-teir fabricated frame scaffold and a ladder jack scaffold were not trained by a competent person in the subject matter to recognize the hazards associated with a fabricated frame scaffold and a ladder jack scaffold and to understand the procedures to control or minimize those hazards; on or about 01/24/2020. Note: In addition to abatement certification, the employer is required to submit abatement documentation for this item in accordance with 29 CFR 1903.19.
Citation ID 01014
Citaton Type Serious
Standard Cited 19260501 B13
Issuance Date 2020-07-20
Current Penalty 1114.0
Initial Penalty 4048.0
Contest Date 2020-09-23
Final Order 2021-03-18
Nr Instances 1
Nr Exposed 2
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Worksite, 57 Glenmore Ave, Montauk NY, West Side of Building - Employees walking along the edge of a concrete basement stairwell were not protected from falling approximately 7-feet by the use of guardrail systems, safety net systems, or personal fall arrest systems; on or about 01/24/2020. Note: Because abatement of this violation is already documented in the case file, the employer need not submit certification or documentation of abatement for this violation as normally required by CFR 1903.19.

Date of last update: 25 Mar 2025

Sources: New York Secretary of State