Name: | KATEWARD CONSTRUCTION, INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Inactive |
Date of registration: | 27 May 2016 (9 years ago) |
Date of dissolution: | 27 Jul 2022 |
Entity Number: | 4954360 |
ZIP code: | 11741 |
County: | Suffolk |
Place of Formation: | New York |
Address: | 132 GEERY AVENUE, HOLBROOK, FL, United States, 11741 |
Principal Address: | 11380 Parkview St, Spring Hill, FL, United States, 34609 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
KATIE M KENNY | DOS Process Agent | 132 GEERY AVENUE, HOLBROOK, FL, United States, 11741 |
Name | Role | Address |
---|---|---|
KATEWARD CONSTRUCTION, INC | Chief Executive Officer | 11380 PARKVIEW ST, SPRING HILL, FL, United States, 34609 |
Start date | End date | Type | Value |
---|---|---|---|
2016-05-27 | 2022-07-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2016-05-27 | 2022-09-14 | Address | 132 GEERY AVENUE, HOLBROOK, NY, 11741, USA (Type of address: Service of Process) |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
220914000088 | 2022-07-27 | CERTIFICATE OF DISSOLUTION-CANCELLATION | 2022-07-27 |
220610002740 | 2022-06-10 | BIENNIAL STATEMENT | 2022-05-01 |
160527000368 | 2016-05-27 | CERTIFICATE OF INCORPORATION | 2016-05-27 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342115862 | 0214700 | 2017-02-17 | 17 DUNE RD., QUOGUE, NY, 11959 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1211567 |
Safety | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260403 B01 |
Issuance Date | 2017-04-06 |
Abatement Due Date | 2017-04-12 |
Current Penalty | 1665.0 |
Initial Penalty | 2716.0 |
Final Order | 2017-05-02 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.403(b)(1): Employer did not ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees: a) Worksite, 17 Dune Rd., Quogue, NY - 2nd level: Employees were using a junction box that powered hand saw, power tap and other electrical tools. The Strain relief on the electric cord was detached from the junction box. The junction box was not examined prior being used; on or about 2/17/17. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260403 B02 |
Issuance Date | 2017-04-06 |
Abatement Due Date | 2017-04-12 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2017-05-02 |
Nr Instances | 2 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: a) Worksite, 17 Dune Rd., Quogue, NY- 2nd level: Employees were using a junction box that powers hand saw, power tap and other electrical tools. The junction box was placed on the work floor; on or about 2/17/17. b) Worksite, 17 Dune Rd., Quogue, NY- 2nd level: Employees were using a Relocatable Power Tap (stock #9900) to power charger, extension cords, and drill; on or about 2/17/17. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260405 G02 IV |
Issuance Date | 2017-04-06 |
Abatement Due Date | 2017-04-12 |
Current Penalty | 1665.0 |
Initial Penalty | 2716.0 |
Final Order | 2017-05-02 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws: a) Worksite, 17 Dune Rd., Quogue, NY- 2nd level: Employees were using a junction box that powers hand saw, power tap and other electrical tools. The Strain relief on the electric cord was detached from the junction box; on or about 2/17/17. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260416 B02 |
Issuance Date | 2017-04-06 |
Abatement Due Date | 2017-04-12 |
Current Penalty | 1665.0 |
Initial Penalty | 2173.0 |
Final Order | 2017-05-02 |
Nr Instances | 1 |
Nr Exposed | 2 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.416(b)(2): Working spaces, walkways, and similar locations were not kept clear of cords which created a hazard to employees: a) Worksite, 17 Dune Rd., Quogue, NY - 2nd level: Electrical cords that power tools and equipment were trailing and enchained in walkways and working spaces; on or about 2/17/17. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19. |
Date of last update: 24 Mar 2025
Sources: New York Secretary of State