2025-03-02
|
No data
|
157 AVENUE, FROM STREET 81 STREET TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb restored
|
2024-12-19
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Reconstructed SE4 corner quadrant was found to be Ada compliant. Remeasured and collected in prism on 6/9/24.
|
2024-10-13
|
No data
|
PINEVILLE LANE, FROM STREET GRAYSON STREET TO STREET NEPTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
roadway paved
|
2024-09-26
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Contractor obtained permit # Q042024143A35 and restored the SE corner quadrant.
|
2024-09-05
|
No data
|
PINEVILLE LANE, FROM STREET GRAYSON STREET TO STREET NEPTON STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
I observed the above respondent paved portion of the roadway in front of sited location without notifying the NYCDOT HIQA borough office within 4 hours prior to paving as per stip violation 1/2+5.
|
2024-07-26
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Permit # Q042024143A34 obtained for the SW corner quadrant , contractor failed to upgrade corner quadrant per BPP plans and H-1011 specifications , DWS mat placed and small pavement key , active CAR within permit.
|
2024-07-02
|
No data
|
157 AVENUE, FROM STREET 81 STREET TO STREET BEND
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb restored in kind
|
2024-06-09
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
DWS Mat placed on corner. Completed single ramp in the SW1 corner quadrant was found to be non Ada compliant. Measured and collected in prism on 6/9/24.
|
2024-06-05
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No new pedestrian ramp work started. Completed single ramp in the SE corner quadrant was found to be non ADA compliant, Prism updated on 7/24/23.
|
2024-06-05
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Newer permit # Q042024143A34 obtained for the SW corner with no new pedestrian ramp work started at this time of inspection.
|
2024-04-25
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Expansion joints along curb recess and sealed.
|
2024-04-19
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the SE corner quadrant was found to be non ADA compliant, Prism updated on 7/24/23.
|
2024-03-16
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent failed to seal expansion joints as per subsection 34RCNY 2-09 (f) (4) (v). A CAR was issued to respondent on 12/9/23 CAR#20235340029 to seal expansion joints. Also saw full depth down to roadway.
|
2024-01-14
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent failed to seal expansion joints as per subsection 34RCNY 2-09 (f) (4) (v). A CAR was issued to respondent on 12/9/23 CAR#20235340029 to seal expansion joints. Also saw full depth down to roadway.
|
2024-01-14
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Duplicate CAR same photos passing.
|
2023-12-09
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
in front of 157-03 81 street expansion joints installed in curb are not sealed
|
2023-12-09
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
at 157-03 81 street expansion joints installed in curb are not sealed
|
2023-11-21
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp in the SE corner quadrant was found to be non ADA compliant, Prism updated on 7/24/23.
|
2023-11-21
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
No work started at this time within the SW1 corner quadrant, pre existing single ramp is functional and accessible. We’ll re-inspect at a later date once work is completed.
|
2023-10-22
|
No data
|
PINEVILLE LANE, FROM STREET GRAYSON STREET TO STREET NEPTON STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
RESET, REPAIR OR REPLACE CURB Work in compliance
|
2023-10-13
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Condition remains the same within the SW1 corner quadrant, pre existing single ramp is functional and accessible. I’ll pass out this inspection and issue a new C.A.R.
|
2023-10-13
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Expired permit on file. No work started at this time within the SW1 corner quadrant, pre existing single ramp is functional and accessible. We’ll re-inspect at a later date.
|
2023-08-29
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done , permit expired. Active CAR under permit # Q042023170A04.
|
2023-08-17
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New permit # Q042023219A73 obtained for the SW corner quadrant with no work started at this time of inspection.
|
2023-08-17
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian ramp work started. Active CAR under permit # Q042023170A05.
|
2023-07-24
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Completed single ramp in the SE corner quadrant was found to be non ADA compliant, Prism updated on 7/24/23.
|
2023-07-07
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No pedestrian ramp work observed in the SW corner quadrant, old existing ramp is accessible and non compliant. Will re inspect at later date once work is completed.
|
2023-06-07
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Completed single ramp within the SE4 corner was found to be non ADA compliant. Previously M\C on Prism on 7/22/22.
|
2023-04-07
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed single ramp within the SE4 corner found to be non ADA compliant. Previously M\C on Prism on 7/22/22.
|
2023-02-01
|
No data
|
235 STREET, FROM STREET SEWARD AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP in compliance at this time.
|
2023-01-17
|
No data
|
235 STREET, FROM STREET SEWARD AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb in compliance.
|
2022-11-22
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
pass permit out of grantee. sidewalk sealed.
|
2022-11-16
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
Newly completed single ramp within the SE4 corner found to be non ADA compliant. Previously M\C on Prism on 7/22/22.
|
2022-09-23
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Expansion joints not sealed between sidewalk flags, sawcut replaced curb down to roadway, and joints need to be recessed 1/2" and sealed. I/f/o 157-03 (CAR CLEAN UP PROJECT)
|
2022-09-23
|
No data
|
157 AVENUE, FROM STREET 81 STREET TO STREET BEND
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
multiple side walk flags and curb replaced within the sidewalk AKA 157-03 81st street, without a valid DOT permit on file for segment. Respondent is identified by permit # Q042021110A07 for work done for property 157-03 81st street.
|
2022-09-23
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
joints not sealed between sidewalk flags installed, newly replaced curb need to be sawcut down to roadway, and joints need to be recessed 1/2 and sealed. 13'x4' Monolithic sidewalk flag for driveway needs to be scored. (CAR CLEAN UP PROJECT)
|
2022-08-28
|
No data
|
235 STREET, FROM STREET SEWARD AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ROADWAY PAVED 1/2 + 5 BUT PORTION OF PLUMBERS RESTORATION STILL EXPOSE.
|
2022-08-22
|
No data
|
235 STREET, FROM STREET SEWARD AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
BPP in front of 80-15 completed and acceptable. Curb to curb - 30' 1", milled - 20' 4" x 70' 3", depth - 3".
|
2022-08-11
|
No data
|
235 STREET, FROM STREET SEWARD AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
REPAIRED PERM SIDEWALK JOINTS SEALED AND IN COMPLIANCE
|
2022-08-08
|
No data
|
81 STREET, FROM STREET 157 AVENUE TO STREET 158 AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
On both sides of corner property saw expansion joints down to roadway and seal. Remove section of sidewalk with wood in as expansion joints. Also two flags on sidewalk patched on 157 Avenue. Recess 1/2" and seal all joints. Driveway flag to large.
|
2022-07-22
|
No data
|
81 STREET, FROM STREET 157 AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Newly completed single ramp within the SE4 corner found to be non ADA compliant due to excessive curb reveal and ramp running slope exceeds the acceptable ADA standards, ramps are functional and accessible. M\C on Prism on 7/22/22.
|
2022-05-28
|
No data
|
49 STREET, FROM STREET BEND TO STREET MASPETH AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk restored according to standard details
|
2021-11-01
|
No data
|
235 STREET, FROM STREET SEWARD AVENUE TO STREET UNION TURNPIKE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
All installed sidewalk flag's expansion joints need to be recessed 1/2'' below sidewalk surface & sealed.
|