Name: | PAGANELLI CONSTRUCTION INC. |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 09 Dec 2016 (8 years ago) |
Entity Number: | 5050355 |
ZIP code: | 12570 |
County: | Dutchess |
Place of Formation: | New York |
Address: | 153 GOLD ROAD, POUGHQUANG, NY, United States, 12570 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
ATTN: JASON PAGANELLI | DOS Process Agent | 153 GOLD ROAD, POUGHQUANG, NY, United States, 12570 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
161209000290 | 2016-12-09 | CERTIFICATE OF INCORPORATION | 2016-12-09 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
335185989 | 0213100 | 2012-07-11 | 49 NORTH CLINTON STREET, POUGHKEEPSIE, NY, 12603 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260501 B13 |
Issuance Date | 2012-08-14 |
Abatement Due Date | 2012-08-23 |
Current Penalty | 1000.0 |
Initial Penalty | 2000.0 |
Contest Date | 2014-05-27 |
Final Order | 2014-09-22 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet or more above lower levels was not protected by guardrail systems, safety net systems, or personal fall arrest systems, nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section 1926.502. a) Building site front - On or about 11 July, 2012 - Employees were installing Hardi-plank siding on the front of the new home without the use of any fall protection while working 6 feet or more above a lower level. Employees were exposed to a fall hazard of approximately 24 feet. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19261053 B01 |
Issuance Date | 2012-08-14 |
Current Penalty | 1000.0 |
Initial Penalty | 2800.0 |
Contest Date | 2014-05-27 |
Final Order | 2014-09-22 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 10 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladders length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) Building site front - On or about 11 July, 2012 - Employees were using a ladder that did not have its side rails extended a minimum 3 feet above the upper landing surface. Employees were exposed to a fall hazard of approximately 24 feet. |
Citation ID | 01003 |
Citaton Type | Serious |
Standard Cited | 19260404 B01 III C |
Issuance Date | 2012-08-14 |
Abatement Due Date | 2012-08-23 |
Current Penalty | 400.0 |
Initial Penalty | 1020.0 |
Contest Date | 2014-05-27 |
Final Order | 2014-09-22 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.404(b)(1)(iii)(C): Where an assured equipment grounding conductor program was being utilized, the employer did not ensure that each cord set, attachment cap, plug and receptacle of cord sets, and any equipment connected by cord and plug, except cord sets and receptacles which are fixed and not exposed to damage, were not visually inspected before each day's use for external defects, such as deformed or missing pins or insulation damage, and for indications of possible internal damage. a) Building site front - On or about 11 July, 2012 - Employees were using a 50 foot extension cord with damaged insulation as a power supply to a circular saw that was being used to cut the Hardi-Plank siding. Employees were exposed to an electrical shock hazard. |
Loan Number | Loan Funded Date | SBA Origination Office Code | Loan Delivery Method | Borrower Street Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8696758606 | 2021-03-25 | 0202 | PPP | 60 Griffen St, Poughquag, NY, 12570-5202 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Date of last update: 24 Mar 2025
Sources: New York Secretary of State