Search icon

SHEELIN CONCRETE CONTRACTING CORP.

Company Details

Name: SHEELIN CONCRETE CONTRACTING CORP.
Jurisdiction: New York
Legal type: DOMESTIC BUSINESS CORPORATION
Status: Active
Date of registration: 10 Jan 2017 (8 years ago)
Entity Number: 5065222
ZIP code: 10470
County: Bronx
Place of Formation: New York
Address: 4287 KATONAH AVE., STE. 151, BRONX, NY, United States, 10470
Principal Address: 711 Yonkers Avenue 2nd floor, New York, NY, United States, 10704

Shares Details

Shares issued 200

Share Par Value 0

Type NO PAR VALUE

DOS Process Agent

Name Role Address
THE CORPORATION DOS Process Agent 4287 KATONAH AVE., STE. 151, BRONX, NY, United States, 10470

Chief Executive Officer

Name Role Address
ADRIAN SMITH Chief Executive Officer 4287 KATONAH AVENUE, SUITE 151, BRONX, NY, United States, 10470

Permits

Number Date End date Type Address
B042024341B20 2024-12-06 2025-01-03 REPAIR SIDEWALK DEAN STREET, BROOKLYN, FROM STREET BROOKLYN AVENUE TO STREET KINGSTON AVENUE
B042024302A22 2024-10-28 2024-11-19 PED RAMP REPLACE/MODIFY/INSTALL GENERAL CONTRACTOR EAST 98 STREET, BROOKLYN, FROM STREET HEGEMAN AVENUE
Q012024297A88 2024-10-23 2024-11-14 PAVE STREET-W/ ENGINEERING & INSP FEE 31 STREET, QUEENS, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD
Q042024292A10 2024-10-18 2024-11-19 REPAIR SIDEWALK 41 AVENUE, QUEENS, FROM STREET BOWNE STREET TO STREET UNION STREET
B012024292C58 2024-10-18 2024-11-09 PAVE STREET-W/ ENGINEERING & INSP FEE GATEWAY DRIVE, BROOKLYN, FROM STREET BEND TO STREET VANDALIA AVENUE
B042024261A34 2024-09-17 2024-10-15 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT GATEWAY DRIVE, BROOKLYN, FROM STREET BEND TO STREET VANDALIA AVENUE
B042024261A33 2024-09-17 2024-10-15 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT GATEWAY DRIVE, BROOKLYN, FROM STREET BEND TO STREET VANDALIA AVENUE
B042024261A30 2024-09-17 2024-10-15 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT GATEWAY DRIVE, BROOKLYN, FROM STREET BEND TO STREET VANDALIA AVENUE
B042024261A38 2024-09-17 2024-10-15 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT GATEWAY DRIVE, BROOKLYN, FROM STREET BEND TO STREET VANDALIA AVENUE
B042024261A37 2024-09-17 2024-10-15 CONSTRUCT NEW SIDEWALK BLG. PAVEMENT GATEWAY DRIVE, BROOKLYN, FROM STREET BEND TO STREET VANDALIA AVENUE

History

Start date End date Type Value
2024-07-03 2024-10-30 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2024-05-07 2024-07-03 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-07-31 2023-07-31 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-07-31 2024-05-07 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-07-28 2023-07-28 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2023-07-28 2023-07-31 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0
2017-01-10 2023-07-28 Shares Share type: NO PAR VALUE, Number of shares: 200, Par value: 0

Filings

Filing Number Date Filed Type Effective Date
220225002071 2022-02-25 BIENNIAL STATEMENT 2022-02-25
170110010097 2017-01-10 CERTIFICATE OF INCORPORATION 2017-01-10

Inspections

Date Inspection Object Address Grade Type Institution Desctiption
2024-12-07 No data WEST 126 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation New steel faced curb in compliance
2024-12-01 No data EAST 98 STREET, FROM STREET HEGEMAN AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation Issue resolved. Newly completed ramp within the NE3 corner quadrant is Ada compliant. Previously Measured and collected in prism on 10/4/23.
2024-11-26 No data GATEWAY DRIVE, FROM STREET BEND TO STREET VANDALIA AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation Bpp done in compliance
2024-11-22 No data FULTON STREET, FROM STREET PENNSYLVANIA AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation Condition previously reported on last permit # B042022014A02. Ramp running slopes have been corrected on both ramps of the SW1 corner at this time, both ramps ADA compliant remeasured in PRISM 9/26/23. No further action taken.
2024-11-01 No data 31 STREET, FROM STREET 28 AVENUE TO STREET ASTORIA BOULEVARD No data Street Construction Inspections: Active Department of Transportation BPP passed and completed, (50' x 35'). Did not monitor full BPP inspection, only witnessed the final wearing course finish at this time. Yellow lane markings still need to be applied after completion. Active permit on file.
2024-10-28 No data GATEWAY DRIVE, FROM STREET BEND TO STREET VANDALIA AVENUE No data Street Construction Inspections: Active Department of Transportation Upon arrival crew on site roadway milled half+5’ in compliance with bpp specs for property 71-95
2024-10-25 No data WEST 126 STREET, FROM STREET 5 AVENUE TO STREET LENOX AVENUE No data Street Construction Inspections: Post-Audit Department of Transportation New curb in compliance at this time.
2024-10-14 No data EAST 98 STREET, FROM STREET HEGEMAN AVENUE No data Street Construction Inspections: CAR Re-Inspect Department of Transportation Completed single ramp in the NW2 corner found not to be ADA compliant. Previously M&C in Prism on 4/28/22.
2024-09-20 No data GATEWAY DRIVE, FROM STREET BEND TO STREET VANDALIA AVENUE No data Street Construction Inspections: Complaint Department of Transportation Sidewalk is currently being excavated will return at later date for re inspection
2024-07-13 No data HILLSIDE AVENUE, FROM STREET 208 STREET TO STREET 209 STREET No data Street Construction Inspections: CAR Re-Inspect Department of Transportation C.A.R. reinspection passed, plastic molding caps removed, expansion joints recessed & sealed in front of 208-09 Hillside Avenue.

Date of last update: 27 Dec 2024

Sources: New York Secretary of State