B022025080A24
|
2025-03-21
|
2025-06-12
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B022025080A26
|
2025-03-21
|
2025-06-12
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B022025080A29
|
2025-03-21
|
2025-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B022025080A28
|
2025-03-21
|
2025-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B022025080A27
|
2025-03-21
|
2025-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B022025080A25
|
2025-03-21
|
2025-06-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B022025079A83
|
2025-03-20
|
2025-05-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022025079A82
|
2025-03-20
|
2025-05-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022025079A81
|
2025-03-20
|
2025-05-31
|
TEMPORARY PEDESTRIAN WALK
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B042025070A04
|
2025-03-11
|
2025-04-09
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B012025070A22
|
2025-03-11
|
2025-04-09
|
RESET, REPAIR OR REPLACE CURB
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022025063C50
|
2025-03-04
|
2025-05-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022025063C47
|
2025-03-04
|
2025-05-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022025063C48
|
2025-03-04
|
2025-05-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022025063C49
|
2025-03-04
|
2025-05-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022025063C52
|
2025-03-04
|
2025-05-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022025063C51
|
2025-03-04
|
2025-05-31
|
PLACE MATERIAL ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022025023B21
|
2025-01-23
|
2025-04-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
55 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025023B22
|
2025-01-23
|
2025-04-22
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
55 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025023B20
|
2025-01-23
|
2025-04-22
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
55 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B022025023B19
|
2025-01-23
|
2025-04-22
|
CROSSING SIDEWALK
|
55 STREET, BROOKLYN, FROM STREET 16 AVENUE TO STREET 17 AVENUE
|
B042024366A11
|
2024-12-31
|
2025-02-04
|
REPLACE SIDEWALK
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B012024366D39
|
2024-12-31
|
2025-02-04
|
RESET, REPAIR OR REPLACE CURB
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024358E53
|
2024-12-23
|
2025-02-27
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024358E54
|
2024-12-23
|
2025-02-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024358E57
|
2024-12-23
|
2025-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024358E55
|
2024-12-23
|
2025-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024358E56
|
2024-12-23
|
2025-02-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024327B14
|
2024-11-22
|
2025-02-11
|
PLACE MATERIAL ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024327B15
|
2024-11-22
|
2025-02-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024286A09
|
2024-10-12
|
2024-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024286A13
|
2024-10-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024286A12
|
2024-10-12
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024286A11
|
2024-10-12
|
2024-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024286A10
|
2024-10-12
|
2024-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024285A23
|
2024-10-11
|
2024-12-14
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024285A24
|
2024-10-11
|
2024-12-13
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024285A20
|
2024-10-11
|
2024-12-31
|
PLACE MATERIAL ON STREET
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024285A21
|
2024-10-11
|
2024-12-13
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024285A22
|
2024-10-11
|
2024-12-13
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B042024234A03
|
2024-08-21
|
2024-09-18
|
REPLACE SIDEWALK
|
AVENUE J, BROOKLYN, FROM STREET EAST 22 STREET TO STREET EAST 23 STREET
|
B022024198A45
|
2024-07-16
|
2024-10-08
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024198A47
|
2024-07-16
|
2024-10-08
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B042024198A21
|
2024-07-16
|
2024-08-17
|
REPLACE SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022024198A44
|
2024-07-16
|
2024-10-08
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B012024198B54
|
2024-07-16
|
2024-08-17
|
RESET, REPAIR OR REPLACE CURB
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022024198A46
|
2024-07-16
|
2024-10-08
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024193A73
|
2024-07-11
|
2024-10-08
|
PLACE MATERIAL ON STREET
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B022024191B42
|
2024-07-09
|
2024-10-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024191B45
|
2024-07-09
|
2024-10-06
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024191B44
|
2024-07-09
|
2024-10-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024191B43
|
2024-07-09
|
2024-10-06
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024191B41
|
2024-07-09
|
2024-10-06
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024179G09
|
2024-06-27
|
2024-07-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024179G06
|
2024-06-27
|
2024-07-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024179G07
|
2024-06-27
|
2024-07-03
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024179G08
|
2024-06-27
|
2024-07-03
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024155B65
|
2024-06-03
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024155B72
|
2024-06-03
|
2024-06-23
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024155B71
|
2024-06-03
|
2024-06-23
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024155B70
|
2024-06-03
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024155B69
|
2024-06-03
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024155B68
|
2024-06-03
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024155B67
|
2024-06-03
|
2024-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024155B64
|
2024-06-03
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024150B60
|
2024-05-29
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024150B58
|
2024-05-29
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024150B59
|
2024-05-29
|
2024-06-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024150B61
|
2024-05-29
|
2024-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024150B57
|
2024-05-29
|
2024-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024106D31
|
2024-04-15
|
2024-06-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024106D32
|
2024-04-15
|
2024-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024106D30
|
2024-04-15
|
2024-06-04
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024087D63
|
2024-03-27
|
2024-06-04
|
CROSSING SIDEWALK
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024087A52
|
2024-03-27
|
2024-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024087A51
|
2024-03-27
|
2024-06-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024087D67
|
2024-03-27
|
2024-04-19
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024087D66
|
2024-03-27
|
2024-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024087D65
|
2024-03-27
|
2024-04-19
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024087D64
|
2024-03-27
|
2024-06-04
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022024087A91
|
2024-03-27
|
2024-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024087A90
|
2024-03-27
|
2024-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024087A89
|
2024-03-27
|
2024-06-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024087A88
|
2024-03-27
|
2024-06-04
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024087A87
|
2024-03-27
|
2024-06-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024087A53
|
2024-03-27
|
2024-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024071B36
|
2024-03-11
|
2024-04-26
|
PLACE MATERIAL ON STREET
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022024064E65
|
2024-03-04
|
2024-06-01
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024064E63
|
2024-03-04
|
2024-06-01
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024064E67
|
2024-03-04
|
2024-05-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024064E64
|
2024-03-04
|
2024-06-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022024064E66
|
2024-03-04
|
2024-05-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022024004B48
|
2024-01-04
|
2024-04-02
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024003E38
|
2024-01-03
|
2024-04-01
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024003E37
|
2024-01-03
|
2024-04-02
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024003E40
|
2024-01-03
|
2024-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022024003E39
|
2024-01-03
|
2024-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 29 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023361B55
|
2023-12-27
|
2024-02-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022023361B82
|
2023-12-27
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023361B81
|
2023-12-27
|
2024-03-30
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023361B80
|
2023-12-27
|
2024-03-30
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023361B79
|
2023-12-27
|
2024-03-30
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023361B78
|
2023-12-27
|
2024-03-30
|
CROSSING SIDEWALK
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023361B56
|
2023-12-27
|
2024-02-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022023361B53
|
2023-12-27
|
2024-02-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023361B52
|
2023-12-27
|
2024-02-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023361B50
|
2023-12-27
|
2024-03-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023361B40
|
2023-12-27
|
2024-03-25
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023361B39
|
2023-12-27
|
2024-03-25
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023361B54
|
2023-12-27
|
2024-02-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023338C06
|
2023-12-04
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023338C05
|
2023-12-04
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023338C04
|
2023-12-04
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023338C03
|
2023-12-04
|
2023-12-31
|
CROSSING SIDEWALK
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023338C07
|
2023-12-04
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023292B18
|
2023-10-19
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022023292B17
|
2023-10-19
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023292B15
|
2023-10-19
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023292B16
|
2023-10-19
|
2023-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023292B19
|
2023-10-19
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022023285B77
|
2023-10-12
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023285B71
|
2023-10-12
|
2023-12-31
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023285B70
|
2023-10-12
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023285B72
|
2023-10-12
|
2023-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023285B73
|
2023-10-12
|
2023-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023285B74
|
2023-10-12
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023285B75
|
2023-10-12
|
2023-12-31
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023285B78
|
2023-10-12
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023285B76
|
2023-10-12
|
2023-12-31
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023285B79
|
2023-10-12
|
2023-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023271A87
|
2023-09-28
|
2023-12-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023269F37
|
2023-09-26
|
2023-09-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023257C36
|
2023-09-14
|
2023-12-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023257C37
|
2023-09-14
|
2023-12-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023257C35
|
2023-09-14
|
2023-12-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023257C33
|
2023-09-14
|
2023-12-12
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023257C32
|
2023-09-14
|
2023-12-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023257C31
|
2023-09-14
|
2023-12-12
|
CROSSING SIDEWALK
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023257C34
|
2023-09-14
|
2023-12-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
52 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET OLD NEW UTRECHT ROAD
|
B022023236B98
|
2023-08-24
|
2023-11-19
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023236B99
|
2023-08-24
|
2023-11-20
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023212A38
|
2023-07-31
|
2023-10-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023212A39
|
2023-07-31
|
2023-10-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022023212A40
|
2023-07-31
|
2023-10-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
FLATLANDS AVENUE, BROOKLYN, FROM STREET AVENUE N TO STREET EAST 35 STREET
|
B022023212A37
|
2023-07-31
|
2023-10-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023212A36
|
2023-07-31
|
2023-10-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 35 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET FLATLANDS AVENUE
|
B022023207D38
|
2023-07-26
|
2023-08-25
|
TEMPORARY PEDESTRIAN WALK
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B042023207A32
|
2023-07-26
|
2023-08-25
|
REPLACE SIDEWALK
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B012023207E07
|
2023-07-26
|
2023-08-25
|
RESET, REPAIR OR REPLACE CURB-PROTECTED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023207D39
|
2023-07-26
|
2023-08-25
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023202B72
|
2023-07-21
|
2023-10-18
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B042023200A35
|
2023-07-19
|
2023-08-16
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B012023200B43
|
2023-07-19
|
2023-08-16
|
RESET, REPAIR OR REPLACE CURB
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023195B21
|
2023-07-14
|
2023-10-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023195B15
|
2023-07-14
|
2023-10-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023195B16
|
2023-07-14
|
2023-10-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023195B18
|
2023-07-14
|
2023-10-11
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023195B19
|
2023-07-14
|
2023-10-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023195B28
|
2023-07-14
|
2023-10-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023195B27
|
2023-07-14
|
2023-10-11
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023195B26
|
2023-07-14
|
2023-10-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023195B25
|
2023-07-14
|
2023-10-11
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023195B24
|
2023-07-14
|
2023-10-11
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023195B23
|
2023-07-14
|
2023-10-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023195B22
|
2023-07-14
|
2023-10-11
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023195B20
|
2023-07-14
|
2023-10-11
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023178C40
|
2023-06-27
|
2023-07-09
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023178C43
|
2023-06-27
|
2023-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023178C42
|
2023-06-27
|
2023-07-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023178C41
|
2023-06-27
|
2023-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023178C39
|
2023-06-27
|
2023-07-09
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023178C03
|
2023-06-27
|
2023-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023178C02
|
2023-06-27
|
2023-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023178C01
|
2023-06-27
|
2023-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023178C00
|
2023-06-27
|
2023-07-09
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023177C55
|
2023-06-26
|
2023-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023177C54
|
2023-06-26
|
2023-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023177D37
|
2023-06-26
|
2023-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023177D36
|
2023-06-26
|
2023-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023135B68
|
2023-05-15
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023135B67
|
2023-05-15
|
2023-06-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023129A31
|
2023-05-09
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023129A29
|
2023-05-09
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023129A30
|
2023-05-09
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023129A04
|
2023-05-09
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023129A03
|
2023-05-09
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023129A02
|
2023-05-09
|
2023-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022023129A28
|
2023-05-09
|
2023-06-26
|
CROSSING SIDEWALK
|
KIMBALL STREET, BROOKLYN, FROM STREET AVENUE R TO STREET QUENTIN ROAD
|
B022023129A06
|
2023-05-09
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023129A05
|
2023-05-09
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B042023118A23
|
2023-04-28
|
2023-05-27
|
REPLACE SIDEWALK
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022023118B29
|
2023-04-28
|
2023-05-27
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022023118B28
|
2023-04-28
|
2023-05-27
|
PLACE MATERIAL ON STREET
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022023086B35
|
2023-03-27
|
2023-06-26
|
CROSSING SIDEWALK
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086C01
|
2023-03-27
|
2023-06-26
|
PLACE MATERIAL ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086B77
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023086B74
|
2023-03-27
|
2023-06-26
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023086B73
|
2023-03-27
|
2023-06-26
|
PLACE MATERIAL ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023086B72
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023086B71
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023086B70
|
2023-03-27
|
2023-06-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023086B69
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023086B68
|
2023-03-27
|
2023-06-26
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023086B67
|
2023-03-27
|
2023-06-26
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023086B66
|
2023-03-27
|
2023-06-26
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022023086B41
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086B40
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086B39
|
2023-03-27
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086B38
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086B37
|
2023-03-27
|
2023-06-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086B36
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022023086B75
|
2023-03-27
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023086B76
|
2023-03-27
|
2023-06-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023083D18
|
2023-03-24
|
2023-06-26
|
PLACE MATERIAL ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023083D77
|
2023-03-24
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023083D76
|
2023-03-24
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023083D75
|
2023-03-24
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023083D74
|
2023-03-24
|
2023-06-26
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023083C74
|
2023-03-24
|
2023-05-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023083C75
|
2023-03-24
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022023083D73
|
2023-03-24
|
2023-06-26
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022023083D24
|
2023-03-24
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023083D23
|
2023-03-24
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023083D22
|
2023-03-24
|
2023-06-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023083D21
|
2023-03-24
|
2023-06-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023083D20
|
2023-03-24
|
2023-06-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023083D19
|
2023-03-24
|
2023-06-26
|
CROSSING SIDEWALK
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023083C97
|
2023-03-24
|
2023-05-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023083C73
|
2023-03-24
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022023083C98
|
2023-03-24
|
2023-05-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023073B20
|
2023-03-14
|
2023-05-09
|
PLACE MATERIAL ON STREET
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022023067D06
|
2023-03-08
|
2023-04-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B042023067A19
|
2023-03-08
|
2023-04-04
|
REPLACE SIDEWALK
|
53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022023067D07
|
2023-03-08
|
2023-04-04
|
TEMPORARY PEDESTRIAN WALK
|
53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022023067D08
|
2023-03-08
|
2023-04-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022023052A74
|
2023-02-21
|
2023-05-17
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022023052A73
|
2023-02-21
|
2023-05-17
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350C89
|
2022-12-16
|
2023-03-31
|
PLACE MATERIAL ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350D10
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D11
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350C42
|
2022-12-16
|
2023-03-15
|
PLACE MATERIAL ON STREET
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022350C43
|
2022-12-16
|
2023-03-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022350C44
|
2022-12-16
|
2023-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022350C46
|
2022-12-16
|
2023-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022350C52
|
2022-12-16
|
2023-03-29
|
PLACE MATERIAL ON STREET
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022350C53
|
2022-12-16
|
2023-03-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022350C54
|
2022-12-16
|
2023-03-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022350C55
|
2022-12-16
|
2023-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022350C56
|
2022-12-16
|
2023-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022350C90
|
2022-12-16
|
2023-03-31
|
CROSSING SIDEWALK
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350C91
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350C92
|
2022-12-16
|
2023-03-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350C93
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350C94
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350C95
|
2022-12-16
|
2023-03-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022350C96
|
2022-12-16
|
2023-03-31
|
PLACE MATERIAL ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350C97
|
2022-12-16
|
2023-03-31
|
CROSSING SIDEWALK
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350C98
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350C99
|
2022-12-16
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D00
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D01
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D02
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D03
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D04
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D05
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D06
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022350D07
|
2022-12-16
|
2023-03-31
|
CROSSING SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D08
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D09
|
2022-12-16
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D12
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D13
|
2022-12-16
|
2023-03-31
|
PLACE MATERIAL ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D14
|
2022-12-16
|
2023-03-31
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D15
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D16
|
2022-12-16
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D17
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022350D18
|
2022-12-16
|
2023-03-31
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022350D19
|
2022-12-16
|
2023-03-31
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022350D20
|
2022-12-16
|
2023-03-31
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022350D21
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022350D22
|
2022-12-16
|
2023-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022350D23
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022350D24
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022350D25
|
2022-12-16
|
2023-03-31
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022350D26
|
2022-12-16
|
2023-03-31
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022350D27
|
2022-12-16
|
2023-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022350D28
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022350D29
|
2022-12-16
|
2023-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022333A10
|
2022-11-29
|
2022-12-29
|
PLACE MATERIAL ON STREET
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022333A14
|
2022-11-29
|
2022-12-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022333A11
|
2022-11-29
|
2022-12-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022333A12
|
2022-11-29
|
2022-12-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022333A13
|
2022-11-29
|
2022-12-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022022306B15
|
2022-11-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B14
|
2022-11-02
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B12
|
2022-11-02
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B11
|
2022-11-02
|
2022-12-31
|
CROSSING SIDEWALK
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B10
|
2022-11-02
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B13
|
2022-11-02
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B73
|
2022-11-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B19
|
2022-11-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B18
|
2022-11-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B17
|
2022-11-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022306B16
|
2022-11-02
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022300B53
|
2022-10-27
|
2022-12-31
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022300B52
|
2022-10-27
|
2022-12-31
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022300B51
|
2022-10-27
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022300B30
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022300B29
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022300B28
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022300B27
|
2022-10-27
|
2022-12-31
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022300B26
|
2022-10-27
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022300A91
|
2022-10-27
|
2022-12-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022300A35
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022300A34
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022300A33
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022300A32
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022300A31
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022300A30
|
2022-10-27
|
2022-12-31
|
CROSSING SIDEWALK
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022300A29
|
2022-10-27
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022300B56
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022300B55
|
2022-10-27
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022300B71
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B70
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B69
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B68
|
2022-10-27
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B67
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B66
|
2022-10-27
|
2022-12-31
|
CROSSING SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B62
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B61
|
2022-10-27
|
2022-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B60
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B59
|
2022-10-27
|
2022-12-31
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B58
|
2022-10-27
|
2022-12-31
|
PLACE MATERIAL ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022300B57
|
2022-10-27
|
2022-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022300B54
|
2022-10-27
|
2022-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022300A28
|
2022-10-27
|
2022-12-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022300A27
|
2022-10-27
|
2022-12-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022235A01
|
2022-08-23
|
2022-09-21
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022235A00
|
2022-08-23
|
2022-09-21
|
TEMPORARY PEDESTRIAN WALK
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B012022235A00
|
2022-08-23
|
2022-09-21
|
RESET, REPAIR OR REPLACE CURB
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B042022235A00
|
2022-08-23
|
2022-09-21
|
REPLACE SIDEWALK
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022223B05
|
2022-08-11
|
2022-11-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B04
|
2022-08-11
|
2022-11-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B03
|
2022-08-11
|
2022-11-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B02
|
2022-08-11
|
2022-11-05
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B01
|
2022-08-11
|
2022-11-05
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B00
|
2022-08-11
|
2022-11-05
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223A99
|
2022-08-11
|
2022-11-05
|
CROSSING SIDEWALK
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223A98
|
2022-08-11
|
2022-11-05
|
PLACE MATERIAL ON STREET
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B08
|
2022-08-11
|
2022-11-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B07
|
2022-08-11
|
2022-10-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022223B06
|
2022-08-11
|
2022-11-05
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
SNEDIKER AVENUE, BROOKLYN, FROM STREET LIVONIA AVENUE TO STREET RIVERDALE AVENUE
|
B022022210C36
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022210C68
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022210C67
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022210C66
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022210C65
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022210C64
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022210C63
|
2022-07-29
|
2022-10-26
|
CROSSING SIDEWALK
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022210C62
|
2022-07-29
|
2022-10-26
|
PLACE MATERIAL ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022210C61
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022210C60
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022210C59
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022210C58
|
2022-07-29
|
2022-10-26
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022210C57
|
2022-07-29
|
2022-10-26
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022210C56
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022210C55
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022210C54
|
2022-07-29
|
2022-10-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022210C53
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022210C52
|
2022-07-29
|
2022-10-26
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022210C51
|
2022-07-29
|
2022-10-26
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022210C50
|
2022-07-29
|
2022-10-26
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022210C49
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C48
|
2022-07-29
|
2022-10-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C47
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C46
|
2022-07-29
|
2022-10-26
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C45
|
2022-07-29
|
2022-10-26
|
PLACE MATERIAL ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C44
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C43
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C42
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C41
|
2022-07-29
|
2022-10-26
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C40
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C39
|
2022-07-29
|
2022-10-26
|
CROSSING SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022210C38
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022210C37
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022210C35
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022210C34
|
2022-07-29
|
2022-10-26
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022210C33
|
2022-07-29
|
2022-10-26
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022210C32
|
2022-07-29
|
2022-10-26
|
PLACE MATERIAL ON STREET
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022182D16
|
2022-07-01
|
2022-07-09
|
PLACE MATERIAL ON STREET
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022182D17
|
2022-07-01
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022168E56
|
2022-06-17
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022168E55
|
2022-06-17
|
2022-07-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022168E57
|
2022-06-17
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022160A40
|
2022-06-09
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022160A39
|
2022-06-09
|
2022-07-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022160A38
|
2022-06-09
|
2022-07-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022160A37
|
2022-06-09
|
2022-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022160A36
|
2022-06-09
|
2022-07-09
|
CROSSING SIDEWALK
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022160A41
|
2022-06-09
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022159C08
|
2022-06-08
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C07
|
2022-06-08
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C06
|
2022-06-08
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C05
|
2022-06-08
|
2022-07-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C04
|
2022-06-08
|
2022-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C03
|
2022-06-08
|
2022-07-09
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C02
|
2022-06-08
|
2022-07-09
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C01
|
2022-06-08
|
2022-07-09
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022159C00
|
2022-06-08
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022159B99
|
2022-06-08
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022159B98
|
2022-06-08
|
2022-07-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022159B97
|
2022-06-08
|
2022-07-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022159B96
|
2022-06-08
|
2022-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022159B95
|
2022-06-08
|
2022-07-09
|
CROSSING SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022159B59
|
2022-06-08
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022159C09
|
2022-06-08
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022147D44
|
2022-05-27
|
2022-07-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022147D53
|
2022-05-27
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022147D52
|
2022-05-27
|
2022-07-09
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022147D51
|
2022-05-27
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022147D50
|
2022-05-27
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022147D49
|
2022-05-27
|
2022-07-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022147D48
|
2022-05-27
|
2022-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022147D47
|
2022-05-27
|
2022-07-09
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022147D46
|
2022-05-27
|
2022-07-09
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022147D45
|
2022-05-27
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022147D43
|
2022-05-27
|
2022-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022147D42
|
2022-05-27
|
2022-07-09
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022147D41
|
2022-05-27
|
2022-07-09
|
PLACE MATERIAL ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022147D40
|
2022-05-27
|
2022-07-09
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022147D39
|
2022-05-27
|
2022-07-09
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022147D38
|
2022-05-27
|
2022-07-09
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022147D37
|
2022-05-27
|
2022-07-09
|
CROSSING SIDEWALK
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022147D36
|
2022-05-27
|
2022-07-09
|
PLACE MATERIAL ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022129B45
|
2022-05-09
|
2022-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022129B44
|
2022-05-09
|
2022-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022129B43
|
2022-05-09
|
2022-06-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022129B42
|
2022-05-09
|
2022-06-04
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022129C17
|
2022-05-09
|
2022-06-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129C18
|
2022-05-09
|
2022-06-04
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129C21
|
2022-05-09
|
2022-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129B41
|
2022-05-09
|
2022-06-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022129B40
|
2022-05-09
|
2022-06-04
|
CROSSING SIDEWALK
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022129B03
|
2022-05-09
|
2022-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129B02
|
2022-05-09
|
2022-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129B01
|
2022-05-09
|
2022-06-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129B00
|
2022-05-09
|
2022-06-04
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129A99
|
2022-05-09
|
2022-06-04
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129A98
|
2022-05-09
|
2022-06-04
|
CROSSING SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129C20
|
2022-05-09
|
2022-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129C19
|
2022-05-09
|
2022-06-04
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022129C16
|
2022-05-09
|
2022-06-04
|
CROSSING SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022118C39
|
2022-04-28
|
2022-06-04
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022089B45
|
2022-03-30
|
2022-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B44
|
2022-03-30
|
2022-06-12
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B43
|
2022-03-30
|
2022-06-12
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B42
|
2022-03-30
|
2022-06-12
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B41
|
2022-03-30
|
2022-06-12
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B20
|
2022-03-30
|
2022-06-12
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CHURCH AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
B022022089B40
|
2022-03-30
|
2022-06-12
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B21
|
2022-03-30
|
2022-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHURCH AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
B022022089B47
|
2022-03-30
|
2022-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B46
|
2022-03-30
|
2022-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022089B48
|
2022-03-30
|
2022-06-12
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022022067B51
|
2022-03-08
|
2022-04-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
53 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET 18 AVENUE
|
B022022056A47
|
2022-02-25
|
2022-05-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022056B34
|
2022-02-25
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022056B33
|
2022-02-25
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022056B32
|
2022-02-25
|
2022-04-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022056B31
|
2022-02-25
|
2022-04-29
|
CROSSING SIDEWALK
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022056B30
|
2022-02-25
|
2022-04-29
|
PLACE MATERIAL ON STREET
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022022056B27
|
2022-02-25
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022056B26
|
2022-02-25
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022056B25
|
2022-02-25
|
2022-04-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022056B24
|
2022-02-25
|
2022-04-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022056B23
|
2022-02-25
|
2022-04-29
|
PLACE MATERIAL ON STREET
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022022056A65
|
2022-02-25
|
2022-04-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022056A64
|
2022-02-25
|
2022-05-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022056A63
|
2022-02-25
|
2022-04-29
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022056A62
|
2022-02-25
|
2022-05-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022056A61
|
2022-02-25
|
2022-05-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022056A60
|
2022-02-25
|
2022-05-29
|
CROSSING SIDEWALK
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022056A59
|
2022-02-25
|
2022-05-29
|
PLACE MATERIAL ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022022056A55
|
2022-02-25
|
2022-05-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022056A54
|
2022-02-25
|
2022-05-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022056A53
|
2022-02-25
|
2022-05-29
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022056A52
|
2022-02-25
|
2022-05-29
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022056A51
|
2022-02-25
|
2022-05-29
|
PLACE MATERIAL ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022022056A50
|
2022-02-25
|
2022-05-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022056A49
|
2022-02-25
|
2022-05-29
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022056A48
|
2022-02-25
|
2022-05-29
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022056A46
|
2022-02-25
|
2022-05-29
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022056A45
|
2022-02-25
|
2022-05-29
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022022005A34
|
2022-01-05
|
2022-04-02
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
CHURCH AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
B022022005A35
|
2022-01-05
|
2022-04-02
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
CHURCH AVENUE, BROOKLYN, FROM STREET BEDFORD AVENUE TO STREET FLATBUSH AVENUE
|
B012022003B32
|
2022-01-03
|
2022-02-01
|
RESET, REPAIR OR REPLACE CURB
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B042022003A08
|
2022-01-03
|
2022-02-01
|
CONSTRUCT NEW SIDEWALK BLG. PAVEMENT
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021362B75
|
2021-12-28
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B78
|
2021-12-28
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B77
|
2021-12-28
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B76
|
2021-12-28
|
2022-03-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B74
|
2021-12-28
|
2022-03-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B73
|
2021-12-28
|
2022-03-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B72
|
2021-12-28
|
2022-03-31
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B71
|
2021-12-28
|
2022-03-31
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021362B70
|
2021-12-28
|
2022-03-31
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B042021357A12
|
2021-12-23
|
2022-01-20
|
REPLACE SIDEWALK
|
17 AVENUE, BROOKLYN, FROM STREET 54 STREET TO STREET 55 STREET
|
B042021357A13
|
2021-12-23
|
2022-01-20
|
REPLACE SIDEWALK
|
55 STREET, BROOKLYN, FROM STREET 17 AVENUE TO STREET DEAD END
|
B022021335B03
|
2021-12-01
|
2022-02-28
|
CROSSING SIDEWALK
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335A94
|
2021-12-01
|
2022-02-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022021335A95
|
2021-12-01
|
2022-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022021335A96
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022021335B20
|
2021-12-01
|
2022-02-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022021335B19
|
2021-12-01
|
2022-02-28
|
CROSSING SIDEWALK
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022021335B18
|
2021-12-01
|
2022-02-28
|
PLACE MATERIAL ON STREET
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022021335B17
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022021335B16
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022021335B15
|
2021-12-01
|
2022-02-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022021335B14
|
2021-12-01
|
2022-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022021335B13
|
2021-12-01
|
2022-02-28
|
PLACE MATERIAL ON STREET
|
EAST 27 STREET, BROOKLYN, FROM STREET AVENUE P TO STREET QUENTIN ROAD
|
B022021335B07
|
2021-12-01
|
2022-02-28
|
PLACE MATERIAL ON STREET
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335B11
|
2021-12-01
|
2022-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
19 AVENUE, BROOKLYN, FROM STREET 59 STREET TO STREET 60 STREET
|
B022021335B09
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335B08
|
2021-12-01
|
2022-02-28
|
CROSSING SIDEWALK
|
EAST 22 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335B06
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335B05
|
2021-12-01
|
2022-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335B04
|
2021-12-01
|
2022-02-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335A97
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022021335B21
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022021335B02
|
2021-12-01
|
2022-02-28
|
PLACE MATERIAL ON STREET
|
EAST 24 STREET, BROOKLYN, FROM STREET AVENUE M TO STREET AVENUE N
|
B022021335A82
|
2021-12-01
|
2022-02-28
|
PLACE MATERIAL ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A83
|
2021-12-01
|
2022-02-28
|
CROSSING SIDEWALK
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A84
|
2021-12-01
|
2022-02-28
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A85
|
2021-12-01
|
2022-02-28
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A86
|
2021-12-01
|
2022-02-28
|
OCCUPANCY OF SIDEWALK AS STIPULATED
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A87
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A88
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A89
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335B22
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
62 STREET, BROOKLYN, FROM STREET 18 AVENUE TO STREET 19 AVENUE
|
B022021335A90
|
2021-12-01
|
2022-02-28
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
22 STREET, BROOKLYN, FROM STREET 5 AVENUE TO STREET 6 AVENUE
|
B022021335A92
|
2021-12-01
|
2022-02-28
|
PLACE MATERIAL ON STREET
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
B022021335A93
|
2021-12-01
|
2022-02-28
|
CROSSING SIDEWALK
|
LIBERTY AVENUE, BROOKLYN, FROM STREET BRADFORD STREET TO STREET MILLER AVENUE
|
Q022021295A42
|
2021-10-22
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
BEACH 146 STREET, QUEENS, FROM STREET OCEAN PROMENADE TO STREET ROCKAWAY BEACH BOULEVARD
|
B022021279C09
|
2021-10-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C03
|
2021-10-06
|
2021-12-31
|
PLACE OPEN CONSTRUCTION DEBRIS CONTAINER ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C04
|
2021-10-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C05
|
2021-10-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C06
|
2021-10-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C07
|
2021-10-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C08
|
2021-10-06
|
2021-12-31
|
PLACE EQUIPMENT OTHER THAN CRANE OR SHOV
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279B99
|
2021-10-06
|
2021-12-31
|
PLACE MATERIAL ON STREET
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C00
|
2021-10-06
|
2021-12-31
|
CROSSING SIDEWALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C01
|
2021-10-06
|
2021-12-31
|
TEMPORARY PEDESTRIAN WALK
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B022021279C02
|
2021-10-06
|
2021-12-31
|
OCCUPANCY OF ROADWAY AS STIPULATED
|
MILLER AVENUE, BROOKLYN, FROM STREET GLENMORE AVENUE TO STREET LIBERTY AVENUE
|
B042021263A16
|
2021-09-20
|
2021-10-19
|
REPAIR SIDEWALK
|
46 STREET, BROOKLYN, FROM STREET 12 AVENUE TO STREET 13 AVENUE
|
B042020314A05
|
2020-11-09
|
2020-12-08
|
REPLACE SIDEWALK
|
EAST 12 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B012020314B39
|
2020-11-09
|
2020-12-10
|
RESET, REPAIR OR REPLACE CURB
|
EAST 18 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B042020314A07
|
2020-11-09
|
2020-12-10
|
REPLACE SIDEWALK
|
EAST 18 STREET, BROOKLYN, FROM STREET AVENUE I TO STREET AVENUE J
|
B042019326A03
|
2019-11-22
|
2019-12-18
|
PED RAMP MODIFY/INSTALL GENERAL CONTRACTOR
|
AVENUE J, BROOKLYN, FROM STREET EAST 22 STREET
|
B012019312A29
|
2019-11-08
|
2019-12-05
|
RESET, REPAIR OR REPLACE CURB
|
EAST 28 STREET, BROOKLYN, FROM STREET AVENUE J TO STREET AVENUE K
|