Inspection Type |
Planned
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2022-05-17
|
Emphasis |
L: LOCALTARG, P: LOCALTARG
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260404 B01 II |
Issuance Date |
2022-11-03 |
Current Penalty |
4144.0 |
Initial Penalty |
4144.0 |
Contest Date |
2023-10-23 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection. Location: a) On the cellar level of the jobsite: On or about May 17, 2022, employees used electric powered tools connected to receptacle outlets that are not provided with ground fault circuit interrupters (GFCI). |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260405 J01 II |
Issuance Date |
2022-11-03 |
Current Penalty |
4144.0 |
Initial Penalty |
4144.0 |
Contest Date |
2023-10-23 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.405(j)(1)(ii): Fixtures, lampholders, rosettes, or receptacles were not securely supported. Location: a) On the cellar level of the jobsite: On or about May 17, 2022, electrical junction boxes with receptacle were not securely supported. They were used to energize electrical equipment. |
|
|