Inspection Type |
Complaint
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2017-08-28
|
Emphasis |
L: FALL
|
Case Closed |
2018-06-21
|
Related Activity
Type |
Complaint |
Activity Nr |
1257522 |
Safety |
Yes |
|
Type |
Inspection |
Activity Nr |
1258881 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Serious |
Standard Cited |
19260451 B01 |
Issuance Date |
2018-02-23 |
Abatement Due Date |
2018-03-14 |
Current Penalty |
2313.0 |
Initial Penalty |
3696.0 |
Final Order |
2018-03-22 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports. Location: 170 West 79th Street New York, NY On or about: August 28th, 2017 a) Worker drilling holes on a steel beam for safety netting was standing approximately 12 to 13 feet high, on the second tier of a two tier tubular welded frame scaffold that was not fully planked. |
|
Citation ID |
01002 |
Citaton Type |
Serious |
Standard Cited |
19260451 E01 |
Issuance Date |
2018-02-23 |
Abatement Due Date |
2018-03-14 |
Current Penalty |
3774.0 |
Initial Penalty |
5174.0 |
Final Order |
2018-03-22 |
Nr Instances |
1 |
Nr Exposed |
1 |
Gravity |
10 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. Location: 170 West 79th Street New York, NY On or about: August 28th, 2017 a) Employee used the cross braces of a two tier 12 to 13 foot high tubular welded frame scaffold to access the work platform. |
|
Citation ID |
01003 |
Citaton Type |
Serious |
Standard Cited |
19261051 A |
Issuance Date |
2018-02-23 |
Current Penalty |
1200.0 |
Initial Penalty |
2217.0 |
Final Order |
2018-03-22 |
Nr Instances |
1 |
Nr Exposed |
4 |
Gravity |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided: Location: 170 West 79th Street New York, NY On or about: August 28th, 2017 a) A break in elevation greater than 19 inches (approximately 22 Inches) on the roof where employees were working building a play deck for a school. |
|
Citation ID |
01004 |
Citaton Type |
Serious |
Standard Cited |
19261052 C01 I |
Issuance Date |
2018-02-23 |
Current Penalty |
2313.0 |
Initial Penalty |
3696.0 |
Final Order |
2018-03-22 |
Nr Instances |
1 |
Nr Exposed |
4 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: Location: 170 West 79th Street New York, NY On or about: August 28th, 2017 a) Employees used stairs that were not equipped with at least one handrail. Employees used the stairs to access the work area on the roof. |
|
|