Name: | EASY GENERAL CONSTRUCTION LLC |
Jurisdiction: | New York |
Legal type: | DOMESTIC LIMITED LIABILITY COMPANY |
Status: | Active |
Date of registration: | 27 Sep 2017 (7 years ago) |
Entity Number: | 5208715 |
ZIP code: | 01852 |
County: | Rensselaer |
Place of Formation: | New York |
Address: | 12 CADY STREET, LOWELL, MA, United States, 01852 |
Name | Role | Address |
---|---|---|
EASY GENERAL CONSTRUCTION LLC | DOS Process Agent | 12 CADY STREET, LOWELL, MA, United States, 01852 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
170927010181 | 2017-09-27 | ARTICLES OF ORGANIZATION | 2017-09-27 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
342324761 | 0215800 | 2017-05-09 | JEFFREY HARDWARE BUILDING 327-333 BLEECKER STREET, UTICA, NY, 13501 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1232837 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1232851 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260102 A01 |
Issuance Date | 2017-09-21 |
Current Penalty | 2037.0 |
Initial Penalty | 2716.0 |
Final Order | 2017-10-24 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.102(a)(1): 1926.102(a)(1): Employees were not provided with eye and face protection equipment when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents: a) At the jobsite, on or about 5/9/17: Workers were taping drywall joints above their heads without wearing eye protection. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260405 G02 IV |
Issuance Date | 2017-09-21 |
Current Penalty | 1222.5 |
Initial Penalty | 1630.0 |
Final Order | 2017-10-24 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 1 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided to prevent pull from being directly transmitted to joints or terminal screws: a) At the jobsite, on or about 5/9/17: Workers were using a Makita circular saw connected to an extension cord that had the insulation pulled free of the plug. |
Citation ID | 01003A |
Citaton Type | Serious |
Standard Cited | 19261053 B04 |
Issuance Date | 2017-09-21 |
Current Penalty | 1629.75 |
Initial Penalty | 2173.0 |
Final Order | 2017-10-24 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed: a) At the jobsite, on or about 5/9/17: Workers were taping drywall joints above their heads while standing on a Werner 8 foot step ladder that was placed onto a job-built platform with castors; and while the ladder and platform was rolled along the drywall seam. |
Citation ID | 01003B |
Citaton Type | Serious |
Standard Cited | 19261053 B11 |
Issuance Date | 2017-09-21 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2017-10-24 |
Nr Instances | 1 |
Nr Exposed | 4 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.1053(b)(11): Ladders were moved, shifted, or extended while occupied: a) At the jobsite, on or about 5/9/17: Workers were taping drywall joints above their heads while standing on a Werner 8 foot step ladder that was placed onto a job-built platform with castors; and while the ladder and platform was rolled along the drywall seam. |
Date of last update: 07 Mar 2025
Sources: New York Secretary of State