2023-08-23
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Curb was installed
|
2023-01-10
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb replaced
|
2022-11-22
|
No data
|
AVENUE Z, FROM STREET EAST 13 STREET TO STREET HOMECREST AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed the above respondent store a commercial refuse container on the street without DOT permit to do so. Container is stored in front of building 1237. DOB Permit B00620582-l1-GC is used for ID purposes.
|
2022-09-25
|
No data
|
AVENUE Z, FROM STREET EAST 13 STREET TO STREET HOMECREST AVENUE
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
A/T/P/O I observed obstruction of parking lane with construction equipment without DOT permit. Container with construction debris placed on street without a DOT permit. Building permit B00620582-l1-GC use for identification purpose only
|
2022-09-21
|
No data
|
AVENUE Y, FROM STREET BATCHELDER STREET TO STREET COYLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags and expansion joint in compliance.
|
2022-06-12
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
NEW SWK FLAGS WERE PROPERLY SEALED-OK
|
2022-05-28
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NEW CURB OK AT STORE RED BASKET MINI MARKET-PERMIT TAKEN OUT AFTER VIOLATION WAS WRITTEN
|
2022-05-25
|
No data
|
ALLEN STREET, FROM STREET CANAL STREET TO STREET HESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP has been milled and resurfaced by in house.
|
2022-05-24
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
SWK FLAGS WERE SEALED AT 1145 AM INSPECTION - DASH WAS DOWN AT TIME OF INSPECTION- OFFICE REQUIRED INSPECTION TO RELEASE HOLD
|
2022-05-04
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I OBSERVED THE ABOVE RESPONDENT FAILED TO RESPOND TO CORRECTIVE ACTION REQUEST#20223340131 (ISSUED 3/30/22) -FAILED TO SEAL EXPANSION JOINTS BETWEEN NEW SIDEWALK FLAGS-A VIOLATION OF THE ABOVE SECTION/RULE OF HIGHWAY RULES.
|
2022-03-30
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk and curb was replaced in kind, ALL expansion joints need to be trimmed & sealed, wood framing removed & broken curb at left property line needs to be replaced/addressed.
|
2022-03-30
|
No data
|
TARGEE STREET, FROM STREET METCALFE STREET TO STREET ROFF STREET
|
No data
|
Street Construction Inspections: Pick-Up
|
Department of Transportation
|
Respondent replaced 98'10 of curb without a permit to do so. As per 34RCNY 2-09 (g)(1)(ii) all curbs replaced more than 20ft need a separate permit. ID by sidewalk permit S042022034A05.
|
2022-03-14
|
No data
|
STERLING PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk repair - in compliance
|
2022-02-25
|
No data
|
ALLEN STREET, FROM STREET CANAL STREET TO STREET HESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I/F/O 22, BPP is acceptable.
|
2022-01-21
|
No data
|
WEST 44 STREET, FROM STREET 9 AVENUE TO STREET 10 AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
ongoing sidewalk restoration is in compliance
|
2022-01-06
|
No data
|
STERLING PLACE, FROM STREET CLASSON AVENUE TO STREET WASHINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work has been started at this time.
|
2021-12-22
|
No data
|
AVENUE Y, FROM STREET BATCHELDER STREET TO STREET COYLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
expansion joints sealed and in compliance
|
2021-12-01
|
No data
|
NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk is in compliance
|
2021-10-27
|
No data
|
AVENUE Y, FROM STREET BATCHELDER STREET TO STREET COYLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
CAR closed as per policy to limit sidewalk permit NOVs. Contractor placed on hold.
|
2021-10-05
|
No data
|
AVENUE Y, FROM STREET BATCHELDER STREET TO STREET COYLE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent failed to seal expansion joint on sidewalk as per (CAR #20216110020) issued on 6/14/2021. Respondent ID by permit on file.
|
2021-09-22
|
No data
|
AVENUE Y, FROM STREET BATCHELDER STREET TO STREET COYLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
I observed the above respondent with multiple sidewalk flag restored in front of #3020. Failure to seal expansion joints as per subsection. Permit was cited as per CAR #20216110020. No action was taken. Permit used for I.D.
|
2021-08-18
|
No data
|
AVENUE Y, FROM STREET BATCHELDER STREET TO STREET COYLE STREET
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the above respondent with multiple sidewalk flags installed in in front of #3020. Failure to seal expansion joints along curb. Permit cited on 6/14/2021 as per CAR #20216110020 and used for I.D.
|
2021-07-18
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
curb work in compliance
|
2021-06-14
|
No data
|
AVENUE Y, FROM STREET BATCHELDER STREET TO STREET COYLE STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk joints need to be sealed
|
2021-06-07
|
No data
|
ORCHARD STREET, FROM STREET CANAL STREET TO STREET HESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
New sidewalk acceptable
|
2021-03-25
|
No data
|
NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
newer sidewalk flags found in front of property 277.
|
2021-03-11
|
No data
|
37 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Sidewalk flags restored, joints sealed
|
2021-01-10
|
No data
|
ARION PLACE, FROM STREET BEAVER STREET TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Length of the milled roadway property line to property line: 35’ Width of the of the entire roadway curb to curb: 30’ Width of the milled roadway: 20’
|
2020-10-30
|
No data
|
ARION PLACE, FROM STREET BEAVER STREET TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Length of the milled roadway property line to property line: 35’Width of the of the entire roadway curb to curb: 30’Width of the milled roadway: 20’Depth of the milled roadway: 3”
|
2020-10-09
|
No data
|
138 STREET, FROM STREET 82 AVENUE TO STREET HOOVER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
sidewalk expansion joints sealed on 138 street and 82 avenue
|
2020-09-25
|
No data
|
ARION PLACE, FROM STREET BEAVER STREET TO STREET BROADWAY
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
No work started at this time
|
2020-09-23
|
No data
|
NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
s/w installed
|
2020-09-23
|
No data
|
138 STREET, FROM STREET 82 AVENUE TO STREET HOOVER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
CAR CLOSED & PERMITTEE PLACED ON HOLD UNTIL CONDITION IS REPAIRED. AS PER DOT SPECIFICATIONS.
|
2020-09-08
|
No data
|
138 STREET, FROM STREET 82 AVENUE TO STREET HOOVER AVENUE
|
No data
|
Street Construction Inspections: CAR Re-Inspect
|
Department of Transportation
|
I observed the respondent failed to seal the expansion joints as per sub-section on sidewalk 34RCNY 2-09(F)(4)(V). CAR #20201700194 was issued to make repairs under permit # Q042020043A24 permit expired 3/21/20.
|
2020-09-06
|
No data
|
LUDLOW STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Steel-face curb installed; expansion joints sealed.
|
2020-09-03
|
No data
|
NEWKIRK AVENUE, FROM STREET EAST 8 STREET TO STREET LAWRENCE AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Upon arrival respondent HI-BUILD CONSTRUCTION CORP failed to comply with terms & conditions of stipulation #013, maintain minimum 5 FOOT clear sidewalk passage to all ongoing pedestrians. Nov issued
|
2020-08-27
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
NO WORK STARTED
|
2020-08-27
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
NEW SWK OK AT NEW BUILDING
|
2020-08-19
|
No data
|
3 STREET, FROM STREET BOND STREET TO STREET HOYT STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Road paved and milled at location of BPP paving contract :DOT-INHSE on file.
|
2020-07-09
|
No data
|
HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done
|
2020-06-19
|
No data
|
138 STREET, FROM STREET 82 AVENUE TO STREET HOOVER AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Replace sidewalk, expansion joints need s to be recessed and sealed.
|
2020-06-19
|
No data
|
82 AVENUE, FROM STREET 135 STREET TO STREET 138 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Replace sidewalk, expansion joints recessed and sealed.
|
2020-06-08
|
No data
|
LUDLOW STREET, FROM STREET BROOME STREET TO STREET GRAND STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No work done.
|
2020-06-01
|
No data
|
37 AVENUE, FROM STREET 85 STREET TO STREET 86 STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
REPAIRED PERM SIDEWALK JOINTS SEALED
|
2020-03-06
|
No data
|
ALLEN STREET, FROM STREET CANAL STREET TO STREET HESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
No new work done I/F/O 22 Open CAR for other contractor under #M042019298A13.
|
2020-03-04
|
No data
|
ORCHARD STREET, FROM STREET CANAL STREET TO STREET HESTER STREET
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
IFO 35 new sidewalk is in compliance
|
2020-02-21
|
No data
|
ORCHARD STREET, FROM STREET CANAL STREET TO STREET HESTER STREET
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
BPP does not extend 5 feet on both sides of the property line
|
2020-02-19
|
No data
|
NOSTRAND AVENUE, FROM STREET GREENE AVENUE TO STREET LEXINGTON AVENUE
|
No data
|
Street Construction Inspections: Active
|
Department of Transportation
|
Crew actively working on sidewalk. Walkway provided.
|
2020-01-30
|
No data
|
HERKIMER PLACE, FROM STREET NOSTRAND AVENUE TO STREET PERRY PLACE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
Work not done
|
2020-01-24
|
No data
|
BLEECKER STREET, FROM STREET CENTRAL AVENUE TO STREET EVERGREEN AVENUE
|
No data
|
Street Construction Inspections: Post-Audit
|
Department of Transportation
|
new sidewalk
|