Name: | ALL 4 U CONSTRUCTION CORP |
Jurisdiction: | New York |
Legal type: | DOMESTIC BUSINESS CORPORATION |
Status: | Active |
Date of registration: | 27 Mar 2018 (7 years ago) |
Entity Number: | 5312131 |
ZIP code: | 11787 |
County: | Queens |
Place of Formation: | New York |
Address: | 38 Sandy Hollow DR, Smithtown, NY, United States, 11787 |
Shares Details
Shares issued 200
Share Par Value 0
Type NO PAR VALUE
Name | Role | Address |
---|---|---|
LOURDES M PINUIL | DOS Process Agent | 38 Sandy Hollow DR, Smithtown, NY, United States, 11787 |
Name | Role | Address |
---|---|---|
LOURDES M PINUIL | Chief Executive Officer | 38 SANDY HOLLOW DR, SMITHTOWN, NY, United States, 11787 |
Start date | End date | Type | Value |
---|---|---|---|
2025-02-27 | 2025-02-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2024-08-27 | 2025-02-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
2018-03-27 | 2024-08-27 | Shares | Share type: NO PAR VALUE, Number of shares: 200, Par value: 0 |
Filing Number | Date Filed | Type | Effective Date |
---|---|---|---|
211115003041 | 2021-11-15 | BIENNIAL STATEMENT | 2021-11-15 |
180327010483 | 2018-03-27 | CERTIFICATE OF INCORPORATION | 2018-03-28 |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
345821425 | 0215000 | 2021-11-12 | 148 CLASSON AVENUE, BROOKLYN, NY, 11205 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Inspection |
Activity Nr | 1524509 |
Safety | Yes |
Inspection Type | Unprog Rel |
Scope | Partial |
Safety/Health | Safety |
Close Conference | 2021-04-07 |
Case Closed | 2024-12-17 |
Related Activity
Type | Inspection |
Activity Nr | 1524508 |
Safety | Yes |
Type | Inspection |
Activity Nr | 1524507 |
Safety | Yes |
Violation Items
Citation ID | 01001 |
Citaton Type | Serious |
Standard Cited | 19260020 B02 |
Issuance Date | 2021-09-24 |
Abatement Due Date | 2021-10-06 |
Current Penalty | 2926.0 |
Initial Penalty | 2926.0 |
Final Order | 2021-10-22 |
Nr Instances | 1 |
Nr Exposed | 1 |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment to be made by a competent person. Location: a) On the second floor of the jobsite: On or about April 7, 2021, an employee was installing framing by a window opening and were exposed to falling approximately 15 feet to the lower level. The employer did not have a competent person on the jobsite to maintain a safety program and provide safety inspections. |
Citation ID | 01002 |
Citaton Type | Serious |
Standard Cited | 19260501 B01 |
Issuance Date | 2021-09-24 |
Abatement Due Date | 2021-09-30 |
Current Penalty | 2926.0 |
Initial Penalty | 2926.0 |
Final Order | 2021-10-22 |
Nr Instances | 1 |
Nr Exposed | 1 |
Related Event Code (REC) | Imminent Danger |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. Location: a) On the second floor of the jobsite: On or about April 7, 2021, an employee was installing framing by a window opening and were exposed to falling approximately 15 feet to the lower level. |
Date of last update: 24 Mar 2025
Sources: New York Secretary of State